54
COMPREHENSIVE MOBILITY PLAN 2001 - 2025 COMPREHENSIVE MOBILITY PLAN 2001 - 2025 KOLKATA METROPOLITAN AREA

COMPREHENSIVE MOBILITY PLAN 2001 - 2025

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

COMPREHENSIVE MOBILITY PLAN 2001 - 2025

COMPREHENSIVE MOBILITY PLAN 2001 - 2025

KOLKATA METROPOLITAN AREA

KMDA’S Planning Directorateprepared a draft TT Master Plan in conjunction with the Perspective Plan (Vision-2025)

January 2000 July 2000 – June 2001

The Draft TT Master Plan was modified as per the deliberations of the Working Group constituted by the Chief Secretary GoWB vide no 2549-UD/0/M/SB S-29/96 dated 6-7-2000. The working group was represented by officials form KMDA, Transport Dept., PW (Roads) Dept. GoWB, Kolkata Municipal Corporation, Howrah Municipal Corporation, Eastern Railways, South Eastern Railways, Kolkata Port Trust, Hooghly River Bridge Commissioners, DC (Traffic) Kolkata Police, SP Howrah, Airport authority of India

Dec 2001 - Feb 2004

The Draft Master Plan was presented to KMPC in December 2001

The Traffic Transportation, Railways & Water ways Sector Committeeconstituted under KMPC finalised the Draft Master Plan after detailed scrutiny and with observations from local bodies within KMA & public representatives

The Draft Master Plan finalised by the TTRW Committe e was formally approved by KMPC in Jan 2006

STAGES FOR PREPARATION OF TT MASTER PLAN

1

� Planning for an integrated transportation network cons idering roads, rail & waterways

� Balanced urban development within the metropolis� Safer, cheaper and faster transport system � Optimum utilisation of existing infrastructures� Energy conservation and protection of environment

POLICY:

MAJOR CONSIDERATIONS

To develop an integrated transportation network in KM A considering all the modes to cater for the movement of passengers and goods within the area and in the hinterland takin g into consideration the likely future scenarios upto 2025.

2

STRATEGIES FOR DEVELOPMENT OF METROPOLITAN TRANSPORT SYSTEM

• Decentralized Metropolitan Structure

• Priority to transit

• Fuel and energy conservation

• Environmental considerations

• Focus on Metropolitan Centre

• Para transit modes

• Pedestrian facilities

• Adoption of updated technology

• Balanced participation of public sectors and private sectors

3

• Surveys conducted for 21,000 households for travel characteristics covering about 110 lakhspeople

• O-D Survey for vehicles : 38 importantlocations to get distribution pattern

• Passenger Volume Survey at 60 locations• Intensive surveys conducted for

• Car Parking (Existing on the street)• Speed and Delay• Ferry-Passenger Volume at 37 locations

Between 1997-2000

MAJOR SURVEYS CONDUCTED

4

Category of Trips Total (in lakh)

Transit Passengers trips 110.60

Private Car trips 1.72

Two Wheeler Trips 2.63

Slow Vehicle Trips 14.16

Para Transit Trips

- Taxi 3.64

- Auto Rickshaw 9.90

- Cycle Rickshaw 7.24

Others 0.53

Walking Trips 62.96

Total 226.15

Break-up of Total Trips in KMA

Average weekday : 1998

As per household survey conducted in 1998

5

6

Components of the Master Plan

• Future Transport Network Plan

• Future Mass Transportation Plan

• Future Goods Transportation Plan

• Traffic Operation Improvement Plan for the Metropolitan Centre

• Transport infrastructure development need & recommend ed action plan

7

ULBS IN KMA

KMA AREA CONSISTS OF :

• 3 Municipal Corporations (Kolkata, Howrah, Chandannagar)

• 38 Municipalities

• 22 Panchayat Samities

AREA : 1851 sqkm

Population : 14.68 million(2001)

KMC

HMC

CMC

8

RAMRAJATALA

ULUBERIA

BUDGE-BUDGE

ABADA

FULESWAR

CHENGAIL

BAURIA

NALPUR

NUNGI

SANTOSHPUR

AKRA

ANDULMOURIGRAM

MIRZAPUR-BANKIPUR

BALARANBATI

HARIPAL

MADHUSUBANPUR

NALIKUL

CHANDANPUR

BARUIPARA

GODRA

DANKUNI

BEGANPUR

KAMARKUNDU

SINSUN

NASIBPUR

DIARA

PORABAZAR

BELMURI

DAKSHINESHWARBALI

CHAMPANTI

KALYANPUR

MALLIKPUR

BARUIPUR JN.

PARK C IRCUS

BALIGHAT

RLY.STN.HOWRAH

RAJCHANDRAPUR

TIK IAPARADASNAGAR

LILUA

BELUR

RLY STN.SEALDAH

NARENDRAPUR HALT

SONARPUR JN.

SUBHASHGRAM

GARIA

KALIKAPUR

BIDHANNAGAR

PIALI

BARASAT JN.

SHYAMNAGAR

SODPUR

AGARPARA

BELGHARIA

HUGLIGHAT

HINDMOTOR

KONNAGAR

UTTARPARABELANAGAR

SEORAPHULI

RISHRA

BARRACKPUR

PALTA

KHARDAH

TITAGARH

CHUNCHURA

MANKUNDU

BHADRESWAR

ICHAPUR

HUGLI

NABA-BARRACKPURMADHYAMGRAM

HRIDAYPUR

KANKINARA

NAIHATI

JAGADDAL

GARIFA

BANDEL JN.

MAGRA

TRIBENI

HALISAHAR

BANSBARIA

SIMANTAKALYANI

KALYANI

BAIDYABATI

SRIRAMPUR

JADAVPUR

BAGHAJATIN

METROPOLITAN STRUCTURE

E A

S T

E R

N

E X

P R

E S

S W

A Y

E A S T E R N

E X P R E S S W A Y

S O U T H E R N

E X P R E S S W A Y

CONNECTOR

CHANDANNAGAR

BHATPARA

SERAMPOREBARRACKPORE BARASAT EXP. WAY

SODEPUR CONNECTOR

EXTENDED BELGHARIA EXP. WAY

RAJARHAT CONNECTOR

SALT-LAKE CONNECTOR

B. N. DEY CONNECTOR

SONARPURCONNECTOR

DU

M D

UM

B

AR

RA

CK

PO

RE

EX

P. WAY

SAL

T LA

KE

BYP

ASS

GARIA SO

NARPUR R

OA

D

SANKRAIL

CONNECTOR

CH

AN

DM

ARI

RO

AD

RO

AD

C

ON

NE

CTI

NG

BA

IDY

AB

ATI

&

M

AG

RA

RO

AD

C

ON

NEC

TIN

G B

ARRA

CKP

OR

& G

AYES

HPU

R

KU

DG

HA

T - AM

TALA

RO

AD

WESTERN

RIVER

FRO

NT EX

P. W

AY

BAURIA

CONNECTOR

BELGHARIA EXP. WAY

NORTH

- S

OU

TH

RI V

ER

FRO

NT

RO

AD

Source : Master Plan for Traffic & Transportation i n KMA,2001 - 2025.

RAJARHAT NEW TOWN

SPATIAL DISTRIBUTION OF CENTRES - 2025

EAST KOLKATA WETLAND

D.H

. R

OA

D(N

.H. -

117

)

AIRPORT

PORT

METRO

CENTRE

Kolkata

METRO

SUB CENTRE

Howrah

TRANS METRO

CITY SYSTEM

MAJOR

CENTRE

DE

LHI

RO

AD

DU

RG

AP

UR

EX

PR

ES

SW

AY

NATIONAL HIGH

WA

Y-6

NH

-34

RE

SS

WA

YE

AS

TE

RN

EX

P

D.H

. RO

AD

Metro Center :

Metro Sub -Center :

Kolkata

Howrah

Trans Metro City System 5 nos.

Kalyani, Barasat,Salt Lake-Rajarhat,Baruipur, Uluberia- BagnanMajor centers: 15 nos.

Population Range:

Below 0.25 million

Dankuni, Sonarpur, Naihati-Bhatpara,Barrackpore, Baranagar-Kamarhati,DumDum-South Dum Dum, Garia-Jadavpur, South suburban, Budge-Budge-Maheshtala, Kona-Unsani, Bally-Jagacha, Serampore, Bhadreswar-Champdani, Hooghly-Chinsurah , Bansberia

PROPOSED METROPOLITAN STRUCTURE SPATIAL DISTRIBUTION OF CENTRES - 2025

Population projected :1.55 million (2025)

Kalyani

Barasat

Rajarhat

Baruipur

Uluberia9

Population projected :4.75 million (2025)

Population range :0.25-0.5 million

Population projected :3.0 million (2025)

Population projected :9.0 million (2025)

RAMRAJATALA

ULUBERIA

BUDGE-BUDGE

ABADA

FULESWAR

CHENGAIL

BAURIA

NALPUR

NUNGI

SANTOSHPUR

AKRA

ANDULMOURIGRAM

MIRZAPUR-BANKIPUR

BALARANBATI

HARIPAL

MADHUSUBANPUR

NALIKUL

CHANDANPUR

BARUIPARA

GODRA

DANKUNI

BEGANPUR

KAMARKUNDU

SINSUN

NASIBPUR

DIARA

PORABAZAR

DAKSHINESHWARBALI

CHAMPANTI

KALYANPUR

MALLIKPUR

BARUIPUR JN.

PARK CIRCUS

BALIGHAT

RLY.STN.HOWRAH

RAJCHANDRAPUR

TIKIAPARA

DASNAGAR

LILUA

BELUR

RLY STN.

SEALDAH

NARENDRAPUR HALT

SONARPUR JN.

SUBHASHGRAM

GARIA

KALIKAPUR

BIDHANNAGAR

PIALI

BARASAT JN.

SHYAMNAGAR

SODPUR

AGARPARA

BELGHARIA

HUGLIGHAT

HINDMOTOR

KONNAGAR

UTTARPARABELANAGAR

SEORAPHULI

RISHRA

BARRACKPUR

PALTA

KHARDAH

TITAGARH

CHUNCHURA

MANKUNDU

BHADRESWAR

ICHAPUR

HUGLI

NABA-BARRACKPURMADHYAMGRAM

HRIDAYPUR

KANKINARA

NAIHATI

JAGADDAL

GARIFA

BANDEL JN.

