45
Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008 10-1 CHAPTER 10 IMPLEMENTATION PLAN 10.1 Overall Implementation Plan for Major Road Development in Mamminasata Metropolitan Area Figure 10.1.1 shows major on-going and future road developments in the Mamminasata Metropolitan area including four F/S roads and one Pre-F/S road undertaken by the JICA Study Team. These are part of the secondary arterial road network system in the Mamminasata Metropolitan Area. Of these, the ongoing road projects and plans to be completed or recommended to be completed by 2010 are: - Jl. Hertasning (on-going) - Jl. Ir.Sutami, Toll and Frontage Roads (on-going) - Jl. A.D.Pettarani (Jl.Tol Reformasi) - Jl.Urip Sumoharjo Flyover (on-going) - Jl. Urip Sumoharjo / Jl. Perintis Kemerdekaan, widening from the existing 4 lanes to 6 lanes (on-going) - Maros - Pangkep Road, widening from the existing 2 lanes to 4 lanes (on-going) - Jl.Malino, widening from the existing 2 lanes to 4 lanes (planned) - KIMA/Jl.Ir.Sutami Access Road, widening from the existing 2 lanes to 4 lanes (proposed) As the budget being allocated for the road infrastructure development would be limited as outlined in Section 3.3 of this Report, the implementation schedule of those road infrastructures should be carefully planned to attain the maximum benefits for the nation, region, local communities and people. Stage implementation approach should be applied in principle. Figure 10.1.2 shows a preliminary implementation schedule drawn taking the road network, traffic demand and yearly budget balance into consideration. It shows approximate road length, construction costs, classification of development/improvement, number of lanes, expected financial source (tentative) and timing/period of construction. Figure 10.1.3 shows a five-year sequence of road development/improvement for those listed roads and forecast traffic flows on the Mamminasata road network. The upper figures are the traffic in pcu in the “without project” case at a five-year interval. The lower figures indicate the projects, based on the traffic flow in the “with project” case, to be completed at every five-year period with a list of road link names on the bottom. Most of the road sections of which volume capacity ratio (VCR) is over 1.00 are solved by the planned road projects in the next five-year term. There would be no road links which may constrain the efficient traffic flow by 2023 (F/S target year) 1 except two road links: the Airport Access Road and Jl. Urip Sumoharjo. 1 The target year of the Sulawesi Island arterial roads for MP was changed from year 2023 to 2024 at the 2 nd workshop on 10 th September 2007 at Makassar. The target year of the F/S remains to be 2023 as defind in the original Scope of Work agreed by GOJ and GOI

CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Embed Size (px)

Citation preview

Page 1: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-1

CHAPTER 10 IMPLEMENTATION PLAN

10.1 Overall Implementation Plan for Major Road Development in Mamminasata Metropolitan Area

Figure 10.1.1 shows major on-going and future road developments in the Mamminasata Metropolitan area including four F/S roads and one Pre-F/S road undertaken by the JICA Study Team. These are part of the secondary arterial road network system in the Mamminasata Metropolitan Area.

Of these, the ongoing road projects and plans to be completed or recommended to be completed by 2010 are: - Jl. Hertasning (on-going) - Jl. Ir.Sutami, Toll and Frontage Roads (on-going) - Jl. A.D.Pettarani (Jl.Tol Reformasi) - Jl.Urip Sumoharjo Flyover (on-going) - Jl. Urip Sumoharjo / Jl. Perintis Kemerdekaan, widening from the existing 4 lanes to 6 lanes

(on-going) - Maros - Pangkep Road, widening from the existing 2 lanes to 4 lanes (on-going) - Jl.Malino, widening from the existing 2 lanes to 4 lanes (planned) - KIMA/Jl.Ir.Sutami Access Road, widening from the existing 2 lanes to 4 lanes (proposed)

As the budget being allocated for the road infrastructure development would be limited as outlined in Section 3.3 of this Report, the implementation schedule of those road infrastructures should be carefully planned to attain the maximum benefits for the nation, region, local communities and people. Stage implementation approach should be applied in principle.

Figure 10.1.2 shows a preliminary implementation schedule drawn taking the road network, traffic demand and yearly budget balance into consideration. It shows approximate road length, construction costs, classification of development/improvement, number of lanes, expected financial source (tentative) and timing/period of construction. Figure 10.1.3 shows a five-year sequence of road development/improvement for those listed roads and forecast traffic flows on the Mamminasata road network. The upper figures are the traffic in pcu in the “without project” case at a five-year interval. The lower figures indicate the projects, based on the traffic flow in the “with project” case, to be completed at every five-year period with a list of road link names on the bottom. Most of the road sections of which volume capacity ratio (VCR) is over 1.00 are solved by the planned road projects in the next five-year term. There would be no road links which may constrain the efficient traffic flow by 2023 (F/S target year)1 except two road links: the Airport Access Road and Jl. Urip Sumoharjo.

1 The target year of the Sulawesi Island arterial roads for MP was changed from year 2023 to 2024 at the 2nd workshop on 10th September 2007 at Makassar. The target year of the F/S remains to be 2023 as defind in the original Scope of Work agreed by GOJ and GOI

Page 2: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-2

Figure 10.1.1 Overall Road Development Plan for Mamminasata Metropolitan Area

Tam

bua/

Kec.M

aros

Uta

ra

Sung

gum

inas

a

1-d

New

Port

Jene

bera

n g R

iver

Maro

s Rive

r

Jl.P

erin

tis

Jl.

Ir.

Suta

mi

Tallo

Rive

r

Taka

lar

KIMA

Gales

ong 8

12

14

11

15

13

7

9

10

17

16

FS

Road b

y JIC

A

(Mar

os-T

akala

r)P

re-FS

Road

by

JIC

A Oute

r Ring

Roa

d

Mam

mina

sa B

ypas

s

Tran

s-Su

lawes

i Roa

dM

amm

inasa

ta S

ectio

n

Herta

sning

Roa

d

Abdu

llah

Daen

g Si

rua

Road

1 2

3 4

5

1-c

2

2

2

3

4

5-b

5-a

Maro

s

6

18

20

19

1-a

1-b

1-d

5-c

17

Leng

thD

evel

opm

ent

(km

)C

lass

ifica

tion

JIC

A FS

/ Pr

e-FS

Roa

d C

onst

ruct

ion

15.

0N

ew7.

6N

ew19

.7N

ew16

.7N

ew2

*15

.9N

ew31

.2W

iden

ing

38.

6W

iden

ing

47.

0W

iden

ing

8.3

New

57.

1N

ew7.

3N

ew9.

8N

ew

6Ir.

Sut

ami R

oad

(Tol

l & F

ront

age)

11.0

New

- T

allo

Riv

er B

ridge

Wid

enin

gW

iden

ing

- F

ull I

nter

chan

ge7

KIM

A/J

l.Ir.S

utam

i Acc

ess

Roa

d W

iden

ing

2.6

Wid

enin

g8

30.0

Wid

enin

g9

Wes

t Coa

st R

oad

Wid

enin

g (4

-lane

s)8.

0W

iden

ing

(T

g,B

unga

- M

.Byp

ass

Sec

tion)

10M

alin

o R

oad

Wid

enin

g8.

5W

iden

ing

11M

amm

inas

a B

ypas

s &

KIM

A C

onne

ctio

n5.

0N

ew12

Cen

tral R

adia

l Roa

d2.

2N

ew13

Mid

dle

Rin

g Tg

.Bun

ga E

xten

sion

4.5

New

14Jl

.Ir.S

utam

i - T

ambu

a(N

orth

Coa

stal

Roa

d)24

.0N

ew15

New

Por

t Acc

ess

Roa

d4.

0N

ew16

Cen

tral R

adia

l Roa

d W

est E

xten

sion

3.0

New

17In

ner R

ind

Roa

d C

osta

l Sec

tion

- C

oast

Lin

e (L

osar

i Bea

ch to

Har

bor)

5.3

New

- S

outh

Rin

g2.

5N

ew18

Jl. P

etta

rani

- Jl

.Uri p

Fly

over

(1)

New

-

Jl. P

etta

rani

- Jl

.Urip

Fly

over

(2)

New

19*

Jl.U

ri p /

Jl. P

erin

tis W

iden

ing

(6 la

nes)

16.0

Wid

enin

g

- Jl

.Per

intis

-Jl.D

aya

Jct.

(wid

enin

g to

8 la

nes)

10.0

Wid

enin

g20

Mar

os -P

angk

ep R

oad

Wid

enin

g ( 4

-lane

s)20

.0W

iden

ing

Not

e: *

Tra

ns-S

ulaw

esi M

amm

inas

ata

Roa

d

Oth

er R

oads

Con

stru

ctio

n

Wes

t Coa

st R

oad,

Tg.

Bun

ga-T

akal

ar (W

iden

ing

- Mar

os B

ypas

s

Tran

s-S

ulaw

esi M

amm

inas

ata

Roa

d

- M

aros

-M.R

ing

& Bo

ka -

Taka

lar

- Mak

assa

r Se

ctio

n

Out

er R

ing

Roa

d

Abd

ulla

h D

aeng

Siru

a

- Mar

os/G

owa

- Mar

os-K

IMA

Acc

ess

- Mid

dle

Sec

tion

(KIM

A Ac

cess

-Jl.

Mal

ino)

Mam

min

asa

Byp

ass

Roa

d Li

nk a

nd S

ectio

n N

ame

- Jl.M

alin

o-M

. Byp

ass

Sec

tion

(Sou

th)

- Jl.

Mal

ino-

Sou

th S

ectio

n (J

l.Tj.B

unga

)

- Jl.P

erin

tis-J

l.Sut

ami (

Priv

ate

Sect

or)

- Jl.P

erin

tis-J

l.Mal

ino

- M

.Rin

g an

d S

outh

Ext

entio

n

Her

tasn

ing

Roa

d (S

ectio

ns C

& D

)

Page 3: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-3

Figure 10.1.2 Overall Implementation Schedule of Road Development in Mamminasata Metropolitan Area

Leng

th*

Con

stru

ctio

n*C

lass

ifica

tion

Num

ber o

fFi

nanc

ial

Per

iod

(km

)C

ost (

Bil.R

p)La

nes

Sour

ce**

1

5.0

88N

ew4

APB

N20

16-2

017

7.6

90N

ew4

APBN

/APB

D20

21-2

023

18.7

280

New

4Ex

tern

al S

oft L

oan

(APB

N/A

PBD

) or P

rivat

eSe

ctor

Inve

stm

ent

2013

-201

5

16.7

250

New

4AP

BN/A

PBD

2019

-202

3

2

15.9

461

New

6 &

4Ex

tern

al S

oft L

oan

(APB

N)

2010

-201

2

31.2

379

Wid

enin

g6

& 4

Exte

rnal

Sof

t Loa

n (A

PBN

)20

13-2

015

38.

