PT.PLN(Persero)UIP2B

RENEWABLEENERGYINTERMITTENTINTEGRATIONTOJAVABALISYSTEM

EkoYudo Pramono – GMPLNP2B

Page 2: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

GENERATION READINESSup to AUGUST 2018

Page 3: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id | 03

JAVA BALI SYSTEM OPERATION EVALUATIONEXECTUTIVE SUMMARY up to August 2018

Energy ProductionCumulative : 122.424 GWh, 100,14 % based on Annual

Planning (ROT), Oil Fueled 0,51 %Growth : 4,04 %Generation Availability (EAF)Cumulative : System 83,51 %, Coal Fired Power Plant 79,12 %

CumulativeLoadFactor :80,64%PeakLoad201826.834 MWTuesday,2-10-201818.00

Page 4: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id | 06

JAVA BALI SYSTEM NIGHT PEAK LOAD TREND2013 – OCt. 2018

Page 5: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id | 06

JAVA BALI SYSTEM DAY PEAK LOAD TREND2013 – OCt. 2018

Page 6: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

612MW 1572MW

561MW

22MW

999MW

212MW

33

NIGHT LOAD FLOW28 AUGUST 2018 18:00; 26.035 MW

APB JBR - APB JKB MW APB JTD - APB JBR MW APB JTM - APB JTD MWGI CIANJUR - LEMBUR SITU -276 GI BREBES - PLTU CEP -274 GI CEPU - BOJONEGORO 23GI CIANJUR - BOGOR BARU -38 GI MAJENANG - BANJAR -43 GI SRAGEN - NGAWI -24GI BEKASI - SUKATANI 15 GITET PEMALANG - MANDIRANCAN 926 GITET KRIAN- UNGARAN 322GITET MUARATAWAR - CIBINONG 47 GITET KESUGIHAN - TASIKMALAYA 963 GITET KEDIRI - PEDAN 561GITET SAGULING - CIBINONG -157 1,572 GITET NGIMBANG - UNGARAN 22GI TAMBUN - PONDOK KELAPA -192 PLTU PACITAN - NGUNTORONADI 95GITET MUARATAWAR - CAWANG 534 999GITET TASIKMALAYA - DEPOK 679

612 APB JTM - APB BLI MWGI BANYUWANGI - GILIMANUK 212

212

Page 7: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id | 35

DAY LOAD FLOW28 AUGUST 2018 13:30; 25.463 MW

1185MW

677MW

20MW

1165MW

153MW

1935MW

APB JBR - APB JKB MW APB JTD - APB JBR MW APB JTM - APB JTD MWGI CIANJUR - LEMBUR SITU -262 GI BREBES - PLTU CEP -201 GI CEPU - BOJONEGORO 33GI CIANJUR - BOGOR BARU -38 GI MAJENANG - BANJAR -26 GI SRAGEN - NGAWI -20GI BEKASI - SUKATANI 15 GITET PEMALANG - MANDIRANCAN 1,019 GITET KRIAN- UNGARAN 383GITET MUARATAWAR - CIBINONG 22 GITET KESUGIHAN - TASIKMALAYA 1,143 GITET KEDIRI - PEDAN 677GITET SAGULING - CIBINONG 99 1,935 GITET NGIMBANG - UNGARAN 20GI TAMBUN - PONDOK KELAPA -199 PLTU PACITAN - NGUNTORONADI 71GITET MUARATAWAR - CAWANG 567 1,165GITET TASIKMALAYA - DEPOK 981

1,185 APB JTM - APB BLI MWGI BANYUWANGI - GILIMANUK 153

153

Page 8: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id | 06

JAVA BALI SYSTEM ENERGY PRODUCTION2013 – Aug 2018

Page 9: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id | 06

JAVA BALI SYSTEM LOAD FACTOR2013 – Aug. 2018

Page 10: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id | 16

LOADSTACKING & COMPOSITION28 AUGUST 2018

Data Source: Rapsodi P2B 2018

Page 11: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id | 19

GENERATION ENERGY PRODUCTIONs.d. August 2018

Data Source : P2B Annual Planning & Settlement Department

GWh CONTRIBUTION (%) GWh CONTRIBUTION (%)

