60
HIDALGO DAVID EMILIO PORTFOLIO

David Emilio Hidalgo Portfolio

Embed Size (px)

DESCRIPTION

DEH Architecture Portfolio

Citation preview

  • HIDALGODAVID EMILIO

    PORTFOLIO

  • 2HIDALGODAVID EMILIO

    [email protected](626) 840 - 7126

  • 3TABLE OF CONTENTS

    SOCIAL HUB | SOUTH CAMPUS DORMITORY

    ARNO RIVER CONNECTION

    PROFESSIONAL WORK

    INCISA TRAIN STATION

    MODELS

    HABITAT ASTIR

    THESIS: RE-INHABITat the LA RIVER

    04 - 13

    14 - 15

    16 - 27

    28 - 33

    34 - 37

    38 - 39

    40 - 57

  • 4SOCIAL HUB | SOUTH CAMPUS DORMITORY Syracuse University, Syracuse, New Yorkcollaboration w/ stephen nowak

  • 5The south campus of syracuse university is a satellite location for housing athletes and underclassmen. The barrack typology plagues the landscape with monotonous bar style apartment buildings. The winding roads are pinched by the main arteries and desired pedestrian paths. This project calls for the insertion of a 60 key dormitory and social hub. These major programmatic elements impregnate the living facilities - a cafe, a movie theater, and a sport court. Each of these elements project visual and audible information to selected adjacent programs.

    With the site having a considerable slope, the building pushes itself into the hill, allowing pedestrians to enter on both the ground and first floor. Against the retaining wall, a road cuts thorough the building, allowing vehicle access to the parking lot. Perpendicular to this roadway, a pedestrian boulevard connects both levels of entry and allows passersby to experience the guts of the building without physically entering. At the intersection of these two paths, rises and elevator core, completing the Cartesian coordinates.

    The building is a steel frame structure with concrete floor slabs. A polycarbonate facade permits the building to read monolithic during the day, while revealing itself at night. Creating the illusion of a seemingly impossible cantilever, a vierendeel truss balances on the larger service core.

  • 6Site Diagrams

    Program + Building Mass

  • 7Dorm Room Block Program OverlapProgram Overlap

  • LEVEL 01

    LEVEL 02

    LEVEL 03

    ROOF LEVEL

    9 -

    09

    - 0

    10 -

    0

    2 -

    62

    - 6

    2 -

    82

    - 6

    +12 - 6

    + 25 - 0

    + 36 - 6

    + 48 - 2

    LEVEL 00+0 - 0

    10 -

    0

    5

    SECTION A

    111111888

    SECTION A

  • 9

  • 10

    Concrete Floor SlabMetal Decking16 Open Web Steel Joist8x12 Steel BeamPolygal Panel ConnectorHanger WireFire StopSelectogal (RFX) Polycarbonate

    Curtain RailAluminum Window FramePolygal CapHahn Louver Window S9Extruded Aluminum2 Steel TubingSiliconSelectogal (RFX) PolycarbonateCurtain Concrete Floor SlabMetal DeckingPolygal Panel ConnectorFire Stop16 Open Web Steel JoistHanger WireQuietRock Soundproof DrywallConcrete Wall

    Translucent Projection ScreenTheater Chair

    Concrete Floor SlabProtection BoardMudslab of Reinforced ConcretePremolded FillerConcrete Footing

  • 11

    Concrete Floor SlabMetal Decking16 Open Web Steel Joist8x12 Steel BeamPolygal Panel ConnectorHanger WireFire StopSelectogal (RFX) Polycarbonate

    Curtain RailAluminum Window FramePolygal CapHahn Louver Window S9Extruded Aluminum2 Steel TubingSiliconSelectogal (RFX) PolycarbonateCurtain Concrete Floor SlabMetal DeckingPolygal Panel ConnectorFire Stop16 Open Web Steel JoistHanger WireQuietRock Soundproof DrywallConcrete Wall

    Translucent Projection ScreenTheater Chair

    Concrete Floor SlabProtection BoardMudslab of Reinforced ConcretePremolded FillerConcrete Footing

  • 12

  • 13

  • 14

    This project is situated in one of the few dense residential areas in Syracuse, adjacent to Washington Square Park. However, while it offers the possibility of urban life, the neighborhood lacks amenities such as recreational and gathering space and is bound by a band of under-utilized industrial warehouses on its southern edge.

