59
Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013 dated 31 st of December 2013 Jakarta, 21 st of March 2014 1

Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

  • Upload
    dangthu

  • View
    217

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

1

Electricity Supply Effort Plan PT PLN (Persero) 2013-2022

Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013 dated 31st of December 2013

Jakarta, 21 st of March 2014

1

Page 2: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Outline of Differences of RUPTL 2013-2022 with Previous RUPTLs

• Updating of demand forecast, reduced projection of average electricity demand growth of 8.4% instead of 8.7% in the previous RUPTL.

• Increased growth of electric facility capacity of 60 GW instead of 57 GW in the previous

RUPTL, transmission from 55 ribu kms to 58 ribu kms, GI trafo from 122,000 MVA to

134,000 MVA.

• Required investments at USD 125.2 billion, comprising of PLN generators at USD 372 billion, IPP generators at USD 54.1 billion, transmission + GI at USD 19.4 billion and distribution at USD 14.5 billion.

• PLN investment capacity decreased with the covenant limit of the credit nearly being passed, thus necessitating the following efforts to maintain the sustainability of PLN:

- Strengthening of PLN‘s capital

- Controlling electricity demand

- New business models that would reduce PLN load by relaxing the electricity sector, such

as: power wheeling, granting business concession areas to other parties

• The biggest risk is funding risk and delay of completion of generation and transmission projects

2

Page 3: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Projected Electricity Needs 2013-2022

66

JB: 7,6%

Indonesia: 8,4%

3

TWh

18 44

TWh

IT: 10,8%

26 TWh Kalimantan: 10,7% Sulawesi: 10,8% TWh

Maluku: 10,9%

Sumatra: 10,6%

385 Papua: 10%

144 275

TWh TWh

Nusa Tenggara: 11,1%

385

TWh

188

TWh

2013 2022

Year 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Need (TWh) 189 208 227 246 266 286 308 332 358 387

Electrification Ratio ( % ) 79.6 82.6 85.9 88.9 91.9 93.7 95.3 96.8 97.4 97.8

Page 4: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Additional Capacity of New Generators (including IPP) Increased growth of electricity facilities

MW

• Total additional capacity until 2022 at ± 60 GW.

• Allocation for PLN and IPP

generator projects is only for

ongoing and committed projects.

• Projects whose developer and

funding sources are not yet

determined are called “unallo-

cated“ projects.

• Additional capacity: MW Per Generator Type

PLTU: 38,0 GW

PLTP: 6,0 GW PLTGU:

5,0 GW PLTG/PLTMG:

3,7 GW PLTA/PLTM: 6,5

GW Lainnya: 0,3 GW

4

Page 5: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Additional Capacity of New Generators (including IPP)

Additional capacity 2013-2022:

FTP-1

FTP-2

Regular

: 5,4 GW.

: 17.8 GW

: 36.8 GW

5

Page 6: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Transmission Growth Per Voltage Level (kms)

500 kVAC:

500 kVDC:

275 kVAC:

250 kVDC:

5,648 kms

1,100 kms

6,386 kms

462 kms

39,593kms

3,943 kms

150 kV

70 kV

:

:

Total about 57,132 kms

6

Page 7: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Main Powerhouse Growth Per Voltage Level (MVA)

500/275 kV:

500/150 kV:

500 kV DC:

275/150 kV:

250 kV DC:

4,000 MVA

35,674 MVA

3,000 MVA

17,070 MVA

600 MVA

480 MVA

72,881 MVA

3,730 MVA

150/70 kV

150/20 kV

70/20 kV

:

:

:

Total about 134,435 MVA

7

Page 8: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Total Projected Energy Mix in Indonesia including IPP

liquefied Natural Gas

Gas

Oil Fuel

Coal

Geothermal

Hydro

8

Import Biomass Solar/Hybrid Coal

Page 9: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Projected Total Energy Mix in Indonesia in 2013 and 2022 Including IPP

9

Page 10: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Total Primary Energy Need in Indonesia including IPP

thousand kL million Ton

bcf

10

COAL

Page 11: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

In Need of Investment

PLN Power Plant

IPP Power Plant

Transmission

Distribution

:

:

:

:

37,2 billion US$

54,1 billion US$

19,4 billion US$

14,5 billion US$

billion US$

Total PLN

Total PLN+IPP

: 71,1 billion US$

: 125,2 billion US$

IPP investment contribution over 10 years equals 43% of total investing needs. 11

PLN total investment

Transmission

PLN+IPP total investment

Distribution

PLN+IPP power plant

PLN power plant

Page 12: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Electricity Systems Development in Java-Bali

PLTGU Muara Karang 450 MW (2016)

PLTGU Muara Tawar Add-on Blok 2,3,4 650 MW (2018)

Keterangan:

Existing enerator

Planned generator

GITET 500 kV

Planned GITET 500 kV

SUTET 500 kV Planned SUTET 500 kV

~ PLTU Jawa-5 2x1.000 MW (2019/20)

PLTU Jawa-6

2x1.000 MW (2021)

PLTU Lontar Exp #4 315 MW (2017)

PLTU Banten

625 MW (2016)

PLTU Jawa-1 1.000 MW (2018)

PLTU Jawa-3 2x660 MW (2019/20)

PLTU Indramayu 2x1.000 MW (2022)

PLTU Tj. Awar-awar 2x350 MW (2014)

BANTEN SRLYA MTWAR PLTU 4x1.000 MW ~ PLTU ~ ~ 2x1.000 MW~

SURALAYA

PRIOK MKRNG PLTU Jawa-4

2x1.000 MW (2019/20) CLGON DKSBI IDRMYU

CBTUBRU

CBATU

BKASI KMBNG

PLTGU Jawa-1 800 MW (2017)

CWANG

TMBUN BRAJA PLTU 2x1.000 MW

TJATI B

GNDUL

DEPOK CIBNG

XBOGOR PLTU 1x1.000 MW

CRATA

~ SGliquefie

d Natural

Gas

BDSLN

~ PLTU Madura 2x200 MW (2022)

JATENG IPP PLTU 2x660 MW GRSIK MDCAN ~ CSKAN PS

~ ~ UNGAR

UJBRG TANDES NGBNG

PMliquefied Natural Gas

SBSLN PLTGU Grati 450 MW (2015/16)

SBBRT

PLTU Jawa-7 2x1.000 MW (2021)

CGRliquefied Natural Gas

~ TASIK GRATI RWALO

SOLO

PEDAN PITON CLCAP IPP ADIPALA

PLTU Clk. Bawang 380 MW (2014/15)

KDIRI BANGIL

PLTU Pelabuhan Ratu 3x350 MW (2013/14) PLTA Jatigede

2x55 MW (2017) PLTU Adipala 660 MW (2014)

NE~W ANTOSARI ~

PLTA Rajamandala 47 MW (2017)

PLTU Cilacap 614 MW (2016)

PLTGU Jawa-2 800 MW (2018)

PLTU Central Java 2x950 MW (2018/19)

PLTU Pacitan 2x315 MW (2013)

~

Upper Cisokan PS 4x260 MW (2017)

Matenggeng PS 4x225 MW (2020/21)

PLTMG Pesanggaran 200 MW (2015)

12

Page 13: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Electricity Development System in Sumatra

PLTMG Arun 200 MW 2015 Ulee

Kareng

PLTGU Sumbagut 2 250 MW-2018 PLTGU Sumbagut 1 250 MW-2018

PLTU Pangkalan Susu #1,2: 440 MW-2014/15

#3,4: 400 MW-2016/17

PLTU Riau Kemitraan (PLN-TNB-PTBA)