Indonesia Power 45.173 36,90% 47.021 38,46% 96,1% 2,84%

Pemb. Jawa Bali 33.319 27,22% 31.867 26,07% 104,6% 6,09%

UP Tj Jati B 12.737 10,40% 13.275 10,86% 95,9% 11,33%

IPP 31.194 25,48% 30.085 24,61% 103,7% 0,96%

HYDRO 4.268 3,49% 4.835 3,96% 88,3% -21,25%

GEOTHERMAL 6.402 5,23% 6.334 5,18% 101,1% 2,37%

COAL 82.406 67,31% 85.550 69,98% 96,3% 4,80%

BBG 20.513 16,76% 20.371 16,66% 100,7% 4,12%

LNG 7.492 6,12% 5.120 4,19% 146,3% 5,69%

CNG 716 0,58% 0 0,00% - 39,16%

SUBTOTAL NON-OIL FUELED 121.796 99,49% 122.210 99,97% 99,7% 3,56%

MFO 229 0,19% 30 0,02% 761,2% 647,67%

HSD 398 0,33% 8 0,01% 5190,1% 1050,60%

SUBTOTAL OIL FUELED 628 0,51% 38 0,03% 1660,5% 861,33%

TOTAL SYSTEM 122.424 100,00% 122.248 100,00% 100,14% 4,04%

POWER PLANT

ACTUAL ANNUAL PLANNING%

PLANNING GROWTH (%)

UTILITY COMPANY

PRIMARY ENERGY

Page 12: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

THE INFLUENCE OF INTERMITTENT RENEWABLE POWER PLANTS

Page 13: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

Background

1. 35000 MW project is to support economic growth as main infrastructure

2. Nationwide energy mix from renewable energy is targeted at 23% at 2025. (25% in electricity utility)

3. Renewable Energy technology has been commercially mature

4. Government target in lowering average system cost (BPP)

Page 14: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

Scope

1. Capacity of intermittent renewable power plant which can be operated in Java Bali system and still keep maintaining reliability/security, quality and economic aspects.

2. Power system operation considering intermittent power plant integration.

Page 15: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

System Operation Criteria

ECONOMIC

QUALITYRELIABLE

Reliability/security:System ability to withstand unplanned condition without any power outageQuality:System ability to keep all constrain to meet the electricity qualityEconomic:Power system optimization without violation in reliability and quality

Page 16: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

SUB SYSTEM SUPPLY CONDITIONNIGHT PEAK LOAD 26.834 MW02 OCTOBER 2018 18.00 WIB

Sumber Data : Data Logsheet BOPS P2BAPB JAKBAN APB JABAR APB JATENG APB JATIM APB BALI

