15
CoiUucfit exploration Company l-imitcb 85 RICHMOND STREET WEST TORONTO 1, CANADA Heron Bay, Ontario. September 27, 1954. The Ontario Department of Mines, Port Arthur Mining Division, Port Arthur, Ontario. Do a r Sirs: 42F04NE0061 63.476 MANITOUWADGE LAKE 010 Herewith is report and plan, in duplicate, of the magnetometer survey carried out on the property of Hucarnp Minos Limited, Manitouwadge Area, Port Arthur Mining Division, as required by the Ontario Mining Act. Section 81, 5 (a). PROPERTY: '-X i The property consists of seventy-one mining claims numbered TB 470Xk O to /..7076 inclusive, TD 47583 to 47586 inclusive, TB 47804 to 47833 inclusive, in the vicinity of Wowun Lake, Manitouwadge Area, District of Thunder Bay. KKASON FOR .S Huca'np Mines property adjoins the Goco Mines property on the east and northeast and a Magnetometer survey was carried out to outline the eastward extension of the sedimentary formations at Geco, in. rfhich the orebody is contained and to determine if other favourable structures exist. KiiftULTS OF SUHVEY : (a) The principal result is the outlining, in detail, of the continua tion of the Gc co zone. This strikes N 60 O E. across the property starting just north of the pond on the southwest boundary. The change in strike of the zone, from that at Goco, is apparently due to a NW-SE fault just south of the southwest boundary. lean iron formation occurring along the zone makes the zone show up quite strongly magnetically. This 7, one, though appearing quite straight, is made up of lenses in "en echelon" formation or faulted slightly. These lenses strike east-west. Limited drilling on the zone to date has shown that in at least one case, a north- south fault has caused the offsetting of the zones. (b) A diabase dike extends from the southeast corner of Wowun Lake to Mose Lake. (This has been confirmed by drilling at one point.) This is apparently the continuation of the north striking diabase dike seen on the south shore of Hose lake.

CoiUucfit exploration Company l-imitcb

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

CoiUucfit exploration Company l-imitcb85 RICHMOND STREET WEST

TORONTO 1, CANADA

Heron Bay, Ontario. September 27, 1954.

The Ontario Department of Mines, Port Arthur Mining Division, Port Arthur, Ontario.

Do a r Sirs:42F04NE0061 63.476 MANITOUWADGE LAKE 010

Herewith is report and plan, in duplicate, of the magnetometer survey carried out on the property of Hucarnp Minos Limited, Manitouwadge Area, Port Arthur Mining Division, as required by the Ontario Mining Act. Section 81, 5 (a).

PROPERTY: '-X iThe property consists of seventy-one mining claims numbered TB 470XkO

to /..7076 inclusive, TD 47583 to 47586 inclusive, TB 47804 to 47833 inclusive, in the vicinity of Wowun Lake, Manitouwadge Area, District of Thunder Bay.

KKASON FOR .S

Huca'np Mines property adjoins the Goco Mines property on the east and northeast and a Magnetometer survey was carried out to outline the eastward extension of the sedimentary formations at Geco, in. rfhich the orebody is contained and to determine if other favourable structures exist.

KiiftULTS OF SUHVEY :

(a) The principal result is the outlining, in detail, of the continua tion of the Gc co zone. This strikes N 60O E. across the property starting just north of the pond on the southwest boundary. The change in strike of the zone, from that at Goco, is apparently due to a NW-SE fault just south of the southwest boundary. lean iron formation occurring along the zone makes the zone show up quite strongly magnetically.

This 7, one, though appearing quite straight, is made up of lenses in "en echelon" formation or faulted slightly. These lenses strike east-west. Limited drilling on the zone to date has shown that in at least one case, a north- south fault has caused the offsetting of the zones.

(b) A diabase dike extends from the southeast corner of Wowun Lake to Mose Lake. (This has been confirmed by drilling at one point.) This is apparently the continuation of the north striking diabase dike seen on the south shore of Hose lake.

f

t-

Contoegt exploration Company Htmittb85 RICHMOND STREET WEST

TORONTO I. CANADA

Heron Bay, Ontario. September 27, 1954.

The Ontario Department of Mines, Port Arthur Mining Division, Port Arthur, Ontario.

Dear Sirs:63.476 MANITOUWADGE LAKE

010

Herewith is report and plan, in duplicate, of the magnetometer survey carried out on the property of Hucamp Mines Limited, Manitouwadge Area, Port Arthur Mining Division, as required by the Ontario Mining Act, Section 81, 5 (a). -* -r

PROPERTY:

The property consists of seventy-one mining claims numbered TB 47040 to 47076 inclusive, TB ^7583 to 47586 inclusive,' TB 478Q4 to. 47833.inclusive, in the vicinity of Wowun Lake, Manitouwadge Area, District of Thunder Bay.