1200 MW-2018

PLTU Jambi KPS

800 MW-2019/20

PLTU Sumsel 5 & 7

600 MW-2015/16/17

• PLTU Banjarsari

230 MW-2014

• PLTU Keban Agung

225 MW-2014

• PLTU Sumsel-1 MT

600 MW-2020

• PLTU Sumsel-6

600 MW-2019/20

• PLTU Sumsel-8,9,10

3000 MW-2018/19 1 . PLTG Apung

2. PLTG Ex Pulo Gadung

D

Sigli C. Trueng

Banda Aceh Jantho

Bireun Samalanga G Lhokseumawe

P. Labu

P

Idie PLTGU Sumbagut 3,4 500 MW-2018

Tualang Cut

PLTU

Seulawah

Takengon

PLTP Seulawah 110 MW-2021/22

PLTU Nagan Raya

#1,2: 220 MW-2013/14

#3,4: 400 MW-2018/19

A

Peusangan1-2

HEPP

Langsa Blangkjeren Meulaboh U P. Brandan P. Susu

G U PLTU

Meulaboh Binjai

PLTG/MG Peaking Riau & Jambi

300 MW-M2ala0ysia 16

~ Lawe Mamas Mabar

P. Pasir HEPP P. Geli A Blang Pidie Labuhan Lamhotma KIM

Wampu Namorambe

GlugurSei Sei. Kuta Cane HEPP P. Batu RotanDenai

A K.Namu Perbaungan Titi Kuning K. Tanjung

Kisaran

T. Tinggi T . Morawa

Galang TNB Brastagi

Renun HEPP ~

Sidikalang

G . Para Tapak Tuan

P. Siantar Aek Kanopan

Sabulusalam Porsea Tele Malaka

Bagan

Siapi- api ~ Asahan I R. Prapat

HEPP

Asahan III

A HEPP

D. Sanggul

PLTP P Tarutung P. Bukit

Simangkok

PLTP K. Pinang Asahan

Sarulla& ~ IV& V ~P PLTA Asahan III 174 MW-2018

Dumai PLTU ~ L. Angin

Sipaholon HEPP KID

U Sibolga

A PLTA

B. Toru

U ~ Duri G .Tua New

Bagan Batu G G . Sakti

Kandis

Minas

Siak Sri

Indra Pura Perawang

Pd . Sidempuan

PLTP Sarulla I&II 440 MW-2017/18/22

PLTP Sorik Merapi 240 MW-2020/21

Garuda

Sakti

Bangkinang

P. Pangarayan Pasir Putih U Tenayan

PLTP P Panyabungan ~ Teluk

Lembu

S. Merapi Kulim

~ Kt. Panjang

HEPP Simpang4 P. Kerinci

Payakumbuh

P Tembilahan Pd. Luar

PLTA Batang Toru 510 MW-2022

PLTP Muara Laboh 220 MW-2017/18

PLTP Bonjol 165 MW-2022

PLTU Teluk Sirih 224 MW-2013/14

PLTA Merangin 350 MW-2021

PLTP Hulu Lais 110 MW-2018/19

PLTP Kepahiyang 220 MW-2022

Maninjau

HEPP ~

Pariaman Lubuk

Singkarak HEPP ~

Batusangkar Rengat T. Kuantan

Pd. Panjang ~ Alung PIP Pauh

~ Ombilin U

PLTU Riau Kiliranjao Kemitraan

Limo

GIS Kota

S. Haru Salak K. Tungkal

Indarung Solok Aur Duri

P PLTP S. Rumbai Payo Selincah G. Talang Bungus

~ Muara Bulian

Sarolangun

U Sumbar Pess

P G el Muara

Bungo B. Lincir

Kambang U

S. Penuh Bangko PLTU Jambi (KPS)

A S. Lilin

U Muara U

Rupit Merangin

HEPP T.Api-api

3 . IPP Palembang Timur

Borang

G ~

Betung Tl. Kelapa

Mukomuko 3 4 5

Sekayu ~ GIS Kot 2 a I PLTP Hulu

Lais

P 1

6 PLTU

S. Belimbing Keramasan 7

Bukit

Asam

~

Lubuk

Linggau

PLTU U K. Agung

U PLTG/MG Peaking Lampung & Bangka

~ Mariana Tes HEPP U ~ Simpang3

U Prabumulih Pekalongan Kayu

Agung

PLTU Banjarsari M. ENIM ~

Argamakmur PLTG G . Megang T. Tinggi

Lahat ~ Musi HEPP

Sukamerindu

200 MW-2016 Dipasena

Gumawang Mesuji

PLTP P.Baai P L. Balai

P Baturaja PLTP

R. Dedap

Muara

PLTP Lumut Balai 220 MW-2017/18/19 PLTP Rantau Dedap 220 MW-2019/20

Pagar Alam

P. Ratu

Menggala

Dua B . Umpu Sp.Banyak Manna Bukit

Kemuning Kotabumi

PLTP P D. Ranau PLTP Danau Ranau 110 MW-2022

PLTP Suoh Sekincau 220 MW-2021/22

PLTP Ulubelu 220 MW-2012 & 16/17

PLTP Rajabasa 220 MW-2021/22

Metro ~ Besai HEPP

G Sribawono Adijaya

275 kV AC

500 kV AC

HVDC

Tegineneng P

PLTP

S . Sekincau

B. Tegi

HEPP

Natar Gd. Tataan

Sutami ~ Pagelaran Langkapura Suka

Tlk .

Liwa PLTP UluBelu~

New

Tarahan

U

Kalianda

rame K.Agung Betung Bengkunat P

PLTP Wai Tlk. Ratai

~ Tarahan

PLTPP Rajabasa

Ratai

SistSeimstem

JAWJ AWA

13

Page 14: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Electricity System Development in Kalimantan

SABAH (MALAYSIA) PLTU Malinau 6 MW-2015

PLTA Kelai 55 MW-2022

PLTU Kaltim 2

200 MW-2017/18

PLTMG Tj. Selor 15 MW-2015

PLTU Tj. Selor

14 MW-2014

• Pontianak100 MW-2017

Tidang Pale

• U Malinau PLTU Parit Baru 100 MW-2015

• PLTU Embalut (Eksp.) 50 MW-2014

PLTU Pantai Kura-Kura 55 MW-2015 U Parit Baru (FTP2) 100 MW-2016 U

G

Tj. Selor U

PLTU Tj. Redep 14 MW-2014

• PLTG Kaltim Peaking SERAWAK (MALAYSIA)

LTU Kalbar-1 0 MW-2018/19

LTU Kalbar-2

40S0ambMas W 2020/21

2x50 MW-2013 PLTG Kaltim Peaker 2

100 MW-2016

PLTU Kaltim 4 100 MW-

2018

PLTG/MG Bangkanai

280 MW-2015/16/17

PLTA Pade Kembayung 30 MW-2022

PLTA Nanga Pinoh

98 MW-2022

Tj. Redep

• UU

AA

• Talisayan

Muara Wahau

U Maloi

Bengkayang Putussibau

PLTU Kaltim-3 300 MW-2020/21

NAgabang Sangatta

Sintang

U mpawah Sanggau U Bontang

UG G

Siantan U Parit BaruU

Sekadau G

G U U UU

Tayan Melak Kota Bangun Nanga Pinoh PLTGU Senipah

117 MW-2013/17 G Kota Baru Sei Raya

A Puruk Cahu

A U

G

UU PLTU Ketapang PLN: 20 MW-2016

IPP: 14 MW-2016

D

U Karangjoang Muara

Teweh Kuala

Kurun Kota Baru D G GGU

PLTU TeluSkULBAaWliEkSpI

aTEpNaGnAH

220 MW-2014

Sukadana D Sukadana

Manggarsari

U Industri Petung

UU Buntok

Kuaro

U U

Ketapang

D

Kasongan

D PLTSUULKAaWlEsSeI

l 200 MW-2017/18

Palangkaraya Parenggean U Tanjung

U SELATAN New

Palangkaraya Pangkalan Banteng

D

U U

Amuntai

D Nangabulik

PLTU Kalselteng-1 200 MW-2018/19 Sampit

U D U

Barikin Selat

U Pangkalan

PLTA Kusan 65 MW-2022

Sukamara

UU PLTU Kalselteng-3 100 MW-2017/18 Bun Rantau

Kayutangi

AA Kotabaru

Ulin Batu

Licin

D

Kuala Pambuang PLTU Sampit 50 MW-2016

Seberang Barito A

TrisGakti Cempaka

Bandara

Pelaihari

Mantuil

PLTU Asam-Asam 130 MW-2013 PLTU Kalselteng 2 200 MW-2017

Satui

PLTG/MG/GU Kalsel Peaker 1 200 MW-2016

PLTU Pulang Pisau 120 MW-2015 U U

U

14

U

PLTG/MG

PL

PL

PLT

• P

20

• P

40

Singkawang

U

Me

U

Page 15: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Electricity System Development in Sulawesi 2

1. 2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

29.

30.

31.

32.

33.

34.

PLTU Sulut 3 PLTG/MG/GU Minahasa

PLTA Sawangan

PLTU Lease

PLTU Sulbagut 2

PLTP Lahendong V & VI

PLTP Kotamobagu I & II

PLTU Sulut I PLTU Gorontalo

PLTU Sulbagut 1

PLTU Sulbagut 3

PLTG/MG/GU Gorontalo

PLTU Tolitoli

PLTU Palu 3

PLTP Marana/Masaingi

PLTP Borapulu

PLTA Poso 2

PLTA Karama

PLTU Mamuju

PLTA Malea

PLTA Bonto Batu

PLTA Bakaru II PLTGU Sengkang

PLTU Sulsel Barru 2

PLTG/MG/GU Makassar

PLTU Sulsel 2

PLTU Jeneponto 2

PLTA Wotunohu

PLTA Konawe

PLTU Kendari 3

PLTP Laenia

PLTU Raha

PLTU Bau-Bau PLTU Wangi-Wangi

100 MW-2018 150 MW-2016

12 MW-2019

50 MW-2016

200 MW-2021/22

40 MW-2017/18

80 MW-2022

50 MW-2014

50 MW-2015

100 MW-2019/20

60 MW-2018

100 MW -2017

45 MW-2016/17

100 MW-2017

20 MW- 2022

55 MW- 2022

132 MW-2021/22

450 MW-2020/21

50 MW-2016

90 MW-2020

110 MW-2019

126 MW-2020

180 MW-2013

100 MW-2017

600 MW-2016/17/18

400 MW-2018/19

200 MW-2018

20 MW-2021

50 MW-2021

100 MW-2018

20 MW-2022

6 MW-2016

14 MW-2014

6 MW-2015/16

Likupang

3 Paniki Bitung Teling Ranomut

1 D

Tasik Ria A Kema

4 U

Sawangan Tomohon U

P P Tonsealama

Kawangkoan 5

Otam

Leok

Tolito1li 3 U D

Lopana 6 U P

9 U

8 KALIMANTAN

TIMUR GORONTALO 10 U

Lolak Bintauna Buroko A

U

Isimu

P7 Bangkir D Botupingge

11 Moutong

12 G

Marisa

SULAWESI UTARA

Molibagu

Tilamuta UU

Tambu

14 U U

Silae 15 P

Bunta

D Talise Ampana

U

U

16 Palu Baru

P Luwuk

Poso Toili

SULAWESI

TENGAH G

Pasangkayu

SULAWESI

BARAT

A

Tentena A

Kolonedale

17 Topoyo

18 A Mamuju Baru

1U9 Malili

Mamuju Wotu

Bungku

20A Palopo

SULAWESI

TENGGARA A

22 Makale

21 Polman A A A

Majene Lasusua Bakaru Enrekang

28 A

Siwa

Sidrap SULAWESI

SELATAN Sengkang

23

29 Pinrang

Pare 30 U

U D A U Kolaka

Kendari P Unaaha G

31 GU

G

24 U Soppeng U

Barru

Andolo Bone

25 32U

Raha

Tonasa Pangkep

Maros Kajuara Kasipute Bosowa

Tello D

G

Daya Baru Sinjai S ungguminasa

U

33 26U U

34 Bantaeng U U

Jeneponto Bulukumba Bau-Bau Tallasa

2U 7 Bantaeng Smelter Punagaya

U U

15

Page 16: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

1. PLTU Am

2. PLTU Am

3. PLTP Tul

Electricity System Development in Maluku

Taniwel 8A

ACSR 1x240 mm2 30 km (2016)

A

9 A Bula

Piru A

6 A

ACSR 1x240 mm2

55 km (2016)

A ACSR 1x240 mm

2

15 km (2017)

ACSR 1x240 mm2

Masohi 7 G A

Kairatu A 105 km (2016)

