EmestJ Kapopo uos, Jr. DUKEY 526 South Church Street ENERGYe Charotte, NC 28202 Mailing Address: Mail Code ECO7H/P.O. Box 1006 Chadotte, NC 28201-1006 704-382-8162 704-382-6056 fax SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 UPON REMOVAL OF ENCLOSURE 1 LETTER IS UNCONTROLLED Serial: RA-14-0023 10 CFR 50.90 November 6, 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 CATAWBA NUCLEAR STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-413 AND 50-414 / RENEWED LICENSE NOS. NPF-35 AND NPF-52 MCGUIRE NUCLEAR STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-369 AND 50-370 / RENEWED LICENSE NOS. NPF-9 AND NPF-17 OCONEE NUCLEAR STATION, UNIT NOS. 1, 2 AND 3 DOCKET NO. 50-269, 50-270 AND 50-287 / RENEWED LICENSE NOS. DPR-38, DPR-47 AND DPR-55 SUBJECT: LICENSE AMENDMENT REQUEST - CYBER SECURITY PLAN IMPLEMENTATION SCHEDULE MILESTONE 8 REFERENCES: 1. Duke Energy letter, Oconee Nuclear Station, Units 1, 2 & 3, McGuire, Units 1 and 2, and Catawba, Units 1 and 2, Response to Request for Additional Information Regarding License Amendment Request for Cyber Security Plan, dated April 15, 2011 (ADAMS Accession No. ML1 1109A074) 2. NRC letter, Catawba Nuclear Station, Units 1 and 2, McGuire Nuclear Station, Units 1 and 2, and Oconee Nuclear Station Units 1, 2, and 3 - Issuance of Amendments Regarding Cyber Security Plans Based on Nuclear Energy Institute 08-09, Revision 6 (TAC Nos. ME4529, 4530, 4531, 4532, 4533, 4534, 4435), dated August 31, 2011 (ADAMS Accession No. ML1 1216A064) Pursuant to 10 CFR 50.90, Duke Energy Carolinas, LLC, referred to henceforth as "Duke Energy", hereby requests a license amendment pertaining to the Cyber Security Plan (CSP) implementation schedule, including a proposed revision to the existing Physical Protection license condition for the associated facility operating licenses. Reference 1 provided, in part, the Revised Duke Energy Cyber Security Plan (Enclosure 4 of Reference 1) and the associated revised CSP. implementation schedule (Enclosure 3 of SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 UPON REMOVAL OF ENCLOSURE 1 LETTER IS UNCONTROLLED

DUKEY ENERGYe NCScott Batson Chris Wasik Sandy Severance Steve Newman Eddie Cleveland ONS Master File 801.01 - ON03DM J. E. Smith (For ONS Licensing/Nuclear Records) SECURITY-RELATED

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DUKEY ENERGYe NCScott Batson Chris Wasik Sandy Severance Steve Newman Eddie Cleveland ONS Master File 801.01 - ON03DM J. E. Smith (For ONS Licensing/Nuclear Records) SECURITY-RELATED

EmestJ Kapopo uos, Jr.DUKEY 526 South Church StreetENERGYe Charotte, NC 28202

Mailing Address:Mail Code ECO7H/P.O. Box 1006Chadotte, NC 28201-1006

704-382-8162

704-382-6056 fax

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390UPON REMOVAL OF ENCLOSURE 1 LETTER IS UNCONTROLLED

Serial: RA-14-0023 10 CFR 50.90November 6, 2014

U.S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, DC 20555-0001

CATAWBA NUCLEAR STATION, UNIT NOS. 1 AND 2DOCKET NOS. 50-413 AND 50-414 / RENEWED LICENSE NOS. NPF-35 AND NPF-52

MCGUIRE NUCLEAR STATION, UNIT NOS. 1 AND 2DOCKET NOS. 50-369 AND 50-370 / RENEWED LICENSE NOS. NPF-9 AND NPF-17

OCONEE NUCLEAR STATION, UNIT NOS. 1, 2 AND 3DOCKET NO. 50-269, 50-270 AND 50-287 / RENEWED LICENSE NOS. DPR-38, DPR-47AND DPR-55

SUBJECT: LICENSE AMENDMENT REQUEST - CYBER SECURITY PLANIMPLEMENTATION SCHEDULE MILESTONE 8

REFERENCES:

1. Duke Energy letter, Oconee Nuclear Station, Units 1, 2 & 3, McGuire, Units 1 and 2, andCatawba, Units 1 and 2, Response to Request for Additional Information RegardingLicense Amendment Request for Cyber Security Plan, dated April 15, 2011 (ADAMSAccession No. ML1 1109A074)

2. NRC letter, Catawba Nuclear Station, Units 1 and 2, McGuire Nuclear Station, Units 1and 2, and Oconee Nuclear Station Units 1, 2, and 3 - Issuance of AmendmentsRegarding Cyber Security Plans Based on Nuclear Energy Institute 08-09, Revision 6(TAC Nos. ME4529, 4530, 4531, 4532, 4533, 4534, 4435), dated August 31, 2011(ADAMS Accession No. ML1 1216A064)

Pursuant to 10 CFR 50.90, Duke Energy Carolinas, LLC, referred to henceforth as "DukeEnergy", hereby requests a license amendment pertaining to the Cyber Security Plan (CSP)implementation schedule, including a proposed revision to the existing Physical Protectionlicense condition for the associated facility operating licenses.