REASON FOR SURVEY;

Hucamp Mines property adjoins the Geco Mines property on the east and northeast and a magnetometer survey was carried out to outline the eastward extension of the sedimentary formations at Geco, in which the orebody is contained and to determine if other favourable structures exist.

RESULTS OF SURVEY:

(a) The principal result is the outlining, in detail, of the continua tion of the Geco zone. This strikes N 600 E. across the property starting just north of the pond on the southwest boundary. The change in strike of the zone, from that at Geco, is apparently due to a NW-SE fault just south of the southwest boundary. Lean iron formation occurring along the zone makes the zone show up quite strongly magnetically.

This zone, though appearing quite straight, is made up of lenses in "en echelon" formation or faulted slightly. These lenses strike east-west, limited drilling on the zone to date has shown that in at least one case, a north- south fault has caused the offsetting of the zones.

(b) A diabase dike extends from the southeast corner of Wowun Lake to Mose Lake. (This has been confirmed by drilling at one point.) This is apparently the continuation of the north striking diabase dike seen on the south shore of Mose Lake.

Contort exploration Company limited85 RICHMOND STREET WEST

TORONTO 1. CANADA

- 2 -

(c) A NW-SE fault cuts through the main zone just west of Wowun Lake with only small horizontal displacement.

(d) In the southeast portion of the property, a number of minor anomalies occur due to the presence of granite gneiss and paragneiss beds in the granite.

(e) In the north central portion of the property, anomalies are caused by gneiss and a limited amount of iron formation.

DATA ON SUftVEY:

Survey carried out by Conwest Exploration Co, for Hucamp Mines Ltd.

FIELD WORK:

Linecutting - January 14 - March 24* 1954 Chief line cut ter - 0. J. Gastpisi^r Total man days linecutting -/3103 Miles of linecut - 71.4 Magnetometer survey - February 14- - May 17, 1954

and June 17 - June 25, 1954 Chief operator - D, J. Kemp- .-. Total man days in survey ~\2 Number of stations established - 3492

INSTRUMENTS USED:

Watt vertical magnetometer (#75151); sensitivity 26.1 gammas per scale division

Watt vertical magnetometer (#43550)j sensitivity 29.1 gammas per scale division.

CONSULTANT: L. K. Lytle •i

Total man days work - 558

Work allowance s 558 x 4 rr 2232 days work s 31.4 days per claim.

Respectfully submitted,^

LKL/AS

L. W Lytle, gineer and Geologist.

iHucamp Mines Limited^ Richmond Street, West

Toronto, Ontario42F84NE0061 63.476 MANITOUWADGE LAKE OSO

Gentlemen:

The following report covers the electrical

resistivity survey conducted over your property located

in the Manitouwadge Lake area, District of Thunder Bay,

Port Arthur Mining Division, Ontario.

The survey was conducted by Geo-Technical Develop

ment Company Limited during the period from March ^th to 14th,

19^4- The results are shown on the accompanying Plan No. 1.

Summary and Re commendati ons

Three electrical conductors were indicated by the

survey, each crossing from the Goldmaque Mines property and

striking in a northeast direction. The area has been in

volved in a complicated shear and fault pattern.

The three conductors are of sufficient strength

and extent to warrant further investigation. Prospecting,

geological mapping and diamond drilling are recommended.

Further electrical resistivity work is also recommended to

trace the zones to Wowun Lake.

Property, Location and Access

The area covered by the survey comprises a portion

of the large group known as the Hucamp Mines Limited property,

further described as claims numbered 47817, 47818, 47819, 47820,*

47821, 47822, 47823, 47821}, 47830, 47831, 47832, 47833, 47807.

Of these, 47820/21/22/07/30/31/32 are half-ciaims, as shown on

Plan No. 1. The claims group adjoins the property of Goldmaque

Mines Limited on the southwest and Geco Mines Ltd on the south.

GEO - TEC H N l C A L DEVELOPMENT COMPANY LIMITED

- 2 -

The property can be reached by a tractor road

and trail which runs north from Lake Manitouwadge, approxi

mately one mile to the property, and which follows Pox

Creek from its junction with the lake. Manitouwadge Lake

can also be reached by air from Geraldton or Marathon,

from various helicopter bases at Stevens or Camp 12, and

by winter snowmobile road from a camp of the Ontario Pulp

fc Paper Company to the south, which is reached by truck

road from Hemlo on the C.F.R. A trail leads from the

Goldmaque Mines property across the Hucamp Mines property

to Wowun Lake which lies in the east portion of the claims

gr oup.