2 U1U

Waai

U

4 Tulehu

P3 Passo

Haruku

Wayame

5G Sirimau

bon

bon 2

ehu PLTU Ambon 3

PLTMG Ambon

PLTA Wai Tala

PLTMG Seram

PLTM Sapalewa

PLTM Nua PLTU Tidore

PLTU Tidore 2

PLTMG Ternate

PLTU Sofifi

PLTP Jailolo

PLTU Tobelo

30 MW-2014/15 30 MW-2016

20 MW-2018

15 MW-2020

50 MW-2016

54 MW-2019/20

10 MW-2016

8 MW-2016/17

8 MW-2017

14 MW-2014

14 MW-2016

20 MW-2016

6 MW-2015

10 MW-2019

14 MW-2019/20

Tobelo15 U

M

4. 5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

ACSR 1x240 mm2

110 km (2019)

14P P Jailolo

ACSR 1x240 mm2

42 km (2019)

ACSR 1x240 mm2

72 km (2019)

1G2

1U0 ACSR 1x240 mm2

23 km (2019) Maba

1U3 11

16

Page 17: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Electricity System Development in Papua

11 10 9 12

3 1

4 2 5 8

6

7

1. 2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

PLTU Holtekamp 1&2 PLTU Skouw

PLTA Genyem 1&2

PLTMG Jayapura 1&2

PLTU Jayapura 3

PLTA Baliem

PLTU Timika

PLTU Nabire

PLTU Biak

PLTU Manokwari

PLTA Warsamson

PLTU Sorong

50 MW-2014&16 30 MW-2018

30 MW-2014&17

40 MW-2016&20

50 MW-2021/22

50 MW-2016-18

28 MW-2015

14 MW-2017

14 MW-2017

14 MW-2017

47 MW-2018/19

30 MW-2017

17

Page 18: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Electricity System Development in Lombok

GI Bayan

ACSR 1x240 mm2

35 km - 2018 ACSR 1x240 mm2

41 km (2018) U5 A

A ACSR 1x240 mm2

15 km 2017 7P 6U GH Tanjung

U4 A

ACSR 1x240 mm2

12 km - 2014 ACSR 1x240 mm2

15 km 2014

GI Pringgabaya

3 G 0

GI Ampenan

GI Rembiga Kabel Tanah 3 km - 2014

ACSR 1x240 mm2

30 km - 2013 D

GI Mantang

GI Selong

1 GI Jeranjang U

U 2 ACSR 1x240 mm2

15 km - 2014 ACSR 1x240 mm2

38 km - 2013

GI Sekotong

1. 2.

PLTU Lombok

PLTU Lease

PLTGU Lombok

PLTU Lombok 2

PLTU Lombok Timur

PLTU Lombok (FTP2)

PLTP Sembalun

50 MW-2014 50 MW-2016

150 MW 2016/17

100 MW-2020/21

50 MW-2017

100 MW-2017/18

20 MW-2020

GI Sengkol

ACSR 1x240 mm2

10,5 km - 2013 3.

4. 5.

6.

7.

GI Kuta

y 18

Page 19: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Electricity System Development in Sumbawa

G1 G3

U2

4G5U ACSR 1x240 mm2

7 km (2016)

GI Bima GI Labuhan GI Woha

GI Dompu GI Alas/Tano 2cct 1xOstrich 60 km - 2013

2cct 1xOstrich 35 km - 2015

2cct 1xOstrich 15 km - 2013 ACSR 1x240 mm2

30 km - 2018 ACSR 1x240 mm2

142 km (2016) GI Sape 2

ACSR 1x240 mm 30 km (2017) ACSR 1x240 mm2

142 km (2016) 6U 7A 8P

GI Empang

GI Taliwang

2 cct, ACSR 1x240 mm2

20 km - 2017

GI Maluk

1. 2.

3.

4.

5.

6.

7.

8.

PLTU Bima PLTU Bima 2

PLTMG Bima

PLTMG Sumbawa

PLTU Sumbawa PLTU Sumbawa Barat

PLTA Brang Beh

PLTP Hu’u

20 MW-2014/16 20 MW-2016

20 MW-2016

20 MW-2016

20 MW-2016/17

14 MW-2014/15

18 MW-2018/19

20 MW-2021

19

Page 20: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Electricity System Development in Timor

Atapupu

6U ACSR 1x240 mm2

18 km - 2014

Atambua

TIMOR LESTE

TIMOR LESTE ACSR 1x240 mm2

75 km - 2014

Kefamenanu

ACSR 1x240 mm2

51 km - 2014

Soe/ Nonohonis

ACSR 1x240 mm2

51 km - 2014 ACSR 1x240 mm2

20 km - 2016 G5

Naibonat

ACSR 1x240 mm2

31 km - 2014 1. 2.

3.

4.

5.

6.

PLTU Kupang PLTU Timor 1

PLTU Kupang IPP

PLTU Timor 2 PLTMG Kupang

PLTU Atambua

33 MW-2013 30 MW-2018/19

30 MW-2015/16

25 MW-2022

70 MW-2016/18/22

24 MW-2016

Maulafa

ACSR 1x240 mm2

15 km - 2014

4U 3U

2U U

1 Bolok

20

Page 21: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

1. PLTU Ropa 14 MW-2013

2. PLTU Maumere 20 MW-2016

3. PLTMG Maumere 20 MW-2017

4. PLTP Oka ile Ange 20 MW-2020

5. PLTP Sokoria 15 MW-2018/19/20

Electricity System Development in Flores

Larantuka

4P 8A

ACSR 1x240 mm2

33 km - 2016

Labuan Bajo Ropa 1U

ACSR 1x240 mm2

85 km - 2015 ACSR 1x240 mm2

60 km - 2014 Ruteng

2

2U G3 ACSR 1x240 mm 100 km – 2019

ACSR 1x240 mm2

95 km - 2015 2

ACSR 1x240 mm 60 km - 2015

Maumere 7P 2

ACSR 1x240 mm 44 km - 2014

ACSR 1x240 mm2

Bajawa 10 km - 2017

5P

6P Ende ACSR 1x240 mm2

15 km - 2017

Waingapu

6. 7.

8.

PLTP Mataloko PLTP Ulumbu

PLTA Wae Rancang

5 MW-2018 20 MW-2014/19/21

16.5 MW-2017/18

21

Page 22: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Most of PLN Investments are Funded with Loans

PLN‘s own capital did not increase throughout the years 2002 -2012, while Loans increased more than 8x, making Debt to Equity Ratio (DER) at 187%. DER of business as usual will continue to worsen, reaching 252% in 2022.

22

Page 23: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Debt Equity Ratio 2013-2021

Projected PLN Debt Equity Ratio is higher if investment funding continues at “business as usual”

• In investment condition according to electricity need, DER will worsen and may reach up to 251 %.

• Debt Equity Ratio will improve if investments are made according to PLN capacity (Scenario 2), wherein DER for 2022 may be less than 150%.

23

DER

(%

)

Rata-rata ASEAN 100 %

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Debt Equity Ratio 2013-2022 300

250

200

150

100

50

-

Scenario 1 227 221 198 208 234 256 276 263 269 251

Scenario 2 227 221 198 197 188 202 203 175 166 148

ASEAN Average 100%

Page 24: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

PLN Investment Capacity is Less than Investment Needs

PLN investment needs according to electricity need (Scenario 1) reaches Rp 884 T, while PLN capacity (Scenario 2) is only Rp 602 T or about Rp 60 T per annum.

24

Page 25: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Reserve Margin of Java-Bali and Sumatra Systems for Additional Capacity According to Need and to PLN Capacity

Sumatra S1 (Need)

Java-Bali S1 (Need)

Sumatra S2 (Capacity)

Java-Bali S2 (Capacity)

Reserve margin of the Java-Bali and Sumatra systems for additional generator capacity according to need (Scenario 1) in comparison with additional generator capacity for maintaining PLN covenant (Scenario 2).

25

Page 26: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

PLN Capital Structure Improvement

• Company capital needs to be strengthened in order to improve PLN capacity for providing electric power.

• This is possible among others by: – Increasing PLN’s internal earning by increasing fees and/or subsidies. This

will also improve investment capacity.

Government support in providing investment funds in the State Capital Inclusion (Penyertaan Modal Negara – PMN) to reduce loan loads.

Restructuring PLN loans, among others by making Sub-Loan Agreement (SLA) swap into PMN, and restructuring direct loans of the Company.

26

Page 27: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Electricity Consumption Control Program

Aside from capital strengthening, electricity consumption control program can also be implemented, which can be done by: - Energy Conservation Program, such as by demand side manage-ment,

tariff patterns on time of use, campaigning for energy-saving equipments, etc.

- Limiting load growth, such as by limiting electricity connections.

27

Page 28: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

New Business Model for Electricity Sector

• Bapepam requires all companies in Indonesia to implement PSAK (Prinsip Standar Akuntansi Keuangan – Standard Financial Accounting Principles) 30. This implementation causes IPP assets and obligations to be included in PLN‘s Financial Position report, causing PLN financial condition to look bad (including DSCR, CICR and other financial ratios).

• In order to improve PLN‘s financial condition, these steps must be taken in order to provide opportunity to non-IPP third parties to participate in the construction of generators and in supporting the industry to keep PLN from being the sole off-taker, such as by power wheeling, determining individual business areas, etc.

• With this business model, the investments made by non-IPP third parties will not burden PLN finances in the long term.

28

Page 29: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Risk of Project Delay Causing Reduction of Capacity Increase

MW

Planned capacity increase according to need is 60 GW (Scenario 1). However, with possible delays, only 55 GW will operate. The delayed 5 GW of the Project will operate after year 2022.

29

Page 30: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Risk of Delayed Completion of Generator and Transmission Projects Oil Fuel consumption remains high if Project completion is delayed

thousand kL

Usage of oil fuel for Scenario 3 (an average of 6.8 million kL/year) is higher than that for Scenario 1 (an average of 4.0 million kL/year) because of Project delays and limited supply of gas/liquefied natural gas.