MAGRA

TRIBENI

HALISAHAR

BANSBARIA

SIMANTAKALYANI

KALYANI

BAIDYABATI

SRIRAMPUR

JADAVPUR

BAGHAJATIN

E A

S T

E R

N

E X

P R

E S

S W

A Y

E A S T E R N

E X P R E S S W A Y

S O U T H E R N

E X P R E S S W A Y

CONNECTOR

CHANDANNAGAR

BHATPARA

SERAMPOREBARRACKPORE BARASAT EXP. WAY

SODEPUR CONNECTOR

EXTENDED BELGHARIA EXP. WAY

RAJARHAT CONNECTOR

SALT-LAKE CONNECTOR

B. N. DEY CONNECTOR

SONARPURCONNECTOR

DU

M D

UM

B

AR

RA

CK

PO

RE

EX

P. W

AY

SA

LT L

AK

EB

YP

AS

S

GARIA SO

NARPUR

RO

AD

SANKRAIL

CONNECTO

R

CH

AN

DM

ARI

RO

AD

RO

AD

C

ON

NE

CTI

NG

BA

IDY

AB

ATI

&

M

AG

RA

RO

AD

CO

NN

EC

TIN

G B

AR

RA

CK

PO

R &

GAY

ES

HP

UR

KU

DG

HA

T - A

MTA

LAR

OA

D

WESTERN

RIV

ERFR

ONT

EXP.

WAY

BAURIA

CONNECTOR

BELGHARIA EXP. WAY

NORTH

- S

OU

TH

RIV

ER

FR

ON

TR

OA

D

Source : Master Plan for Traffic & Transportation i n KMA,2001 - 2025.

RAJARHAT NEW TOWN

NEW SETTLEMENT AREAS NEW TOWNSHIP : 2025

EAST KOLKATA WETLANDD

.H.

RO

AD

(N.H

. - 1

17)

AIRPORT

PROPOSED SETTLEMENT AREAS / NEW TOWNSHIP (14 Nos)

DU

RG

AP

UR

EX

PR

ES

SW

AY

NH

-34

RE

SS

WA

YE

AS

TE

RN

EX

P

Meeting N

H-6

Bansberia

Chandannagar

Baidyabati

Dankuni

West Howrah

Sankrail-Abada

Bauria

Maheshtala

Jagadishpur

South suburban

Natagachi

Bon-Hooghly

Barrackpore

Bhatpara

Southern Expressway10

RAMRAJATALA

ULUBERIA

BUDGE-BUDGE

ABADA

FULESWAR

CHENGAIL

BAURIA

NALPUR

NUNGI

SANTOSHPUR

AKRA

ANDULMOURIGRAM

LEGEND

EXISTING RAILWAY

EXISTING ROAD

RIVER / CANAL

KMA BOUNDARY

MIRZAPUR-BANKIPUR

BALARANBATI

HARIPAL

MADHUSUBANPUR

NALIKUL

CHANDANPUR

BARUIPARA

GODRA

DANKUNI

BEGANPUR

KAMARKUNDU

SINSUN

NASIBPUR

DIARA

PORABAZAR

BELMURI

SIBAICHANDIPUR

DAKSHINESHWARBALI

CHAMPANTI

KALYANPUR

MALLIKPUR

BARUIPUR JN.

PARK CIRCUS

BALIGHAT

RLY.STN.HOWRAH

RAJCHANDRAPUR

TIKIAPARADASNAGAR

LILUA

BELUR

RLY STN.SEALDAH

NARENDRAPUR HALT

SONARPUR JN.

SUBHASHGRAM

GARIA

KALIKAPUR

BIDHANNAGAR

PIALI

BARASAT JN.

SHYAMNAGAR

SODPUR

AGARPARA

BELGHARIA

HUGLIGHAT

HINDMOTOR

KONNAGAR

UTTARPARABELANAGAR

SEORAPHULI

RISHRA

BARRACKPUR

PALTA

KHARDAH

TITAGARH

CHUNCHURA

MANKUNDU

BHADRESWAR

ICHAPUR

HUGLI

NABA-BARRACKPURMADHYAMGRAM

HRIDAYPUR

KANKINARA

NAIHATI

JAGADDAL

GARIFA

BANDEL JN.

MAGRA

TRIBENI

HALISAHAR

BANSBARIA

SIMANTAKALYANI

KALYANI

BAIDYABATI

SRIRAMPUR

JADAVPUR

BAGHAJATIN

E A

S T

E R

N

E X

P R

E S

S W

A Y

E A S T E R N

E X P R E S S W A Y

S O U T H E R N

E X P R E S S W A Y

CONNECTOR

CHANDANNAGAR

BHATPARA

SERAMPOREBARRACKPORE BARASAT EXP. WAY

SODEPUR CONNECTOR

EXTENDED BELGHARIA EXP. WAY

RAJARHAT CONNECTOR

SALT-LAKE CONNECTOR

B. N. DEY CONNECTOR

SONARPURCONNECTOR

DU

M D

UM

B

AR

RA

CK

PO

RE

EX

P. W

AY

SA

LT L

AK

EB

YP

AS

S

GAR

IA SO

NARPU

R R

OA

D

SANKRAIL

CONNECTOR

CH

AN

DM

AR

I

RO

AD

RO

AD

C

ON

NE

CT

ING

BA

IDY

AB

AT

I &

M

AG

RA

RO

AD

CO

NN

EC

TIN

G B

AR

RA

CK

POR

& G

AY

ESH

PU

R

KU

DG

HA

T - A

MTA

LAR

OA

D

WESTERN

RIV

ERFR

ON

T EX

P. W

AY

BAURIA

CONNECTOR

BELGHARIA EXP. WAY

NORTH

- S

OU

TH

RIV

ER

FR

ON

TR

OA

D

PROPOSED NEW ARTERIAL ROAD

PROPOSED EXPRESSWAY

Source : Master Plan for Traffic & Transportation i n KMA,2001 - 2025.

PROPOSED INDUSTRIAL

RAJARHAT NEW TOWN

INDUSTRIAL GROWTH CENTRES IN KMA

GROWTH CENTRES

D.H

. RO

AD

(N.H

. - 1

17)

EXISTING/COMMITED

AIRPORT

PORT

INDUSTRIAL PARK

DU

RG

AP

UR

EX

PR

ES

SW

AY

NH

-34

RE

SS

WA

YE

AS

TE

RN

EX

P

Kalyani

Dankuni

Uluberia

Sonarpur

Rajarhat(outside KMA)

Champdani

Barasat-Nabapalli

INDUSTRIAL GROWTH CENTRES IN KMA

Southern Expressway

Leather Complex

1

245

6

7

3

8

1

2 Garment Park

3 Food Park4 Foundry Park

5 Chemical Park6 Industrial Park

7 Rubber Park

8 Apparel Park

Existing/Committed industrial parks

Proposed Industrial growth centre

11

HALDIA

PANSKURA

NABADWIP KRISHNANAGAR

BONGAON

BASIRHAT

D HARBOUR

OUTER RING ROAD

HALDIA-PANSKURA-

ARAMBAGH-BARDHAMAN-

NABADWIP-KRISHNANAGAR-

BONGAON-BASIRHAT-

CANNING-D HARBOUR:TOTAL

400 Km.

70Km. TO BE CONSTRUCTED

IN 4 GAPS

1

2

3

1

2

3

4

Arambagh Bypass

Taki Rd to Hasnabad

INTERMEDIATE METROPOLITAN REGION

ARAMBAG

BARDHAMAN

Canning to Suryapur

Raichawk-Kukrahati(Bridge)

CANNING

4Identified connectivity gaps:

12

HALDIA

PANSKURA

ARAMBAG

BARDHAMAN

NABADWIP KRISHNANAGAR

BONGAON

BASIRHAT

D HARBOUR

BARASAT BY-PASS

BUDGE-

BUDGE

AMTA

1. KALNA-SHANTIPUR

2. POLBA CONNECTOR

3. TARAKESHWAR-AMTA

4. BAURIA - BUDGE BUDGE

5. BARASAT- BUDGE

BUDGE (EASTERN Exp. &

SOUTHERN Exp.)

CANNING

INNER METROPOLITAN REGION

BAURIA

TARAKESHWAR

BARUIPUR

RANAGHAT

SHANTIPURKALNA

Existing Roads

Roads to be

constructed

Committed Roads

RAJARHAT

TOWNSHIP

SONARPUR

TOWNSHIP

POLBA

Identified connectivity gaps:

1

2

3

4

5

13

TRANSPORTATION SCENARIO IN KMA (2001 - 2025)

POPULATION : 147 TO 210 LAKHS (46%)MOTORISED VEHICLE: 10 TO 30 LAKHS (300%) DAILY TRANSIT PASS. VOL.: 187 TO 322 LAKHS (72%)GOODS VEHICLES : 41,000 TO 71,000 (73%)GOODS CARRIED / YEAR: 980 TO 1700 LAKH-TONS (73%)THE NUMBER OF PERSONS COMING DAILY TO KMA FROM THE ADJOINING AREAS BY RAIL AND ROADS WILL INCREASE FROM 12 TO 20 LAKHS (67%).TOTAL FAST TRANS-RIVER TRAFFIC WOULD INCREASE FROM 1.43 TO 3.12 LAKHS/ DAY(118%).

14

Bandel Polba Rd.Dhaniakhali Rd.

Tarakeswar Rd.

Serampur-Antpur Rd.

NH-6

as Rd.

Ben

ar

Howrah Amta Rd.

T.N. Mukherjee Rd.

NH

-34

Taki Rd.

NH-35

Kharib

ari R

d.

Canning Rd.

Sonardra

Bopur

Rd.

Rd.

Basanti Rd.

BaruipurAmtala Rd.

Budge BudgeRd.