610

6W

iden

ing

4AP

BD

Up

to 2

010

410

6

2.5

26W

iden

ing

4AP

BD

2006

-200

9

7.0

91W

iden

ing

4AP

BD

2010

-201

1

8.3

124

New

4Ex

tern

al S

oft L

oan

(APB

N/A

PBD

) or P

rivat

eSe

ctor

Inve

stm

ent

2012

-201

5

5

7.1

0N

ew4

Priv

ate

Sect

or20

09-2

011

7.3

193

New

4AP

BN/A

PBD

2015

-201

7

9.8

115

New

4AP

BN/A

PBD

2021

-202

3

6Ir.

Suta

mi R

oad

(Tol

l & F

ront

age)

11.0

0N

ew4

+ 4

BO

TU

p to

200

9

- T

allo

Riv

er B

ridge

Wid

enin

g0

Wid

enin

g8

BO

T20

14-2

015

- I

nter

chan

ge0

BO

T20

14-2

015

7K

IMA

/Jl.I

r.Sut

ami A

cces

s R

oad

Wid

enin

g2.

631

Wid

enin

g4

APB

D20

09-2

010

830

.045

Wid

enin

g2

(7m

)AP

BN/A

PBD

2009

-201

2

9W

est C

oast

Roa

d W

iden

ing

(4-la

nes)

8.0

60W

iden

ing

4AP

BN/A

PBD

2016

-201

8

(T

g,Bu

nga

- M.B

ypas

s Se

ctio

n)

10M

alin

o R

oad

Wid

enin

g8.

534

Wid

enin

g4

APB

D20

08-2

010

11M

amm

inas

a B

ypas

s &

KIM

A C

onne

ctio

n5.

050

New

4AP

BN/A

PBD

2018

-201

9

12C

entra

l Rad

ial R

oad

2.2

26N

ew4

APBN

/APB

D20

13-2

016

13M

iddl

e R

ing

Tg.B

unga

Ext

ensi

on4.

554

New

4AP

BN/A

PBD

2013

-201

4

14Jl

.Ir.S

utam

i - T

ambu

a(N

orth

Coa

stal

Roa

d)24

.010

8N

ew2

APBN

/APB

D20

17-2

020

15N

ew P

ort A

cces

s R

oad

4.0

0N

ew4

BO

T20

17-2

019

16C

entra

l Rad

ial R

oad

Wes

t Ext

ensi

on3.

063

New

6AP

BD

2021

-

17In

ner R

ind

Roa

d C

osta

l Sec

tion

- C

oast

Lin

e (L

osar

i Bea

ch to

Har

bor)

5.3

111

New

6AP

BD

2018

-202

0

- S

outh

Rin

g2.

553

New

6AP

BD

2021

-

18Jl

. Pet

tara

ni -

Jl.U

rip F

lyov

er (1

)48

New

4AP

BN

2007

-200

9

-

Jl. P

etta

rani

- Jl

.Urip

Fly

over

(2)

48In

terc

hang

eAP

BN

2018

-202

0

19Jl

.Urip

/ Jl

. Per

intis

Wid

enin

g (6

lane

s)16

.013

9W

iden

ing

6AP

BN

2007

-201

0

-

Jl.P

erin

tis-J

l.Day

a Jc

t. (w

iden

ing

to 8

lane

s)10

.046

Wid

enin

g8

APB

N20

16-2

018

20M

aros

-Pan

gkep

Roa

d W

iden

ing

( 4-la

nes)

20.0

100

Wid

enin

g4

APB

N20

07-2

008

Tota

l30

2.3

3,22

0

Sour

ce: J

ICA

Stu

dy T

eam

17

25

27 50

3546

34

1313

27

1416

16

134

133

135

155

5050

1417

3535

3535

158

1417

17

307

165

169

128

275

3339

39

1111

11

2727

00

13

2727

2727

77

77

1717

25

11

2424

12

19 1111

11

12

2007

-201

0

00

00

126

126

127

00

7758

00

0

0

58

3131

4645

3131

1033

3033

36

5050

5050

4444

8411

284

161

161

139

Wes

t Coa

st R

oad,

Tg.

Bung

a-Ta

kala

r (W

iden

ing

to 7

m)

Not

e: *

app

roxi

mat

e le

ngth

and

pub

lic in

vest

men

t con

stru

ctio

n co

st, *

* te

ntat

ive

sour

ces

303

117

160

139

299

217

181

2021

-202

320

11-2

015

2008

2009

2013

2019

2016

2016

-202

020

1420

2320

1520

2120

2220

2020

1720

18JI

CA

FS /

Pre-

FS R

oads

2012

2010

2007

2011

- Mid

dle

Sect

ion

(KIM

A A

cces

s-Jl

. Mal

ino)

- Jl.

Mal

ino-

Sou

th S

ectio

n (J

l.Tj.B

unga

)

Tran

s-Su

law

esi M

amm

inas

ata

Roa

d

- Pha

se 1

: M

-Rin

g an

d Ac

cess

(6 la

nes

& 4

lane

s),

Sect

ions

B a

nd C

- Jl.M

alin

o-M

. Byp

ass

Sect

ion

(Sou

th)

Mam

min

asa

Byp

ass

Oth

er R

oads

(con

stru

ctio

n)

Roa

d

- Mak

assa

r Se

ctio

n

- Mar

os/G

owa

Sect

ion

- Mar

os B

ypas

s S

ectio

n

- Mar

os-K

IMA

Acc

ess

- Pha

se 2

: M

aros

-Jl.I

r.Sut

ami I

C a

nd B

oka

IC -

Taka

lar,

(6

lane

s &

5 la

nes)

, Sec

tions

A a

nd D

Her

tasn

ing

Roa

d (S

ectio

ns C

+ D

)

0

Abd

ulla

h D

aeng

Siru

a R

oad

Out

er R

ing

Roa

d

- Jl.P

erin

tis-J

l.Mal

ino

- Jl.P

erin

tis-J

l.Sut

ami (

Priv

ate

Sec

tor)

- Mak

assa

r Se

ctio

n (O

n-go

ing)

810

8

Phas

e 1

Phas

e 2

Page 4: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-4

Figure 10.1.3 Traffic Condition in Mamminasata Metropolitan Area With- and Without-Project Cases at Each Fiver-Year Period

LEG

EN

D

8-la

ne ro

ads

6-la

ne ro

ads

4-la

ne ro

ads

2-la

ne ro

ads

Not

e: A

fter i

mpr

ovem

ent i

nclu

ding

wid

enin

g

3). H

erta

snin

g R

oad

1).

Mam

min

asa

Byp

ass

(Mid

dle

Sect

ion)

6) Ir.Sut

ami R

oad

10).

Mal

ino R

oad

Wid

enin

g2).

Tra

ns-S

ulaw

esi M

am

min

asat

a R

oad

5).

Out

er

Rin

g R

oad

(N

orth

)5).

Oute

r R

ing

Roa

d15)

. New

Por

t A

ccess

Roa

d1)

. M

amm

inas

a B

ypas

s (M

aros

- G

owa)

, ( G

ow

a- T

akal

ar)

7) K

IMA

/Jl.I

r.Suta

mi A

cce

ss R

oad W

iden

ing

4).

Abd

ulla

h D

aeng

Sirua

Road

8). W

est

Coa

st R

oad

(Tg.

Bunga

- T

akal

ar)

9).

Wes

t C

oast

Roa

d W

ideni

ng (4-

lanes

)12

). C

ent

ral R

adia

l R

oad

11). M

amm

inas

a B

ypa

ss &

KIM

A C

onne

ctio

n18

).Jl.

Pet

tara

ni -

Jl.U

rip F

lyov

e19

). Jl.U

rip /

Jl.

Per

intis

Wid

enin

g6) Ir.S

uta

mi R

oad

(Tal

lo R

iver

Bridge

Wid

eni

ng &

Int

erc

hange

)14)

. Jl.I

r.Suta

mi -

Tam

bua

(N

orth

Coa

stal

Road

)17

). In

ner R

ind

Roa

d C

osta

l Sec

tion

(Los

ari B

each

to H

arbo

r)20

). M

aros

-Pan

gkep

Roa

d W

ideni

ng13)

. M

iddl

e R

ing

Tg.

Bung

a Ext

ensi

on

19)

. Jl.P

erin

tis-

Jl.D

aya

Jct. (w

iden

ing

to 8

lan

es)