Reference 1 provided, in part, the Revised Duke Energy Cyber Security Plan (Enclosure 4 ofReference 1) and the associated revised CSP. implementation schedule (Enclosure 3 of

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390UPON REMOVAL OF ENCLOSURE 1 LETTER IS UNCONTROLLED

mtr1
Cross-Out
mtr1
Cross-Out
Page 2: DUKEY ENERGYe NCScott Batson Chris Wasik Sandy Severance Steve Newman Eddie Cleveland ONS Master File 801.01 - ON03DM J. E. Smith (For ONS Licensing/Nuclear Records) SECURITY-RELATED

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390UPON REMOVAL OF ENCLOSURE 1 LETTER IS UNCONTROLLED

U.S. Nuclear Regulatory CommissionRA-14-0023Page 2

Reference 1). In Reference 2, the NRC approved the CSP and associated implementationschedule and added a license condition to each of the facility operating licenses to require thelicensees to fully implement and maintain in effect all provisions of the NRC-approved CSP.

The CSP implementation schedule provided in Reference 1 listed completion dates forMilestones 8 and 9. Milestone 8 pertains to the date that complete operational and managementcontrols, as provided in NEI 08-09, Revision 6, Appendix E, will be achieved. Milestone 9pertains to the date that full implementation of the CSP for all Safety, Security, and EmergencyPreparedness (SSEP) functions will be achieved. As stated in Reference 2, subsequentchanges to the NRC-approved CSP implementation schedule require prior NRC approvalpursuant to 10 CFR 50.90. Accordingly, pursuant to the provisions of 10 CFR 50.4 and10 CFR 50.90, Duke Energy is submitting this request for an amendment to the facility operatinglicenses for the stations listed in this letter to propose a change in the completion date forMilestone 8.

Enclosure 1 provides an evaluation of the proposed change. Marked-up facility operatinglicense pages for the Physical Protection license condition for the affected plants, reflecting thecommitment change proposed in this submittal, are included as Enclosure 2. Enclosure 3provides a complete, redacted version of Enclosure 1. This submittal also contains a revisedregulatory commitment as identified in Enclosure 4.

The proposed changes have been evaluated in accordance with 10 CFR 50.91 (a)(1) usingcriteria in 10 CFR 50.92(c), and it has been determined that the proposed changes involve nosignificant hazards consideration. The bases for these determinations are included inEnclosure 1.

NRC approval of this license amendment application is requested prior to June 30, 2015. Onceapproved, the license amendments will be implemented within 30 days.

Enclosure 1 contains security-related information (SRI) to be withheld from public disclosure inaccordance with 10 CFR 2.390. Enclosures 2, 3, and 4 are not SRI documents and are notmarked as such in this submittal.

In accordance with 10 CFR 50.91, Duke Energy is notifying the States of North Carolina andSouth Carolina of this license amendment request by transmitting a copy of this letter andenclosures to the designated State Officials. Should you have any questions concerning thisletter, or require additional information, please contact Julie Olivier, Manager - Nuclear FleetLicensing, at 980-373-4045.

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390UPON REMOVAL OF ENCLOSURE 1 LETTER IS UNCONTROLLED

mtr1
Cross-Out
mtr1
Cross-Out
Page 3: DUKEY ENERGYe NCScott Batson Chris Wasik Sandy Severance Steve Newman Eddie Cleveland ONS Master File 801.01 - ON03DM J. E. Smith (For ONS Licensing/Nuclear Records) SECURITY-RELATED

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390UPON REMOVAL OF ENCLOSURE 1 LETTER IS UNCONTROLLED

U.S. Nuclear Regulatory CommissionRA- 14-0023Page 3

I declare under penalty of perjury that the foregoing is true and correct. Executed onNovember 6, 2014.

Sincerely,

Ernest J. Kapopoulos, Jr.Vice President - Corporate Governance and Operations Support

MKL/NDE

Enclosures:1. Evaluation of the Proposed Change2. Proposed Facility Operating License Changes (Mark-up)3. Evaluation of the Proposed Change (Redacted)4. Revised Cyber Security Plan Implementation Schedule (Milestone 8)

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390UPON REMOVAL OF ENCLOSURE 1 LETTER IS UNCONTROLLED

mtr1
Cross-Out
mtr1
Cross-Out
Page 4: DUKEY ENERGYe NCScott Batson Chris Wasik Sandy Severance Steve Newman Eddie Cleveland ONS Master File 801.01 - ON03DM J. E. Smith (For ONS Licensing/Nuclear Records) SECURITY-RELATED

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390UPON REMOVAL OF ENCLOSURE 1 LETTER IS UNCONTROLLED

U.S. Nuclear Regulatory CommissionRA-14-0023Page 4

cc: USNRC Region IIUSNRC Resident Inspector - CNSUSNRC Resident Inspector - MNSUSNRC Resident Inspector - ONSG. E. Miller, NRR Project Manager - CNS & MNSJ. R. Hall, NRR Project Manager - ONSW. L. Cox, Ill, Chief, North Carolina Department of Health and Human Services, RPSection (NC)S. E. Jenkins, Manager, Radioactive and Infectious Waste Management (SC)

SECURITY-RELATED INFORMATION -WITHHOLD UNDER 10 CFR 2.390UPON REMOVAL OF ENCLOSURE 1 LETTER IS UNCONTROLLED

mtr1
Cross-Out
mtr1
Cross-Out
Page 5: DUKEY ENERGYe NCScott Batson Chris Wasik Sandy Severance Steve Newman Eddie Cleveland ONS Master File 801.01 - ON03DM J. E. Smith (For ONS Licensing/Nuclear Records) SECURITY-RELATED