The area surveyed is fairly rugged and heavily

forested with spruce, Jackpine, birch and poplar. A swamp

which is covered with cedars occupies the central part of

the property.

General Geology

The geology of the general area is described in

the Ontario Department of Mines Vol. XLI, Part VI, 1932,

"Geology of Huron Bay, White Lake Area", by Jas. E.

Thompson. Otherwise our information on the area is very

limited.

The property lies in granite and granite gneiss

north of the narrow greenstone belt in which the Geco Mines

Limited orebody is located. Various narrow greenstone

ribbons appear to strike east towards Wowun Laka. The

trends shown by the electrical resistivity survey do not

indicate a massive, uniform intrusive. Bedded or banded

BED - TEC HNICAL DEVELOPMENT COMPANY LIMITED

- 3 -

formations are indicated; gn eisses and sheared greenstone

may be expected.

Explanation of Resistivity Method

The method used by Geo-Technical Development

Company Limited is a form of the early resistivity methods

modified by some eight years' experience in the field.

In effect, a known current is put into the ground

and readings are taken at 50 foot intervals along picket

lines by sensitive vacuum tube voltmeters measuring the

voltage drop across this interval. Calculations translate

these voltage readings into resistance values in terms of

ohm-centimeters. These are plotted on the map accompany

ing this report.

Due to the inhomogeneity of the medium being

examined; i.e., the complexity of the geology and structure,

interpretations are based on experience and a knowledge of

the geological conditions in the area being tested with

this particular method. Where the latter are unknown, the

interpretation must, of necessity, be limited or very

tentative.

However, without any geological information it

is generally possible to differentiate between banded rocks

such as volcanics, sediments or gneiss and large bodies of

massive intrusive*, due to the difference of electrical con

ductivity between the various flows or beds. Strike trends,

folding, etc. are therefore readily picked up. In some

cases rock contacts may be inferred.

GEO -TECHNICAL DEVELOPMENT COMPANY LIMITED

- k -Shear or fracture zones are relatively better

conductors, due to their higher water content. Where

extreme low resistivity values are found, graphite or

sulphides are indicated. Graphite is found in schist

or shear zones or sedimentary horizons, which are shown

by electrical methods as, generally, narrow low linear

trends. Unfortunately, from the point of view of inter

pretation, sulphides may be present with the graphite or

may occur in shear zones giving similar low linears,

Interpretation of Resistivity Results

The overall electrical picture suggests gneissic

or sheared rocks striking generally northeast on the east

ern part of the claims group and more nearly east in the

northwest part; the whole area being involved in a com

plicated shear and fault pattern.

Two cross-fault directions are inferred, one

north and south, the other a few degrees east of north.

The fault which lies along Pox Creek is apparently the

same one which cuts the Geco Mines Limited orebody. In

the west part of the area minor east-west shearing is

present. In the north central and east, north-east shear

ing is present. This shearing is disclosed by the three

good conductors identified as the "A", "B" and "C" zones

on the accompanying Plan.

"A" zone lies in the southeast corner of the

claims group, trending northeast. It is not an exceptionally

G E O -TECHNICAL DEVELOPMENT COMPANY LIMITED

strong conducting zone but is well lineated, and appar

ently marks the trend of gneissic or schistose rock

formations.

"B" zone lies in the northwest portion of the

area and is a fairly strong, narrow, lineal zone of good

conductivity. It trends northeast, ending abruptly on

the west at an inferred north-south fault. This good con

ductor may represent a sheared or fractured zone. The

zone appears to have a slightly different strike from

the southern part of the surveyed area. There is a "dead"

area which extends north and south past the west end of

this zone. This "dead" area is inferred to be a north-

south fault typical of the region. There appears to be

an offset of approximately ^00 feet between the eastern

and western portions of "B". The western portion shows a

slightly different strike.

"C" zone of good conductivity is believed to

represent a sheared or fractured zone. It has a north

easterly strike, a length of 2l|00 feet, and appears to be

a continuation of a shear cone which extends northeast

from the adjoining property. Two irregular, parallel zones

lie on the south flank of "C".

"C" zone appears to be the most persistent and

well delineated zone outlined by the resistivity survey.

Two diamond drill holes have been laid out tentatively

as cross-section holes across this zone.