Up

to Y

ear 2

010

Up

to Y

ear 2

015

Up

to Y

ear 2

020

Up

to Y

ear 2

023

175439376

317

249313

314 274

274

242

308

387 331

250

243

280

86

59

428

428212

187

308

195

143143

33

15

512546

992

597

719

719

24

8 3

3

444

448

226302

141

257

1 96

11

316

244 160

8038

1 570

601

138

385

516

12

64

2

6

0

2

27

242

185

482

6

36

1

18

19

0

106

0

103

0

56

056

3737

82

82

87

87

10

4

6

42

54

47

11

36

3

223

0

5610

6

3 93

158

29466

1

504

282

189

137

464471 461

523461548

215

111

460

193

346

201

690

386

356

159

604

1

227 24

5

78

354

244

286

960 297

768

402

633

217

217297

0273

0

1030

448

0

256

11233

138 5

186

0

231

135

147 0

152152

0

105

268

104

226

355

375

287

287

273

9025

044

3

194

1

234

176

0

217

6

16132169339 333

448

444

0

55

278

318

375

426 387

32

331

416

740508

39

1030

147

386

108

320

757 5

234

206265

265519

312

370

12

28 293

250

458

308340 331

291

0

0

517

251

251

250

604

111

177

288

311

111

604

117

136 285

136

136

589

324316

548 458

95

461

461

456

274

1

187456391

319

258297

294 449

395

256

352

414 358

264

243280

74

59

462

456304

266

266

181

129129

28

19

534575

1017

614

715

715

59

38

3

3

531

541

237290

141

257

196

117

338253181

7938

1 573

623

163

410

605

22

24

21

39

2

21

9

256

202

560

39

37

1

18

19

0

107

0

260

0

56

056

3737

62

62

102

102

16

4

7

45

54

44

8

36

3

225

0

5510

7

403

177

31763

2

534

287

192

140

477471 461

534494548

221

93

431

202

363

212

715

425

357

188

577

9

240 24

0

143

287

228

300

980 307

820

462

736

299

307

0296

0

1074

532

929

5

24

31

0

151

135

112 0

105105

62

94

120

395

315

301

301

296

9022

746

9

190

7

247

155

0

62

21

16146144 313 295

541

531

0

116315

315

470 414

43

358

471

828

569

42

1064

112

425

94

325

656 5

247

218275

275532

271

311

7

30 221

227

458

268317 321

319

0

0

529

291

291

254

624

122

178

300

343

122

624

157

148 272

148

148

616

332338

548 458

120

494

461

438

313

9

154519405

345

216272

305 348

307

204

287

344 297

217

202228

84

47

464

377239

208

208

141

102101

20

18

650537

1352

920

959

959

47

24

3

3

547

547

547354

104

208

159

99

413

326 141

5739

9 662

771

88

476

670

0

24

26

46

17

26

0

146

169

671

46

13

6

15

16

0

246

75

81

0

46

047

2727

45

45

83

83

12

4

6

43

45

33

2

31

3

334

0

5424

6

322

130

39054

9

608

374

263

261

614510 517

558402612

263

86

404

277

412

283

1047

402

206

177

572

64

303 28

2

81

205

202

998 265

573

414

651

257

265

7232

7

993

547

0

24

29

0

29

109

87 0

12971

45

83

275

244

244

232

9424

852

8

115

17

232

112

7

45

17

208

354

547

547

0

88 275

275

397 344

34

297

425

750626

41

977

87

402

73

266

5353

232

202

105 180

248

518

261342 321

293

0

0

573

213

1058

21

201

222

21

1058

129

173

464

383413

612 518 402

517

64

165411347

285

233272

236

358

318

207

291

347 300

217

199228

73

47

424

402237

205

205

140

100100

20

18

484458

849

498

572

572

48

25

3

3

421

421

196

227

104

207

1 58

98289

216 145

8636

9 562

596

129

301

572

0

17

11

25

1

11

0

165

168

534

25

28

1

15

16

0

960

208

0

46

047

2929

43

43

83

83

12

4

6

43

45

33

2

31

3

186

0

4496

362

147

25953

5

481

267

193

112

428447

415

491434498

198

78

405

167

297

161

570

387

307

173

532

0

232 20

3

98

269

225

263

917 268

716

399

660

275

268

0239

0

999

421

0

225

17

24

0

129

103

81 0

6565

43

36

105

330

278

246246

239

8624

941

1

141

1

206

151

0

43

15

1112998238 225

421

421

0

93 278

278

401 347

36

300

418

728

495

41

999

81

387

72

265

5252

206

197225

225431

225

278

6

15 176

249

412

264335 317

302

0

0

493

223

223

211

525

75

132

207

295

75

525

136

128 162

128

128

452

292289

498 412

105

434

415

366

251

0

142387322

313

353400

462 497

443

310 206 180

140

170

170130

101141

77

25

307

107107

56

56

44

2334

3

18

387258

605

310

349

349

51

32 16

16

400

297

293213

5712

2

9262

277

20860 10

1371

581

791

67

172

381

140

66

52

11541

52

4

67

109

649

115

96

71

8

10

30

244

9511

8

25

35

233

404064

64

104

104

33

55

24

32

30

48

28

21

16

191

30

53

83

77

244

260

8620

3192

419

195210

117

437455 425

611462775

212

47

177

168

288

139

209

125

439

292

166

197

617

224

221 23

2

120

66

292

16

142

1313

99

297

77

83

89 91

96

598

74

212 269

270

73

73

116

240277

775 598 462

425

224

158459366

321

312424

637 613

520

377

198186 12

7

142137182

110

34

471

188188

89

89

82

5257

17

26

536385

1063

720

747

747

99

68

7

7

408

408

408278

7616

2

1 22

79

336

302 136

1083

7560

2

812

82

276

641

0

70

49

83

31

49

0

88

156

583

83

98

92

13

13

14

216

25

178

78

40

640

4444

105

105

117

117

49

83

49

21

38

42

17

26

33

284

14

5321

6

282

166

33837

5

583

273

227

172

560552 512

634562967

260

161

424

237

350

164

802

451

182

233

734

290

301 28

0

178

187

150

187

187

81

6681

812

408

0

70

14

53

15025

105

76

186186

6623

989

89

96

81

105

31

162

278

408

408

78

156

260 186

90

127

280

216

19

734

451

31

174

143 2

66

150

97 122

47

728

238286 399

253

42

42

137

802

0

802

134

144

307

309336

967 728 562

512

290

131413334

301

195236

222 252

223

141

231282 24

4

196

182

182

81

34

400

300176

153

153

103

7473

12

16

512378

989

717

737

737

34

15

2

2

431

431

431278

7616

2

122

79

302

224

92 7038

5 630

743

79

267

628

0

17

12

28

8

12

0

97

132

600

28

8

1

13

13

0

195

52

60

0

40

040

00

31

3165

65

6

3

5

38

38

26

0

26

2

207

0

4519

5

294

105

26938

1

534

297

245

165

515450

428

463370548

197

58

361

232

339

169

736

338

99

164

438

16

240 21

1

60

194

159

915 219

500

327

551

213

219

3194

3

941

431

0

17

21

0

21

7866 0

9353

31

53

246

196

196

194

61

240

487

66

7

194

120

3

31

8

162

278

431

431

0

70

246

246

323 282

2924

4

373

624

509

36

926

66

338

50

230

383 8

194

159

90 142

240

487

235300 267

282

0

0

500

193

746

18

181

199

18

746

104

120

277

275302

548 487 370

428

16

128377323

278

281390

550 500

435

309

144

155 116

120

101141

80

25

328

104104

47

47

55

3336

6

15

393253

728

486

506

506

57

54

4

4

310

310

310

213

5712

2

92

268

212

77 9335

3 555

711

35

177

479

0

56

40

69

24

40

0

49

106

551

69

81

77

8

10

8

184

7

137

30

35

233

4040

73

73

98

98

39

59

31

19

30

32

12

21

13

179

8

4218

4

218

109

21825

6

435

210 202

110

428446

414

511490846

204

124

352

169

253

9553

4

296

146

190

634

231

215 20

9

137

125

96

125

125

615061

711

310

0

56

8

42

967

73

14

159159

5019

778

78

76

61

73

24

122

213

310

310

30

106

211 155

64

116

209

184

18

634

296

16

134

1014

50

96

84 91

42

649

179239 305

218

36

36

108

534

053

4

100

95

182

235268

846 649 490

414

231

93297264

233

301340

352 380

356

248 185 157

127

129

12999

77108

44

18

214

6868 37

37

28

1321

2

13

284176

483

259

287

287

32

24 11

11

305

230

230170

4190

6 747

217

15143 80

305 5

0561

8

46

163

292

98

50

31

7626

31

0

46

86

500

76

74

52

6

8

17

191

67

88

14

27

225

313129

29

64

64

22

24

3

26

23

32

17

15

11

114

17

42

59

51

191

186

7416

1153

311

160

200

87

320366 347

495449723

159

3815

910

620

3

93

169

7437

9

178

143

165

492

153

204 16

2

98

55

178

8

104

66

84

230

51

59

51 75

70

563 24181 20628

8

36

36

87

193217

723 563 449

347

153

With

out

Proj

ects

With

out

Proj

ects

With

out

Proj

ects

Year

200

6 AD

T &

Roa

d N

etw

ork

With

Pro

ject

sW

ith P

roje

cts

With

Pro

ject

sW

ith P

roje

cts

With

out

Proj

ects

1

1

2

2

2

20

14

117

6

5

5

18

15

17

19

3

4

6

10

12

139

8

2

5

1

1

2

5

Maro

s

Sung

gum

inas

a

Taka

lar

Maka

ssar

Page 5: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-5

Figure 10.1.4 presents an estimate of public investments required for the on-going and new major road development projects in the Mamminasata Metropolitan Area in 2008-2023. An amount of Rp 190 billion will be required on an average.

Source: JICA Study Team

0

50

100

150

200

250

300

350

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

Rp

(bill

ion)

Figure 10.1.4 Estimate of Public Investment (Construction Cost)

for Major Road Development for 2008-2023 Period

10.2 Implementation Plan for the F/S Roads

10.2.1 Trans-Sulawesi Mamminasata Road

(1) Priority and Recommendation of Earliest Project Implementation

Among the F/S and other roads, the Trans-Sulawesi Road Mamminasata Section (the Trans-Sulawesi Mamminasata Road) was identified as the most viable on economic, technical and regional development aspects, and its earliest implementation was envisaged. The JICA Study Team completed the feasibility study for the Trans-Sulawesi Mamminasata Road and incorporated its implementation plan in the Interim Report submitted in June 2007. The JICA Study Team also assisted in preparing the Implementation Program and Project Digest for the Trans-Sulawesi Mamminasata Road Project (the TSMR Project).

(2) Implementation of Jl.Perintis Kemerdekaan 6-Lane Widening

The DGH has commenced the construction of a flyover and intersection for Jl.A.P.Pettarani (Jl.Tol Reformasi) - Jl.Urip Sumoharjo IC. The DGH also commenced the road widening from 4 lanes to 6 lanes for Jl.Perintis Kemerdekaan. The latter is a part of the Trans-Sulawesi Road Mamminasata section, and will be completed up to Jl.Ir.Sutami IC (new Airport Access Road IC) by 2010. As the commencement of the Trans-Sulawesi Mamminasata Road Project is scheduled to be in 2010, the TSMR Project does not include the DGH’s APBN section, except overpass pedestrian bridges required for safety of pedestrian crossings. Moreover, as the Jl.Perintis

Page 6: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-6

Kemerdekaan / Jl.Ir.Sutami IC flyover at the new airport terminal access will be completed under the ongoing BOT scheme by 2009, this is also excluded from the Trans-Sulawesi Mamminasata Road Project.

(3) Expressway/Toll Road Scheme

The DGH has conducted an expressway/toll road study in 2006 for Sulawesi Island (Trans-Sulawesi Road). The study recommended that the Maros-Mandai-Makassar, Middle Ring Road (Makassar - Sungguminasa) and Sungguminasa - Takalar section of the Trans-Sulawesi road should be included as priority roads in the expressway/tollway development programs to be implemented in the period of 2006 - 2020. However, a joint investment by the Government and private sector (Public-Private Partnership) is required to attain the marginal FIIR of 16% (or 20%).

The express/toll roads in the DGH’s study followed the routes suggested in the Mamminasata Spatial Plan Study. The JICA Study Team changed the Trans-Sulawesi route from the Mamminasata Plan to the existing national road as described in Section 7.3. As a result, both the Maros - Mandai - Makassar and Sungguminasa (Boka IC) - Takalar sections are not recommended for toll road development but recommended for national road development (public investment).