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390UPON REMOVAL OF ENCLOSURE 1 LETTER IS UNCONTROLLED

U.S. Nuclear Regulatory CommissionRA- 14-0023Page 5

bcc: Chris NolanJulie OlivierMatt CoulterJoe FriscoLara NicholsDavid CummingsFile: (Corporate)Electronic Licensing Library (ELL)

Kelvin HendersonRandy HartTolani OwusuAndy GullionNorth Carolina Municipal Power Agency No. 1 (NCMPA)Piedmont Municipal Power Agency (PMPA)North Carolina Electric Membership Corporation (NCEMC)CNS Master File 801.01 - CN04DMT. K. Pasour (For CNS Licensing/Nuclear Records)

Steven CappsJeff RobertsonJulius BryantMike VanhoyMNS Master File 801.01 - MG01 DMK. L. Crane (For MNS Licensing/Nuclear Records)

Scott BatsonChris WasikSandy SeveranceSteve NewmanEddie ClevelandONS Master File 801.01 - ON03DMJ. E. Smith (For ONS Licensing/Nuclear Records)

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390UPON REMOVAL OF ENCLOSURE 1 LETTER IS UNCONTROLLED

mtr1
Cross-Out
mtr1
Cross-Out
Page 6: DUKEY ENERGYe NCScott Batson Chris Wasik Sandy Severance Steve Newman Eddie Cleveland ONS Master File 801.01 - ON03DM J. E. Smith (For ONS Licensing/Nuclear Records) SECURITY-RELATED

Enclosure 2 toRA-14-0023

Enclosure 2

RA-14-0023

Proposed Facility Operating License Changes (Mark-up)

Page 7: DUKEY ENERGYe NCScott Batson Chris Wasik Sandy Severance Steve Newman Eddie Cleveland ONS Master File 801.01 - ON03DM J. E. Smith (For ONS Licensing/Nuclear Records) SECURITY-RELATED

Enclosure 2 toRA-14-0023Page 1 of 7

Catawba Nuclear Station, Unit No. 1,Docket No. 50-413 / Renewed License No. NPF-35

-6-

E. Physical Protection

Duke Energy Carolinas, LLC shall fully implement and maintain in effect allprovisions of the Commission-approved physical security, training andqualification and safeguards contingency plans including amendments made

as supplemented pursuant to provisions of the Miscellaneous Amendments and Searchby a change Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to theapproved by Uthorty of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans,License *ch contains safeguards information protected under 10 CFR 73.21, isAmendment No. entid: "Duke Energy Physical Security Plan," Revision 8 submitted by letter

dated y 17, 2007.lzzz

Duke Ene Carolinas, LLC shall fully Implement and maintain in effect allprovisions of t Commission-approved cyber security plan (CSP), includingchanges made p suant to the authority of 10 CFR 50.90 and 10 CFR50.54(p). The Duk nergy Carolinas, LLC CSP was approved by LicenseAmendment No. 2 -

F. Reporting to the Commission Deleted by Amendment No. 230

G. The licensees shall have and maintain financial protection of such type and in suchamounts as the Commission shall require in accordance with Section 170 of theAtomic Energy Act of 1954, as amended, to cover public liability claims.

3. This renewed license is effective as of the date of issuance and shall expire at midnight onDecember 5, 2043.

FOR THE NUCLEAR REGULATORY COMMISSION

Original Signed By: J. E. Dyer

J. E. Dyer, Director

Office of Nuclear Reactor Regulation

Attachments:

1. Appendix A - Technical Specifications2. Appendix B - Additional Conditions3. Appendix C - Antitrust Conditions

Date of Issuance: December 5, 2003

Renewed License No. NPF-35Amendment No. -6f-

Page 8: DUKEY ENERGYe NCScott Batson Chris Wasik Sandy Severance Steve Newman Eddie Cleveland ONS Master File 801.01 - ON03DM J. E. Smith (For ONS Licensing/Nuclear Records) SECURITY-RELATED

Enclosure 2 toRA-14-0023Page 2 of 7

Catawba Nuclear Station, Unit No. 2,Docket No. 50-414 / Renewed License No. NPF-52

-6-

E. Physical Protection

, as supplementedby a changeapproved byLicenseAmendment No.

Duke Energy Carolinas, LLC shall fully implement and maintain in effect allprovisions of the Commission-approved physical security, training andqualification and safeguards contingency plans including amendmentsmade pursuant to provisions of the Miscellaneous Amendments andSearch Requirements revisions to 10 CFR 73.55 (51 FR 27817 and27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). Thecombined set of plans, which contains safeguards information protectedunder 10 CFR 73.21, is entitled: "Duke Energy Physical Security Plan,"Revision 8 submitted by letter dated May 17, 2007.

zzz Duke Energy Carolinas, LLC shall fully implement and maintain in effect allprovisions of the Commission-approved cyber security plan (CSP), includingchanges made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).The Duke Energy Carolinas, LLC CSP was approved by License AmendmentNo. 262.

F. Reporting to the Commission Deleted by Amendment No. 226

G. The licensees shall have and maintain financial protection of such type and insuch amounts as the Commission shall require in accordance with Section 170 ofthe Atomic Energy Act of 1954, as amended, to cover public liability claims.