EXISTING METROPOLITAN HIGH WAYS & ARTERIAL ROADS WITH RAILWAY NETWORK

NH

Railway

Del

hi R

oad.

NH

-117

Ranihati Amta Rd.

G.T

. Rd.

B.K

.Exp

ress

way

BaduRd.

B.T

. Rd.

Lauati Rd.

E.M

.Byp

ass

Garia- B

aruipurR

d.

Cha

mpa

hati

Arterial Road

To Ban

gaon

To

Ran

agh

at

To Burdw

an

To Kharagpur

To Diamond Harbour

KMA

Durgapur

Expressw

ay.(NH

-2)

To Kulpi

Metro Core

15

Bandel Polba Rd.Dhaniakhali Rd.

Tarakeswar Rd.

Serampur-Antpur Rd.

NH-6

as Rd.

Ben

ar

Howrah Amta Rd.

T.N. Mukherjee Rd.

NH

-34

Taki Rd.

NH-35

Kharib

ari R

d.

Canning Rd.

Sonardra

Bopur

Rd.

Rd.

Basanti Rd.

BaruipurAmtala Rd.

Budge BudgeRd.

PROPOSED METROPOLITAN HIGH WAYS NETWORK IN KMA

NH

Railway

Del

hi R

oad.

NH

-117

Ranihati Amta Rd.

G.T

. Rd.

B.K

.Exp

ress

way

BaduRd.

B.T

. Rd.

Lauati Rd.

E.M

.Byp

ass

Garia- B

aruipurR

d.

Cha

mpa

hati

Arterial Road

To Ban

gaon

To

Ran

agh

at

To Burdw

an

To Kharagpur

To Diamond Harbour

KMA

Durgapur

Expressw

ay.(NH

-2)

To Kulpi

Metro Core

1

2

Eastern Expressway

3

Southern Expressway

4

BudgeBudgeNH-6 Connector

5

Western Riverfront Expressway

6

Serampur-Barrackpur-BarasatExpressway

7BelghoriaExpressway

DumDum Bkp. Expressway Chandannagar-

Bhatparaconnector

8

Extended BelghoriaExpressway

9

1 2

3

4

8

5 6

7

9

ProposedTo Raichak

Airport

16

Bandel Polba Rd.Dhaniakhali Rd.

Tarakeswar Rd.

Serampur-Antpur Rd.

NH-6

as Rd.

Ben

ar

Howrah Amta Rd.

T.N. Mukherjee Rd.

NH

-34

Taki Rd.

NH-35

Kharib

ari R

d.

Canning Rd.

Sonardra

Bopur

Rd.

Rd.

Basanti Rd.

BaruipurAmtala Rd.

Budge BudgeRd.D

elhi

Roa

d.

NH

-117

Ranihati Amta Rd.

G.T

. Rd.

B.K

.Exp

ress

way

BaduRd.

B.T

. Rd.

Lauati Rd.

E.M

.Byp

ass

Garia- B

aruipurR

d.

Cha

mpa

hati

To Ban

gaon

To

Ran

agh

at

To Burdw

an

To Kharagpur

To Diamond Harbour

Durgapur

Expressw

ay.(NH

-2)

To Kulpi

1

2

Kamalgazi-Baruipur Rd.

3

Mallickpur - Garia Rd.

4

Mukundapur - Chakberia Rd.5

Ballygunj Connector

6

Saltlake Connector

7

Rajarhat Connector

8 Sodepur Connector

9

Barrackpore – Gayeshpur Rd.

10

11

Central Howrah Art. Rd.

12

Sankrail Connector

13

Thakurpukur Budge Budge Rd.

Maheshtala Connector

Pailan Jagadishpur Rd.

Kudghat Amtala Rd.

Baidyabati – Mogra Rd.

14

15

16 G.T.Rd-Delhi Rd. Connector at Chandanagar

17 Halisahar Connector Balidagahta-BkExp

18 BD Expway-Old Kolkata Rd.

19 Budge Budge Rd Bypass

20 Elachi-Pailan Road

13

2

5

74

6

11

10

9

8

14

12

1315

16

17

18

19

20

PROPOSED MAJOR ARTERIAL ROAD NETWORK IN KMA (excluding metrocore)

Proposed Arterial Road

17

Bandel Polba Rd.Dhaniakhali Rd.

Tarakeswar Rd.

Serampur-Antpur Rd.

NH-6

as Rd.

Ben

ar

Howrah Amta Rd.

T.N. Mukherjee Rd.

NH

-34

Taki Rd.

NH-35

Kharib

ari R

d.

Canning Rd.

Sonardra

Bopur

Rd.

Rd.

Basanti Rd.

BaruipurAmtala Rd.

Budge BudgeRd. NH

Railway

Del

hi R

oad.

NH

-117

Ranihati Amta Rd.

G.T

. Rd.

B.K

.Exp

ress

way

BaduRd.

B.T

. Rd.

Lauati Rd.

E.M

.Byp

ass

Garia- B

aruipurR

d.

Cha

mpa

hati

Arterial Road

To Ban

gaon

To

Ran

agh

at

To Burdw

an

To Kharagpur

To Diamond Harbour

KMA

Durgapur

Expressw

ay.(NH

-2)

To Kulpi

Metro Core

WIDENING OF EXISTING ARTERIAL ROADS IN KMA (27 nos.)

Airport

18

HO

WR

AH

S A

L K

I A

DE

RE

ALI

PU

R R

D.

H I

D E

R O

A D

T A

R A

T A

L A

BUDGEBUDGE

TARATALA ROAD

HA

RB

OU

R

DIA

MO

ND

B I R E N R O Y

ROAD

R O A D

MAHATMA

JAM

ES

LON

G

RO

AD

SA

RA

NI

GANDHIROAD

TOLLYGUNJ

CIRCULAR ROAD

RO

AD

B. L

. SA

HA

BE

LVE

R O A D

A N D

U L

AN O N A

L

T I

H I G H W A Y

NETAJI

BENARAS RD.

R O

A D

DOCK

AMTA

HOWRAH

RD.

SETU

F O

R E

S H

O R

E

ROAD

CALCUTTA PORT

SHALIMAR

RO

AD

COARSERACE

VIDYASAGAR WILLIUMFORT

ANANTALA

BELILIOUS RD.

SUBHAS

PANCH

ROAD

RD.

G.T

. RO

AD

N O.

6

AV

.A

ME

R A

L I

BO

SE

M A

L L I C

ROADLAYALKA

N E T A J I

S U B H A S

R O A D

HAZRA ROAD

RASH BEHARI AV.

SOUTHERN AVENUE

A.P.SHAH

S.P

. MU

KH

RE

RJE

ER

OA

DA

.T. M

UK

HE

RJE

E

RD

. SA

RA

T

ROAD

R A

J AS

. C.

RO

AD

AH

AT

GA

RI

E.

M.

B Y

-

P A

S S

G A R I A

M. R

O A

D

R O

A D

R. B.CONN E CTOR

NAGAR

BIDHAN

K A J I

N

A J R U

L

S

O

R

E

CO

SS

IPO

RE

D U M D U M R D.

RD.

RA

M

MO

HA

N

S.N.BANERJEE RD.

B.B. GANGULI ST.

A. J. C. BOSE RD.

RO

AD

LELIN SARANI

SA

YE

D

SA

RA

NI

RO

AD

A.J

.C. B

OS

E

SEAL

DAH

A.P

.C.

SA

RA

NI

S C

H O

O L

RABINDRA

SETU

RA

BIN

D

RA

STR

AN

D

RD

.

RD.

KESAB SEN ST.

VIVEKANANDA

AVED ANANDA RD.

SARANI

AUROB INDA

AV

EN

UE

M.G.

C.R

.

J.M

. AV

E.

RO

Y R

D.

RD.

NARKELDANGA

C.I.

T.

RO

AD

NARIKELDANGA MAIN ROAD

BELIAGHATA MAIN ROAD

ONNEC

P.C. CTOR

MAIN RD.

B. N.

MANIKTALA MAIN RD.MANIKTALA

MAIN RD.

ULTAD

MAIN RD.

ANGA

J E S

RO

AD

VIVEKANANDA

SETU

B.

T.

RO

AD

A V

E N

U E

D E Y R O A D

A I R P O R T

R O

A D

KON

A

EXPRESSWAY

BAG

RA

J

H. M

UK

HE

RJE

ER

OA

D

EAST WEST RD

HO

WR

AH

DR

AIN

AGE

CA

NA

LRD

.

R.S

.

R.S.

13

2

10

5

4

1514

1

9

8

7

11

3

12

6

PROPOSED ARTERIAL ROADS IN METRO CORE

16New Kolkata Passenger Terminal

19

Extn. Central Rd.

River front Rd. in Howrah

1

2

3

4

5

6

7

8

Belgachia Rd-Ultadanga Rd. Connector

Extn. Of Howrah Drainage Canal Rd.

Moulali EMBP Connector

D.H. Rd.-D.S. Rd. along Boat canal

Howrah Drainage canal Rd upto Andul Rd.

Grand Foreshore Rd. Extn

Road connecting VIP.Rd.Jessore Rd., BT. Rd. along Bagjola Canal

9

10

11

D.H. Rd.-D.S. Rd. Connector

Central Howrah Arterial Rd.

12 Drainage canal Rd. NH-6 Connector

Southern Ave. & P.A Shah. Rd Connector

13

Extension of Sarani – Lenin Sarani

14

Gobindo Khatik Rd. Extn. to Canal East Road

15

River Front Rd. in Kolkata16

LIST OF PROPOSED ARTERIAL ROADS IN METRO CORE

20

HO

WRAH

S A

L K

I A

DE

RE

AL

IPU

R R

D.

H I

D E

R O

A D

T A

R A

T A

L A

BUDGEBUDGE

TARATALA ROAD

HA

RB

OU

R

DIA

MO

ND

B I R E N R O Y

ROAD

R O A D

MAHATMA

JAM

ES

LO

NG

RO

AD

SA

RA

NI

GANDHIROAD

TOLLYGUNJ

CIRCULAR ROAD

RO

AD

B.L

. SA

HA

BE

LVE

R O A D

A N D

U L

AN O N A

L

T I

H I G H W

A Y

NETAJI

BENARAS RD.