The Study Team reviewed the toll road plan and PPP scheme for the Middle Ring Road (Makassar - Sungguminasa) as described in Section 7.3.3 on technical aspects and Section 9.3 on financial aspects, as one of the alternative implementation plans and recommended an ordinal public investment scheme with an external soft loan. The JICA Study Team also prepared a cost recovery plan required for operation and maintenance of the roads after their construction.

(4) Alternative Implementation Plans

The investment required for the Trans-Sulawesi Road Project was estimated at approximately Rp 1,651-1,757 billion in total including civil works, consultancy services, ROW acquisition, administration and tax (VAT). If Japanese ODA facility (JBIC Loan) is used, 100% of civil works and consultancy service costs can be covered by a soft loan. However, GOI needs to provide own finance for land acquisition, resettlement, administration and tax (VAT), which are not eligible for external loan. Land acquisition and resettlement costs for the Trans-Sulawesi Mamminasata Road were estimated at Rp 310 billion including inflation. The central and regional governments will share the cost, allocate budget and complete the land acquisition and resettlement in the years 2008 - 2010.

As allocation of sufficient budget for the land acquisition and resettlement in this short period seems to be difficult, the Study Team prepared alternative implementation schedules. Alternative A is implementation of the full length in one time and Alternative B is implementation in two phases. Phase 1 covers the Middle Ring Road and its south extension as these two sections are more urgently required in terms of traffic demand while less settlement is required. Phase 2 covers the Maros-Jl.Ir.Sutami IC and Sungguminasa (Boka IC) - Takalar sections. Table 10.1.1 shows

Page 7: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-7

the concept of the alternative plans.

Table 10.2.1 Alternative Implementation Plans Alternative

Plans Concept Section Length Construction

Period Estimated

Construction Cost A Non-phased

Implementation Sections A, B, C and D

47.1 km 36 months (2010-2012)

Rp 1,651 billion

Phase 1: Sections B and C

16.0 km 36 months (2010-2012)

Rp 888 billion B Phased Implementation

Phase 2: Sections A and D

31.1 km 36 months (2013-2015)

Rp 869 billion

Approximately Rp 99 billion will be required from 2008 to 2010 for the land acquisition and resettlement in the case of Alternative A. Annual budget requirement could be reduced to approximately Rp 55 billion from 2008 to 2013. It seems that Alternative B is more practicable and, therefore, it is recommended to be selected.

Land Acquisition & Resettlement Expenditures

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

2007 2008 2009 2010 2011 2012 2013 2014 2015

Financial Year

Land

Aqu

isiti

on &

Res

ettle

men

t Exp

endi

ture

s (R

p B

illio

n)

Alternative AAlternative B (Phase 1 + Phase 2)

Alternative A : Full

Alternative B :Staged Implementation (Phase 1)

Alternative B :Staged Implementation(Phase 2)

Figure 10.2.1 Land Acquisition and Resettlement Expenditures for Alternative Implementation Plans

There are many houses to be moved for the existing road widening, along the project road, especially at Mandai in Kab.Maros (Section A) and Limbung in Kab.Gowa (Section D) and it needs considerable time for resettlement negotiations and arrangements. On the other hand, the ROW acquisition is in progress for the Middle Ring Road (Section B) and there are not so many houses to be moved for Section C. It is expected that land acquisition and resettlement for Sections

Page 8: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-8

A and D can be carried out and completed during the construction of Sections B and C.

10.2.2 Mamminasa Bypass, Hertasning Road and Abdullah Daeng Sirua Road

The following implementation plans are recommended for the Mamminasa Bypass, Hertasning Road and Abdullah Daeng Sirua Road in the F/S.

(1) Mamminasa Bypass

Four ring roads were planned for the Mamminasata Metropolitan Area namely the inner ring (Jl A.P.Pettarani/ Jl Tol Reformasi), middle ring, outer ring and outer-outer ring (Mamminasa Bypass). A general order of development requirement is from the inner ring to outside. According to the results of traffic survey and analysis, there would be no large through traffic on the Mamminasa Bypass from the south to the north bypassing Makassar City. However, as the anticipated role and function of the Mamminasa Bypass are to induce/promote the creation of a new satellite town at the foot of Mt. Moncongloe (approximately 15 km east of the Makassar City center), the middle part of the bypass road, which is an arterial road for the new town, should be constructed earlier than the northern and southern parts.

(2) Hertasning Road

The Hertasning Road (4-lane road) is under construction by the South Sulawesi Provincial Government. It is anticipated that the Provincial Government will continue the construction and complete this road by the end of 2010 using APBD I (provincial budget). After completion of the on-going sections (sections A-C), if budget availability is tight, staged implementation could be applied for Section D, 4.5 km long from the new campus of the State Islamic University to the intersection of the Kabupaten road. The 1st stage consists of widening the existing 4.5 m road to 7 m road, and the 2nd stage consists of further widening it to 4-lane road in the future.

(3) Abdullah Daeng Sirua Road

A part of the Abdullah Daeng Sirua Road (Section B) is under construction by Makassar City (APBD II). This road will have two functions: One is to serve as a radial road for transportation of residents around this road within the Makassar City territory (up to the Tallo River). The other is to provide a direct access from the Makassar City center to a planned new satellite town at the foot of Mt. Moncongloe (approximately 15 km east of the Makassar City center) and KIWA.

10.3 Executing Agency

(1) Trans-Sulawesi Mamminasata Road

The Tran-Sulawesi Road Project should be implemented as a strategic road development

Page 9: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-9

contributing to the regional economy, both for Sulawesi and the eastern part of Indonesia. The status of the Middle Ring and its extension is expected to be changed to national road after their completion. The Directorate General of Highways (DGH) of the Ministry of Public Works will be the executing agency responsible for the construction and operation/maintenance of the Project. In the detailed design and construction stage, a Project Management Unit (PMU) will be established in Bina Marga. The PMU will represent DGH and act as the Employer of the Project.

The JICA Study Team suggests that user charges should be collected at the two new bridges, one at the Tallo River Bridge and the other at the Jeneberang River Bridge, to cover the operation and maintenance costs of the whole Trans-Sulawesi Mamminasata Road. The operation and maintenance works can be contracted out to the private sector. The Balai Besar VI of Bina Marga will be responsible for controlling the operation and maintenance works to be carried out by the management and operation contractor.

(2) Mamminasa Bypass

The Mamminasata Bypass should be designated as a strategic provincial road since it is part of the secondary arterial road network system for the Mamminasata Metropolitan Area that connects the capital of Maros, Gowa and Takalar passing through a new satellite town. The Public Infrastructure Agency (Dinas Praswil) of South Sulawesi Province will be the executing agency responsible for the construction and maintenance of the Project. For the implementation, “Officers for Technical Activities Implementation” will be appointed and they will represent Dinas Praswil and act as the Employer of the Project.

Note: The Maros Town Section (Maros bypass) might be changed to national road after its completion. In this case, the executing agency will be DGH.

(3) Hertasning Road

Sections A, B and C) of the Hertasning Road were implemented by the Public Infrastructure Agency (Dinas Praswil) of South Sulawesi Province. Therefore, Section D of this road under the F/S will also be executed by the same agency.

(4) Abdullah Daeng Sirua Road

The Abdullah Daeng Sirua Road will not have the status of provincial road as it is not a connecting road between the Provincial capital and Kabupaten/Kota capitals or between Kabupaten capitals. Therefore, the project within the territory of Kota Makassar should be implemented as a city road. Dinas PU of Kota Makassar should be the executing agency responsible for the construction and maintenance of the project within the Makassar City territory. As for the project road passing through the territories of Kabupaten Maros and Gowa, Dinas Praswil of South Sulawesi Province should be the executing agency as this road section should be designated as a strategic road for a new satellite town development.

Page 10: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-10

Note: As the Kabupaten Maros and Gowa section provides direct access to a planned new satellite town, it might be constructed by a private investor who is participating in the new satellite town development.

10.4 Contract Packaging

10.4.1 Trans-Sulawesi Mamminasata Road

The project should be implemented with appropriate contract packages to be determined taking into consideration the size of contracts (amount and quantity), characteristics of the section, technical difficulty, construction period, funding source, and competition in bidding. Figure 10.3.1 shows the packaging and scope of work for alternative implementation plans A and B.

(1) Alternative A

The Study Team recommends to implement the project in four (4) packages if Alternative A of the above implementation plan is adopted.

Package 1 is the road section from the junction beside the office of Maros Regency Governor to Jl.Tol.Ir.Sutami IC (refer to Figure 10.4.1). The new Maros town and the divided 4-lane road completed in 2003-2004 shall not be disturbed. The construction works are to widen the existing 4-lane road to a divided 6-lane road.

Source: Drawn on Google Earth Map

End of Trans-SulawesiMamminasataRoad Project

The newtown sectionnot touched

MamminasaBypass

Office ofGovernor

Figure 10.4.1 End of Trans-Sulawesi Mamminasata Road at Maros (Package 1)

Page 11: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-11

The construction length is 8.7 km and no long bridges exist. The scope of works includes the pedestrian bridges on the Jl.Perintis Kemerdekaan (length 10.3 km) to be widened to 6 lanes under the national budget (APBN) by 2010.

Package 2 consists of the construction of a new 7.3 km long road from Jl.Perintis Kemerdekaan/Middle Ring Road intersection to Jl.Sultan Alauddin IC in Makassar City. The road will have 6 lanes and a wide median for keeping space for its future widening to 8 lanes. The Tallo River bridge (L=136 m) and a flyover on Jl.Sultan Alauddin are included in this section. Pile slabs will be used for the weak soil section located in the Tallo River basin, at the entrance to the Middle Ring Road from Jl.Perintis Kemerdekaan. The Middle Ring Road will cross Jl.Abdullah Daeng Sirua, Central Radial Road from Pannakukang, Jl.Borong Raya, Jl.Hertasning and some other minor roads.

Package 3 consists of the construction of the Middle Ring Access (new road) from the Jl.Sultan Alauddin IC to the intersection with the national road at Boka in Kabupaten Gowa. The section is 8.7 km long and includes a new Jeneberang River bridge (L=393 m). The road will have 4 lanes and a wide median for keeping space for its future widening to 6 lanes.

Package 4 consists of widening the existing 22.4 long road from Boka IC in Kabupaten Gowa to the center of Takalar town, from a 2-lane road to a divided 4-lane road. Widening will be made mostly on the west side as an irrigation canal runs along the east side of the existing road. No long bridges exist in this section.

(2) Alternative B

The Study Team recommends to implement the project in two packages in each phase as illustrated in Figure 10.4.2 if Alternative B of the above implementation plan is adopted. The outline of each package is the same as that described for Alternative A.