    Main Deck

    Secondary Routes

    OutdoorIndoorBelow

    HABITAT ASTIR | Washington Square Park Syracuse, New York An Urban Landscape for Activity and Play

    HABITAT ASTIR | LITTLE ITALY Syracuse University, Syracuse, New Yorkcollaboration w/ stephen nowak

    Diagramming the extension of the commercial district leading to the ressurection ofWashington Square Park

    Scape Provides: Roof + Ground + Void

    Scape

    Ground

    The given program is based on creating a microcosm of urban life, a center for activity in the neighborhood. The project not only acts as a destination for it surrounding residents and beyond but also injects life back into the historic park.

  • 15

  • 16

    ARNO RIVER CONNECTION | SAN FREDIANO PLAZA REVITILIZATION San Frediano, Firenze, Italy

    The site for the project consists of an existing piazza - dedicated to parking - and an unused strip of space alongside the citys medieval wall, and a portion of riverbank with access to the Arno River There is a demand for recreational space in the city to host community functions and sports, in hopes to foster inter-generational learning and community building. Re-injecting public space back into the piazza was a priority. Thus, transforming the existing parking lot into a hybridized space to accommodate a flea market, outdoor seating for projecting screen, and park would become an attraction. A redesigned promenade along the medieval wall will guide pedestrians from the new riverfront community hall that houses local gallery exhibits and a traditional coffee shop along the Arno River.

  • 17

    Surrounding Piazzas along Main Rd

    Piazza is at the center of 3 main axis Potential piazza oppurtunities

    Medieval wall as barrierMedieval wall as barrier

  • 18

  • 19

  • 20

  • 21

  • 22

    View from promenade to car park and elvated bar/projecting screen

  • 23

    View from the Arno River into the gallery and cafe down through the promenade

  • 24

  • 25

  • 26

  • 27

  • 28

    p

    Connection through Fragmentation | Incisa Train Station ParkIncisa, Val DArno, Italy

    Lobby/EntanceBedroom

    Bedroom

    Bedroom Bedroom

    Bedroom

    Bedroom

    Bedroom

    Bedroom

    Bedro

    om

    Bedroom

    Bedroom

    Bedroom

    Bedroom

    Be

    dro

    om

    Bedroo

    m

    Bedroom

    Bedroom

    Bedroom

    Bedroom

    Bedroom

    Bedroom

    Living Room

    Living Room

    Street

    B ackya r d

    Primar y Corr idor

    Incisa serves as a bedroom community for people who work in Firenze. However, years of poor planning allowed the small city to balloon outside of its historically dense core, leaving it depleted ofoutside of its historically dense core, leaving it depleted ofoutside of its historically dense core, leaving it depleted ofurban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster urban amenities necessary to foster growth. The strategy is to bolster Incisas appeal by re-imagining a vacant train yard. A mix of housing, Incisas appeal by re-imagining a vacant train yard. A mix of housing, Incisas appeal by re-imagining a vacant train yard. A mix of housing, Incisas appeal by re-imagining a vacant train yard. A mix of housing, Incisas appeal by re-imagining a vacant train yard. A mix of housing, Incisas appeal by re-imagining a vacant train yard. A mix of housing, Incisas appeal by re-imagining a vacant train yard. A mix of housing, Incisas appeal by re-imagining a vacant train yard. A mix of housing, Incisas appeal by re-imagining a vacant train yard. A mix of housing, Incisas appeal by re-imagining a vacant train yard. A mix of housing, Incisas appeal by re-imagining a vacant train yard. A mix of housing, Incisas appeal by re-imagining a vacant train yard. A mix of housing, offices, public services, retail, transportation infrastructure, and a hotel were offices, public services, retail, transportation infrastructure, and a hotel were offices, public services, retail, transportation infrastructure, and a hotel were offices, public services, retail, transportation infrastructure, and a hotel were offices, public services, retail, transportation infrastructure, and a hotel were offices, public services, retail, transportation infrastructure, and a hotel were offices, public services, retail, transportation infrastructure, and a hotel were offices, public services, retail, transportation infrastructure, and a hotel were offices, public services, retail, transportation infrastructure, and a hotel were offices, public services, retail, transportation infrastructure, and a hotel were determined to provide a suitable programmatic mix.determined to provide a suitable programmatic mix.determined to provide a suitable programmatic mix.determined to provide a suitable programmatic mix.