30

Page 31: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Thank You

31

Page 32: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Power Balance of Java-Bali System 2013-2022

MW

PLTA

PLTGU

New PLTU

PLTU PLN

PLTU IPP

PLTP

Installed Capacity

32

Installed Capacity

Peak Load

Page 33: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Power Balance of Java-Bali System 2013-2022 [1/3]

33

Project

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

Need

Growth

Production

Load Factor Gross Top Load

GWh

%

GWh

%

MW

144,010

8.8

163,501

78.4

23,801

157,183

9.1

178,009

78.5

25,880

170,232

8.3

192,714

78.6

27,982

183,486

7.8

207,605

78.7

30,106

197,293

7.5

223,336

78.8

32,346

211,527

7.2

239,235

78.9

34,605

226,314

7.0

255,816

79.0

36,957

241,805

6.8

273,475

79.1

39,458

257,968

6.7

292,238

79.2

42,112

274,850

6.5

312,111

79.3

44,919

Capacity

Net Capacity MW 29,053 29,028 29,028 29,028 29,028 29,028 27,997 27,997 27,997 27,997

Installed Capacity MW 30,285 30,261 30,261 30,261 30,261 30,261 29,229 29,229 29,229 29,229

PLN MW 24,625 24,601 24,601 24,601 24,601 24,601 23,569 23,569 23,569 23,569

Retired/Mothballed -200 -25 0 0 0 0 -1031 0 0 0

IPP MW 5,660 5,660 5,660 5,660 5,660 5,660 5,660 5,660 5,660 5,660

PLN On-going and Committed

Pelabuhan Ratu PLTU 700 350

Pacitan PLTU 630

Tj. Awar-awar PLTU 350 350

Adipala PLTU 660

Indramayu #4 (FTP2) PLTU 1,000

Upper Cisokan PS (FTP2)

IPP On-going and Committed

PLTA 1,040

Celukan Bawang PLTU 130 250

Banten PLTU 625

Sumsel-8 MT PLTU 1,200

Sumsel-9 MT (PPP) PLTU 600 600

Sumsel-10 MT (PPP) PLTU 600

Cilacap exp PLTU 614

Madura 2x200 MW (FTP2) PLTU 400

Central Java (PPP) PLTU 950 950

Page 34: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Power Balance of Java-Bali System 2013-2022 [2/3]

34

Project

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

Rajamandala PLTA 47

Patuha PLTP 55 110

Kamojang-5 PLTP 30

Karaha Bodas PLTP 30 110

Tangkuban Perahu 1 PLTP 110

Ijen PLTP 110

Iyang Argopuro PLTP 55

Wilis/Ngebel PLTP 110 55

Cibuni PLTP 10

Tangkuban Perahu 2 PLTP 60

Cisolok - Cisukarame PLTP 50

Ungaran PLTP 55

Wayang Windu PLTP 220

Dieng PLTP 115

Tampomas PLTP 45

Baturaden PLTP 220

Guci PLTP 55

Rawa Dano PLTP 110

Umbul Telomoyo PLTP 55

Gn. Ciremai PLTP 110

Gn. Endut PLTP 55

Planned Additional Capacity

Jawa-1 (Load Follower) PLTGU 800

Jawa-2 (Load Follower) PLTGU 800

Muara Tawar Add-on Blok 2,3,4 PLTGU 650

Peaker Muara Karang PLTGU 450

Peaker Grati PLTGU 300 150

Peaker Pesanggaran PLTMG 50 150

Page 35: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Power Balance of Java-Bali System 2013-2022 [3/3]

35

Project

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

Karangkates #4-5 (Jatim) PLTA 100

Kesamben (Jatim) PLTA 37

Kalikonto-2 (Jatim) PLTA 62

Jatigede (FTP2) PLTA 110

Matenggeng PS PLTA 450 450

Indramayu #5 PLTU 1,000

Lontar Exp #4 PLTU 315

Jawa-1 (FTP2) PLTU 1,000

Jawa-3 (FTP2) PLTU 660 660

Jawa-4 (FTP2) PLTU 1,000 1,000

Jawa-5 (FTP2) PLTU 1,000 1,000

Jawa-6 (FTP2) PLTU 2,000

Jawa-7 PLTU 1,000 1,000

Iyang Argopuro PLTP 220

Cisolok - Cisukarame PLTP 110

Ungaran PLTP 140

Dieng PLTP 110

Bedugul PLTP 10

Gn. Lawu PLTP 165

Arjuno Welirang

Tota l Additional Capacity Total System Capacity

Total Net Capacity

PLTP

MW

MW

1,680

31,965

30,733

1,595

33,536

32,303

110

3,255

60,269

59,037

730

34,266

33,033

1,869

36,135

34,902

2,537

38,672

37,439

5,800

44,472

43,239

6,684

50,124

48,892

4,220

54,344

53,112

2,670

57,014

55,782

RESERVE MARGIN

%

34

30

22

20

20

29

36

38

35

34

NET RESERVE MARGIN

%

29

25

18

16

16

25

32

35

32

31

Page 36: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Sumatra Power Balance

20.000

PLTA PLTA IPP 18.000

63%

16.000 PLTU IPP PLTU PLN

14.000 IPP Generator PLN existing generator

12.000

10.000

8.000 37%

6.000

4.000

2.000

- 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Year 36

MW

Reserve Margin PLTG/MG

65%

PLTA PLN PLTGU

PLTP PLTU

64%

PLTU & PLTG Lease Lease Generator 58%

Top Load 56%

42% 45%

39%

13%

Page 37: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Power Balance System of Sumatra [1/3]

37

No. Supply and Need Satuan 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

1

2

3

Need

Production

Load Factor

Gross Top Load

Supply

Installed Capacity

Capacity

PLN

Lease

IPP

Retired & Mothballed (PLN)

Additional Capacity

PLN ON-GOING & COMMITTED

GWh

%

MW

MW

MW

MW

MW

MW

MW

28.935 31.603 34.918 38.562 42.599 47.047 51.981 57.456 63.539 70.312

70 69 69 70 70 71 72 72 73 73

4.742 5.227 5.770 6.316 6.912 7.566 8.288 9.088 9.976 10.961

5.722 5.607 5.492 4.832 4.542 4.384 4.384 4.384 4.384 4.384

4.711 4.672 4.542 4.019 3.849 3.742 3.742 3.742 3.742 3.742

3.126 3.093 3.093 2.960 2.795 2.773 2.773 2.773 2.773 2.773

728 728 688 298 293 208 208 208 208 208

857 851 761 761 761 761 761 761 761 761

90 33 - 133 166 22 - - - -

Tarahan (FTP1) PLTU 200

Meulaboh (Nagan Raya) #1,2 (FTP1) PLTU 110 110

Teluk Sirih #1,2 (FTP1) PLTU 112 112

Pangkalan Susu #1,2 (FTP1) PLTU 220 220

Riau (amendment to FTP1) PLTU 220

Pangkalan Susu #3,4 (FTP2) PLTU 200 200

Sungai Gelam (CNG/Peaker) PLTMG 92

Duri PLTMG 112

Arun (Peaker) PLTG/MG 200

Batanghari PLTGU 30

Keramasan PLTGU 80

Hululais (FTP2) PLTP 55 55

Sungai Penuh (FTP2) PLTP

Peusangan 1-2 PLTA 88

Asahan III (FTP2) PLTA 174

Masang-2 (FTP2)

Lease

PLTA 55

Dumai PLTU 240

Lampung (Sribawono + Sutami) PLTG/MG 200 -200

Payo Selincah PLTG/MG 50 -50

Tanjung Jabung Timur PLTG/MG 100 -100

Page 38: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Power Balance of Sumatra [2/3]

38

No. Supply and Need Satuan 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Additional Lease (PLTD/PLTG/MG)

Sumbagut MW 165 265 -175 -255

Sumbagselteng

IPP ON-GOING & COMMITTED

MW 50 80 -130

Banjarsari PLTU 230

Keban Agung PLTU 225

Sumsel - 5 PLTU 150 150

Sumsel - 7 PLTU 150 150

Riau Kemitraan (PLN-TNB-PTBA) PLTU 1.200

Jambi PLTU 400 400

Gunung Megang, ST Cycle PLTGU 30

Lumut Balai (FTP2) PLTP 55 55 110

Ulubelu #3,4 (FTP2) PLTP 55 55

Sarulla I (FTP2) PLTP 110 220

Muara Laboh (FTP2) PLTP 110 110

Rantau Dadap (FTP2) PLTP 110 110

Sorik Marapi (FTP2) PLTP 80 160

Seulawah Agam (FTP2) PLTP 55 55

Rajabasa (FTP2) PLTP 110 110

Suoh Sekincau (FTP2) PLTP 110 110

Sipoholon Ria-Ria (FTP2) PLTP 55

Wai Ratai (FTP2) PLTP 55

Sarulla II (FTP2) PLTP 110

Simbolon Samosir (FTP2) PLTP 110

Danau Ranau (FTP2) PLTP 110

Bonjol (FTP2) PLTP 165

PLTM Tersebar Sumut PLTM 25 25 46

Wampu (FTP2) PLTA 45

Semangka (FTP2) PLTA 56

Hasang (FTP2) PLTA 40

Merangin PLTA 350

Peusangan-4 (FTP2) PLTA 83

Batang Toru (Tapsel) PLTA 510

Page 39: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Power Balance of Sumatra [3/3]

39

No. Supply and Need Satuan 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Planned Additional Capacity

Meulaboh (Nagan Raya) #3,4 PLTU 200 200

Sumut-1 PLTU 300

Sumut-2 PLTU 300 300

Sumsel-1 MT PLTU 600

Sumsel-6 MT PLTU 300 300

Sumbagsel-1 MT PLTU 150 150

Bengkulu PLTU 200

Banyuasin PLTU 230

Aceh PLTG 25

Riau PLTGU 50

Lampung Peaker PLTG/MG 200

Jambi Peaker PLTG/MG 100

Riau Peaker PLTG/MG 200

Sumbagut-1 Peaker PLTGU/MGU 250

Sumbagut-2 Peaker (Arun) PLTGU/MGU 250

Sumbagut-3 Peaker (Medan) PLTGU/MGU 250

Sumbagut-4 Peaker (Medan) PLTGU/MGU 250

G. Talang PLTP 20

Kepahiyang PLTP 220

Simonggo-2 PLTA 90

Meureubo-2 PLTA 59

Ketahun-3 PLTA 61

Kumbih-3 PLTA 42

Sibundong-4

Sumut (Pump Storage)

PLTA

PLTA

32

0

Sumbagsel (Pump Storage) PLTA

Pembangkit Baseload MW

Pembangkit Medium MW

Pembangkit Peaking MW

4 Total Additional MW 667 1.801 990 1.666 819 2.699 1.275 1.887 1.330 1.840

5 Total System Capacity MW 6.389 8.075 8.950 9.956 10.485 12.426 13.701 15.588 16.918 18.758

6 Total Net Capacity MW 5.378 7.140 8.000 9.143 9.792 11.784 13.059 14.946 16.276 18.116

Page 40: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Neraca Daya Kalimantan Barat