Page 12: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-12

Maros

Sungguminasa

P2-2

Jl.Per

intis

Middle Ring R

oad

Jeneberang River

Takalar

New Jeneberang RiverBridge (393m)

New Tallo RiverBridge (136m)

Boka IC

Tran

s-Su

law

esi M

amm

inas

ata

Roa

dPr

ojec

t (M

aros

- M

akas

sar)

, L=5

7.4k

m

P2-1

L=22.5km

L=8.6km

L=8.7km

L=7.3km

On-going 6-laneWidening by APBNL=10.3km

Jl.S.AlauddinInterchange(flyover)

P1-2

P1-1

LEGEND

Phase 2 Contracts

Phase 1 ContractsP1-1

P2-1

P1-2

P2-2

A

B

C

D

Tallo River

Maros River

Trans-SulawesiMamminasata Road

KIMA

Planned New Campus ofHasanuddin University(Engineering Department)

ExistingHasanuddinUniversity

Jl.Ir.S

utami

(Toll R

oad)

Jl.Urip-Jl.Tol.ReformasiFlyover underconstruction

Roadway PavementExisting Plan*

Maros -Jl.Ir.Sutami IC 8.7 4 6 Widening Concrete

PavementJl.Ir.Sutami IC-Middle Ring Road(Jl.Perintis)

- 4 6 (8)On-going

Widening byGOI (APBN)

ConcretePavement

Onlypedestrianbridges

B P1-1Middle Ring Road

7.3 - 6 (8) New Road ConcretePavement

Jl.SultanAlauddin IC

Tallo RiverBridge(136m)

C P1-2Middle Ring RoadAccess 8.6 - 4 (6) New Road AC

Pavement -JeneberangRiver Bridge(393m)

D P2-2 Boka IC -Takalar(national road) 22.5 2 4 Widening AC

Pavement -

Total: 47.1Note: the figure in ( ) shows a future plan.

SectionNo.

A

ContractPackage

No.

P2-1

Scope of Works RemarksLength(km)

Major RiverBridge (m)

FlyoverInterchange

Section NameNumber of Lanes

Source: JICA Study Team

Figure 10.4.2 Implementation Plan B for Trans-Sulawesi Mamminasata Road

Page 13: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-13

10.4.2 Mamminasa Bypass, Hertasning Road, A.D. Sirua Road

(1) Mamminasa Bypass

The Mamminasa Bypass was divided into four (4) sections as indicated in Table 10.4.1 taking the appropriate construction timing into consideration.

Table 10.4.1 Implementation Section of Mamminasa Bypass Section

No.* Section Name Road

Length Major Bridge

Length Construction

Period Estimated

Construction Cost 1-A Maros Bypass

Section 5.7 km Maros Bridge

(126m) 24 months (2016-2017)

Rp 88 billion

1-C Middle Section (KIMA Access - Jl Malino)

6.9 km 36 months (2013-2015)

Rp 280 billion

1-B Maros-KIMA Access

19.7 km Jeneberang Bridge (154m)

36 months (2021-2023)

Rp 90 billion

1-D Jl Malino - South Section (Jl Tj Bunga)

16.7 km 60 months 2019-2023

Rp 250 billion

Total 49.1 km 280m Rp 708 billion Note: Order of sections from the north (Matos) to the south Source: JICA Study Team

Of the above, it is assumed that an external soft loan would be applied for Section C, Middle Section (KIMA Access – Jl Malino), as this section should be constructed earlier than other sections according to the strategy of inducing the creation of a new satellite town along this road section. The construction should be carried out in one or two contract packages taking the estimated project cost and work characteristics into account.

(2) Hertasning Road

The JICA Study Team studied only Section D (4.9 km) of the Hertasning Road. Application of a single contract package would be appropriate for the construction of this road section..

(3) Abdullah Daeng Sirua Road

Section B of the Abdullah Daeng Sirua Road is under construction and, therefore, Sections C and D within the territory of Makassar City should be implemented with appropriate contract packaging determined by Dinas PU. For the construction of Sections E and F in the territories of Kabupaten Maros and Gowa, it is recommended to use an external soft loan as these sections should be connected to the Mamminasa Bypass to induce the new satellite town. Considering the estimated project cost, application of one or two contract packages would be appropriate for the construction of these sections.

Page 14: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-14

Table 10.4.2 Implementation Section of Abdullah Daeng Sirua Road Section

No. Section Name Road

LengthLong Bridge

Length Construction

Period Estimated

Construction Cost 4-A,

4-C and 4-D

Makassar City Section

7.0km 48 months (2010-2013)

Rp 91 billion

4-E and 4-F

Kabupaten Maros & Gowa Section

8.3km Tallo Bridge (60m)

36 months (2013-2015)

Rp 124 billion

Total 15.3km Rp 315 billion Source: JICA Study Team

10.5 Implementation Schedule

10.5.1 Trans-Sulawesi Mamminasata Road

(1) Pre-construction Schedule and Action Plan

As the feasibility study for the Trans-Sulawesi Mamminasata Road Project was completed by the end of June 2007, a series of procedures are required for financial arrangement for implementation of the project. It should also be noted that land acquisition and compensation are required for the project.

The JICA Study Team understands that joint financing by GOI and an external source (either Japanese ODA scheme or other donor agency) will be appropriate for implementation of the project. Figure 10.5.1 shows a draft schedule (implementation plan for phase 1 project) and action plan for the use of the Japanese ODA facility for earliest project implementation. Similar procedures will be required in the case of using other external funding. The phase 2 project also should be implemented in the same way as the phase 1.

The DGH needs to make internal project screening and submit the project proposal to Bappenas through MOW for Blue Book listing. As to the application for JBIC loan in the fiscal year 2008, a project proposal shall be submitted to Bappenas by the end of December 2007. Financial arrangements of GOI (APBN/ABPD) are also necessary for the cost not covered by the external loan like land acquisition, resettlement and administration costs.

AMDAL (EIA) for the project was approved by the Governor of South Sulawesi Province in September 2007. The LARAP policy frame required for project appraisal was also prepared by the JICA Study Team.

Page 15: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-15

Period 20061.2.3.4.5.6. 2009-20127. Maintenance

Feasibility Study Up to Jene 2007

Assist in EIA (AMDAL)Assist in LARAPFrameworkPreparation of ProjectDigest

Jun 2007

Assist in ImplementaionProgram Preparation

Jun 2007

Fact Findings Aug - Sep 2007Project Appraisal Oct-Nov 2007Pledge Feb 2008Exchnage of Notes Mar 2008Loan Agreement Mar 2008Project Monitoring

Bina Marga EIA (AMDAL) Up to Jun 2007

Bapedal-Da Public Consultation (TOR) (EIA) (LARAP Framwork)

Bapedal-Da Assessment and Approvalof AMDAL Up to Sep.2007

Bina Marga Implementation Program Up to Jun.2007

Bina Marga Screening and Proposal ofProject to Bappenas Nov 2007

MOF Request to GOJ Feb.2007Bina Marga Request for Blue Book Up to Dec.2007BinaMarga/MOF/Regional Goverment

Budget consultation /negotiation

BinaMarga/MOF/Regional Goverment

Budget allocation for landacquisition andresettlement

Dinas PU/ Kota/Kabupaten

Land acquisition /Resettlement

Note: * a case for use of Japanese ODA facilities (JBIC Loan) F/S Report for Trans Sulawesi Mamminasata Road (June 2007)

Indo

nesi

an S

ide

2010Item / Action

JBIC

*JI

CA

(JIC

A S

tudy

Team

)

Soft

Loan

Age

ncy*

Feasibility Study (Interim Report)2007 2008 2009

Construction

2013

Screeing and Financial (Loan) Procedures

Detailed Engineering DesignProcurement of Consultant

Bidding and Contract

2011 2012

Figure 10.5.1 Implementation Schedule and Action Plan for Trans-Sulawesi Mamminasata Road Project (Case of Japanese ODA Facility)

A consultant will be employed in accordance with the guidelines of the financing agency and the executing agency for detailed engineering design, contractor procurement assistance and construction supervision.

Construction contractors will be procured through international competitive bidding in accordance with the guidelines of the loan agency. For the project of this type and scale, the selection will be made through separate pre-qualification and bidding among the pre-qualified contactors.

(2) Construction Stage

After the contract signing, the construction will be started. The construction period is estimated to be 30 - 36 months as shown in Figure 10.5.2. The required period for the roadway and bridge construction is estimated based on the work quantities in Section 9.1, daily productivity, number of work-units, and seasonal working days.

Page 16: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-16

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

● Package P2-1● Mobilization● Earthworks● Drainage works● Pavement● Bridge and other structures● Miscellaneous● Demobilization

● Package P1-1● Mobilization● Earthworks● Drainage works● Pavement● Bridge and other structures

(Tallo river bridge, flyover)● Miscellaneous● Demobilization

● Package P1-2● Mobilization● Earthworks● Drainage works● Pavement● Bridge and other structures

(Jeneberang river bridge)● Miscellaneous● Demobilization

● Package P2-2● Mobilization● Earthworks● Drainage works● Pavement● Bridge and other structures● Miscellaneous● Demobilization

Notes: Continuous Activities Discontinue Activities

Calendar MonthPackage No. / Works

Figure 10.5.2 Construction Schedule by Contract Package for Trans-Sulawesi Mamminasata Road

(3) Post-construction Stage

Maintenance of the works and structures throughout the construction period and maintenance period is the responsibility of the contractors. After that, the project road will be maintained by DGH. If operation and maintenance works are contracted out, they are under the responsibility of contractors. The project execution will be continually monitored by the executing agency.

10.5.2 Mamminasa Bypass, Hertasning Road, A.D. Sirua Road

The implementation schedule of the Mamminasa Bypass, Hertasning Road and Abdullah Daeng Sirua Road would differ by financing source and availability. The anticipated or assumed source and plans are as shown in Figure 10.5.3.