R O

A D

DOCK

AMTA

HOWRAH

RD.

SETU

F O

R E

S H

O R

E

RO

AD

CALCUTTA PORT

SHALIMAR

RO

AD

COARSERACE

VIDYASAGAR WILLIUMFORT

ANANTALA

BELILIOUS RD.

SUBHAS

PANCH

ROAD

RD.

G.T

. RO

AD

N O.

6

AV

.A

ME

R A

LI

BO

SE

M A

L L

I C

ROADLAYALKA

N E T A J I

S U B H A S

R O A D

HAZRA ROAD

RASH BEHARI AV.

SOUTHERN AVENUE

A.P.SHAH

S. P

. M

UK

HR

ER

JEE

RO

AD

A.T

. M

UK

HE

RJE

E

RD

. SA

RA

T

ROAD

R A

J AS

. C.

RO

AD

AH

AT

GA

RI

E.

M.

B Y

-

P A

S S

G A R I A

M. R O

A D

R O

A D

R. B.CONN

E CTOR

NAGAR

BIDHAN

K A J I

N

A J R U

L

S

O

R

E

CO

SS

IPO

RE

D U M D U M R D.

RD.

RA

M

MO

HA

N

S.N.BANERJEE RD.

B.B. GANGULI ST.

A. J. C. BOSE RD.

RO

AD

LELIN SARANI

SA

YE

D

SA

RA

NI

RO

AD

A.J

.C. B

OS

E

SEALDAH

A.P

.C.

SA

RA

NI

S C

H O

O L

RABINDRA

SETU

RA

BIN

D

RA

ST

RA

ND

R

D.

RD

.

KESAB SEN ST.

VIVEKANANDA

AVED ANANDA RD.

SARANI

AUROB INDA

AV

EN

UE

M.G.

C.R

.

J.M

. AV

E.

RO

Y

RD

.

RD.

NARKELDANGA

C.I.

T.

RO

AD

NARIKELDANGA MAIN ROAD

BELIAGHATA MAIN ROAD

ONNEC

P.C. CTOR

MAIN RD.

B. N.

MANIKTALA MAIN RD.MANIKTALA

MAIN RD.

ULTAD

MAIN RD.

ANGA

J E S

RO

AD

VIVEKANANDA

SETU

B.

T.

RO

AD

A V

E N

U E

D E Y R O A D

I S

L A

M

A I R P O R T

R O

A D

KO

NA

EXPRESSWAY

BAG

RA

J

H. M

UK

HE

RJ E

ER

OA

D

RABINDRA SAROBAR

TOLLYGUNGE

JATIN DAS

KALIGHAT

PARK

SADANRABINDRA

NETAJI BHABAN

CHANDNI

MAIDAN

ESPLANADE

PARK STREET

CHAWK

SHYAMBAZAR

BELGACHIA

DUM DUM

SOVABAZAR

CENTRAL

PARKGIRISH

M.G. ROAD

EXTENDED BELGHARIA EXP. WAY

ROAD ALONG

BAGJOLA

CAN

AL

RIV

ER

FR

ON

TA

RTE

RIA

L

ROAD

RIV

ER

FRO

NT

RO

AD

GRAND F

ORESHORE R

D.

EAST WEST RD

CE

NTR

AL

HO

WR

AH

A

RTE

RIA

L

RD

.

D.C. DEY RD.

HO

WR

AH

DR

AIN

AG

E

CA

NA

LR

D.

R.S

.

R.S

.

Proposed widening of arterial roads in Metro Core

Proposed Widening of Existing Road

1

2

3

4

5

6

7

89

1011

1213

14

15

16

17

18

1920 21

22

23

24

26 2728

29

30

312532

33

34

35

36

37

21

1 EM Bypass

2 P.A. Connector

3 Manicktoal main Rd

4 Narkeldanga main Rd

5 Basanti Rd.

6 Grand Foresore Rd

7 Kazi Nazrul Islam Sarani

8 Jessore Rd.

9 Dum Dum Rd.

10 B.T.Rd.

11 G.T.Rd

12 Benaras Rd.

13 Amta Rd.

14 Kona Expway

15 Andul Rd.

16 Foresore Rd.

17 Raja Manindra Rd.

18 Budge Budge Rd

19 Taratala Rd

20 Hide Rd

21 Coal Dock ,Remount Rd.,

22 NH-117

23 SP Mukherjee Rd.

24 Park Street

25 Bentinck Street

26 Kyd Street Ext.

27 Chaulpatti Rd.

28 Beliaghata Main Rd.

29 Kalutola Street

30 JL Mallik Street

31 India Exchange Place

32 Hare Street

33 M.Bhattacharjee Rd.

34 Biren Roy Rd

35 MG Road

36 East West Rd, Howrah

37 G.K.Rd – B N Dey Rd Connector

List of arterial roads to be widened in Metro Core

22

YEAR Daily Volume

2011 2,03,100

2021 2,77,500

2025 3,12,400

ESTIMATED TRANSRIVER VEHICULAR TRAFFIC

23

E A

S T

E R

N

E X

P R

E S

S W

A Y

E A S T E R N

E X P R E S S W A Y

S O U T H E R N

E X P R E S S W A Y

CONNECTOR

CHANDANNAGAR

BHATPARA

SERAMPOREBARRACKPORE BARASAT EXP. WAY

SODEPUR CONNECTOR

EXTENDED BELGHARIA EXP. WAY

RAJARHAT CONNECTOR

SALT-LAKE CONNECTOR

B. N. DEY CONNECTOR

SONARPURCONNECTOR

DU

M D

UM

B

AR

RA

CK

PO

RE

EX

P. W

AY

SA

LT L

AK

EB

YP

AS

S

GARIA SO

NAR

PUR

R

OA

D

SANKRAIL

CONNECTO

R

CH

AN

DM

AR

I

RO

AD

RO

AD

C

ON

NE

CT

ING

BA

IDY

AB

AT

I &

M

AG

RA

RO

AD

CO

NN

EC

TIN

G B

AR

RA

CK

PO

R &

GA

YE

SH

PU

R

KU

DG

HA

T - A

MT

ALA

RO

AD

WESTE

RN R

IVER

FRO

NT

EXP.

WAY

BAURIA

CONNECTOR

BELGHARIA EXP. WAY

NORTH

- S

OU

TH

RIV

ER

FR

ON

TR

OA

D

RO

AD

FRO

M

MU

KU

ND

AP

UR

TO CHAMPAHATI

ROAD FROM

MA

LLIC

KP

UR

TO

GA

RIA

ELACHI PAILAN ROAD

RO

AD

FR

OM

SO

UT

HE

RN

E

XP

. WA

Y T

O U

ST

HI

M.A

.R.

� � � � �

� � � �

RLY STN.

SEALDAH

�� �� �����

� � � � �

� � � � �

PORT AREA

HOWRAH RLY.STN.

AIRPORT

Proposed Bridges

(TOTAL 5 Nos.)

•Iswar Gupta Setu – 2nd Phase

•Serampore-Barrackpore

•Bhatpara-Chandennagar

•Sovabazar-Salkia

•Budge Budge - Bauria

EXISTING & PROPOSED BRIDGES ACROSS HOOGHLY

RIVER IN KMA

Vivekananda Setu

Rabindra Setu

Vidyasagar Setu

Proposed Bridges

24

Modules Volume of passengers (in lakhs)

2001 2011 2016 2021 2025

Surface Transit

Private Bus 85.00(7000) 94.00 100.00 107.00 112.00

Public Bus 12.50(1550) 16.00 19.00 25.00 30.00

Tram/LRT 2.00(200) 5.00 7.00 9.00 10.00

Minibus 12.50(1560) 16.00 18.00 20.00 22.00

Ferry 2.40 4.00 5.00 6.00 7.00

Chartered Bus 2.70(2150) 5.00 7.00 9.00 11.00

Sub-Total 117.10 140.00 156.00 176.00 192.00

Rail

Suburban Rail 32.50 37.50 41.00 44.00 46.00

Metro Rail 2.00 8.00 10.00 11.50 13.00

Circular Rail 0.20 2.50 3.00 3.50 4.00

Sub-Total 34.70 48.00 54.00 59.00 63.00

MOVEMENT OF PASSENGERS WITHIN KMAAnticipated modal split

Average Week day

25

Modules Volume of passengers (in lakhs)

2001 2011 2016 2021 2025

Para Transit

Taxi 11.00(22000) 17.00 22.00 26.00 28.00

Autorickshaw 16.50(25000) 23.00 27.00 30.00 31.00

Cyclerickshaw/Rickshaw/Cyclevan etc.

7.50(25000) 7.00 7.00 8.00 8.00

Sub Total 35.00 47.00 56.00 64.00 67.00

Total 187.00 235.00 266.00 299.00 322.00

MOVEMENT OF PASSENGERS WITHIN KMA(Contd)..

26

NUMBER OF PASSENGERS CROSSING THE RIVER HOOGHLY

BY FERRY SERVICES IN KMA AVERAGE WEEKDAY-2001

WITH IN THE METRO CORES AREA

1,09,533

OUTSIDE THE METROCORE AREA

87,689

TOTAL 1,97,222

� ���� ����

� � � � �

� � � �

RLY STN.

SEALDAH

�� �� �����

� � � � �

� � � � �

�� �� �����

☺��� � �����

PORT AREA

AIRPORT

HOWRAH

RLY.STN.

EXISTING FERRY SERVICE IN KMA

Ferry Ghat For BhutBhutiFerry Ghat For Launch & VesselsFerry Ghat For Launch / Vessels & BhutBhuti

Total No of Ferry Stations : 72

27

HO

WR

AH

S A

L K

I A

SETU

F O

R E

S H

O R

E

RO

AD

VIDYASAGAR WILLIUMFORT

ANANTALA

BELILIOUS RD.

PANCHRD.

G.T

. RO

AD

NAGAR

BIDHAN

K A J I

N

A J R U

L

S

O

R

E

CO

SS

IPO

RE

D U M D U M R D.

RD

.

RA

M

MO

HA

N

S.N.BANERJEE RD.