    The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant pThe first decision was to be able to accommodate a significant pThe first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant pThe first decision was to be able to accommodate a significant pThe first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant The first decision was to be able to accommodate a significant amount of parking. By elevating the ground plane to then act as a floating amount of parking. By elevating the ground plane to then act as a floating amount of parking. By elevating the ground plane to then act as a floating amount of parking. By elevating the ground plane to then act as a floating amount of parking. By elevating the ground plane to then act as a floating amount of parking. By elevating the ground plane to then act as a floating amount of parking. By elevating the ground plane to then act as a floating amount of parking. By elevating the ground plane to then act as a floating amount of parking. By elevating the ground plane to then act as a floating amount of parking. By elevating the ground plane to then act as a floating amount of parking. By elevating the ground plane to then act as a floating oasis, while the cars were house underneath. The main strategy was to take oasis, while the cars were house underneath. The main strategy was to take oasis, while the cars were house underneath. The main strategy was to take oasis, while the cars were house underneath. The main strategy was to take oasis, while the cars were house underneath. The main strategy was to take oasis, while the cars were house underneath. The main strategy was to take oasis, while the cars were house underneath. The main strategy was to take oasis, while the cars were house underneath. The main strategy was to take oasis, while the cars were house underneath. The main strategy was to take the grid of a car and make strategic voids in order to differentiate between the grid of a car and make strategic voids in order to differentiate between the grid of a car and make strategic voids in order to differentiate between the grid of a car and make strategic voids in order to differentiate between the grid of a car and make strategic voids in order to differentiate between the grid of a car and make strategic voids in order to differentiate between the grid of a car and make strategic voids in order to differentiate between the grid of a car and make strategic voids in order to differentiate between the grid of a car and make strategic voids in order to differentiate between the grid of a car and make strategic voids in order to differentiate between the grid of a car and make strategic voids in order to differentiate between the grid of a car and make strategic voids in order to differentiate between program and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lotprogram and allow light into the parking lot

  • 29

    Garage

    Lobby

    Ristorante e Bar

    Ho

    tel

    de

    l g

    iov

    en

    tu

    U

    cc

    i p

    rofe

    ssio

    na

    li

    Ap

    artim

    en

    ti

    Cro

    ce

    Ro

    ssa

    Parcheggi macchine Piaz

    za

    Gia

    rd

    in

    i

    Autolavaggio

    PallavoloPing PongBasketball

    Auto meccanico

    G r i dbased off car dimensionto maximize parking.Reflects city block structure.

    U n d u l a t i n g S p a c e s

  • 30

    Organizational grid from fabric and car dimension

    Total Parking Provided: 374

    Structural Grid

    Program Given

    Program Sunken Below

    Elevated Park

    Piazza : Hotel + Station+ Oces

    Voids in Platform

  • 31

    Organizational grid from fabric and car dimension

    Total Parking Provided: 374

    Structural Grid

    Program Given

    Program Sunken Below

    Elevated Park

    Piazza : Hotel + Station+ Oces

    Voids in Platform

  • 32

  • 33

  • 34

    David Hidalgo Architects, Inc. | Professinoal Work Varios projects in CaliforniaIncollboration with DHA Office

  • 35

  • 36

  • 37

  • 38

    Models | Various ProjectsMaterials:Chipboard, Museum Board, Foam Core, Basswood, Plexiglas, Resin, Laser-Cutting, 3D Printing,

  • 39

  • 40

    Premise:The lack of public space in Los Angeles is privatizing the lifestyle of its various distinct neighborhoods. The creation of new public nodes of interaction, connecting social boundaries will ensure the vitality of these neighborhoods.

    Contention:Due to its lack of programming and connective infrastructure, the Los Angeles River exists as an uninhabitable rift between three low-income communities. Architecturally rehabilitating the riverfront allows for an opportunity to connect these divided communities by providing public nodes to encourage cultural interaction and community identity, particularly among its large underprivileged youth population. The incorporation of recreational and educational facilities within a rehabilitated wildlife corridor will provide the youth on both sides of the river with a new community destination.