Page 17: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-17

Length* Financial Period(km) Source* 2006

- 5.0 APBN 2016-2017

- 7.6 APBN/APBD I

2021-2023

- 19.4 ExternalLoan orPrivateInvestor

2013-2015

- 16.7 APBN/APBD I

2019-2023

- 3.4 APBD I Up to 2008

- 4.9 APBD I 2008-2010

- 2.5 APBD II Up to 2009

- 7.4 APBD II 2010-2011

- 7.2 ExternalLoan orPrivateInvestor

2012-2015

Source: JICA Study Team

2021-202320232015 2021 202220202017 2018

2011-20152008 2009 2013 20192016

2016-20202014201220102007 2011

Mamminasa Bypass

Road 2006-2010

Makassar Section(Sections A, C, D)

Middle Section (KIMAAccess-Jl. Malino)

Jl. Malino- South Section(Jl.Tj.Bunga)

Maros-KIMA Access

Secions C

Secions D

Makassar Section(Section B)

Maros/Gowa Section(Section E and F)

Maros Bypass Section

Hertasning Road

Abdullah Daeng SiruaRoad

Figure 10.5.3 Construction Schedule of Mamminasa Bypass, Hertasning Road and Abdullah Daeng Sirua Road

10.6 Operation and Maintenance Plan

10.6.1 Key Maintenance Issues and Financing Sources

Sustainability of the road facilities after development is the most important issue. The asset management approach should be applied. Asset management can be defined as “comprehensive and structured approach to the long term management of assets as tools for the efficient and effective delivery of community benefits”2; or “systematic process of effectively maintaining, upgrading and operating assets, combining engineering principles with sound business practice and economic rationale, and providing the tools to facilitate a more organized and flexible approach to making decisions necessary to achieve the public’s expectations”3.

The road maintenance work consists of routine maintenance and periodic maintenance. Management, planning and execution of the maintenance work for national roads are under the responsibility of Balai Besar VI of DGH. Routine maintenance is conducted by force account of provincial or regency governments using APBN allocated by DGH. Periodic maintenance is contracted out. Planning and execution of the maintenance work for provincial roads is under the responsibility of Praswil of South Sulawesi Province using APBD I, while for city or Kabupaten roads they are under the responsibility of Dinas PU of city or regency governments using APBD II (refer to Section 3.2.4).

2 Austroads 1997 for improving asset management practice 3 OECD

Page 18: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-18

The key issue for maintenance is the lack of financial and budgetary sustainability and/or insufficient budget allocation. A stable funding source should be established for maintenance financing. There are two approaches: budget approach and road fund approach. In the first approach, the road costs are considered as public expenditures to be covered by national or provincial budget. The revenue from fuel taxes, vehicle registration fees and others levies is used to cover such road costs. In the second approach, road users pay for the road costs. The former is the current practice in Indonesia and the establishment of road fund is one of the future challenges.

The road fund is an instrument that generally becomes the main financing source for road maintenance and other road expenditures. This approach has been used in the USA, Japan, New Zealand since the mid 1950s. Road users pay charges mainly in the form of gasoline levy. This is the most economical and efficient collection method as the charges can be collected at oil refineries or at ports of import. The road fund is free from budget fluctuation as it is generally managed and distributed by an independent board. In recent years, the road fund approach has been applied in many developing countries (more than 30 countries), including Ethiopia, Ghana, Benin, Kenya, Uganda, Honduras, Laos, etc. The first target is to collect the fund sufficiently to cover the road maintenance cost. Several countries have succeeded in collecting 90% of the required fund for maintenance at present. Some of the road fund could be used for securing road safety, overload control and other road asset management activities

A study was made in Indonesia on appropriateness of establishing a road fund with the World Bank’s financial cooperation. However, as its application has not yet started, it is necessary to strengthen the current approach for a while to secure the maintenance cost.

10.6.2 Trans-Sulawesi Mamminasata Road

The operation and maintenance cost required for the Trans-Sulawesi Mamminasata Road is estimated to be Rp 9,000 million per annum for routine maintenance as detailed in Section 9.1. Periodic maintenance is also required at a certain interval. In order to secure sustainability of the Trans-Sulawesi Mamminasata Road after construction, a funding mechanism to finance operation and maintenance cost should be instituted. There will be three methods: the operation and maintenance by force account of DGH; by contractors under supervision of DGH (Balai Besar VI); and by participation of the private sector. The former two involve public financing and the last one involves financing by the private sector.

It is recommended that the following mechanism with the private sector participation be contemplated.

i) A public service agency (Badan Layanan Umum: BLU4) will be established to provide independently the operation and maintenance services for the Trans-Sulawesi Mamminasata Road.

4 Law No.1/2004 concerning government accounting, Government Regulation No.23/2005 concerning governance of BLU

Page 19: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-19

ii) Two toll gates will be constructed at the Tallo River Bridge and the Jeneberang River Bridge as illustrated in Figure 10.6.1. There will be no access control for the Middle Ring Road but the users of this section will be tolled to finance the operation and maintenance of the entire section of the Trans-Sulawesi Mamminasata Road from Maros to Takalar.

iii) BLU will conduct a tender to select a private company who provides actual operation and maintenance services for the road on a contractual basis. Payment for the services of the company will be made on the performance basis and the cost will be financed using the toll revenue and public budget, if necessary.

Maros

Sungguminasa

B

Jl.Ir.Sutami

Jl.SultanAlauddin

C

D

A

Jl.Per

intis

Middle Ring R

oad

Jeneberang River

Takalar

New JeneberangRiver Bridge (393m)

New Tallo RiverBridge (136m)

Boka IC

A TS Mamminasata Road Project:Section No.

Tra

ns-

Sula

wesi

Mam

min

asat

a R

oad

Pro

ject

(Mar

os

- M

akas

sar)

Toll Gates

Toll Gates

Figure 10.6.1 Location of Toll Gates for O&M Cost Recovery

Page 20: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-20

10.6.3 Mamminasa Bypass, Hertasning Road and Abdullah Daeng Sirua Road

The road maintenance work for the Mamminasa Bypass, Hertasning Road, Abdullah Daeng Sirua Road consists of routine maintenance and periodic maintenance. Management, planning and execution of the maintenance work for these roads are under the responsibility of Praswil of South Sulawesi Province using APBD I or Dinas PU of Makassar City using APBD II, except part of the national road. Therefore, those regional governments are required to allocate appropriate budgets for road maintenance.

As the central section of the Mamminasa Bypass and the Maros/Gowa section of Abdullah Daeng Sirua Road are for the service of a new satellite town, the maintenance obligation might be transferred to the private investors who participate in the new town development.

10.7 Financing Plan and Annual Fund Requirements

10.7.1 Trans-Sulawesi Mamminasata Road Project

(1) Financing Methods

Figure 10.7.1 summarizes the general financing methods studied for the Trans-Sulawesi Mamminasata Road Project.

Note: Excluding VAT and Administration costSource: JICA Study Team

Construction Operation and Maintenance

External Soft Loan(100%)

GovernmentInvestment

Land Acquisition

Civil Works

ConsultancyServices

GOI (APBN / APBD)

GOI (APBN /APBD) Land Acquisition

External Soft Loan(GOI Portion) Civil Works

ConsultancyServices

Civil Works

GOI (APBN / APBD)

Private SectorInvestment

ConsultancyServices

Expressway / Toll Road

Arterial Road(National)

Public PrivatePartnership

(PPP)

GOI (APBN)

Private Sector(Road User Charge)

Private Sector(Road User Charge)

Road use fee is collectedat toll gates

Figure 10.7.1 Financing Methods for Trans-Sulawesi Mamminasata Road Project

Page 21: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-21

There will be two financing methods for implementation of the project. One is financing by the public sector and the other is co-financing with the private sector (Public-Private Partnership). In both methods it is possible to use a soft loan facility either from Japan or other sources. A Build-Operate-Transfer (BOT) scheme will not be applicable as the Project’s FIRR is too low. Operation and maintenance can be financed by the public (ABBN) or covered by user charges as one of the sustainable maintenance methods.

(2) PPP System in Road Sector

1) Historical Outline of Toll Road Development

The first toll road built in Indonesia was the “Jagorawi Toll Road” with a length of 46 km linking Jakarta to the outer suburbs of Bogor and Ciawi in March 1978. The Government funded it through offshore loans and the issuance of Indonesia Highway Corporation (Jasa Marga) bonds. Having been founded to operate the toll road on March 1st, 1978 based on the Government Regulation No. 4 of 1978, later based on Presidential Decree No. 38 of 1981, PT Jasa Marga (Persero) was appointed to operate nine toll roads/bridges in Indonesia. At the end of the 1980s, the Government invited the private sector to take part in the development of the toll road network through Build-Operate-Transfer (BOT) schemes. As of the beginning of 2006, 649 km of toll roads have been in operation in Indonesia, of which 165 km are managed by private operators.

In general, toll roads form part of the road infrastructure network. They are deemed to be implemented in a self-sufficient context without straining the Government’s budget. In order to give further strength to that investment concept, the regulatory status of toll roads was alerted by the Road Law No. 38/2004. The Government tends to finance future toll roads through both approaches of fully private funds and Public-Private Partnership (PPP) programs. In order to attract the private sector, there are steps that are done or being considered by the Government:

* Strengthening the institutional and regulatory framework for toll roads * Establishing the Indonesian Toll Road Authority (BPJT) which will be responsible for

investment regulations on toll roads to replace Jasa Marga regulatory role * Formulating appropriate structure for the automatic adjustment of toll rates * Applying transparent and competitive process * Addressing issues on land acquisition and rights * Establishing clear and sound policies to determine the proper conditions under which

government support should be extended * Formulating a road master plan including toll road master plan

2) Regulatory Framework

Article 43(2) of the Road Law No. 38/2004 determines the new policy of the Government regarding the development of toll roads, and Article 19-23 of the Government Regulation No. 15/2005 on toll roads stipulates that for the toll road sections that indicate positive economic

Page 22: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-22

viability but not financially viable, the Government will finance or construct the respective toll roads. After constructing the toll road, the Government will conduct contract management for the operation and maintenance of the facility. For toll road sections with indications of positive economic viability but marginal financial viability, they can be implemented by the Government and an enterprise in which finance and construction can be conducted through a partnership scheme. For toll roads having good economic and financial viability, they will be offered through open and transparent investment tender process. The Road Law No. 38/2004 encompasses the following regulations: Indonesian Toll Road Authority (BPJT)

* Indonesian Toll Road Authority (BPJT) established by, and is responsible to the Minister of Public Works.

* The Authority includes participants from the Government, stakeholders and the public.

* BPJT’s basic responsibilities encompass the implementation of regulations and the supervision of toll road operators in accordance with the policies and regulations specified in Law No. 38 of 2004 and Government Regulation No. 15 of 2005.

* Major tasks to be carried out by the Government/BPJT include: project preparation, invitation to pre-qualification (PQ) and bidding, pre-bid conference, evaluation of bids, appointment of successful bidder, contract signing and contract implementation.

Toll Rates

* Initial toll rates and subsequent toll rate adjustments are proposed by the investor through BPJT and approved by the Minister of Public Works.

* The rates are calculated by taking into consideration the willingness-to-pay of toll road users, savings in vehicle operating cost and the feasibility of the investment.

* Tariffs are regulated under a toll road authorization agreement; however, their application is subject to the official announcement of the toll road operator.