B.B. GANGULI ST.

LELIN SARANI

SA

RA

NI

RO

AD

A.J

.C. B

OS

E

SEAL

DAH

A.P

.C.

SA

RA

NI

S C

H O

O L

RABINDRA

SETU

RA

BIN

D

RA

ST

RA

ND

R

D.

RD

.

KESAB SEN ST.

VIVEKANANDA

AVED ANANDA RD.

SARANI

AUROB INDA

AV

EN

UE

M.G.

C.R

.

J.M

. AV

E.

RO

Y R

D.

RD.

NARKELDANGA

C.I.

T.

RO

AD

NARIKELDANGA MAIN ROAD

BELIAGHATA MAIN ROAD

MAIN RD.

MANIKTALA MAIN RD.MANIKTALA

MAIN RD.

ULTAD

MAIN RD.

ANGA

J E S

RO

AD

B.

T.

RO

AD

A V

E N

U E

A I R P O R T

R O

A D

BAG

RA

J

EAST WEST RD

R.S

.

R.S.

Krishnapur C

analTo K

ulti River

Circu

lar Can

al

Riv

er

Hoogh

ly

Restoration of water transport facility

PROPOSED WATER TRANSPORT FACILITIES

faci

litie

s

Inte

nsifi

catio

nof

wat

ertr

ansp

ort

28

Bandel Polba Rd.Dhaniakhali Rd.

Tarakeswar Rd.

Serampur-Antpur Rd.

NH-6

as Rd.

Ben

ar

Howrah Amta Rd.

T.N. Mukherjee Rd.

NH

-34

Taki Rd.

NH-35

Kharib

ari R

d.

Canning Rd.

Sonardra

Bopur

Rd.

Rd.

Basanti Rd.

BaruipurAmtala Rd.

Budge BudgeRd. NH

Railway

Del

hi R

oad.

NH

-117

Ranihati Amta Rd.

G.T

. Rd.

B.K

.Exp

ress

way

BaduRd.

B.T

. Rd.

Lauati Rd.

E.M

.Byp

ass

Garia- B

aruipurR

d.

Cha

mpa

hati

Arterial Road

To Ban

gaon

To

Ran

agh

at

To Burdw

an

To Kharagpur

To Diamond Harbour

KMA

Durgapur

Expressw

ay.(NH

-2)

To Kulpi

Metro Core

PROPOSED BUS TERMINALS IN KMA

12

34

5

8

9

6

7

10

11

1213

14

15

16

17

18

19202122

23

24

25

26

2729

29

20 Tahkurpukur

19 Garia

18 East Kolkata

17 Science City

16 Rajarhat Newtown

21 Maheshtala

22 Budge Budge

23 Uluberia

24 Baruipur

25 Santragachi

26 Pujali

27 Bally

28 New Kolkata RS.

29 Airport

1 Bansberia

2 Kalyani

3 Chinsura

4 Chandannagar

5 Serampur

6 Barrackpur

7 Barasat

8 Dankuni

9 Domjur

10 Dakshineswar

11 Shalimar

12 Andul

13 Vidyasagar Setu

14 Gardenreach

15 Rajarhat

LIST OF PROPOSED BUS TERMINALS IN KMA

30

� � � � �

� � � �

�� �� �����

� � � � �

� � � � �

�� �� �����

☺��� � �����

� ���� ����

RO

ADRO

AD

R A I L W A Y

O U T E R

R I N G

PROPOSED MASS RAPID TRANSPORT

SYSTEM IN KMA

Joka ThakurpukurGaria

Tollyganj

Existing

Proposed

Work In ProgressPanihati

New Dasnagar`Rajarhat

Dum Dum

Barrackpore

Airport1. East-West Metro

(Airport-New Dasnagar)

2. North-South Elevated MRTS (Barrackpore –

Joka)

31

Bandel Polba Rd.Dhaniakhali Rd.

Tarakeswar Rd.

Serampur-Antpur Rd.

NH-6

as Rd.

Ben

ar

Howrah Amta Rd.

T.N. Mukherjee Rd.

NH

-34

Taki Rd.

NH-35

Kharib

ari R

d.

Canning Rd.

Sonardra

Bopur

Rd.

Rd.

Basanti Rd.

BaruipurAmtala Rd.

Budge BudgeRd. NH

Railway

Del

hi R

oad.

NH

-117

Ranihati Amta Rd.

G.T

. Rd.

B.K

.Exp

ress

way

BaduRd.

B.T

. Rd.

Lauati Rd.

E.M

.Byp

ass

Garia- B

aruipurR

d.

Cha

mpa

hati

Arterial Road

To Ban

gaon

To

Ran

agh

at

To Burdw

an

To Kharagpur

To Diamond Harbour

KMA

Durgapur

Expressw

ay.(NH

-2)

To Kulpi

Metro Core

New Kolkata (Chitpur)

Majherhat

SealdahShalimar

Howrah

Existing Major Railway Terminals

Proposed Major Railway Terminals

Circular Railway

EXISTING &PROPOSED RAIL NETWORK IN KMA

Extn. Of Railway32

Bandel Polba Rd.Dhaniakhali Rd.

Tarakeswar Rd.

Serampur-Antpur Rd.

NH-6

as Rd.

Ben

ar

Howrah Amta Rd.

T.N. Mukherjee Rd.

NH

-34

Taki Rd.

NH-35

Kharib

ari R

d.

Canning Rd.

Sonardra

Bopur

Rd.

Rd.

Basanti Rd.

BaruipurAmtala Rd.

Budge BudgeRd. NH

Railway

Del

hi R

oad.

NH

-117

Ranihati Amta Rd.

G.T

. Rd.

B.K

.Exp

ress

way

BaduRd.

B.T

. Rd.

Lauati Rd.

E.M

.Byp

ass

Garia- B

aruipurR

d.

Cha

mpa

hati

Arterial Road

To Ban

gaon

To

Ran

agh

at

To Burdw

an

To Kharagpur

To Diamond Harbour

KMA

Durgapur

Expressw

ay.(NH

-2)

To Kulpi

Metro Core

Majherhat

Barrackpore

Shalimar

Howrah

PROPOSED LIGHT RAIL TRANSIT ALIGNMENTS IN KMA

Kalyani

Airport

Sonarpur

LRT33

MOVEMENT 0F PASSENGERSAVERAGE WEEKDAY PASSENGER VOLUME IN LAKHS

MODES 2001 2025 %INCREASE

SUBURBAN RAIL 32.5 46.0 41

METRO RAIL 2.0 13.0 550

CIRCULAR RAIL 0.2 4.0 1900

TRAM/LRT 2.0 10.0 400

BUS 113 175 55

PARA TRANSIT 35.0 67.0 91

INLAND WATER TRANSPORT(Ferry)

2.4 7.0 191

TOTAL 187.0 322.0 72

34

Bandel Polba Rd.Dhaniakhali Rd.

Tarakeswar Rd.

Serampur-Antpur Rd.

NH

-6

as Rd.

Ben

ar

Howrah Amta Rd.

T.N. Mukherjee Rd.

NH

-34

Taki Rd.

NH-35

Kharib

ari R

d.

Canning Rd.

Sonardra

Bopur

Rd.

Rd.

Basanti Rd.

BaruipurAmtala Rd.

Budge BudgeRd.

PROPOSED TRUCK TERMINALS CUM WHOLESALE TRADING CENTRES IN KMA

Del

hi R

oad.

NH

-117

Ranihati Amta Rd.

G.T

. Rd.

B.K

.Exp

ress

way

BaduRd.

B.T

. Rd

.

Lauati Rd.

E.M

.Byp

ass

Garia- B

aruipurR

d.

Cha

mpa

hati

To Ban

gaon

To

Ran

agh

at

To Burdw

an

To Kharagpur

To Diamond Harbour

Durgapur

Expressw

ay.(NH

-2)

To Kulpi

BARASAT

AMTALA

DANKUNI

RAJARHAT

DHULAGARH

KONA

Proposed TTWTC

Proposed Intermediate Truck Terminals

Under ConstructionKalyani

Bansberia

Naihati

Chinsurah

Barrackpore

Port area

ChampahatiBudge Budge

35

Bandel Polba Rd.Dhaniakhali Rd.

Tarakeswar Rd.

Serampur-Antpur Rd.

NH

-6

as Rd.

Ben

ar

Howrah Amta Rd.

T.N. Mukherjee Rd.

NH

-34

Taki Rd.

NH-35

Kharib

ari R

d.

Canning Rd.

Sonardra

Bopur

Rd.

Rd.

Basanti Rd.

BaruipurAmtala Rd.

Budge BudgeRd.

PROPOSED AREA WIDE TRAFFIC OPERATION & MANAGEMENT I MPROVEMENT SCHEMES

Del

hi R

oad.

NH

-117

Ranihati Amta Rd.

G.T

. Rd.

B.K

.Exp

ress

way

BaduRd.

B.T

. Rd.

Lauati Rd.

E.M

.Byp

ass

Garia- B

aruipurR

d.

Cha

mpa

hati

To Ban

gaon

To

Ran

agh

at

To Burdw

an

To Kharagpur

To Diamond Harbour

Durgapur

Expressw

ay.(NH

-2)

To Kulpi

Area wide Traffic operation & management improvement

Budge Budge

Alampur

Seoraphulilevel crossing

New Assam Link Rd. - Iswar Gupta Setu

Naihati Stn. Area

BarrackpurChiriamore

Barasat

MadhyamgramChowrasta

Garia

Baruipur Level Corssing

Behala Chowrasta 36

HO

WR

AH

S A

L K

I A

DER

E

ALI

PU

R R

D.

H I

D E

R O

A D

T A

R A

T A

L A

BUDGEBUDGE

TARATALA ROAD

HA

RB

OU

R

DIA

MO

ND

B I R E N R O Y

ROAD

R O A D

MAHATMA

JAM

ES

LON

G

RO

AD

SA

RA

NI

GANDHIROAD

TOLLYGUNJ

CIRCULAR ROAD

RO

AD

B.L

. SA

HA

BE

LVE

R O A D

A N D

U L

AN O N A

L

T I

H I G H W

A Y

NETAJI

BENARAS RD.