63%

15%

22%

53%

47%

73%

27%

50%

50%

34%

66%

53%

36%

11%

82% 18%

48%

49%

3%

81%

19%

79% 21%

71%29%

86% 14%

45%

19%36%

62%

19%

19%

49%

51%

84% 16%

80% 20%

80%

20%

72% 27%

1%KITCLBWG- KITIPBALI- KabelLaut

KRIAN3-4KITGRSIK- GRESIK1-

KRIAN1-2KITRBANG- KITTBROK-UNGAR3- TJATI1-2

KITTJWAR-NGIMBANG1-2PEDAN1-2

KITPCTAN- KEDIRI2-3

KITCLCAP- KITMRICA- KIT

TBROK- UNGAR1-2

KEDIRI1

KITCEPWR-MANDIRANCAN1-2 KITGRATI- GRATI1-2-

PAITON1-2-3

KITDRJAT3- TASIK1-2

KITKMJNG- KITDRJAT-UJUNGBERUNG1-2

KITIDMYU-KITJTLHR-CIBATU3-4

KITBKPWR- KITCLNDO- CIBATU1-2

KITPTUHA-CIRATA1-2

KITPRIOK-CAWANG1-BEKASI2-4

CIBINONG3-BEKASI1-3

KITPRATU-KITSALAK-

CIBINONG1-2- DEPOK 2

KITMKRNG-GANDUL1-3

KITLNTAR- BALARAJA3-4 -KEMBANGAN1-2

DEPOK1 -CAWANG2-3

KITWYNDU-BANDUNGSELATAN1-2

KITCLGON- KITLBUAN- CILEGON

BARU1-2

BALARAJA1-2

GANDUL2-4SURALAYA1-2-CiILEGONBARU3

70%

7%

23%

47%

48%

5%

82% 18%

52%

34%

14%58%

16%

26%

67%

18%

15% 86%14%

45%

55%

78%

14%

8%

27%

73%

PEDAN3-4

APB BALI

Page 17: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

MUST RUN GENERATION

0

5000

10000

15000

20000

25000

30000

0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00

TOPEnergiPrimer TOPKontrak Penyaluran Beban

Page 18: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

System Reliability

1. Reliability Criteria : maintain reserve margin at minimum 30%Reserve Margin 15 September 2017 :RM=(Nett Capacity-Peak Load)/Peak Load= (33.439 – 25.225)/ 25.225 = 32,7%

2. Normal System Operation Criteria : Normal Criteria is Spinning Reserve fulfilled at least as same as the biggest unit size of power plant

in Java Bali system. (Grid Code OC 2.2) In Java Bali = 815 MW

3. Alert Condition Criteria : maintain System Reserve at least as twice as the biggest unit size. (1630 MW)

4. Defense Scheme Protection : Manual Load Shedding (f<49,5 Hz)UFR (48,4 < f < 49,0 Hz, in 7 steps)Islanding Mode (48,1 < f < 48,3 Hz)Over Generation SheddingOver Load Shedding

5. Grid Limitation / Constraint :network configuration (building sub-system)

Page 19: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

Service Quality

1.Voltage Stability (Grid Code OC 4.0) :150 kV and 66 kV system : +5% and -10%500 kV system : +/- 5%

How to keep voltage stability :- Reactive power management (generation side and compensation)- Transmission operation management

2. Frequency Stability (Grid Code OC 3.0) : 49.80 – 50.20 Hz (97,7% achieved in one year 2016)Load Frequency Control ( approx ± 250 MW )Governor Free Mode ( participant < 30% of 250 unit )

Page 20: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

Economic Operation of Java Bali System

System Constraint :1. Stability (System Inertia)2. Primary energy Take or Pay Contract and Pipe Line Pack limitation (gas,

geothermal)3. Transmission congestion 3. Long distance power transfer (voltage stability)4. Losses

Power Plant Constraint :1. Power plant mode of operation (base load, load follower or peaker)2. Availibility condition of power plant (FOR, derating)3. Minimum technical loading

Economic Dispatch :1. Hydro thermal coordination2. Merit order

Page 21: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

Defect to FrequencyOne characteristic of Wind Power Plant is lowestcertainty of energy availability compared to other typeof power plant thus variation of its load will affectsystem frequency

Solar power plant load is extremely fluctuated (fullload to no load in seconds) thus will significantlyaffect frequency quality.

Sumber :SMA German, 2017

Solar PV

Household

Wind Generation

Page 22: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

Renewable Energy – Constraint System

Types or renewable energy power plant:− Planned control /dispatchable (hydro/PLTA,geothermal/PLTP)− Unplanned control /intermittent /non-dispatchable

(solar/PLTS,wind/PLTB),whichneedtobebacked-upbysystemwith:

• Load Frequency Control 200MW• Spinningreserve (1biggestunit – 813 MW)with response rate at5MWperminute

• Standbyreserve (2xspinningreserve – 1.626 MW),with responsetime around 30minutes

• Peaker (GasTurbin/PLTGopencycle with response time 10minutes)

Page 23: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

Renewable Energy – Grid Constraint• In sub-system, capacity of intermittent units is limited by capability of inter-bus transformer (IBT) with residual

capacity equal with capacity of intermittent unit• Grid capability of sub system should be maintain its reliability as N-1 therefore adding intermittent unit will be

limited to N-1 of grid• Thus, intermittent unit can only be connected to 150kV or 20kV grid and not to 500kV gridExample :