    RE-INHABITAT the Los Angeles River | 5th Year ThesisLos Angeles, CAPrimary Advisor: Victor Tzen

  • 41

  • 42

    4 yrs

    5 -17

    18 - 64

    64 +

    .5 mi 1 mi 2 mi 5 mi

    750

    1,500

    5,000

    750

    3,000

    5,800

    19,000

    2,600

    11,000

    20,00

    70,000

    10,600

    95,000

    170,000

    660,000

    96,600

    8,000 30,400 111,600 1,020,000TOTALS

    AGE GROUPS ADJACENT TO SITE

    4.5 miles

    Hispanic 56% White 20% Asian 17%Black 7%

    Area of Public Park per thousand residnts in LA

    15, 686 Acres

    Public Green Space

    Privatized Living34,563 Acres

    Private Green Space

    Freeways: 160 miRiver: 52miMain Rd: 1,400miShore Line: 45mi

    LA City Infrastructure

    AGE GROUPS ADJACENT TO SITE:

    Demographic Map: 4.5 mi radius

    Wealthier Neighborhood of L.A.1.7 acres/ 1.000

    Poorer Neighborhood of L.A.0.3 acres/ 1.000

  • 43

    .25 MI

    .50 MI

    1.0 MI

    1.5 MI

    School

    Religious

    Recreation

    Public Facilities

    .25 MI

    .50 MI

    1.0 MI

    1.5 MI

    School

    Religious

    Recreation

    Public Facilities

    Cypress Park

    Elysian Valley

    Glassel Park

    SITE

    L.A. RIVERTAYLOR YARD (ABANDONED RAILYARD)RailroadMIXED USE (INDUST./COMMER./SCHOOL/REC.SAN FERNANDO BLVD.

    COMMERCIAL STRIP

    HIGH DENSITY RESIDENTIAL

    HILLSIDE RESIDENT.

    HILLSIDE RESIDENT.I-5 INTERSATE FREEWAY

    HIGH DENSITY RESIDENTIAL

    INDUSTRY

    LA River only accessible from the south-west

    Wealthy NeighborhoodPrivate Green Space

    Poorer NeighborhoodPrivate Green Space

    Neighborhoods Divided by 3 FREEWAYS and LA River

  • 44

  • 45

    LIbraryVisitor Centter

    CafeSkate Park

    GroveElevated Plaza

    Video Plaza

    WallsElevated Paths

    Bird Towers

    Bridge

    Undulating Ground Slab

  • 46

    Grove

    Visitor Center

    Skate Park

    Library

    Urban Agriculture Skate Plaza Video Plaza

    Pedestrian Path Skate ParkSkate Park

    W e t l a n dW e t l a n dW e t l a n dW e t l a n d

  • 47

    Video Plaza

    Graffiti Wall

    Elevated Green Plaza

    Cafe

    River Front Ramp Pedestrian Path

    Video PlazaVideo Plaza

  • 48

  • 49

  • 50

  • 51

  • 52

  • 53

  • 54

  • 55

  • 56

  • 57

  • 58

    EDUCATION

    Syracuse University School of Architecture 2012Syracuse, NY Bachelor of Architecture, Deans List; Minor in Spanish Thesis: RE-INHABITAT the Los Angeles River, CA International Studies: London Fall 2010 & Florence Spring 2011 SU School of Architecture Full-Tuition Scholarship Finalist, King and King Comprehensive Design Studio Prize

    Autodesk Authorized Training Center 2012Los Angeles, CA Revit Architecture 2012 Fundamentals - 3 Day Course

    St. Francis High School 2007La Canada, CA Honors Diploma, Summa Cum Laude 4.27 California Scholarship Federation National Honor Society Varsity Captain, Track & Field and Cross-Country Volunteer Leader: Mission to Mexico

    EXPERIENCE

    David Hidalgo Architects, Inc. Summer 2004 - PresentArcadia, CA 3-D modeling & rendering, graphic design, design development, design presentations & drawing layouts, construction doc. edit, research at Planning & Building Department, zoning and building code research, building measuring and site documentation, preparation of as-built drawings, site & building modeling, organize material and product catalogs

    Castle Rock Construction Corp. Summer 2010Anaheim, CA Member of the contruction team with focus on commerical development; two office buildings and a shopping center. Participated in installing acoustical ceilings, wood and steel framing and plumbing. Client liaison on the team to resolve onsite matters.