R O

A D

DOCK

AMTA

HOWRAH

RD.

SETU

F O R

E S

H O

R E

R

OAD

CALCUTTA PORT

SHALIMAR

RO

AD

COARSERACE

VIDYASAGAR WILLIUMFORT

ANANTALA

BELILIOUS RD.

SUBHAS

PANCH

ROAD

RD.

G.T

. RO

AD

N O.

6

AV

.A

ME

R A

LI

BO

SE

M A

L L I C

ROADLAYALKA

N E T A J I

S U B H A S

R O A D

HAZRA ROAD

RASH BEHARI AV.

SOUTHERN AVENUE

A.P.SHAH

S.P

. MU

KH

RE

RJE

ER

OA

DA

.T. M

UK

HE

RJE

E

RD

. SA

RA

T

ROAD

R A

J AS

. C.

RO

AD

AH

AT

GA

RI

E.

M.

B Y

-

P A

S S

G A R I A

M. R

O A D

R O

A D

R. B.CONN E CTOR

NAGAR

BIDHAN

K A J I

N A J R

U L

S

O

R

E

CO

SS

IPO

RE

D U M D U M R D.

RD.

RA

M

MO

HA

N

S.N.BANERJEE RD.

B.B. GANGULI ST.

A. J. C. BOSE RD.

RO

AD

LELIN SARANI

SA

YE

D

SA

RA

NI

RO

AD

A.J

.C. B

OS

E

SEAL

DAH

A.P

.C.

SA

RA

NI

S C

H O

O L

RABINDRA

SETU

RA

BIN

D

RA

ST

RA

ND

R

D.

RD.

KESAB SEN ST.

VIVEKANANDA

AVED ANANDA RD.

SARANI

AUROB INDA

AV

EN

UE

M.G.

C.R

.

J.M

. AV

E.

RO

Y R

D.

RD.

NARKELDANGA

C.I.

T.

RO

AD

NARIKELDANGA MAIN ROAD

BELIAGHATA MAIN ROAD

ONNEC

P.C. CTOR

MAIN RD.

B. N.

MANIKTALA MAIN RD.MANIKTALA

MAIN RD.

ULTAD

MAIN RD.

ANGA

J E S

RO

AD

VIVEKANANDA

SETU

B.

T.

RO

AD

A V

E N

U E

D E Y R O A D

I S

L A

M

A I R P O R T

R O

A D

KON

A

EXPRESSWAY

BAG

RA

J

H. M

UK

HE

RJE

ER

OA

D

RABINDRA SAROBAR

TOLLYGUNGE

JATIN DAS

KALIGHAT

PARK

SADANRABINDRA

NETAJI BHABAN

CHANDNI

MAIDAN

ESPLANADE

PARK STREET

CHAWK

SHYAMBAZAR

BELGACHIA

DUM DUM

SOVABAZAR

CENTRAL

PARKGIRISH

M.G. ROAD

EXTENDED BELGHARIA EXP. WAY

ROAD ALONG

BAGJOLA

CAN

AL

RIV

ER

FR

ON

TA

RT

ER

IAL

ROAD

RIV

ER

FRO

NT

RO

AD

GRAND F

ORESHO

RE RD.

EAST WEST RD

CE

NT

RA

L H

OW

RA

H

AR

TER

IAL

R

D.

D.C. DEY RD.

HO

WR

AH

DR

AIN

AG

E

CA

NA

LRD

.

R.S

.

R.S.

Area wide Traffic engineering & operation improvement measures

Proposed Area wide Traffic engineering & operation

improvement measures in Metro Core

Howrah

Shyambazar

Ultadanga

Sealdah Stn. AreaBBD Bag & Esplanade

Park Circus

Gariahat

Port area

Burrabazar

Bamungachi-Belgachia

37

E A

S T

E R

N

E X

P R

E S

S W

A Y

E A S T E R N

E X P R E S S W A Y

S O U T H E R N

E X P R E S S W A Y

CONNECTOR

CHANDANNAGAR

BHATPARA

SERAMPOREBARRACKPORE BARASAT EXP. WAY

SODEPUR CONNECTOR

EXTENDED BELGHARIA EXP. WAY

RAJARHAT CONNECTOR

SALT-LAKE CONNECTOR

B. N. DEY CONNECTOR

SONARPURCONNECTOR

DU

M D

UM

B

AR

RA

CK

PO

RE

EX

P. W

AY

SA

LT L

AK

EB

YP

AS

S

GARIA SO

NARPUR

R

OA

D

SANKRAIL

CONNECTOR

CH

AND

MAR

I

RO

AD

RO

AD

C

ON

NE

CT

ING

BA

IDY

AB

ATI

&

M

AG

RA

RO

AD

CO

NN

EC

TIN

G B

AR

RA

CK

PO

R &

GA

YE

SHP

UR

KU

DG

HA

T - AM

TALA

RO

AD

WESTE

RN R

IVER

FRO

NT EX

P. W

AY

BAURIA

CONNECTOR

BELGHARIA EXP. WAY

NORTH-

SO

UTH

RIV

ER

FR

ON

TR

OA

D

� ���� ���R

OA

D FR

OM

MU

KUN

DA

PUR

TO CHAMPAHATI

ROAD FROM

MA

LLICK

PU

R T

O G

AR

IAELACHI PAILAN ROAD

RO

AD

FR

OM

SO

UT

HE

RN

E

XP

. WA

Y T

O U

STH

I

M.A

.R.

� � � � �

� � � �

RLY STN.

SEALDAH

�� �� �����

� � � � �

� � � � �

�� �� �����

☺��� � �����

PORT AREA

HOWRAH RLY.STN.

AIRPORT

PROPOSED FLYOVERS AND UNDERPASSES IN KMA

(Outside metro core)

38

Underpass below railway track at Chinsurah

Underpass at Bandel Railway stn

Construction of single RCC Box tanel and widening of existing approach road by the side of existing underpass at Bally railway station

At Baruipur over the railway track

Widening of O.T. Link Road upto NH-6 with a flyover at Dompara Cabin No.-7

Barasat on NH-34 across the railway track

Khardah Railway Station

Halisahar Railway Station

Naihati Railway Station

Grade separated vehicular facility at Belur Railway station

PROPOSED FLYOVERS AND UNDERPASSES IN KMA

39

HO

WR

AH

S A

L K

I A

DER

E

AL

IPU

R R

D.

H I

D E

R O

A D

T A

R A

T A

L A

BUDGEBUDGE

TARATALA ROAD

HA

RB

OU

R

B I R E N R O Y

ROAD

R O A D

LON

G

RO

AD

SA

RA

NI

TOLLYGUNJ

CIRCULAR ROAD

RO

AD

B.L

.SA

HA

BE

LVE

R O A D

A N D

U L

AN O N A

L

T I

H I G H W

A Y

NETAJI

BENARAS RD.

R O

A D

DOCK

AMTA

HOWRAH

RD.

SETU

F O

R E

S H

O R

E

RO

AD

CALCUTTA PORT

SHALIMAR

RO

AD

COARSERACE

VIDYASAGAR WILLIUMFORT

ANANTALA

BELILIOUS RD.

SUBHAS

PANCH

ROAD

RD.

G.T

. RO

AD

N O

. 6

AV

.A

ME

R A

LI

BO

SE

M A

L L I C

ROADLAYALKA

N E T A J I

S U B H A S

R O A D

HAZRA ROAD

RASH BEHARI AV.

SOUTHERN AVENUE

A.P.SHAH

S. P

. MU

KH

RE

RJE

ER

OA

DA

.T. M

UK

HE

RJE

E

RD

. SA

RA

T

ROAD

R A

J AS

. C.

RO

AD

AH

AT

GA

RI

E.

M.

B Y

-

P A

S S

R O

A D

R. B.CONN E CTOR

NAGAR

BIDHAN

K A J I

N

A J R U

L

S

O

R

E

CO

SS

IPO

RE

D U M D U M R D.

RD

.

RA

M

MO

HA

N

S.N.BANERJEE RD.

B.B. GANGULI ST.

A. J. C. BOSE RD.

RO

AD

LELIN SARANI

SA

YE

D

SA

RA

NI

RO

AD

A.J

.C. B

OS

E

SEAL

DAH

A.P

.C.

SA

RA

NI

S C

H O

O L

RABINDRA

SETU

RA

BIN

D

RA

ST

RA

ND

R

D.

RD.

KESAB SEN ST.

VIVEKANANDA

AVED ANANDA RD.

SARANI

AUROB INDA

AV

EN

UE

M.G.

C.R

.

J.M

. AV

E.

RO

Y R

D.

RD.

NARKELDANGA

C.I.

T.

RO

AD

NARIKELDANGA MAIN ROAD

BELIAGHATA MAIN ROAD

ONNEC

P.C. CTOR

MAIN RD.

B. N.

MANIKTALA MAIN RD.MANIKTALA

MAIN RD.

ULTAD

MAIN RD.

ANGA

J E S

RO

AD

VIVEKANANDA

SETU

B.

T.

RO

AD

A V

E N

U E

D E Y R O A D

I S

L A

M

A I R P O R T

R O

A D

KO

NA

EXPRESSWAY

BAG

RA

J

H. M

UK

HE

RJE

ER

OA

D

EXTENDED BELGHARIA EXP. WAY

ROAD ALONG

BAGJOLA

CA

NA

L

RIV

ER

FR

ON

TA

RT

ER

IAL

ROAD

RIV

ER

FRO

NT

RO

AD

GRAND F

ORESHO

RE RD.

EAST WEST RD

CE

NT

RA

L H

OW

RA

H

AR

TE

RIA

L

RD

.

D.C. DEY RD.

HO

WR

AH

DR

AIN

AG

E

CAN

AL

RD.

R.S

.

R.S

.