* Tariffs are subject to be reviewed and adjusted every two years with a coefficient based on the inflation rate.

Land Acquisition

* The Government is responsible for the acquisition of land through the Ministry of Public Works.

* Land Acquisition is funded either by the Government, State Owned Company or the private sector.

Page 23: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-23

* The budget for land acquisition is determined by the Government.

* The toll road and the land on which it is built are the property of the Government.

* In case of land acquisition funds emanating from private parties, if the cost exceeds the approved budget, the shortfall will be compensated by an adjustment of the concession or through other acceptable methods.

To cope with the problem of land speculation that has caused project-cost inflation and uncertainty, it is expected that the Government will issue a regulation banning the use of land designated for turnpike projects for other purposes. With this regulation, land that has been earmarked for turnpike projects cannot be sold except to the local government at a price that is slightly higher than the market value. This will be a part of the Government’s efforts to encourage investors to participate in future toll road projects and to reduce the length of the land acquisition process.

3) Issues

PPP projects in the road sector are being offered to the private sector through KKPPI (Komite Kebijakan Percepatan Penyediaan Infrastruktur: The National Committee for the Acceleration of Infrastructure Provision). As described in the last section, a PPP project is offered when the project has a marginal financial viability. As of now only two PPP projects in the road sector have been under the tender process, which are the Solo - Kertosono Toll Road and Medan - Kualanamu Toll Road. The criteria for selecting a winning bidder is the least viability gap funding provided by the Government.

There are following issues in the current PPP system in the road sector:

i. When traffic demand is marginal, although the viability gap is filled by the Government in the initial construction cost, there is always a tendency for the private sector to become cautious in taking such risk, thus hinders its participation.

ii. There may be a risk for the Government to end up providing a large subsidy in the form of viability gap funding to a PPP concessionaire on the basis of its request for the viability gap funding.

iii. On the other hand, there is also an inherent risk that competition in tender tends to drive the private sector to overestimate future traffic demand so as to minimize the viability gap funding in order to come up with competitive pricing for the financial proposal. However, this overestimation of the future traffic demand may negatively affect the sustainability of the Project in the future.

iv. There is no adjustment mechanism for the profit which the private sector will make in the future, therefore the Government may always face the criticism that it gives away excessive profit to the private sector when the traffic demand grows beyond the original forecast level.

Page 24: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-24

v. It is difficult for the line ministry to estimate the amount of viability gap funding with a great degree of certainty, therefore there may always be a risk involved for the line ministry in budgeting such viability gap funding with the Ministry of Finance.

4) Application for the Trans-Sulawesi Mamminasata Road Project

Public-Private Partnership (PPP) is one of the methods for financing the Trans-Sulawesi Mamminasata Road Project. However, financial viability (FIRR) analyzed in Section 9.3 was very low and together with the issues raised in the preceding section and Section 7.3.3, it is not recommended to apply Public-Private Partnership (PPP).

(3) Financing Plan

Table 10.7.1 and Figure 10.7.2 indicate the financing plan for the project in the case of amplification of Japanese ODA facility (JBIC soft loan) by alternative implementation plan with assumptions that:

* 100% of the costs of civil works, consulting services and contingencies are financed by an external soft loan

* GOI finances the land acquisition/resettlement, administration cost and tax (VAT), which are not eligible for the JBIC loan

* The assumed currency exchange rate is US$ 1.00=¥120=Rp.9,322 (as of May 2007).

The project cost is estimated at Rp 1,651 billion for Alternative A including VAT and inflation. The total project cost for Alternative B is estimated at Rp 1,757 billion (Rp 888 billion for Phase 1 and Rp 869 billion for Phase 2). The loan amount for the project, which is the total of the civil works, consulting services and contingencies, is estimated to be US$ 132.3 million, 72.7 million and 67.7 million by alternative plan, respectively. The rest of the project cost, namely the land acquisition cost, administration cost and tax cost, estimated to be Rp 448 billion, Rp 227 billion and Rp 254 billion respectively, is needed to be financed by the local budget (APBN and APBD). The loan can cover 71% - 75% of the project cost.

Page 25: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-25

Table 10.7.1 Project Cost and Loan Amount by Alternative Implementation Plan

Phase 1 Phase 2 Total

External Soft Loan (US $ million) - Civil Works 112.7 61.9 57.6 119.5 61.9 - Consulting Services 8.4 4.6 4.3 8.9 5.7 - Contingencies 11.3 6.2 5.8 11.9 6.2

Total 132.3 72.7 67.7 140.4 73.8GOI APBN / APBD (Rp billion) - Land Acquisition 309.6 151.2 183.9 335.1 151.2 - Administration Cost 16.8 9.2 7.6 16.8 9.2 - Tax (VAT) 121.7 66.8 62.2 129.0 67.8

Total 448.1 227.2 253.7 480.9 228.2Grand Total (Rp billion) 1,651.2 888.0 868.9 1,756.9 899.0Note: * The detailed design for Phase 2 will be carried out during the Phase 1 work.Source: JICA Study Team

Alternative AActual

Implementaionfor Phase 1*

Alternative B

For the earliest start of the land acquisition for the Phase 2 project, the detailed design for the Phase 1 and Phase 2 should be carried out at the same time.

Source: JICA Study Team

External Soft Loan(100%)

Civil Works

ConsultancyServices

Land Acquisition& Resettlement

GOI (APBN / APBD) AdministrationCost

Tax (VAT)

Loan Amount

61.9 57.6

8.4

4.64.3

11.3

6.25.8

112.7

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

Alt.A Alt.B (Phase 1) Alt.B (Phase 2)

US

$ (m

illio

n)

Contingencies

Consulting Services

Civil Works

APBN/APBD

309.6

151.2183.9

16.8

9.27.6

121.7

66.862.2

0.0

50.0

100.0

150.0

200.0

250.0

300.0

350.0

400.0

450.0

500.0

Alt.A Alt.B (Phase 1) Alt.B (Phase 2)

RP

(bi

llion)

Tax (VAT)

Administration Cost

Land Acquisition

Figure 10.7.2 Financing Plan for Trans-Sulawesi Mamminasata Road Project

(4) Annual Fund Requirements

The financing plan is further broken down by annual fund requirements based on the implementation schedule as indicated in Tables 10.7.2, 10.7.3 and 10.7.4 for the implementation plan Alternative A, Alternative B (Phase 1) and Alternative B (Phase 2), respectively. In the

Page 26: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-26

schedule, the foreign currency component is assumed to be 50% of the civil works and consultancy service costs and the rest is the local currency component. Price escalation is assumed to be 2% and 6% per year for the foreign and local components, respectively.

Note: The detailed design for Phase 1 and Phase 2 should be carried out at the same time in order to commence the ROW acquisition (see the table below) for Phase 2 as soon as possible.

Table 10.7.2 Disbursement Schedule for Implementation Plan Alternative A

Category Total 2007 2008 2009 2010 2011 2012 2013(I) Foreign Currency Portion (Mil US$)

Civil Works (Base Cost) 46.19 0.00 0.00 0.00 16.17 16.17 13.86 0.00Price Escalation 2.0% 4.76 0.00 0.00 0.00 1.33 1.68 1.75 0.00Physical Contingency 10.0% 5.10 0.00 0.00 0.00 1.75 1.78 1.56 0.00

Sub-Total 56.05 0.00 0.00 0.00 19.25 19.63 17.17 0.00Consulting Services (Base Cost) 3.23 0.00 0.00 1.29 0.65 0.65 0.65 0.00Price Escalation 2.0% 0.28 0.00 0.00 0.08 0.05 0.07 0.08 0.00Physical Contingency 10.0% 0.35 0.00 0.00 0.14 0.07 0.07 0.07 0.00

Sub-Total 3.87 0.00 0.00 1.51 0.77 0.79 0.80 0.00Total 59.92 0.00 0.00 1.51 20.02 20.42 17.97 0.00

(II) Local Currency Portion (Bil Rp.)Civil Works (Base Cost) 419.92 0.00 0.00 0.00 146.97 146.97 125.98 0.00Price Escalation 6.0% 141.01 0.00 0.00 0.00 38.58 49.71 52.72 0.00Physical Contingency 10.0% 56.09 0.00 0.00 0.00 18.55 19.67 17.87 0.00

Sub-Total 617.02 0.00 0.00 0.00 204.10 216.35 196.57 0.00Consulting Services (Base Cost) 29.40 0.00 0.00 11.76 5.88 5.88 5.88 0.00Price Escalation 6.0% 8.24 0.00 0.00 2.25 1.54 1.99 2.46 0.00Physical Contingency 10.0% 3.76 0.00 0.00 1.40 0.74 0.79 0.83 0.00

Sub-Total 41.40 0.00 0.00 15.40 8.16 8.65 9.17 0.00Land Acquisition and Resettlement 260.34 13.02 78.10 78.10 91.12 0.00 0.00 0.00Price Escalation 6.0% 49.27 0.78 9.65 14.92 23.92 0.00 0.00 0.00

Sub-Total 309.61 13.80 87.76 93.02 115.04 0.00 0.00 0.00Administration Cost 16.80 0.00 0.00 4.20 4.20 4.20 4.20 0.00

Total 984.83 13.80 87.76 112.63 331.50 229.20 209.94 0.00(III) VAT Tax Portion (Bil Rp.)