1,600

1,400

1,200

1,000

800 Import from Sesco

600 59%

400

P 200

- 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Tahun

40

MW

PLN existing generator

Lease Generator

PLTU PLN 62% PLTU IPP

PLTU 62%

PLTG/MG

PLTA

Power Purchase (Sesco)

PLTG/MG 51% Hydro

Reserve Margin

Top Load 58% 43%

CFPP

59%

35%

Import f

28%

P

LN CFPP

15%

Rental

Existing

Capacity

Page 41: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Neraca Daya Kalimantan Barat

41

Need and Supply Satuan 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Need

Production

Load Factor

Top Load

Supply

Installed Capacity

Daya Mampu

PLN

PLTG-HSD PLN (Siantan)

PLTD-MFO PLN (Sei Raya & Siantan) PLTD-MFO PLN (Sei Wie & Sudirman) Interconnection of sistem-sistem isolated Lease

Retired & Mothballed (PLN)

Additional Capacity

PLN ON-GOING and COMMITTED

GWh

%

MW

MW

MW

MW

MW

MW

MW

MW

MW

MW

1,371 1,632 1,855 2,373 2,907 3,302 3,675 4,088 4,544 5,040

67 67 66 66 66 66 66 66 67 67

234 280 319 413 506 575 636 703 776 856

335 434 136 79 131 139 139 139 139 139

270 360 123 71 119 126 126 126 126 126

105 105 30 30 30 30 30 30 30 30

30 30 30 30 30 30 30 30 30 30

61 61 - - - - - - - -

14 14 - - - - - - - -

- - - 41 89 96 96 96 96 96

164 254 93 - - - - - - -

- - 75 - - - - - - -

Pantai Kura-Kura (FTP1) PLTU 55

Parit Baru (FTP1) PLTU 100

Parit Baru (FTP2) PLTU 100

IPP ON-GOING and COMMITTED

Planned Additional Capacity

Kalbar - 1 PLTU 100 100

Kalbar - 2 (usulan baru) PLTU 200 200

Peaker PLTG/MG 100

Nanga Pinoh*) PLTA 98

Pade Kembayung PLTA 30

Power Purchase dgn SESCo (Peaking) 275 KV 180

Power Purchase dgn SESCo (Baseload) 275 KV 50 -50

Total Additional Capacity MW 0 0 385 100 200 100 0 150 200 128

Total Supply (DMN) MW 270 360 508 556 804 911 911 1061 1261 1389

Reserve Margin (DMN) % 15 28 59 35 59 58 43 51 62 62

Page 42: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Power Balance of Kalseltengtimra

4,000

3,500

3,000 53% Additional PLTG/MG/GU 59%

PLTG PLN 2,500

2,000

1,500

1,000

Lease Generator

500 IPP Generator & Excess Power

PLN Generator

- 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

42

Reserve Margin A d d I t I o na l PLTA

A dditional PLTG/MG/GU PLTG PLN

PLTGU IPP PLTG/MG PLN

PLTU PLN PLTM (PLN+IPP)

52% 47%

Lease generator Additional PLTU IPP generator and Excess Power PLN generator 50%

Ta

41%

PLTG/M G PLN

PLTU PL

N

30%

PLTU IPP 24%

Additional

PLTU

35%

33%

Pe

Pe

Pe

Page 43: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Power Balance system of Kalseltengtimra

43

Project

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Interconnection of Kalselteng - Kaltim (2016)

Interconnection of Kalselteng-Kaltim-Kaltara (2018) Need

Production

Load Factor

Top Load

Supply

Installed Capacity

Capacity

PLN

Private Owner

Retired & Mothballed

Additional Capacity

GWh

%

MW

5,154

69.5

847

6,304

69.5

1,036

7,744

69.8

1,266

8,495

69.7

1,391

9,376

70.8

1,511

10,545

71.2

1,690

11,390

71.5

1,819

12,277

71.6

1,956

13,178

71.8

2,095

14,190

71.9

2,252

MW

MW

970

815

388

428

21

969

814

394

420

-

862

708

400

308

-

682

527

400

128

-

335

299

238

61

143

390

354

272

82

-

390

354

272

82

-

390

354

272

82

-

390

354

272

82

-

390

354

272

82

-

PLN Ongoing & Committed

Pulang Pisau (FTP1) PLTU - - 120 - - - - - - -

Asam Asam (FTP1) PLTU 130 - - - - - - - - -

Bangkanai (FTP2) PLTG/MG/GU - - 155 70 70 - - - - -

Kaltim Peaking (APBN) PLTG 100 - - - - - - - - -

Muara Jawa/Teluk Balikpapan (FTP1) PLTU - 220 - - - - - - - -

Sampit PLTU - - - 50 - - - - - -

IPP Ongoing & Committed

Senipah PLTG 82 - - - - - -

Embalut (Ekspansi) PLTU - 50 - - - - - - - -

Senipah (ST) PLTGU - - - - 35 - - - - -

Planned Additional Capacity

Kalsel Peaker 1 PLTG/MG/GU - - - 200 - - - - - -

Kalsel Peaker 2 PLTG/MG/GU - - - - - - - - 50 -

Kaltim Peaker 2 PLTG/MG/GU - - - 100 - - - - - -

Kaltim Peaker 3 PLTG/MG/GU - - - - - - - - 50 -

Kelai PLTA - - - - - - - - - 55

Kusan PLTA - - - - - - - - - 65

Kalsel (FTP2) PLTU - - - - 100 100 - - - -

Kalselteng 1 PLTU - - - - - 100 100 - - -

Kalselteng 2 PLTU - - - - 200 - - -

Kalselteng 3 PLTU - - - - 50 50 - - - -

Kaltim (FTP2) PLTU - - - - 100 100 - - - -

Kaltim (MT) PLTU - - - - - 55 - - - -

Kaltim 3 PLTU - - - - - - - 150 150 -

Kaltim 4 PLTU - - - - - 100 - - - -

Total Additional Capacity MW 312 270 275 420 555 505 100 150 250 120

TOTAL System Capacity MW 1,282 1,551 1,719 1,959 2,167 2,727 2,827 2,977 3,227 3,347

TOTAL Net Capacity MW 1,127 1,396 1,565 1,804 2,131 2,691 2,791 2,941 3,191 3,311

RESERVE MARGIN % 51 50 36 41 43 61 55 52 54 49

NET RESERVE MARGIN % 33 35 24 30 41 59 53 50 52 47

Page 44: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Power Balance System of Sulbagut

1,600

1,400

1,200

51% 1,000 58%

800

PLTU Lease

600 PLTP IPP

7% 2% 14% 400

IPP and Lease Capacity

200 PLN Installed Capacity

- 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

44

Reserve Margin Additional PLTA/M

Additional PLTG/MG/GU PLTP PLN

Additional PLTP PLTU Lease

Additional PLTU PLTU IPP 62% PLTU PLN Capacity Lease Capacity IPP Installed Capacity PLN

PEAK DEMAND FORECAST 52% PLTA

56% Additional PLTG/MG/GU

34% PLTU

Additional PLTU

22%

P

LTU PLN

Page 45: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Power Balance System of Sulbagut

Project

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Need Interconnection of Sulut-Gorontalo-Tolitoli (2016)

Energy Production GWh 1,777 2,000 2,182 2,536 2,787 3,075 3,391 3,740 4,119 4,539

Load Factor % 65 65 66 65 65 66 66 66 66 67

Top Load MW 311 349 379 445 487 535 587 645 708 777

Supply

Installed Capacity MW 386 386 386 282 195 195 195 195 195 195

Net Capacity MW 336 336 336 232 168 168 168 168 168 168

PLN 226.4 MW 227 227 227 227 164 164 164 164 164 164

Private Owner MW

IPP 5.3 MW 4 4 4 4 4 4 4 4 4 4

Lease MW 104 104 104 - - - - - - -

Retired & Mothballed - - - - 63 - - - - -

Additional Capacity

Lease

PLTU Lease Amurang (2x25) PLTU 50

PLN ON GOING & COMMITTED

Gorontalo (FTP1) PLTU 50

Sulut I (FTP1) PLTU 25 25

IPP ON GOING & COMMITTED

Molotabu PLTU 20 -

Gorontalo (obstructed) PLTU 12*)

Planned Additional Capacity

Tolitoli PLTU 15 30

Sulut 3 PLTU 100

Sulbagut 1 PLTU 50 50

Sulbagut 2 PLTU - 100 100

Sulbagut 3 PLTU 60

Poigar 2 PLTA 30

Sawangan PLTA 12

Minahasa Peaker PLTG/MG/GU - 150

Gorontalo Peaker PLTG/MG/GU 100

Kotamobagu 1, 2 (FTP2) PLTP 40

Kotamobagu 3, 4 (FTP2) PLTP 40

Lahendong 5 (FTP2) PLTP - 20

Lahendong 6 (FTP2) PLTP - 20

Total Additional Capacity MW 20 0 50 240 175 180 92 50 100 180

TOTAL System Capacity MW 406 406 456 592 680 860 952 1002 1102 1282

TOTAL Net Capacity MW 356 356 406 542 653 833 925 975 1075 1255

RESERVE MARGIN % 30 16 20 33 40 61 62 55 56 65

NET RESERVE MARGIN % 14 2 7 22 34 56 58 51 52 62

Page 46: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Power Balance System of Sulbagsel

5,000

4,500 Additional PLTMG PLTGU IPP

4,000

3,500 Additional PLTA/M

3,000

PLTG/MG/GU PLN 2,500 PLTP

PLTU PLN PLTU IPP 2,000

PLTMG IPP PLTGU IPP 1,500 Additional PLTU

Lease Generator

1,000

500

- 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

46

Reserve Margin Additional PLTA

PLTA IPP Additional PLTG/MG/GU 59%

PLTU PLN PLTU IPP 58% Additional PLTU Lease Generator

IPP Generator PLN Generator 46%

41% T

39%

PLTG/M

23% 19%

PLTMG I 51% 27% 11%

PLTMG I

IPP Generator

Page 47: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

47

Neraca Daya Sulbagsel Project 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Need

5,776

Sistem Sulsel Interconnection of dengan Palu (2014) and Sultra (2016)