3. This renewed license is effective as of the date of issuance and shall expire at midnighton December 5, 2043.

FOR THE NUCLEAR REGULATORY COMMISSION

Original Signed By: J. E. Dyer

J. E. Dyer, DirectorOffice of Nuclear Reactor Regulation

Attachments:

1. Appendix A - Technical Specifications2. Appendix B -Additional Conditions3. Appendix C - Antitrust Conditions

Date of Issuance: December 5, 2003

Renewed License No. NPF-52Amendment No. 262

,4

69FFOGteGliayieffeFuateraaept9F:RuBF 28 Aldii

Page 9: DUKEY ENERGYe NCScott Batson Chris Wasik Sandy Severance Steve Newman Eddie Cleveland ONS Master File 801.01 - ON03DM J. E. Smith (For ONS Licensing/Nuclear Records) SECURITY-RELATED

Enclosure 2 toRA-1 4-0023Page 3 of 7

McGuire Nuclear Station, Unit No. 1,Docket No. 50-369 / Renewed License No. NPF-9

-4A-

D. Physical Protection

Duke Energy Carolinas, LLC shall fully implement and maintain in effect allprovisions of the Commission-approved physical security, training andqualification and safeguards contingency plans including amendments madepursuant to provisions of the Miscellaneous Amendments and SearchRequirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the

as supplemented authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans,byaehch ontains safeguards information protected under 10 CFR 73.21, isbya change Itled: "Duke Energy Physical Security Plan' submitted by letter dated

approved by Selmber 8. 2004. and supplemented on September 30, 2004, October 15,License 2004A.ctober 21, 2004, and October 27, 2004.

Amendment No.Duke Ener Carolinas, LLC shall fully implement and maintain in effect allprovisions of Commission-approved cyber security plan (CSP), includingchanges made p uant to the authority of 10 CFR 50.90 and 10 CFR50.54(p).The Duke ergy Carolinas, LLC CSP was approved by LicenseAmendment No. 2

E. Deleted by Amendment No. 233.

Renewed License No. NPF-9Amendment No. -'

Page 10: DUKEY ENERGYe NCScott Batson Chris Wasik Sandy Severance Steve Newman Eddie Cleveland ONS Master File 801.01 - ON03DM J. E. Smith (For ONS Licensing/Nuclear Records) SECURITY-RELATED

Enclosure 2 toRA-1 4-0023Page 4 of 7

McGuire Nuclear Station, Unit No. 2,Docket No. 50-370 / Renewed License No. NPF-17

-5-

4. Procedures for implementing integrated fire response strategy5. Identification of readily-available pre-staged equipment6. Training on integrated fire response strategy7. Spent fuel pool mitigation measures

C) Actions to minimize release to include consideration of:1. Water spray scrubbing2. Dose to onsite responders

D. Physical Protection

Duke Energy Carolinas, LLC shall fully implement and maintain in effect allprovisions of the Commission-approved physical security, training andqualification and safeguards contingency plans including amendments madepursuant to provisions of the Miscellaneous Amendments and SearchRequirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to theauthority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans,which contains safeguards information protected under 10 CFR 73.21, is

as supplemented entitled: -Duke Energy Physical Security Plan" submitted by letter datedby a change September 8. 2004, and supplemented on September 30, 2004, October 15,approved by T004. October 21, 2004, and October 27, 2004.LicenseAmendment No. D ke Energy Carolinas, LLC shall fully implement and maintain in effect all

pr visions of the Commission-approved cyber security plan (CSP), includingZZZ ch ges made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The uke Energy Carolinas, LLC CSP was approved by License Amendment No.244"

E. Deleted by Amendment No. 215.

F. The licensee shall have and maintain financial protection of such type and insuch amounts as the Commission shall require in accordance with Section 170of the Atomic Energy Act of 1954, as amended, to cover public liability claims.

G. In accordance with the Commission's direction in its Statement of Policy,Ucensina and Reaulatorv Policy and Procedures for Environmental Protection:Uranium Fuel Cycle Imoacts. October 29, 1982, this renewed operating licenseis subject to the final resolution of the pending litigation involving Table S-3.See, Natural Resources Defense Council v. NRC. No. 74-1586 (D.C. cir. April27, 1982).

H. The licensee is authorized to receive from the Oconee Nuclear Station, Units 1,2, and 3, possess, and store irradiated Oconee fuel assemblies containingspecial nuclear material, enriched to not more than 3.24% by weight U-235subject to the following conditions:

a. Oconee fuel assemblies may not be placed in the McGuire Nuclear Station,Unit 1 and 2, reactors.

b. Irradiated fuel shipped to McGuire Nuclear Station, Units 1 and 2, fromOconee shall have been removed from the Oconee reactor no less than270 days prior to shipment.

Renewed License No. NPF-1 7Amendment No. 2*

Page 11: DUKEY ENERGYe NCScott Batson Chris Wasik Sandy Severance Steve Newman Eddie Cleveland ONS Master File 801.01 - ON03DM J. E. Smith (For ONS Licensing/Nuclear Records) SECURITY-RELATED

Enclosure 2 toRA-1 4-0023Page 5 of 7

Oconee Nuclear Station, Unit No. 1,Docket No. 50-269 / Renewed License No. DPR-38

-10-

3) The licensee shall maintain appropriate compensatory measures In placeuntil completion of all modifications and implementation items delineatedabove.

E. Physical Protection

Duke Energy Carolinas, LLC shall fully implement and maintain in effect allprovisions of the Commission-approved physical security, training andqualification and safeguards contingency plans including amendments madepursuant to provisions of the Miscellaneous Amendments and SearchRequirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to

as supplemented the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set ofby a change plans, which contains safeguards information protected under 10 CFR 73.21,approved by is entitled: "Duke Energy Physical Security Plan' submitted by letter dated

September 8, 2004, and supplemented on September 30, 2004, October 15,License 004, October 21, 2004, and October 27, 2004.Amendment No.zzz Du e Energy Carolinas, LLC shall fully implement and maintain in effect all

prov Ions of the Commission-approved cyber security plan (CSP), includingchang s made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).The Du Energy Carolinas, LLC CSP was approved by License AmendmentNo. 37

F. In the update to the UFSAR required pursuant to 10 CFR 50.71(e)(4) scheduled forJuly. 2001. the licensee shall update the UFSAR to Include the UFSAR supplementsubmitted pursuant to 10 CFR 54.21(d) as revised on March 27. 2000. Until theUFSAR update is complete, the licensee may make changes to the programsdescribed in its UFSAR supplement without prior Commission approval, providedthat the licensee evaluates each such change pursuant to the criteria set forth in10 CFR 50.59 and otherwise complies with the requirements in that section.