• Pedan Subsistem : could only accommodate maximum 200MW (PPA Wind/PLTB Samas 70 MW)• Cirata Subsistem : maximum 100 MW• Bali Subsistem : maximum 50 MW• Madura Island (Krian Subsistem 1,2) : maximum 10 MW

• Intermittent unit could not provide adequate reactive power thus can not be transmitted in long distance• Capacity of intermittent unit can be allowed if system reserve is ready

Page 24: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

Intermittency

- Intermittent units are non-dispatchable,

- Operation depends on energy source availability which is uncontrollable,- Intermittent power plant penetration to power system will affect :

§ Quality of frequency and voltage

§ Economic aspect§ System stability

Page 25: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

Stability

One characteristic of Intermittent unit is not having inertia thuspenetration to grid will lower system inertiaImpact on non intermittent unit trip when intermittent unit is inoperation is higher than when intermittent unit is not in operation.Intermittent unit needs energy storage as pumped storage or battery

Page 26: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

Economic Aspect

- Because of Intermittent Unit impact on system frequency, it need tobe prepared a Special Reserve (Special Spinning Reserve) tomaintain system reliability.

- Special reserve comes from thermal unit with very fast ramp rate(Gas/PLTG and Diesel/PLTD) which has very high operation cost.

- Consequently with this special reserve, average cost of operationwill increase

Page 27: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

Solar Energy Potential

Page 28: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

Wind Power Plant Potentioal

Sumber :windprospecting

Page 29: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

Intermittent Power Plant Proposal Proposed (MoU FS)TypeofPowerPlant PNominal(MW) Rencana LokasiSolarPowerPlant(PLTS) 100 GI(Substation)150kVNegara,BaliSolarPowerPlant(PLTS) 100 GI150kVAmplapura, BaliSolarPowerPlant(PLTS) 100 GI150kVKubu,BaliSolarPowerPlant(PLTS) 100 GI150kVCirataSolarPowerPlant(PLTS) 600(150) (SwitchingStationLineHarapanIndah– KandangSapi)SolarPowerPlant(PLTS) 500 Scaterred inJavaBaliWindPowerPlant(PLTB) 70 GI150kVWates,SamasWindPowerPlant(PLTB) 250 SukabumiWindPowerPlant(PLTB) 20 P. NusaPenida/NusaLembongan/NusaCeninganWindPowerPlant(PLTB) 150 GarutWindPowerPlant(PLTB) 103 LebakWindPowerPlant(PLTB) 102 Ciemas,SukabumiHybridPLTSdan PLTB 220 TegalHybridPLTSdan PLTB 140 TubanPLTS &PLTD/MG(Hybrid) MaduraIsolasiPLTS &PLTD/MG(Hybrid) Gili KetapangPLTS &PLTD/MG(Hybrid) BaweanPLTS &PLTD/MG(Hybrid) Karimun, JawaTengahTOTAL 2.555

Page 30: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

Fast response and flexible power plant to compensate RE Intermittent

Load

&NetLoa

d(M

W)

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

14,000

16,000

18,000

20,000

22,000

24,000

26,000

28,000

30,000

32,000

34,000

Load, Wind & Solar Profiles --- Base ScenarioJanuary 2020

Net_Load Load Wind Total Solar

Wind&Solar(M

W)

6,700 MW in 3-hours

7,000 MW in 3-hours

12,700 MW in 3-hours

NetLoad=Load- Wind- Solar

Page 31: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

Defect to Voltage

Voltage from Wind Power Plantdepends on wind speed, thus it isunpredictable

The entry of PV Power Plant into grid couldmake voltage range variate higher than withoutpenetration of PV Power plant

Sumber : - ELP and Power Grid International- Researchgate 2016

Page 32: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

Voltage RegulatorAccording to voltage characteristic at intermittent power plant, it will beneeded voltage regulator (Volt-VAR Control). Volt-VAR control will actas profile voltage buffer and supporting electromechanical voltageregulator.