13,822 Production GWh 6,892 8,066 9,491 10,431 11,452 12,457 14,984 16,158

Load Factor

Gross Top Load

Supply

Installed Capacity

Capacity

PLN

IPP

Lease

Retired & Mothballed

%

MW

63

1,042

63

1,241

63

1,451

64

1,690

65

1,842

65

2,000

65

2,180

65

2,420

65

2,619

65

2,822

MW

MW

MW

MW

1,533

1,396

370

695

331

25

1,495

1,366

379

695

293

-

1,490

1,361

379

695

288

-

1,270

1,141

379

695

68

-

1,140

1,013

380

633

-

-

909

835

202

633

-

178

909

835

202

633

-

-

935

861

228

633

-

-

935

861

228

633

-

-

935

861

228

633

-

-

Additional Capacity

Planned

PLN Ongoing & Comitted

Sulsel Barru #2 (FTP1) PLTU 50 - - - - - - - - -

Nii Tanasa/Kendari #2 (FTP1) PLTU 10 - - - - - - - - -

Nii Tanasa/Kendari (Ekspansi) PLTU - 10 - - - - - - - -

PLTM Tersebar PLTM - - 4 6 - - - - - -

IPP Ongoing & Committed

Sengkang (GT 22) PLTG 60 - - - - - - - - -

Sengkang (ST 28) PLTGU 60 - - - - - - - - -

Mamuju PLTU - - - 50 - - - - - -

Tawaeli Ekspansi PLTU - - - 30 - - - - - -

Planned Additional Capacity

Makassar Peaker PLTG/MG/GU - - - 300 150 150 - - - -

Punagaya (FTP2) PLTU - - - 200 - - - - - -

Jeneponto 2 PLTU - - - - - 225 - - - -

Kendari 3 PLTU - - - - - 100 - - - -

Sulsel Barru 2 PLTU - - - - 100 - - - - -

Sulsel 2 PLTU - - - - - 200 200 - - -

Palu 3 PLTU - - - - 100 - - - - -

Sulsel 3/Takalar PLTU - - - - - - - - - 200

Wajo PLTMG - - 20 - - - - - - -

Poso 2 2x66 PLTA - - - - - - - - 66 66

Poko PLTA - - - - - - - 117 117 -

Konawe PLTA - - - - - - - - 50 -

Watunohu PLTA - - - - - - - - 15 -

Bakaru 2 PLTA - - - - - - - 126 - -

Karama Baseload (Unsolicited) PLTA - - - - - - - 100 - -

Karama Peaking (Unsolicited) PLTA - - - - - - - - 350 -

Bonto Batu (FTP2) PLTA - - - - - - 110 - - -

Malea (FTP2) PLTA - - - - - - - 90 - -

Bora Pulu (FTP2) PLTP - - - - - - - - - 55

Marana/Masaingi (FTP2) PLTP - - - - - - - - - 20

Lainea PLTP - - - - - - - - - 20

PLTM Tersebar PLTM - 19 21 34 38 - - - - -

Kendari 4 PLTU - - - - - - - - - -

Total Additional Capacity MW 180 29 45 620 388 675 310 433 598 361

TOTAL System Capacity MW 1,713 1,703 1,744 2,143 2,401 2,846 3,156 3,615 4,213 4,574

TOTAL Net Capacity MW 1,576 1,575 1,615 2,015 2,274 2,771 3,081 3,540 4,138 4,499

RESERVE MARGIN % 64 37 20 27 30 42 45 49 61 62

NET RESERVE MARGIN % 51 27 11 19 23 39 41 46 58 59

Page 48: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Power Balance System of Lombok

Reserve Margin PLTM (PLN+IPP) 700

600

500 Additional PLTG/MG/GU

400 PLTU IPP

PLTU PLN

300

Additional PLTU 200

Capacity IPP Additional PLTP 100

Installed Capacity PLN

0 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

48

48

Additional PLTG/MG/GU PLTBio 52% PLTU IPP PLTU PLN

Additional PLTU PLTP IPP 49% Lease Generator IPP Generator

PLN Generator Top Load 41%

46% 33%

44%

25% PLTU

26% 16% 26%

Lease

Page 49: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Power Balance System of Lombok

49

49

Project

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

Need

Energy Production

Top Load

Load Factor

Supply

Installed Capacity

Net Capacity

PLN Siz e

Private Owner

Retired & Mothballed

GWh

MW

%

919

176

60

1,086

206

60

1,210

229

60

1,348

254

61

1,510

283

61

1,671

311

61

1,829

339

62

2,001

369

62

2,150

396

62

2,314

426

62

MW

MW

244

215

89

126

0

216

198

72

126

18

216

198

72

126

0

163

160

32

128

40

91

88

32

56

0

91

88

32

56

0

91

81

26

56

0

91

81

26

56

0

91

81

26

56

0

91

81

25

56

0 Additional Capacity

PLN

Santong PLTM 0.85

Lombok (FTP1) PLTU 50

IPP

Lombok Timur (Lombok Energi Dinamik

PLTU 50

PLTM Tersebar PLTM 6.0 5.1 6.1

Planned Additional Capacity

Lombok Peaker 1, 2 PLTG/MG/GU 90 60

Lombok (FTP2) PLTU 50 50

Sembalun (FTP2) PLTP 20

Lombok 2 PLTU 50 50

Lombok Peaker 3 PLTG/MG/GU 60

Sembalun 2 PLTP 20

Total Additional Capacity MW 7 55 6 90 160 50 0 70 70 60

TOTAL System Capacity MW 251 278 284 321 409 459 459 529 599 659

TOTAL Net Capacity MW 222 260 266 318 406 456 449 519 589 649

RESERVE MARGIN % 43 35 24 27 45 48 35 43 51 55

NET RESERVE MARGIN % 26 26 16 25 44 46 33 41 49 52

Page 50: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Power Balance System of Sumbawa-Bima

50

Supply/Need Unit 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Need

Energy Production

Load Factor

Top Load

Supply

Installed Capacity

Net Capacity Size

PLN

PLTD

PLTD Labuhan 12.9

PLTD Alas 2.1

PLTD Empang 1.7

PLTD Taliwang 5.0

PLTD Bima 6.7

PLTD Ni'u 5.6

PLTD Dompu 3.7

PLTD Sape 0.9

PLTM

PLTM Mamak 0.4

Se w a

PLTD HSD

PLTD MFO

Additional Capacity

Planned

PLN Ongoing & COMMITTED

Sumbawa Barat

Bima (FTP1)

IPP Ongoing & COMMITTED Planned

Additional Capacity

Bima 2 (Merah Putih)

Sumbawa (Merah Putih)

Sumbawa 2

Brang Beh

Hu'u (FTP 2)

Hu'u 2

PLT Biomass

Bima Peaker

Bima Peaker 2

Sumbawa Peaker

Sumbawa Peaker 2

Bintang Bano

Brang Rea 1

Brang Rea 2

GW h

%

MW

MW

MW

MW

MW

MW

MW

MW

MW

MW

MW

MW

MW

MW

MW

PLTU

PLTU

PLTU

PLTU

PLTU

PLTA

PLTP

PLTP

PLTBio

PLTMG

PLTMG

PLTMG

PLTMG

PLTM

PLTM

PLTM

ISumbawa - Bima System Interconnection 2016

377.0 445.5 496.6 553.3 619.6 685.6 750.7 821.1 882.2 949.6

56.4 56.7 57.0 57.3 57.6 57.9 58.2 58.5 58.5 58.5

76.3 89.7 99.4 110.2 122.8 135.2 147.2 160.2 172.1 185.3

39 39 39 39 39 39 39 39 39 39

28 28 28 14 14 14 11 11 0 0

8.9 8.9 8.9 - - - - - - -

1.9 1.9 1.9 - - - - - - -

1.0 1.0 1.0 - - - - - - -

2.0 2.0 2.0 - - - - - - -

5.6 5.6 5.6 5.6 5.6 5.6 5.6 5.6 - -

4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 - -

2.9 2.9 2.9 2.9 2.9 2.9 - - - -

0.7 0.7 0.7 0.7 0.7 0.7 - - - -

0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4

65.0 70.0 67.0 46.0 14.0 - - - - -

37.0 42.0 39.0 32.0 - - - - - -

28.0 28.0 28.0 14.0 14.0 - - - - -

- 7 7 - - - - - - -

- 10 10 - - - - - - -

- - - 20 - - - - - -

- - - 10 10 - - - - -

- - - - - 20 - - - -

- - - - - 12 6 - - -

- - - - - - - - 20 -

- - - - - - - - - 20

- 2

- - - 20 - - - - - -

- - - - - 20 - - - -

- - - 20 - - - - - -

- - - - - - - 20 - -

- - - - 8 - - - - -

- - 4 - - - - - -

- - 3 - - - - - - Jumla h Efe ktif (Ba sis DMN) MW 93.1 116.8 130.8 172.4 158.4 196.4 198.9 218.9 228.5 248.5

Reserve:

Maintenance

Operation

MW

MW

MW

12.3 12.3 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0

6.7 6.7 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0

5.6 5.6 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0

Surplus/De fisit (N-2) MW 4.5 14.9 1.4 32.2 5.6 31.2 21.7 28.7 26.3 33.2

Page 51: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Power Balance System of Timor

51

51

Supply/Need Unit 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Need

Energy Production

Load Factor

Top Load

Supply

Installed Capacity

Derating Capacity

Net Capacity

PLN Generator

PLTD Kuanino

PLTD Tenau

PLTD Soe

PLTD Kefamenanu

PLTD Atambua

Generator Lease

PLTD HSD Lease

PLTD MFO Lease

PLN Ongoing & COMMITTED

Kupang (FTP 1)