G. The licensee's UFSAR supplement submitted pursuant to 10 CFR 54.21(d), asrevised on March 27, 2000, describes certain future inspection activities to becompleted before the period of extended operation. The licensee shallcomplete these activities no later than February 6, 2013.

H. Mitloation Strateev License Condition

Develop and maintain strategies for addressing large fires and explosions and thatinclude the following key areas:

(a) Fire fighting response strategy with the following elements:

1. Pre-defined coordinated fire response strategy and guidance2. Assessment of mutual aid fire fighting assets3. Designated staging areas for equipment and materials4. Command and control5. Training of response personnel

Renewed License No. DPR-38Amendment No. -3%-

Page 12: DUKEY ENERGYe NCScott Batson Chris Wasik Sandy Severance Steve Newman Eddie Cleveland ONS Master File 801.01 - ON03DM J. E. Smith (For ONS Licensing/Nuclear Records) SECURITY-RELATED

Enclosure 2 toRA-14-0023Page 6 of 7 Oconee Nuclear Station, Unit No. 2

Docket No. 50-270 / Renewed License No. DPR-47

-10-

3) The licensee shall maintain appropriate compensatory measures in placeuntil completion of all modifications and implementation items delineatedabove.

E. Physical Protection

Duke Energy Carolinas, LLC shall fully implement and maintain in effect allprovisions of the Commission-approved physical security, training andqualification and safeguards contingency plans including amendments made

as supplemented pursuant to provisions of the Miscellaneous Amendments and SearchRequirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to theby a change uthority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans,

approved by ich contains safeguards information protected under 10 CFR 73.21, isLicense en ed: Duke Energy Physical Security Plan" submitted by letter datedAmendment No. Sept ber 8,2004. and supplemented on September 30.2004, October 15,

2004, ober 21, 2004. and October 27, 2004.

Duke Energ arolinas, LLC shall fully implement and maintain In effect allprovisions of Commission-approved cyber security plan (CSP). includingchanges made p uant to the authority of 10 CFR 50.90 and 10 CFR50.54(p). The Duk nergy Carolinas, LLC CSP was approved by LicenseAmendment No.0.

F. In the update to the UFSAR required pursuant to 10 CFR 50.71(e)(4) scheduled forJuly, 2001, the licensee shall update the UFSAR to include the UFSAR supplementsubmitted pursuant to 10 CFR 54.21(d) as revised on March 27, 2000. Until theUFSAR update is complete, the licensee may make changes to the programsdescribed in its UFSAR supplement without prior Commission approval, providedthat the licensee evaluates each such change pursuant to the criteria set forth in10 CFR 50.59 and otherwise complies with the requirements in that section.

G. The licensee's UFSAR supplement submitted pursuant to 10 CFR 54.21(d), asrevised on March 27, 2000, describes certain future inspection activities to becompleted before the period of extended operation. The licensee shallcomplete these activities no later than February 6, 2013.

H. Mitigation Strategv License Condition

Develop and maintain strategies for addressing large fires and explosions and thatinclude the following key areas:

(a) Fire fighting response strategy with the following elements:1. Pre-defined coordinated fire response strategy and guidance2. Assessment of mutual aid fire fighting assets3. Designated staging areas for equipment and materials4. Command and control5. Training of response personnel

Renewed License No. DPR-47Amendment No. 38&

Page 13: DUKEY ENERGYe NCScott Batson Chris Wasik Sandy Severance Steve Newman Eddie Cleveland ONS Master File 801.01 - ON03DM J. E. Smith (For ONS Licensing/Nuclear Records) SECURITY-RELATED

Enclosure 2 toRA-14-0023Page 7 of 7

Oconee Nuclear Station, Unit No. 3Docket No. 50-287 / Renewed License No. DPR-55

- 10-

3) The licensee shall maintain appropriate compensatory measures in placeuntil completion of all modifications and implementation items delineatedabove.

E. Physical Protection

Duke Energy Carolinas. LLC shalR fully implement and maintain in effect allprovisions of the Commission-approved physical security, training andqualification and safeguards contingency plans including amendmentsmade pursuant to provisions of the Miscellaneous Amendments and Search

as supplemented Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and toby a change the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set ofby v plans, which contains safeguards information protected under 10 CFRapproved by 73.21, is entitled: 'Duke Energy Physical Security Plan submitted by letterLicense ated September 8, 2004, and supplemented on September 30, 2004,Amendment No. ober 15, 2004, October 21. 2004, and October 27, 2004.lZZZ I Du Energy Carolinas, LLC shall fully implement and maintain in effect all

provi ns of the Commission-approved cyber security plan (CSP), includingchang made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).The Ou Energy Carolinas, LLC CSP was approved by License AmendmentNo. 37

F. In the update to the UFSAR required pursuant to 10 CFR 50.71(e)(4) scheduledfor July, 2001. the licensee shall update the UFSAR to include the UFSARsupplement submitted pursuant to 10 CFR 54.21(d) as revised on March 27,2000. Until the UFSAR update Is complete, the licensee may make changes tothe programs described in its UFSAR supplement without prior Commissionapproval, provided that the licensee evaluates each such change pursuant to thecriteria set forth in 10 CFR 50.59 and otherwise complies with the requirementsin that section.