GEO -TECHNICAL DEVELOPMENT COMPANY LIMITED

. 6 -

Survey Data

An electrical resistivity survey was conducted

over the property of Hucamp Mines Limited located in the

Manitouwadge Lake area, District of Thunder Bay, Port

Arthur Mining Division, Ontario. The survey was con

ducted by Geo-Technical Development Company Limited

during the period from March 5th to U+th, 19^. The

results are shown on the accompanying Plan No. 1.

Electrical resistivity readings were taken

at 50 foot intervals along the north-south picket

lines. These readings are shown on Plan No. l, plotted

in ohm-centimeters x 10^.

A total of 7*32 miles of line were surveyed

by the electrical resistivity method, which required

773 station readings. The total area covered by this

survey is approximately 338 acres.

G E O -TECHNICAL DEVELOPMENT COMPANY LIMITED

- 7 -

The number of eight-hour man-days required

to complete this work is as follows:

(8-hour) Attributable to Man Days Assessment Work

Laying spread wire 2 x tj. 8

Operating Resistivity Survey 9 x Ij. 36

Calculation Se Interpretation 2 x 14. 8

Drafting 6 x !| 2lj.

Office typing and supervision If x 1| 16

TOTALS 23 \ 92

Respectfully submitted,

GEO-TECHNIOAL DEVELOPMENT COMPANY LTD.

f JE. P. Sheppard Geologist

May 19, Toronto, Ontario

GED - TECHNICAL DEVELOPMENT COMPANY LIMITED

i I

MINING GEOPHYSICS CORP LTDDISTRICT OF THUNDER BAY

AEROMAGNETIC SURVEY

produced m Canada by AEROMAGNETIC SURVEYS LIMITED

R own and Comp.iedm March- April 1954 SHEET No. 5

MCA* FUGHT UME SPACING- - . . . , . _ . I32O FEET

MEJH TBIWUdl O.EAHAWCE . . . . . . . . . .500

5OO GAMMA CONTOUR

(OD GAMMA COMTOUfl

5O GAMMA CONTOUR

25 GAMMA CONTOUR

MAGNETIC UOW

FLIGHT UNES

MANITOUWADGE LAKE AREA

30OC 4OOO

I32O FAf to l tnch

63 476 MAMITDUVAOGE LAKE

•— \

200

I

*2F*4*fM6t 63 476 MANITOUVAOGE LAKE 210

Produced m Canada by AEROMAGNETIC SURVEYS UNITED

Flown and Compiled m March — Apnl,O54 SHEET No 2

CONTOUR

MEAN FU6HT LME SPACING. - . . ... . . J3ZQ

MEAN TEfTRAM CLEARANCE . . . ,- . ,, . ,.50O fEET

5OO GAMMA CONTOUR. --..-.-.. _ .X*"**^ *

IOO GAMMA CONTOUR.

SO GAMMA CONTOUR.

25 GAMMA CONTOUR

MAGNETIC LOW--, - ,

FU6HT UNES __

MANITOUWADGE! LAKE AREA1000 ZOOO 3000 4000 5000

J32O Feet ID l Inch FEET

l

/o

i/ '\ .i/^N

\x# Jio^

T0.+70IO

' ~V,-^

r r ^. \Jf

* *^^

K 'PUT-IW V** "' :V -

63.478 MANITOUWADQE LAKE

-v^ ̂.

^tfj ^*-

r^^l\ tww

-nl. i l' L*

f, jtnOfW ^

y 3 j. 3 wo M 3N o

Q3JM-]

S. 47824

IOO OHM - CM x I01

42F*4NE**61 B3.476 MANITOUWADGE UAKE

——l-4*-,MJ-.-~.4U-40CP /MiMKS

LOCATION MASCALE l - l MILE

ELECTRICAL RESISTIVITY SURVEY OVER PART OF PROPERTY

HUCAMP MINES LI MITEDRESISTIVITY CONTOURS AND GEOLOGICAL INTERPRETATION

MANITOUWADGE LAKE AREA DISTRICT OF THUNDER-BAY

PORT ARTHUR MINING DIVISION ONTARIO

GEOPHYSICAL SURVEY BY i

GEO-TECHNICAL DEVELOPMENT COMPANY LIMITED

LEGEND

LINES CUT AND CHAINED, RESISTIVITY READINGS OBSERVED

RESISTIVITY CONTOUR

FAULT ZONE INFERRED FROM GEOPHYSICAL SURVEY

POSSIBLE SHEAR OR FRACTURE ZONE (INFERRED J

PROPOSED DRILL HOLE

OUTLINE OF HILL OR HIGH GROUND

SWAMP

OUTCROP

CLAIM BOUNDARY AND CLAIM POST LOCATION

PLAN NO - MARCH - I944-

V V 'f f 1'

SCALE l"- 200' t**'_______4p"______