New KolkataRly. Terminal

Riv

er H

oogh

ly

River Hooghly

PROPOSED FLYOVER/UNDERPASSES

IN METRO CORE

NEW ROAD

WIDENING OF ROAD

LEGEND

EXISTING ROAD

PROPOSED UNDERPASS

EXISTING RAIL LINE

PROPOSED FLYOVER /

EXISTING FLYOVER TO BE INTEGRATED WITH PROPOSED FLYOVER

PROPOSED BRIDGES

40

Flyover from EMBP to Kazi Nazrul Islam Avenue (VIP Ro ad)

Vivekananda Road Flyover (Ph-I) from Howrah to CR Av enue Crossing

Inter change at Dunlop junction of B.T. Road & P.W. D. Road

Elevated Road from Park circus to Parama Island on EMBP

Left turning north bound Off Ramp of the A.J.C. Bos e Road Flyover at Beck Bagan

Exit Ramp from Park Street Flyover to Mayo Road

Patipukur Underpass on Jessore Road

Construction of Road and over bridge connecting Bel gachia main road, Ultadanga Main Road & Railway Passenger Terminal at Chitpur (Cossipore alignment No .I and scheme no VII M of KIT)

Railway underpass at Canal south road

Railway underpass at Chaulpatty road

Vivekanada Raod Flyover (Ph-II) from CR Avenue crossi ng to Airport

Flyover at Salkia crossing from GT Road and Beneras R oad

At Nagerbazar at the crossing of Jessore Road and Dum Dum Road

Flyover along Saltlake By pass across J.K. Saha Bridg e

Along Anwar Shah across Raja Subodh Mallik Road Crossi ng

Widening of underpasses below railway track at

i) Muraripukur

ii) Bagmari Road

iii) On Narkeldanga main Road

LIST OF PROPOSED FLYOVER / UNDERPASS IN METRO CORE

41

At Esplanade (along J. L. Nehru Road and Central A venue)

Ramp connecting Vidyasagar Setu & Hasting Bridge cros sing St. Jeorges Gate Road.

Along Rafi Ahmed Kidwai Road across Park Street

Along Loudon Street across Shakespeare Sarani

Along Camac Street across Shakespeare Sarani

R.O.B. Over Railway track at Barrackpur

Flyover along Howrah Drainage Canal across Kona Expre ssway

Widening of the Flyover on EMBP at Baghajatin

Flyover across New-cut canal connecting Canal South Road and Chitpur Railway Terminal

Reconstruction of Convent Bridge

R.O.B. Railway track along the proposed new corrido r connecting D.C. Dey Road

Flyover at new Shalimar Station

LIST OF PROPOSED FLYOVER / UNDERPASS IN METRO CORE (CONTD..)

LIST OF PROPOSED BRIDGES OVER CANAL

New bridge over irrigation Canal at Kanchrapara (on the road connecting K.R.D Rd and Chandmari Rd.)

New Bridge along Ghosh para Road over Bagher Kahl

Kidderpur Bridge

Hastings Bridge

Zeerat Bridge (2 nd Phase)

Swing Bridge

Bascule Bridge

Chelta Bridge (Over Tolly’s Nala) – North of Chetla Cen tral road 42

HO

WR

AH

S A

L K

I A

DERE

ALI

PU

R R

D.

H I

D E

R O

A D

T A

R A

T A

L A

BUDGEBUDGE

TARATALA ROAD

HA

RB

OU

R

DIA

MO

ND

B I R E N R O Y

ROAD

R O A D

MAHATMA

JAM

ES

LON

G

RO

AD

SA

RA

NI

GANDHIROAD

TOLLYGUNJ

CIRCULAR ROAD

RO

AD

B. L

.SA

HA

BE

LVE

R O A D

A N D U L

AN O N A

L

T I

H I G H W

A Y

NETAJI

BENARAS RD.

R O

A D

DOCK

AMTA

HOWRAH

RD.

SETU

F O

R E

S H

O R

E

RO

AD

CALCUTTA PORT

SHALIMARR

OA

D

COARSERACE

VIDYASAGAR WILLIUMFORT

ANANTALA

BELILIOUS RD.

SUBHAS

PANCH

ROAD

RD.

G.T

. RO

AD

N O.

6

AV

.A

ME

R A

LI

BO

SE

M A

L L I C

ROADLAYALKA

N E T A J IS U B H A S

R O A D

HAZRA ROAD

RASH BEHARI AV.

SOUTHERN AVENUE

A.P.SHAH

S. P

. MU

KH

RE

RJE

ER

OA

DA

.T. M

UK

HE

RJE

E

RD

. SA

RA

T

ROAD

R A

J AS

. C.

RO

AD

AH

AT

GA

RI

E.

M.

B Y

-

P A

S S

G A R I A

M. R O

A D

R O

A D

R. B.CONN E CTOR

NAGAR

BIDHAN

K A J I

N A J R

U L

S

O

R

E

CO

SS

IPO

RE

D U M D U M R D.

RD.

RA

M

MO

HA

N

S.N.BANERJEE RD.

B.B. GANGULI ST.

A. J. C. BOSE RD.R

OA

D

LELIN SARANI

SA

YE

D

SA

RA

NI

RO

AD

A.J

.C. B

OS

E

SEAL

DAH

A.P

.C.

SA

RA

NI

S C

H O

O L

RABINDRA

SETU

RA

BIN

D

RA

STR

AN

D

RD

.

RD.

KESAB SEN ST.

VIVEKANANDA

AVED ANANDA RD.

SARANI

AUROB INDA

AV

EN

UE

M.G.

C.R

.

J.M

. AV

E.

RO

Y R

D.

RD.

NARKELDANGA

C.I.

T.

RO

AD

NARIKELDANGA MAIN ROAD

BELIAGHATA MAIN ROAD

ONNEC

P.C. CTOR

MAIN RD.

B. N.

MANIKTALA MAIN RD.MANIKTALA

MAIN RD.

ULTAD

MAIN RD.

ANGA

J E S

RO

AD

VIVEKANANDA

SETU

B.

T.

RO

AD

A V

E N

U E

D E Y R O A D

I S

L A

M

A I R P O R T

R O A

D

KO

NA

EXPRESSWAY

BAG

RAJ

H. M

UK

HE

RJ E

ER

OA

D

EAST WEST RD

HO

WR

AH

DR

AIN

AG

E

CAN

ALRD.

R.S

.

R.S.

Pedestrian Underpass

Elevated Walkway

Proposed Pedestrian Underpass and Elevated Walkway

43

On E. M. Bypass near Science City

On. E. M. Bypass near Yubabharati Krirangan

Around BBD Bag Area

At Circular Rly. Stn. across Strand Road at i) Sova bazar ii) Bura bazaar iii) BBD Bag iv) Eden Gardens

At Samsal Huda Road – Tiljala Road

On B. T. Road at Sinthi

On G. T. Road near Howrah Maidan

Eelvated pedestrian plaza along BB Ganguly street

LIST OF PEDESTRIAN UNDERPASS

44

HO

WRAH

S A

L K

I A

DER

E

ALI

PU

R R

D.

H I

D E

R O

A D

T A

R A

T A

L A

BUDGEBUDGE

TARATALA ROAD

HA

RB

OU

R

DIA

MO

ND

B I R E N R O Y

ROAD

R O A D

MAHATMA

JAM

ES

LON

G

RO

AD

SA

RA

NI

GANDHIROAD

TOLLYGUNJ

CIRCULAR ROAD

RO

AD

B.L

. SA

HA

BE

LVE

R O A D

A N D

U L

AN O N A

L

T I

H I G H W A Y

NETAJI

BENARAS RD.

R O

A D

DOCK

AMTA

HOWRAH

RD.

SETU

F O

R E

S H

O R

E

RO

AD

CALCUTTA PORT

SHALIMARR

OA

D

COARSERACE

VIDYASAGAR WILLIUMFORT

ANANTALA

BELILIOUS RD.

SUBHAS

PANCH

ROAD

RD.

G.T

. RO

AD

N O.

6

AV

.A

ME

R A

LI

BO

SE

M A

L L I C

ROADLAYALKA

N E T A J I

S U B H A S

R O A D

HAZRA ROAD

RASH BEHARI AV.

SOUTHERN AVENUE

A.P.SHAH

S.P

. MU

KH

RE

RJE

ER

OA

DA

.T. M

UK

HE

RJE

E

RD

. SA

RA

T

ROAD

R A

J AS

. C.

RO

AD

AH

AT

GAR

I

E.

M.

B Y

-

P A

S S

G A R I A

M. R

O A

D

R O

A D

R. B.CONN E CTOR

NAGAR

BIDHAN

K A J I

N A J R

U L

S

O

R

E

CO

SS

IPO

RE

D U M D U M R D.

RD.

RA

M

MO

HA

N

S.N.BANERJEE RD.

B.B. GANGULI ST.

A. J. C. BOSE RD.

RO

AD

LELIN SARANI

SA

YE

D

SA

RA

NI

RO

AD

A.J

.C. B

OS

E

SEAL

DAH

A.P

.C.

SA

RA

NI

S C

H O

O L

RABINDRA

SETU

RA

BIN

D

RA

STR

AN

D

RD

.

RD.

KESAB SEN ST.

VIVEKANANDA

AVED ANANDA RD.

SARANI

AUROB INDA

AV

EN

UE

M.G.

C.R

.

J.M

. AV

E.

RO

Y R

D.

RD.

NARKELDANGA

C.I.

T.

RO

AD

NARIKELDANGA MAIN ROAD

BELIAGHATA MAIN ROAD

ONNEC

P.C. CTOR

MAIN RD.

B. N.

MANIKTALA MAIN RD.MANIKTALA

MAIN RD.

ULTAD

MAIN RD.

ANGA

J E S

RO

AD

VIVEKANANDA

SETU

B.

T.

RO

AD

A V

E N

U E

D E Y R O A D

A I R P O R T

R O

A D

KO

NA

EXPRESSWAY

BAG

RAJ

H. M

UK

HE

RJE

ER

OA

D

EAST WEST RD

HO

WR

AH

DR

AIN

AG

E

CAN

ALR

D.

R.S.

R.S.

PROPOSED ELEVATED RING ROAD CORRIDOR PROJECT AROUND KOLKATA

ELEVATED RING ROAD CORRIDOR

1 2

3

4

5

6

7

8

9

10

11

P.C. Connector

R.B. Connector

P.A. ConnectorTollygunj

Behala-Taratala

Vidyasagar Setu

Rabindra Setu

B.T. Rd.