Atambua

IPP Ongoing & COMMITTED

Kupang

Planned Additional Capacity

Kupang Peaker

Kupang Peaker 2

Timor 1

Timor 2

Kupang

GWh

%

MW

MW

MW

MW

PLTD

PLTD

PLTD

PLTD

PLTD

PLTU

PLTU

PLTU

PLTMG

PLTMG PLTU

PLTU

Solar Thermal

Kupang - Soe - Kefamenanu – Atambua Interconnection System

377.6 441.0 503.1 566.7 622.6 685.0 757.1 833.7 924.8 1,021.5

64.7 66.0 68.9 71.1 71.5 71.8 72.4 72.6 73.3 73.6

66.6 76.3 83.3 91.0 99.4 108.9 119.4 131.0 144.0 158.4

52.3 51.0 51.0 51.0 41.7 41.7 41.7 41.7 41.7 41.7

13.7 13.1 13.1 36.0 29.7 41.7 41.7 41.7 41.7 41.7

38.6 37.9 37.9 15.0 12.0 - - - - -

3.0 3.0 3.0 3.0 - - - - - -

28.2 27.5 27.5 12.0 12.0 - - - - -

2.6 2.6 2.6 - - - - - - -

1.9 1.9 1.9 - - - - - - -

3.0 3.0 3.0 - - - - - - -

47.7 44.4 44.9 6.0 - - - - - -

37.7 34.4 34.9 6.0 - - - - - -

10.0 10.0 10.0 - - - - - - -

33.0 - - - - - - - - -

- - - 24.0 - - - - - -

- - 15.0 15.0 - - - - - -

- - - 40.0 - - - - - -

- - - - - 20.0 - - - 10.0

- - - - - 15.0 15.0 - - -

- - - - - - - - - 25.0

10.0

Effective Total MW 119.3 115.3 140.8 158.0 149.0 172.0 187.0 187.0 187.0 222.0

Reserve

Maintenance

Operation

MW

MW

MW

22.8 22.8 31.5 31.5 31.5 31.5 31.5 31.5 31.5 41.5

16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 25.0

6.3 6.3 15.0 15.0 15.0 15.0 15.0 15.0 15.0 16.5

Surplus/Deficit ( N-2 ) MW 29.9 16.1 25.9 35.5 18.1 31.6 36.1 24.5 11.5 22.1

Page 52: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Power Balance System of Flores

52

Supply/Need Unit 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Need

Energy Production

Load Factor

Top Load

Supply

Installed Capacity

Derating Capacity

Net Capacity

PLN Generator

PLTD

PLTM

PLTP

PLTD HSD Lease

PLN ON GOING & COMMITTED

Ende (FTP 1)

Ndungga

Ulumbu ADB

IPP ON GOING & COMMITTED

Planned Additional Capacity

Maumere (Merah Putih)

Sokoria (FTP2) - Ende

Mataloko (FTP2)

Oka ile Ange (FTP2)

Mataloko 3, 4

Ulumbu 3

Ulumbu 4

Sokoria 4 - Ende

Larantuka

Adonara

Maumere Peaker

Wae Rancang - Manggarai

Wae Roa - Ngada

Lamanabi

Wae Lega

Sita - Borong

GWh

%

MW

MW

MW

MW

MW

MW

MW

PLTU

PLTM

PLTP

PLTU

PLTP

PLTP

PLTP

PLTP

PLTP

PLTP

PLTP

PTMPD

PTMPD

PLTMG

PLTA

PLTM

PLTM

PLTM

PLTM

208.0 242.8 276.8 311.7 342.3 376.5 416.0 458.1 508.0 561.1

55.6 56.9 59.6 61.7 62.3 62.8 63.5 63.9 64.8 65.3

42.7 48.7 53.0 57.7 62.8 68.5 74.8 81.8 89.5 98.1

44.3 23.1 21.9 21.9 15.1 15.1 10.5 10.5 10.5 10.5

21.1 12.4 11.2 11.2 9.7 9.7 8.4 8.4 8.4 8.4

23.2 10.7 10.7 10.7 5.4 5.4 2.1 2.1 2.1 2.1

23.2 10.7 10.7 10.7 5.4 5.4 2.1 2.1 2.1 2.1

0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2

4.9 5.1 5.1 5.1 5.1 5.1 5.1 5.1 5.1 5.1

43.5 41.4 37.1 12.6 4.0 5.0

7.0 7.0

1.9

5.0

20

5 5 5 - -

5

10

5 5

5

5

- 5

2.4

2.4

20

10 6.5

0.4

0.1

1.1 0.7

1.0 Total Efek tif MW 78.7 79.8 79.0 77.5 93.5 111.0 117.8 137.8 142.8 147.8

Reserve

Maintenance

Operation

MW

MW

MW

9.5 9.5 9.5 17.0 17.0 17.0 17.0 17.0 17.0 17.0

7.0 7.0 7.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0

2.5 2.5 2.5 7.0 7.0 7.0 7.0 7.0 7.0 7.0 Surplus/Deficit (N-2) MW 26.5 21.5 16.5 2.8 13.8 25.6 25.9 39.0 36.3 32.6

Page 53: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Power Balance System of Ambon

53

Supply/Need Unit 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Need

Energy Production

Load Factor

Top Load

Supply

Installed Capacity

Daya Mampu

Derating Capacity

PLN Generator

Manufacture Opr Year Size

PLTD Hative Kecil 21.5

PLTD Poka 33.6

Pembangkit Sew a

PLTD Lease (HSD) 16.8

PLTD Lease (MFO)

Artho Ageng (Hative K) 33.7

PLN Ongoing & COMMITTED

Ambon/Waai (FTP 1)

IPP Ongoing & COMMITTED

Planned Additional Capacity

Ambon Peaker

Ambon Peaker 2

Ambon 2 (Waai #3,4)

Ambon 3

Tulehu (FTP 2)

GWh

%

MW

MW

MW

MW

MW

MW

MW

MW

MW

MW

PLTU

PLTMG

PLTMG

PLTU

PLTU

PLTP

290 319 364 397 440 486 530 577 629 686

70.7 70.7 70.7 70.7 70.7 70.7 70.7 70.7 70.7 70.7

46.8 51.6 58.8 64.2 71.0 78.5 85.5 93.2 101.6 110.8

55.1 55.1 55.1 55.1 - - - - - -

39.5 39.5 39.5 - - - - - - -

15.6 15.6 15.6 - - - - - - -

39.5 39.5 39.5 - - - - - - -

15.2 15.2 15.2 -

24.3 24.3 24.3 - - - - - -

37.0 25.0 25.0 - -

12.0 - - -

25.0 25.0 25.0 - -

25.0 25.0 25.0

15 15

50

10

30

15

20

Effective Total MW 76.5 79.5 94.5 110.0 110.0 130.0 130.0 145.0 155.0 155.0

Reserve

Maintenance

Operation

MW

MW

MW

8.5 19.5 19.5 25.0 25.0 25.0 25.0 25.0 25.0 25.0

4.5 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0

4.0 4.5 4.5 10.0 10.0 10.0 10.0 10.0 10.0 10.0

Surplus/Deficit (N-2) MW 21.2 8.4 16.2 20.8 14.0 26.5 19.5 26.8 28.4 19.2

Page 54: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Power Balance System of Seram

54

Pa soka n/Ke butuha n Unit 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Need

Energy Production

Load Factor

Top Load

Supply

Installed Capacity

Capacity

Derating Capacity

PLN Generator

Manufacture Opr Year Size

PLTD Masohi 6.7

PLTD Liang 0.9

PLTD W aipia 0.8

PLTD Kairatu 3.9

PLTD Piru 3.0

Lease Generator

PLTD Lease (HSD)

Masohi (Comiko) 2.3

Kairatu (Sakabaja) 3.4

Liang (MEP) 1.68

PLN Ongoing & COMMITTED

IPP Ongoing & COMMITTED

Sapalewa

Planned Additional Capacity

Seram Peaker

Kairatu

Masohi

W ai Tala

Nua (Masohi)

W ae Mala

Makariki

Isal

Tene

GWh

%

MW

MW

MW

PLTD

PLTD

PLTD

PLTM

PLTMG

PTMPD

PTMPD

PLTA

PLTA

PLTM

PLTM

PLTM

PLTM

<=== Iinterconnection of M asohi, Waipia, Liang, Kairatu & Piru (2014)

<=== Interconnection of Kairatu & Piru (2017)

32.4 36.0 41.1 45.0 94.7 110.4 120.7 132.0 144.4 158.0

59.8 59.9 59.9 60.0 46.9 45.4 45.5 45.6 45.6 45.7

6.2 6.9 7.8 8.6 23.0 27.8 30.3 33.1 36.1 39.5

15.3 15.3 15.3 15.3 15.3 15.3

8.9 9.8 9.8 10.1 4.7 4.7 - - - -

6.4 5.5 5.5 5.2 10.6 10.6

4.7 4.7 4.7 4.7 4.7 4.7

0.3 0.3 0.3

0.5 0.5 0.5 0.5

2.6 2.6 2.6 2.7 - -

1.2 1.8 1.8 1.9

5.0 5.0 5.0 - - - - - - -

2.0 2.0 2.0

2.0 2.0 2.0

1.0 1.0 1.0

8.0

10.0

1.2

1.2

13.5 40.5

8.0

2.0

4.0

6.0 2.0

4.0 Effective Total MW 13.9 14.8 17.2 26.5 43.1 49.1 59.9 100.4 100.4 100.4

Reserve

Maintenance

Operation

MW

MW

MW

2.1 2.1 2.1 6.2 9.0 9.0 18.5 18.5 18.5 18.5

1.1 1.1 1.1 5.0 5.0 5.0 13.5 13.5 13.5 13.5

1.0 1.0 1.0 1.2 4.0 4.0 5.0 5.0 5.0 5.0

Surplus/Deficit (N-2) MW 5.6 5.9 7.3 11.7 11.1 12.3 11.1 48.8 45.8 42.4

Page 55: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Power Balance System of Ternate-Tidore

55

55

Supply/Need Unit 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Need

Energy Production

Load Factor

Top Load

Supply

Installed Capacity

Capacity

Derating Capacity

PLN Generator

Manufacture Size

PLTD Kayu Merah 11.5

PLTD Soa Siu 3.9

Lease Generator

Lease P L T D (HSD)

Kayu Merah (Leasetama 1) 5.75

Kayu Merah (Leasetama 2) 6.69

Kayu Merah (Bima Golten) 7.2

Soa Siu (Triagung JA) 2.5

PLN Ongoing & COMMITTED

Tidore (FTP1)

IPP Ongoing & COMMITTED Planned

Additional Capacity

Tidore 2 (Merah Putih)