    SKILLS

    Digital: Adobe CS5, AutoCAD 2012, Revit 2012, SketchUp 8, Rhinoceros 5 Irender nXt, V-Ray, Ecotect, Arch-GIS, Microsoft Office

    Physical: Hand Drafting and Sketching Chipboard, Museum Board, Foam Core, Basswood, Plexiglas, Resin Laser-Cutting, 3D Printing, 3D Scanning

    Languages: Fluent in Spanish

    AFFILIATIONS + interests

    School of Architecture Peer Advising Committee & Orientation Leader 2009 - 2012American Institute of Architecture Students 2007 - 2012School of Architecture Student Liaison Team 2009 - 2012International Council of Shopping Centers 2011 - PresentSurfing, Hiking, Traveling

    D A V I D E M I L I O

    H I D A L G O45 Tudor City Pl. Apt. # 202New York, NY 10017

    [email protected]

    3-D Modeling & Rendering, Research at Planning & Building Department, Zoning and Building Code Research, Design Development, Graphic Design, Design Presentations & Drawing Layouts,Preparation of As-Built drawings, Computer Aided Drafting, Building Measuring and Site Documentation, Site & Building Modeling, Organized materials samples and product catalogs, ordered supplies and orga-nizing plan sets.

    EDUCATION

    Syracuse University School of Architecture 2012Syracuse, NY Bachelor of Architecture, Deans List; Minor in Spanish Thesis: RE-INHABITAT the Los Angeles River, CA International Studies: London Fall 2010 & Florence Spring 2011 SU School of Architecture Full-Tuition Scholarship Finalist, King and King Comprehensive Design Studio Prize

    Autodesk Authorized Training Center 2012Los Angeles, CA Revit Architecture 2012 Fundamentals - 3 Day Course

    St. Francis High School 2007La Canada, CA Honors Diploma, Summa Cum Laude 4.27 California Scholarship Federation National Honor Society Varsity Captain, Track & Field and Cross-Country Volunteer Leader: Mission to Mexico

    EXPERIENCE

    David Hidalgo Architects, Inc. Summer 2004 - PresentArcadia, CA 3-D modeling & rendering, graphic design, design development, design presentations & drawing layouts, construction doc. edit, research at Planning & Building Department, zoning and building code research, building measuring and site documentation, preparation of as-built drawings, site & building modeling, organize material and product catalogs

    Castle Rock Construction Corp. Summer 2010Anaheim, CA Member of the contruction team with focus on commerical development; two office buildings and a shopping center. Participated in installing acoustical ceilings, wood and steel framing and plumbing. Client liaison on the team to resolve onsite matters.

    SKILLS

    Digital: Adobe CS5, AutoCAD 2012, Revit 2012, SketchUp 8, Rhinoceros 5 Irender nXt, V-Ray, Ecotect, Arch-GIS, Microsoft Office

    Physical: Hand Drafting and Sketching Chipboard, Museum Board, Foam Core, Basswood, Plexiglas, Resin Laser-Cutting, 3D Printing, 3D Scanning

    Languages: Fluent in Spanish

    AFFILIATIONS + interests

    School of Architecture Peer Advising Committee & Orientation Leader 2009 - 2012American Institute of Architecture Students 2007 - 2012School of Architecture Student Liaison Team 2009 - 2012International Council of Shopping Centers 2011 - PresentSurfing, Hiking, Traveling

    D A V I D E M I L I O

    H I D A L G O45 Tudor City Pl. Apt. # 202New York, NY 10017

    [email protected]

    3-D Modeling & Rendering, Research at Planning & Building Department, Zoning and Building Code Research, Design Development, Graphic Design, Design Presentations & Drawing Layouts,Preparation of As-Built drawings, Computer Aided Drafting, Building Measuring and Site Documentation, Site & Building Modeling, Organized materials samples and product catalogs, ordered supplies and orga-nizing plan sets.

  • 59

    HIDALGODAVID EMILIO

    [email protected](626) 840 - 7126

  • 60