Sumber : ELP and Power Grid International

Page 33: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

1. Downward ramping capability Thermal resources operating to serve loads at night must be ramped downward and potentially shut down to make room for a significant influx of solar energy after the sun rises.

2. Minimum generation flexibilityOvergeneration may occur during hours with high renewable production even if thermal resources and imports are reduced to their minimum levels. A system with more flexibility to reduce thermal generation will incur less overgeneration.

3.Upwardrampingcapability

Thermalresourcesmustrampquicklyfromminimumlevelsduringdaytimehoursandnewunitsmayberequiredtostarttomeethighnetpeakdemandoccurringshortlyaftersundown.

4.Peakingcapability

Thesystemwillneedenoughresourcestomeetthehighestnet-loadswithsufficientreliability

Power plant characteristic to compensate Intermittent RE Power Plant

Page 34: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

60MW

Back Up Unit

Because of renewable power plant intermittency, fast response power plants (GasFired Power Plant/PLTG or Diesel Fired Power Plant/PLTD) are needed as a backup when the load of RE power plant is decreasing

PLTS Unit Back Up

TML

60MW

Page 35: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

Example Duck Curve in California regarding withIntermittent Renewable penetration

Page 36: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

Maximum capacity in one time

Maximum capacity of Intermittent Units are limited by: 1. Ramp up/ down ability of thermal power plant2. Thermal power plant technical minimum load + regulator power plant3. Start up/down speed of thermal power plant4. Capacity of power plant which can act as frequency regulator

Power Plant RampRate

CoalFiredSteamPowerPlant(PLTU) 1– 5MW/minutes

GasFiredSteamPowerPlant(PLTGU) 5– 8MW/minutes

GasFiredPowerPlant(PLTG) 15– 20MW/minutes

HydroPowerPlant(PLTA) 20– 50MW/minutes

Page 37: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

Quota of acceptable Intermittent Power Plant capacity to be integrated to Java Bali System

Phase Year Load(MW)

RM Quota(MW)

Constraint

∆AverageCost

Prasyarat

1 2018– 2020 30.792 36% 200 LFC ≈ LFC

2 2020– 2022 34.581 38% 1000 Spinningreserve,MustRununit

+

+AGC,WeatherMonitoringSystem,FastResponse(10minutesfullload)andflexible

3 2022– 2024 38.150 44% 3000 Peakerpowerplantcapacity

+PumpStorage UpperCisokan,StorageSystem,FSRU/CNGTerminal

4 >2024 44.518 30%20%PeakLoad

USCCFSPPTML,FastResponse Unit

- +PowerMarket

Page 38: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

Java Bali System Duck Curve

19524

22906

25665

31007

23424

27482

30792

44518

15000

20000

25000

30000

35000

40000

45000

0.30

1.00

1.30

2.00

2.30

3.00

3.30

4.00

4.30

5.00

5.30

6.00

6.30

7.00

7.30

8.00

8.30

9.00

9.30

10.00

10.30

11.00

11.30

12.00

12.30

13.00

13.30

14.00

14.30

15.00

15.30

16.00

16.30

17.00

17.30

18.00

18.30

19.00

19.30

20.00

20.30

21.00

21.30

22.00

22.30

23.00

23.30

24.00

2020

ENERGIPLTS

2027

2017

Page 39: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

www.pln.co.id |

Recommendation1. Building cooperation and knowledge sharing with well-experienced Sister Company

(abroad)2. Grid Code Revision 3. Weather Monitoring System is needed4. Fast Response (Pump Storage)5. Flexibility in Gas supply/facility (FSRU/CNG Terminal)6. Power plants with lower technical minimum load and capability of start/stop operation7. Transmission bottlenecking clearance8. Electric Vehicle usage promotion (Green to Green)9. System Stability (HVDC Link)10. Evolving existing energy transaction to power market

Page 40: (materi2)MATERI EYP-(RENEWABLE ENERGY INTERMITTENT ...elektro.ub.ac.id/fortei/wp-content/uploads/2018/10/materi2MATERI... · pt. pln (persero) uip2b renewable energy intermittent

Listrik untuk Kehidupan yang Lebih Baik

TERIMA KASIHTHANK YOU