Tidore 3

Ternate Peaker

GWh

%

MW

MW

MW

MW

PLTD

MW

MW

MW

MW

PLTU

PLTU

PLTU

PLTMG

166.3 192.7 216.3 245.2 274.2 304.4 335.9 370.9 409.5 452.3

72.6 73.3 74.1 74.8 75.6 76.3 77.1 77.9 78.6 79.4

26.2 30.0 33.3 37.4 41.4 45.5 49.7 54.4 59.4 65.0

15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5

13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 10.4

2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 5.1

10.4 10.4 10.4 10.4 10.4 10.4 10.4 10.4 10.4 10.4

2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6

24.0 15.0 17.0 - - - - - -

6.0 4.0 6.0

7.0 4.0 4.0

7.0 5.0 5.0

4.0 2.0 2.0

14

14

14

20 10 10

Effective Total MW 37.0 42.0 44.0 61.0 61.0 71.0 71.0 85.0 85.0 92.4

Reserve

Maintenance

Operation

MW

MW

MW

10.6 10.6 10.6 17.0 17.0 17.0 17.0 17.0 17.0 17.0

7.0 7.0 7.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0

3.6 3.6 3.6 7.0 7.0 7.0 7.0 7.0 7.0 7.0

Surplus/Deficit (N-2) MW 0.24 1.39 0.06 6.59 2.6 8.5 4.3 13.6 8.6 10.4

Page 56: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Power Balance System of Jayapura

56

Supply/Need

Unit 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Need

Energy Production

Load Factor

Top Load

Supply

Installed Capacity

Capacity

PLN Generator

Manufacture Size Unit

PLTD Yarmoch

PLTD Waena

PLTD Sentani

Lease Generator

PLTD Lease (HSD)

PLN Ongoing & COMMITTED

Orya (Genyem)

Jayapura (FTP1) - Holtekamp

IPP Ongoing & COMMITTED

Jayapura - Skouw

Planned PENAMBAHAN Capacity

Jayapura - Holtekamp 2 (Merah Putih)

Jayapura 3

Orya 2

Jayapura Peaker

Jayapura Peaker 2

Amai

GWh

%

MW

MW

MW

PLTD

PLTA

PLTU

PLTU

PLTU

PLTU

PLTA

PLTMG

PLTMG

PLTM

409.5 456.9 515.9 566.2 621.3 681.8 748.3 821.3 901.6 989.9

66.3 66.3 65.9 66.0 66.0 66.0 66.0 66.1 66.1 66.1

70.5 78.6 89.3 98.0 107.5 117.9 129.4 141.9 155.8 171.0

46.6 46.6 46.6 46.6 46.6 46.6 46.6 46.6 46.6 46.6

32.2 32.2 32.2 20.8 16.8 3.0 3.0

7.8 7.8 7.8 7.8 7.8 - - - - -

24.4 24.4 24.4 13.0 9.0 3.0 3.0 - - -

49.8 49.8 37.8

20

20

30

30

25 25

10

40

30

1.4

Effective Total MW 82.0 122.0 110.0 130.8 136.8 154.4 154.4 181.4 206.4 231.4

Reserve:

Maintenance

Operation

MW

MW

MW

8.0 15.0 15.0 25.0 25.0 25.0 25.0 25.0 40.0 40.0

5.0 10.0 10.0 15.0 15.0 15.0 15.0 15.0 25.0 25.0

3.0 5.0 5.0 10.0 10.0 10.0 10.0 10.0 15.0 15.0

Surplus/Deficit (N-2) MW 3.5 28.4 5.7 7.8 4.3 11.5 0.0 14.5 10.6 20.4

Page 57: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Power Balance System of Timika

57

57

Supply/Need Unit 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Need

Energy Production

Load Factor

Top Load

Supply

Installed Capacity

Derating capacity

PLN Generator

Manufacture Size Unit

Caterpillar 0.25 1

Caterpillar 0.54 1

Caterpillar 0.73 2

MAN 0.40 1

Deutz MWM 0.80 2

Perkins 1.20 1

Komatsu 0.70 1

Mitsubhisi 1.20 3

Additional Supply

Sew a PLTD

PT SEWATAMA I 6.0 1

PT SEWATAMA II 1.8 1

DAYA MANUNGGAL DIESEL 3.6 1

Pemda 2.0 1

PLN Ongoing & COMMITTED

Timika (Merah Putih)

Peaker (Relokasi dari Bali)

IPP Ongoing & COMMITTED Planned

Additional Capacity

Timika 3.5 2

Timika Peaker (gas)

GWh

%

MW

MW

PLTD

PLTD

PLTD

PLTD

PLTD

PLTD

PLTD

PLTD

PLTD

PLTD

PLTD

PLTD

PLTD

PLTU

PLTD

PTMPD

PLTMG

109.3 119.7 130.3 140.2 150.9 162.4 174.7 187.9 202.0 217.3

61.1 61.3 61.5 61.8 62.0 62.2 62.4 62.6 62.9 63.1

20.4 22.3 24.2 25.9 27.8 29.8 31.9 34.2 36.7 39.3

23.6 22.0 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2

3.9 4.4 1.8 0.8 0.8 0.3 0.3 0.3 0.3 0.3

10.2 8.6 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2

0.3 0.3

0.5 0.5

1.6 1.6

0.4 0.4

1.6

1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2

0.7 0.7

3.9 3.9

13.4 13.4

6.0 6.0

1.8 1.8

3.6 3.6

2.0 2.0

28.0

5.0 5.0

7.0

5.0 5.0

Effective Total MW 24.7 27.6 37.4 45.4 45.4 50.9 50.9 50.9 55.9 55.9

Reserve

Maintenance

Operation

MW

MW

MW

4.2 4.2 10.2 10.2 10.2 12.0 12.0 12.0 12.0 12.0

3.2 3.2 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0

1.0 1.0 3.2 3.2 3.2 5.0 5.0 5.0 5.0 5.0

Surplus/Deficit MW 0.1 1.1 3.1 9.3 7.4 9.1 6.9 4.6 7.2 4.5

Page 58: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Power Balance System of Nabire

58

58

Supply/Need

Unit

2013 2014 2015 2016

2017

2018 2019

2020 2021 2022

Need

Energy Production

Load Factor

Top Load

Supply

Installed Capacity

Derating capacity

PLN Generator

Manufacture Size Jlh unit

Deutz 0.7 1

Komatsu 0.7 4

Skoda

MTU 1.0 2

MAN 1.0 2

Caterpillar 2.4 1

Deutz

Lease Generator

Lease PLTD

PT. UTAMA PRIMA MANDIRI

PT. PAPUA RAYA MANDIRI

Additional Lease

PLN Ongoing & COMMITTED

Kalibumi I (APBN)

IPP Ongoing & COMMITTED

Nabire - Kalibobo

Planned Additional Capacity

Kalibumi II

Kalibumi III Cascade

Nabire (liquefied Natural Gas)

GWh

%

MW

MW

PLTD

PLTD

PLTD

PLTD

PLTD

PLTD

PLTD

PLTD

PLTD

PLTD

PLTD

PLTM

PLTU

PLTM

PLTM PLTMG

68.5 76.6 85.0 93.5 102.7 112.9 124.1 136.4 150.0 164.9

61.8 62.1 62.4 62.7 63.1 63.4 63.7 64.0 64.3 64.6

12.7 14.1 15.5 17.0 18.6 20.3 22.2 24.3 26.6 29.1

9.2 9.2 9.2 9.2 9.2 7.8 4.3 4.3 4.3 4.3

1.7 1.7 1.7 1.7 1.9 1.8 1.2 1.0 1.0 0.9

0.8 0.8 0.8 0.8 0.8 0.8

0.7 0.7 0.7 0.7 0.7 0.7

0.7 0.7 0.7 0.7 0.7

2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0

2.0 2.0 2.0 2.0 2.0 2.0

2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3

0.8 0.8 0.8 0.8 0.8

8.0 10.0 13.0 15.0 7.00 - - - - -

4.0 4.0 4.0 4.0

4.0 4.0 4.0 4.0

2.0 5.0 7.0 7.0

2.6

14.0

2.5 2.5

2.5 2.5 2.5

5.0 5.0

Effective Total MW 15.5 17.5 20.5 22.5 33.3 30.1 34.7 37.4 42.4 42.5

Reserve

Maintenance

Operation

MW

MW

MW

2.8 2.8 4.6 4.6 9.5 9.5 12.0 12.0 12.0 12.0

2.0 2.0 2.6 2.6 7.0 7.0 7.0 7.0 7.0 7.0

0.8 0.8 2.0 2.0 2.5 2.5 5.0 5.0 5.0 5.0

Surplus/Deficit MW 0.1 0.7 0.4 0.9 5.3 0.3 0.4 1.1 3.8 1.4

Page 59: Electricity Supply Effort Plan PT PLN (Persero) 2013 … Electricity Supply Effort Plan PT PLN (Persero) 2013-2022 Enacted with the Decree of the Minister of ESDM No. 4092K/21/MEM/2013

Development of Small-scale New and Renewable Energy (Energi Baru dan Terbarukan) (EBT)

Planned Small Scale EBT Generator Development (MW)

Cost for Small Scale EBT Generator Development (Million US$)

59

No EBT Generator Satuan 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Total

1 PLTMH Juta US$ 83 105 240 373 593 480 465 390 475 500 3,703

2 PLT Surya Juta US$ 28 468 337 241 160 270 338 338 338 338 2,853

3 PLT Bayu Juta US$ - - 85 34 34 34 51 68 85 85 476

4 PLT Biomass Juta US$ 144 30 45 60 90 120 150 150 150 150 1,089

5 PLT Kelautan Juta US$ - - 4 - 4 12 12 20 20 40 112

6 PLT Bio-Fuel Juta US$ 14 364 364 455 455 545 545 545 545 545 4,377

Total Juta US$ 268 967 1,075 1,162 1,335 1,461 1,561 1,511 1,613 1,658 12,610

No EBT Generator Capacity 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Total

1 PLTMH MW 33 42 96 149 237 192 186 156 190 200 1,481

2 PLT Surya MWp 6 104 75 54 36 60 75 75 75 75 634

3 PLT Bayu MW - - 50 20 20 20 30 40 50 50 280

4 PLT Biomass MW 48 10 15 20 30 40 50 50 50 50 363

5 PLT Kelautan MW - - 1 - 1 3 3 5 5 10 28

6 PLT Bio-Fuel Ribu Kilo Liter 15 400 400 500 500 600 600 600 600 600 4,815

Total MW 87 156 237 243 324 315 344 326 370 385 2,786