G. The licensee's UFSAR supplement submitted pursuant to 10 CFR 54.21(d),as revised on March 27, 2000, describes certain future inspection activitiesto be completed before the period of extended operation. The licensee shallcomplete these activities no later than February 6. 2013.

H. Mitiaation Strateav Ucense Condition

Develop and maintain strategies for addressing large fires and explosions andthat include the following key areas:

(a) Fire fighting response strategy with the following elements:1. Pre-defined coordinated fire response strategy and guidance2. Assessment of mutual aid fire fighting assets3. Designated staging areas for equipment and materials4. Command and control5. Training of response personnel

Renewed License No. DPR-55Amendment No. -379-

Page 14: DUKEY ENERGYe NCScott Batson Chris Wasik Sandy Severance Steve Newman Eddie Cleveland ONS Master File 801.01 - ON03DM J. E. Smith (For ONS Licensing/Nuclear Records) SECURITY-RELATED

Enclosure 3 toRA- 14-0023

REDACTED

Enclosure 3

RA-1 4-0023

Evaluation of the Proposed Change (Redacted)

Attached is the Redacted Version of Enclosure 1 to RA- 14-0023.

Page 15: DUKEY ENERGYe NCScott Batson Chris Wasik Sandy Severance Steve Newman Eddie Cleveland ONS Master File 801.01 - ON03DM J. E. Smith (For ONS Licensing/Nuclear Records) SECURITY-RELATED

Enclosure 1 toRA-14-0023Page 1 of 7

SREDACTEDl

Enclosure 1

Evaluation of the Proposed Change

Subject: This license amendment request (LAR) includes a proposed change to Milestone 8of the Cyber Security Plan implementation schedule and a proposed revision to theexisting Physical Protection license condition for the facility operating licenses

1. SUMMARY DESCRIPTION

2. DETAILED DESCRIPTION

3. TECHNICAL EVALUATION

4. REGULATORY EVALUATION

4.1 Applicable Regulatory Requirements/Criteria

4.2 Precedent

4.3 No Significant Hazards Consideration Determination

4.4 Conclusions

5. ENVIRONMENTAL CONSIDERATION

6. REFERENCES

Page 16: DUKEY ENERGYe NCScott Batson Chris Wasik Sandy Severance Steve Newman Eddie Cleveland ONS Master File 801.01 - ON03DM J. E. Smith (For ONS Licensing/Nuclear Records) SECURITY-RELATED

Enclosure 1 toRA-1 4-0023Page 2 of 7

REDACTED

1. SUMMARY DESCRIPTION

This license amendment request (LAR) includes a proposed change to Milestone 8 of the CyberSecurity Plan (CSP) implementation schedule and a proposed revision to the existing PhysicalProtection license condition for the facility operating licenses for Catawba Nuclear Station, UnitNos. 1 and 2 (CNS), McGuire Nuclear Station, Unit Nos. 1 and 2 (MNS) and Oconee NuclearStation, Unit Nos. 1, 2 and 3 (ONS). The completion date for Milestone 8 is proposed to bechanged from June 30, 2015, to December 31, 2017.

2. DETAILED DESCRIPTION

Reference 1 provided, in part, the Revised Duke Energy Cyber Security Plan (Enclosure 4 ofReference 1) and the associated revised CSP implementation schedule (Enclosure 3 ofReference 1). In Reference 2, the NRC approved the CSP and associated implementationschedule and added a license condition to each of the facility operating licenses to require thelicensees to fully implement and maintain in effect all provisions of the NRC-approved CSP.

Nuclear Energy Institute (NEI) 08-09 (Reference 3) was developed by the industry to assistlicensees in constructing and implementing their CSP. The CSP implementation scheduleprovided in Reference 1 listed a completion date of June 30, 2015 for Milestone 8. Milestone 8pertains to the date that complete operational and management controls, as provided inNEI 08-09, Revision 6, Appendix E, will be achieved. Appendix E of NEI 08-09 pertains tooperational and management cyber security controls.

As stated in Reference 2, subsequent changes to the NRC-approved CSP implementationschedule require prior NRC approval pursuant to 10 CFR 50.90. Accordingly, pursuant to theprovisions of 10 CFR 50.4 and 10 CFR 50.90, Duke Energy is submitting this request for anamendment to the aforementioned facility operating licenses to propose a change in thecompletion date for Milestone 8 from June 30, 2015, to December 31, 2017.

This license amendment application includes the proposed change to the existing operatinglicense condition for "Physical Protection" (Enclosure 2 to the cover letter) for CNS, Unit Nos. 1and 2, MNS, Unit Nos. 1 and 2, and ONS, Unit Nos. 1, 2 and 3. Enclosure 4 to the cover lettercontains the proposed Revised Cyber Security Plan Implementation Schedule (Milestone 8).