RajarhatUltadanga

Beliaghata

Interchange locations

CBD OF KOLKATA

45

E A

S T

E R

N

E X

P R

E S

S W

A Y

E A S T E R N

E X P R E S S W A Y

S O U T H E R N

E X P R E S S W A Y

CONNECTOR

CHANDANNAGAR

BHATPARA

SERAMPOREBARRACKPORE BARASAT EXP. WAY

SODEPUR CONNECTOR

EXTENDED BELGHARIA EXP. WAY

RAJARHAT CONNECTOR

SALT-LAKE CONNECTOR

B. N. DEY CONNECTOR

SONARPURCONNECTOR

DU

M D

UM

B

AR

RA

CK

PO

RE

EX

P. W

AY

SA

LT L

AK

EB

YP

AS

S

GARIA SO

NARPUR R

OA

D

SANKRAIL

CONNECTOR

CH

AN

DM

ARI

RO

AD

RO

AD

C

ON

NE

CT

ING

BA

IDY

AB

AT

I &

M

AG

RA

RO

AD

CO

NN

EC

TIN

G B

AR

RA

CK

PO

R &

GAY

ES

HPU

R

KU

DG

HA

T - AM

TALA

RO

AD

WESTERN

RIV

ERFR

ON

T EX

P. W

AY

BAURIA

CONNECTOR

BELGHARIA EXP. WAY

NORTH- S

OU

TH

RIV

ER

FR

ON

TR

OA

D

� ���� ���

RO

AD FR

OM

MU

KUN

DAPU

R

TO CHAMPAHATI

ROAD FROM

MA

LLICK

PU

R T

O G

AR

IA

ELACHI PAILAN ROAD

M.A

.R.

� � � � �

� � � �

RLY STN.

SEALDAH

�� �� �����

� � � � �

� � � � �

�� �� �����

☺��� � �����

PORT AREA

HOWRAH RLY.STN.

AIRPORT

PROJECTS ON PRIOIRITY

Extn. of E.M. Bypass

AJC Bose Road off Ramp

Dunlop Interchange

HOW

RAH

DERE

ALI

PU

R R

D.

H I

D E

R O

A D

T A

R A

T A

L A

TARATALA ROADTOLLYGUNJ

CIRCULAR ROAD

RO

AD

B.L

.SA

HA

BE

LVE

NETAJI

R O

A D

DOCK

SETU

F O R

E S

H O

R E

R

OAD

CALCUTTA PORT

SHALIMAR

RO

AD

COARSERACE

VIDYASAGAR WILLIUMFORT

ANANTALA

SUBHAS

PANCH

ROAD

RD.

AV

.A

ME

R A

LIBO

SE

HAZRA ROAD

RASH BEHARI AV.

SOUTHERN AVENUE

A.P.SHAH

S.P

. MU

KH

RE

RJE

ER

OA

DA

.T. M

UK

HE

RJE

E

RD

. SA

RA

T

ROAD

R A

J A

RO

AD

AH

AT

GAR

I

R. B.CONN

ECTOR

NAGAR

BIDHAN

RD.

RA

M

MO

HA

N

S.N.BANERJEE RD.

B.B. GANGULI ST.

A. J. C. BOSE RD.

RO

AD

LELIN SARANI

SA

YE

D

SA

RA

NI

RO

AD

A.J

.C. B

OS

E

SEAL

DAH

A.P

.C.

RABINDRA

SETU

RA

BIN

D

RA

KESAB SEN ST.

VIVEKANANDAAV

EN

UE

M.G.

C.R

.

RO

Y R

D.

RD.

NARKELDANGA C.I.

T.

RO

AD

NARIKELDANGA MAIN ROAD

BELIAGHATA MAIN ROAD

ONNEC

P.C. CTOR

MAIN RD.

B. N.

MANIKTALA MAIN RD.MANIKTALAMAIN RD.

D E Y R O A D

BAG

RAJ

H. M

UK

HE

RJE

ER

OA

DR

IVE

RFR

ON

T

GRAND F

ORESHORE

RD.

CE

NTR

AL

HO

WR

AH

A

RTE

RIA

L

D.C. DEY RD.

HO

WR

AH

DR

AIN

AGE

R.S.

R.S.

River Hooghly

AJC BOSE ROAD OFF RAMP

Parama IslandPark Circus

EM

ByP

ass

Estimated Daily trafficvolume in (PCU)

2010 21760

2015 25190

2020 27250

2023 28630

Total length 425m.

Objective : To facilitate the use of the AJC Bose Road flyover for the traffic generated in the west of the flyover and bound to Sealdah Area & further north.

Benefits : The above mentioned traffic would be able to attain higher speed and would relieve the surface level traffic on AJC Bose Rd. beneath the fly over

AJC BOSE ROAD OFF RAMP

AV

.A

ME

R A

LI

BO

SE

HAZRA ROAD

RASH BEHARI AV.

SOUTHERN AVENUE

A.P.SHAH

S.P

. MU

KH

RE

RJ E

ER

OA

DA

.T. M

UK

HE

RJE

E

RD

. SA

RA

T

ROAD

R A

J AS

. C.

RO

AD

AH

AT

GA

RI

R. B.CONN

E CTOR

HO

WR

AH

S A

L K

I A

DE

RE

ALI

PU

R R

D.

H I

D E

R O

A D

T A

R A

T A

L A

BUDGEBUDGE

TARATALA ROAD

ROAD

TOLLYGUNJ

CIRCULAR ROAD

RO

AD

B.L

.SA

HA

BE

LVE

R O A D

A N D

U L

AN O N A

L

T I

H I G H W

A Y

NETAJI

BENARAS RD.

R O

A D

DOCK

AMTA

HOWRAH

RD.

SETU

F O

R E

S H

O R

E

RO

AD

CALCUTTA PORT

SHALIMAR

RO

AD

COARSERACE

VIDYASAGAR WILLIUMFORT

ANANTALA

BELILIOUS RD.

SUBHAS

PANCH

ROAD

RD.

G.T

. RO

AD

N O.

6

NAGAR

BIDHAN

K A J I

N A J R U

L

S

O

R

E

CO

SS

IPO

RE

D U M D U M R D.

RD

.

RA

M

MO

HA

N

S.N.BANERJEE RD.

B.B. GANGULI ST.

A. J. C. BOSE RD.

RO

AD

LELIN SARANI

SA

YE

D

SA

RA

NI

RO

AD

A.J

.C. B

OS

E

SEAL

DAH

A.P

.C.

SA

RA

NI

S C

H O

O L

RABINDRA

SETU

RA

BIN

D

RA

ST

RA

ND

R

D.

RD

.

KESAB SEN ST.

VIVEKANANDA

AVED ANANDA RD.

SARANI

AUROB INDA

AV

EN

UE

M.G.

C.R

.

J.M

. AV

E.

RO

Y

RD

.

RD.

NARKELDANGA

C.I.

T.

RO

AD

NARIKELDANGA MAIN ROAD

BELIAGHATA MAIN ROAD

ONNEC

P.C. CTOR

MAIN RD.

B. N.

MANIKTALA MAIN RD.MANIKTALA

MAIN RD.

ULTAD

MAIN RD.

ANGA

J E S

RO

AD

VIVEKANANDA

SETU

B.

T.

RO

AD

A V

E N

U E

D E Y R O A D

I S

L A

M

A I R P O R T

R O

A D

KO

NA

EXPRESSWAY

BAG

RA

J

H. M

UK

HE

RJE

ER

OA

D

EXTENDED BELGHARIA EXP. WAY

ROAD ALONG

BAGJOLA

CAN

AL

RIV

ER

FRO

NT

AR

TER

IAL

ROAD

RIV

ER

FRO

NT

ROAD

GRAND F

ORESHO

RE RD.

EAST WEST RD

CE

NT

RA

L H

OW

RA

H

AR

TER

IAL

R

D.

D.C. DEY RD.

HO

WR

AH

DR

AIN

AG

E

CA

NA

LR

D.

R.S

.

R.S

.

New KolkataRly. Terminal

Riv

er H

oogh

ly

River Hooghly

DUNLOP INTERCHANGE

Estimated Daily trafficvolume in (PCU)

2010 96940

2015 122850

2020 150170

2025 185670

Total length 1000m.

Objective : Provision of grade separated facilities at the crossing of Belgharia Expway and B.T. Road, the major North-South arterial rd. in the east bank.

Benefits : The vehicular traffic between the Vevekananda Setu (old & new) and B.T. Road would have grade separated dispersal facility and would minimise the intersection delays to a considerable extent

DUNLOP INTERCHANGE

E A

S T

E R

N

E X

P R

E S

S W

A Y

S O U T H E R N

E X P R E S S W A Y

EXTENDED BELGHARIA EXP. WAY

BAR

RA

CK

POR

EE

XP

. WAY

WES

TERN

RIV

ER

FR

ON

T EX

P. W

AYBELGHARIA EXP. WAY

RLY STN.

SEALDAH

PORT AREA

AIRPORT

HOWRAH

RLY.STN.

EXTENSION OF EM BYPASS FROM KAMALGAZI TO

BARUIPUR

Kamalgazi

Padmapukur

To Suryapur

Baruipur

NH

-117

Estimated Daily trafficvolume in (PCU)

2010 13785

2015 23868

2020 34855

2025 47165

Total length 9600m.

Objective : To provide a high speed traffic corridor in the extension of EM Byepass in the south to ensure better accessibility in the southeastern part of KMA particularly the fast growing municipal areas and the proposed District HQ at Baruipur and the adjoining township as well as the vast hinter land in the Sunderbans in the South 24parganas

Benefits : The areas in the south eastern part of the metropolis would have high speed arterial road facility for the movement of vehicular traffic including the transit passengers and the perishable commodities viz fruits, vegetables, milk etc. The existing highly congested SH-3 (Sonarpur-BaruipurRd.) would also be relieved of excessive traffic

EXTENSION OF EM BYPASS FROM KAMALGAZI TO BARUIPUR