3. TECHNICAL EVALUATION

Page 17: DUKEY ENERGYe NCScott Batson Chris Wasik Sandy Severance Steve Newman Eddie Cleveland ONS Master File 801.01 - ON03DM J. E. Smith (For ONS Licensing/Nuclear Records) SECURITY-RELATED

Enclosure 1 toRA- 14-0023Page 3 of7 7REDACTE]

Page 18: DUKEY ENERGYe NCScott Batson Chris Wasik Sandy Severance Steve Newman Eddie Cleveland ONS Master File 801.01 - ON03DM J. E. Smith (For ONS Licensing/Nuclear Records) SECURITY-RELATED

Enclosure 1 toRA-1 4-0023Page 4 of 7

FI iTEDAýD

4. REGULATORY EVALUATION

4.1 Applicable Regulatory Requirements/Criteria

10 CFR 73.54 requires licensees to maintain and implement a Cyber Security Plan. CatawbaNuclear Station, Unit Nos. 1 and 2 (Renewed Facility Operating License Nos. NPF-35 andNPF-52), McGuire Nuclear Station, Unit Nos. 1 and 2 (Renewed Facility Operating License Nos.NPF-9 and NPF-17) and Oconee Nuclear Station, Unit Nos. 1, 2 and 3 (Renewed FacilityOperating License Nos. DPR-38, DPR-47, and DPR-55) include a Physical Protection licensecondition that requires the respective licensees to fully implement and maintain in effect allprovisions of the Commission-approved Cyber Security Plan, including changes made pursuantto the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

4.2 Precedent

In Reference 5, NEI transmitted to the NRC an implementation schedule template to aidcompliance with the NRC's cyber security regulations codified in 10 CFR 73.54. In Reference 6,the NRC indicated that they had identified no issues with the template. The NEI templateincluded eight milestones, with Milestone 8 relating to the date of full implementation of theCyber Security Plan. In contrast, the implementation schedule proposed for CNS, MNS, andONS (Reference 1) included nine milestones, with Milestone 9 being equivalent to Milestone 8of the NEI template, and Milestone 8 being an intermediate milestone not included in the NEItemplate. This LAR does not propose a change to the scheduled date of full implementation ofthe Cyber Security Plan (i.e., December 31, 2017 for Milestone 9); it does align the dateMilestone 8 with Milestone 9. Therefore, the effect of the LAR is to eliminate the intermediatemilestone and bring the structure of the milestones in closer alignment with the NEI templateand the rest of the industry.

Page 19: DUKEY ENERGYe NCScott Batson Chris Wasik Sandy Severance Steve Newman Eddie Cleveland ONS Master File 801.01 - ON03DM J. E. Smith (For ONS Licensing/Nuclear Records) SECURITY-RELATED

Enclosure 1 toRA-14-0023 REDACTEDPage 5 of 7

While the subject of this LAR is believed to be unique, there are several precedents in theindustry of license amendments involving changes to cyber security milestone schedules. SeeReferences 7 and 8 for recent examples.

4.3 No Significant Hazards Consideration Determination

Duke Energy is requesting an amendment to the Catawba Nuclear Station, Unit Nos. 1 and 2(Renewed Facility Operating License Nos. NPF-35 and NPF-52), McGuire Nuclear Station, UnitNos. 1 and 2 (Renewed Facility Operating License Nos. NPF-9 and NPF-1 7) and OconeeNuclear Station, Unit Nos. 1, 2 and 3 (Renewed Facility Operating License Nos. DPR-38,DPR-47, and DPR-55) Facility Operating Licenses to revise the Physical Protection licensecondition as it relates to the Cyber Security Plan. The current license condition reflects theCyber Security Plan implementation schedule previously approved by the NRC, which listed acompletion date of June 30, 2015, for Milestone 8. Milestone 8 pertains to the date thatcomplete operational and management controls, as provided in Nuclear Energy Institute 08-09,Revision 6, Appendix E, will be achieved. A revised Milestone 8 completion date ofDecember 31, 2017, is requested.

Duke Energy has evaluated whether or not a significant hazards consideration is involved withthe proposed amendment by focusing on the three standards set forth in 10 CFR 50.92,"Issuance of Amendment," as discussed below:

1. Does the proposed change involve a significant increase in the probability orconsequences of an accident previously evaluated?

Response: No.

The amendment proposes a change to the Milestone 8 schedule date, as set forth in theCyber Security Plan (CSP) implementation schedule. The revision of the schedule datefor the CSP does not involve modifications to any safety related structures, systems orcomponents (SSCs). Rather, the implementation schedule provides a timetable for fullyimplementing the CSP. The CSP describes how the requirements of 10 CFR 73.54 areto be implemented to identify, evaluate, and mitigate cyber-attacks up to and includingthe design basis cyber-attack threat, thereby achieving high assurance that the facilitydigital computer and communications systems and networks are protected from cyber-attacks. The revision of the CSP implementation schedule will not alter previouslyevaluated design basis accident analysis assumptions, add any accident initiators,modify the function of the plant safety related SSCs, or affect how any plant safety-related SSCs are operated, maintained, modified, tested, or inspected. Further, basedon the efforts accomplished to date in implementing CSP Milestones 1 through 7, DukeEnergy believes that the proposed schedule change will have no adverse effect onsafety.

Therefore, the proposed change does not involve a significant increase in the probabilityor consequences of an accident previously evaluated.

2. Does the proposed change create the possibility of a new or different kind of accidentfrom any accident previously evaluated?

Response: No.

The amendment proposes a change to the Milestone 8 schedule date, as set forth in theCyber Security Plan (CSP) implementation schedule. The implementation of the Cyber

Page 20: DUKEY ENERGYe NCScott Batson Chris Wasik Sandy Severance Steve Newman Eddie Cleveland ONS Master File 801.01 - ON03DM J. E. Smith (For ONS Licensing/Nuclear Records) SECURITY-RELATED

Enclosure 1 toRA-14-0023 REDACTEDPage 6 of 7

Security Plan does not introduce new equipment that could create a new or different kindof accident, and no new equipment failure modes are created. No new accidentscenarios, failure mechanisms, or limiting single failures are introduced as a result of thisproposed amendment. Further based on the efforts accomplished to date inimplementing CSP Milestones 1 through 7, Duke Energy believes that the proposedschedule change will have no adverse effect on safety.

Therefore, the proposed change does not create the possibility of a new or different kindof accident from any accident previously evaluated.

3. Does the proposed change involve a significant reduction in a margin of safety?

Response: No.

Plant safety margins are established through limiting conditions for operation, limitingsafety system settings, and safety limits specified in the technical specifications. Theproposed change revises the Cyber Security Plan implementation schedule. Becausethere is no change to these established safety margins as result of this change, theproposed change does not involve a significant reduction in a margin of safety.

Therefore, the proposed change does not involve a significant reduction in a margin ofsafety.

Based on the above, Duke Energy concludes that the proposed change presents no significanthazards consideration under the standards set forth in 10 CFR 50.92(c), and accordingly, afinding of "no significant hazards consideration" is justified.

4.4 Conclusions

In conclusion, based on the considerations discussed above: (1) there is reasonable assurancethat the health and safety of the public will not be endangered by operation in the proposedmanner; (2) such activities will be conducted in compliance with the Commission's regulations;and (3) the issuance of the amendment will not be inimical to the common defense and securityor to the health and safety of the public.

5. ENVIRONMENTAL CONSIDERATION

The proposed amendment provides a change to the Cyber Security Plan implementationschedule for Milestone 8. The proposed amendment meets the eligibility criterion for acategorical exclusion set forth in 10 CFR 51.22(c)(12). Therefore, pursuant to 10 CFR 51.22(b),no environmental impact statement or environmental assessment need be prepared inconnection with the issuance of the amendment.

6. REFERENCES

1. Duke Energy letter, Oconee Nuclear Station, Units 1, 2, and 3, Docket Nos. 50-269, 50-270,and 50-287, McGuire Nuclear Station, Units 1 and 2, Docket Nos. 50-369 and 50-370, andCatawba Nuclear Station, Units 1 and 2, Docket Nos. 50-413 and 50-414, Response toRequest for Additional Information Regarding License Amendment Request for CyberSecurity Plan, dated April 15, 2011 (ADAMS Accession No. ML1 1109A074)

2. NRC letter, Catawba Nuclear Station, Units 1 and 2 (Catawba 1 and 2), McGuire NuclearStation, Units 1 and 2 (McGuire 1 and 2), and Oconee Nuclear Station, Units 1, 2, and 3

Page 21: DUKEY ENERGYe NCScott Batson Chris Wasik Sandy Severance Steve Newman Eddie Cleveland ONS Master File 801.01 - ON03DM J. E. Smith (For ONS Licensing/Nuclear Records) SECURITY-RELATED

Enclosure 1 toRA-1 4-0023Page 7 of7 7REDACTED

(Oconee 1, 2, and 3) - Issuance of Amendments Regarding Cyber Security Plans Based onNuclear Energy Institute 08-09, Revision 6 (TAC Nos. ME4529, ME4530, Catawba;ME4531, ME4532, McGuire; ME4533, ME4534, ME4535, Oconee), dated August 31, 2011(ADAMS Accession No. ML1 1216A064)

3. Nuclear Energy Institute, NEI 08-09, Revision 6, Cyber Security Plan for Nuclear Power

Reactors, April 2010

4. Nuclear Energy Institute, NEI 13-10, Revision 0, Cyber Security Control Assessments,January 2014

5. Letter from Christopher E. Earls (NEI) to Richard P. Correia (NRC), Template for the CyberSecurity Plan Implementation Schedule, dated February 28, 2011 (ADAMS Accession No.ML110600211 and ML110600218)

6. Letter from Richard P. Correia (NRC) to Christopher E. Earls (NEI), Template for the CyberSecurity Plan Implementation Schedule, dated March 1, 2011 (ADAMS Accession No.ML110070348)

7. NRC letter, Virgil C. Summer Nuclear Station, Unit 1 - Issuance of Amendment 198Regarding the Cyber Security Plan Implementation Schedule Milestone 8 (TACNo. MF2899), dated May 29, 2014 (ADAMS Accession No. ML14122A309)

8. NRC letter, Comanche Peak Nuclear Power Plant, Unit Nos. 1 and2 - Issuance ofAmendments re: Approval of the Revised Cyber Security Plan Implementation Schedule(TAC Nos. MF3216 and MF3217), dated September 8, 2014 (ADAMS AccessionNo. ML14183A342)

Page 22: DUKEY ENERGYe NCScott Batson Chris Wasik Sandy Severance Steve Newman Eddie Cleveland ONS Master File 801.01 - ON03DM J. E. Smith (For ONS Licensing/Nuclear Records) SECURITY-RELATED

Enclosure 4 toRA-14-0023Page 1 of 1

Revised Cyber Security Plan Implementation Schedule(Milestone 8)

The following table identifies the regulatory commitments in this document. Any otherstatements in this submittal represent intended or planned actions. They are provided forinformation purposes and are not considered to be regulatory commitments.

# I M Co-pletionDate Basi

8 Complete Operational andManagement controls, asprovided in NEI 08-09, Rev 6,Appendix E.

The implementation of controlsthat require a designmodification that are notfinished by the completion datewill be documented in the siteconfiguration managementand/or change control programto assure completion of thedesign modification as soon aspossible, but no later than thefinal implementation date.

December 31, 2017 The implementation of the cybersecurity program is expected to requirepolicy/procedure development and/orupgrades for nearly every plantdepartment. Many of the securitycontrols will require development of thetechnical processes for implementingthe control in a nuclear plantenvironment including development ofnew procedures for surveillances,periodic monitoring and reviews.

Some controls from Appendix E couldrequire a design modification.