Civil Works (Base Cost) 85.05 0.00 0.00 0.00 29.77 29.77 25.52 0.00Price Escalation 18.54 0.00 0.00 0.00 5.10 6.54 6.90 0.00Physical Contingency 10.36 0.00 0.00 0.00 3.49 3.63 3.24 0.00

Sub-Total 113.95 0.00 0.00 0.00 38.35 39.94 35.66 0.00Consulting Services (Base Cost) 5.95 0.00 0.00 2.38 1.19 1.19 1.19 0.00Price Escalation 1.09 0.00 0.00 0.30 0.20 0.26 0.32 0.00Physical Contingency 0.70 0.00 0.00 0.27 0.14 0.15 0.15 0.00

Sub-Total 7.74 0.00 0.00 2.95 1.53 1.60 1.66 0.00Total 121.70 0.00 0.00 2.95 39.89 41.54 37.32 0.00

(IV) Total Project Cost (Bil Rp.)1,665.07 13.80 87.76 129.65 558.01 461.09 414.76 0.00

Eligible Portion (Loan Amount) 1,216.96 0.00 0.00 29.48 398.89 415.36 373.23 0.0073.1%

Note: Currency Exchange Rates US$ 1.00= Rp. 9,322 = 120 J.YenRp 1.00= US$ 0.00011 = 0.013 J.Yen

Source: JICA Study Team

Page 27: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-27

Table 10.7.3 Disbursement Schedule for Implementation Plan Alternative B (Phase 1) Category Total 2007 2008 2009 2010 2011 2012 2013 2014 2015

(I) Foreign Currency Portion (Mil US$)Civil Works (Base Cost) 25.37 0.00 0.00 0.00 8.88 8.88 7.61 0.00 0.00 0.00Price Escalation 2.0% 2.62 0.00 0.00 0.00 0.73 0.92 0.96 0.00 0.00 0.00Physical Contingency 10.0% 2.80 0.00 0.00 0.00 0.96 0.98 0.86 0.00 0.00 0.00

Sub-Total 30.78 0.00 0.00 0.00 10.57 10.78 9.43 0.00 0.00 0.00Consulting Services (Base Cost) 1.78 0.00 0.00 0.71 0.36 0.36 0.36 0.00 0.00 0.00Price Escalation 2.0% 0.15 0.00 0.00 0.04 0.03 0.04 0.04 0.00 0.00 0.00Physical Contingency 10.0% 0.19 0.00 0.00 0.08 0.04 0.04 0.04 0.00 0.00 0.00

Sub-Total 2.12 0.00 0.00 0.83 0.42 0.43 0.44 0.00 0.00 0.00Total 32.91 0.00 0.00 0.83 10.99 11.21 9.87 0.00 0.00 0.00

(II) Local Currency Portion (Bil Rp.)Civil Works (Base Cost) 230.61 0.00 0.00 0.00 80.71 80.71 69.18 0.00 0.00 0.00Price Escalation 6.0% 77.44 0.00 0.00 0.00 21.19 27.30 28.95 0.00 0.00 0.00Physical Contingency 10.0% 30.80 0.00 0.00 0.00 10.19 10.80 9.81 0.00 0.00 0.00

Sub-Total 338.85 0.00 0.00 0.00 112.09 118.81 107.95 0.00 0.00 0.00Consulting Services (Base Cost) 16.15 0.00 0.00 6.46 3.23 3.23 3.23 0.00 0.00 0.00Price Escalation 6.0% 4.52 0.00 0.00 1.23 0.85 1.09 1.35 0.00 0.00 0.00Physical Contingency 10.0% 2.07 0.00 0.00 0.77 0.41 0.43 0.46 0.00 0.00 0.00

Sub-Total 22.74 0.00 0.00 8.46 4.48 4.75 5.04 0.00 0.00 0.00Land Acquisition and Resettlement 127.13 6.36 38.14 38.14 44.50 0.00 0.00 0.00 0.00 0.00Price Escalation 6.0% 24.06 0.38 4.71 7.29 11.68 0.00 0.00 0.00 0.00 0.00

Sub-Total 151.19 6.74 42.85 45.42 56.17 0.00 0.00 0.00 0.00 0.00Administration Cost 9.22 0.00 0.00 2.31 2.31 2.31 2.31 0.00 0.00 0.00

Total 522.00 6.74 42.85 56.19 175.05 125.87 115.29 0.00 0.00 0.00(III) VAT Tax Portion (Bil Rp.)

Civil Works (Base Cost) 46.71 0.00 0.00 0.00 16.35 16.35 14.01 0.00 0.00 0.00Price Escalation 10.18 0.00 0.00 0.00 2.80 3.59 3.79 0.00 0.00 0.00Physical Contingency 5.69 0.00 0.00 0.00 1.91 1.99 1.78 0.00 0.00 0.00

Sub-Total 62.58 0.00 0.00 0.00 21.06 21.93 19.58 0.00 0.00 0.00Consulting Services (Base Cost) 3.27 0.00 0.00 1.31 0.65 0.65 0.65 0.00 0.00 0.00Price Escalation 0.60 0.00 0.00 0.16 0.11 0.14 0.18 0.00 0.00 0.00Physical Contingency 0.39 0.00 0.00 0.15 0.08 0.08 0.08 0.00 0.00 0.00

Sub-Total 4.25 0.00 0.00 1.62 0.84 0.88 0.91 0.00 0.00 0.00Total 66.83 0.00 0.00 1.62 21.91 22.81 20.50 0.00 0.00 0.00

(IV) Total Project Cost (Bil Rp.)895.57 6.74 42.85 65.54 299.45 253.22 227.77 0.00 0.00 0.00

Eligible Portion (Loan Amount) 668.33 0.00 0.00 16.19 219.06 228.11 204.97 0.00 0.00 0.0074.6%

Note: Currency Exchange Rates US$ 1.00= Rp. 9,322 = 120 J.YenRp 1.00= US$ 0.00011 = 0.013 J.Yen

Source: JICA Study Team

Page 28: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-28

Table 10.7.4 Disbursement Schedule for Implementation Plan Alternative B (Phase 2) Category Total 2007 2008 2009 2010 2011 2012 2013 2014 2015

(I) Foreign Currency Portion (Mil US$)Civil Works (Base Cost) 20.82 0.00 0.00 0.00 0.00 0.00 0.00 6.93 6.93 6.96Price Escalation 2.0% 3.58 0.00 0.00 0.00 0.00 0.00 0.00 1.03 1.19 1.36Physical Contingency 10.0% 2.44 0.00 0.00 0.00 0.00 0.00 0.00 0.80 0.81 0.83

Sub-Total 26.84 0.00 0.00 0.00 0.00 0.00 0.00 8.76 8.94 9.14Consulting Services (Base Cost) 1.46 0.00 0.00 0.00 0.00 0.12 0.47 0.29 0.29 0.29Price Escalation 2.0% 0.22 0.00 0.00 0.00 0.00 0.01 0.06 0.04 0.05 0.06Physical Contingency 10.0% 0.17 0.00 0.00 0.00 0.00 0.01 0.05 0.03 0.03 0.03

Sub-Total 1.85 0.00 0.00 0.00 0.00 0.14 0.58 0.37 0.38 0.38Total 28.69 0.00 0.00 0.00 0.00 0.14 0.58 9.13 9.31 9.53

(II) Local Currency Portion (Bil Rp.)Civil Works (Base Cost) 189.31 0.00 0.00 0.00 0.00 0.00 0.00 63.04 63.04 63.23Price Escalation 6.0% 112.78 0.00 0.00 0.00 0.00 0.00 0.00 31.75 37.44 43.59Physical Contingency 10.0% 30.21 0.00 0.00 0.00 0.00 0.00 0.00 9.48 10.05 10.68

Sub-Total 332.29 0.00 0.00 0.00 0.00 0.00 0.00 104.27 110.52 117.50Consulting Services (Base Cost) 13.25 0.00 0.00 0.00 0.00 1.06 4.24 2.65 2.65 2.65Price Escalation 6.0% 6.87 0.00 0.00 0.00 0.00 0.36 1.77 1.33 1.57 1.83Physical Contingency 10.0% 2.01 0.00 0.00 0.00 0.00 0.14 0.60 0.40 0.42 0.45

Sub-Total 22.13 0.00 0.00 0.00 0.00 1.56 6.62 4.38 4.65 4.92Land Acquisition and Resettlement 133.21 0.00 0.00 0.00 33.30 33.30 33.30 33.30 0.00 0.00Price Escalation 6.0% 50.71 0.00 0.00 0.00 8.74 11.26 13.94 16.77 0.00 0.00

Sub-Total 183.92 0.00 0.00 0.00 42.04 44.57 47.24 50.07 0.00 0.00Administration Cost 7.57 0.00 0.00 0.00 0.00 0.85 1.68 1.68 1.68 1.68

Total 545.92 0.00 0.00 0.00 42.04 46.97 55.54 160.40 116.85 124.11(III) VAT Tax Portion (Bil Rp.)

Civil Works (Base Cost) 38.34 0.00 0.00 0.00 0.00 0.00 0.00 12.77 12.77 12.81Price Escalation 14.61 0.00 0.00 0.00 0.00 0.00 0.00 4.14 4.85 5.62Physical Contingency 5.30 0.00 0.00 0.00 0.00 0.00 0.00 1.69 1.76 1.84

Sub-Total 58.25 0.00 0.00 0.00 0.00 0.00 0.00 18.59 19.38 20.27Consulting Services (Base Cost) 2.68 0.00 0.00 0.00 0.00 0.21 0.86 0.54 0.54 0.54Price Escalation 0.89 0.00 0.00 0.00 0.00 0.05 0.23 0.17 0.20 0.24Physical Contingency 0.36 0.00 0.00 0.00 0.00 0.03 0.11 0.07 0.07 0.08

Sub-Total 3.93 0.00 0.00 0.00 0.00 0.29 1.20 0.78 0.81 0.85Total 62.19 0.00 0.00 0.00 0.00 0.29 1.20 19.38 20.20 21.12

(IV) Total Project Cost (Bil Rp.)875.54 0.00 0.00 0.00 42.04 48.58 62.12 264.89 223.86 234.04

Eligible Portion (Loan Amount) 621.86 0.00 0.00 0.00 0.00 2.88 12.00 193.76 201.98 211.2371.0%

Note: Currency Exchange Rates US$ 1.00= Rp. 9,322 = 120 J.YenRp 1.00= US$ 0.00011 = 0.013 J.Yen

Source: JICA Study Team

10.7.2 Mamminasa Bypass Project, Hertasning Road Project and Abdullah Daeng Sirua Road Project

(1) Financing Methods

1) Mamminasa Bypass and Hertasning Road

Figure 10.7.3 summarizes the general financing methods studied for the Mamminasa Bypass and Hertasning Road Projects (provincial road).

Note: As the Maros bypass section could be changed to a national road after construction, its financial method would be similar to that of the Trans-Sulawesi Mamminasata Road Project.

Since both the Mamminasata Bypass and the Hertasning Road will be developed as provincial roads, the construction and consultancy services will be financed by APBD I (the provincial budget) and possibly by APBN as these are arterial road links in the Mamminasata Metropolitan Area. External soft loan may be used for the development of the Mamminasa Bypass Project possibly covering a substantial part on a granting basis from the central government. Maintenance will be financed by APBD I since the roads are provincial roads, but there may be a possible option in the future that the maintenance of the roads may be financed through the Road Fund which will be established for the maintenance of public roads throughout the country.

Page 29: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-29

Source: JICA Study Team

MaintenanceConstruction

APBN/APBD I

Land Acquisition

Civil Works

ConsultancyServices

APBD I / APBD II Road Fund (in future)

APBD I

Figure 10.7.3 General Financing Method for Mamminasa Bypass and Hertasning Road Projects

As the middle part of the Mamminasa Bypass is an arterial road planned for a new satellite town, it might be possible to be constructed by a private investor who will participate in the new satellite town development.

2) Abdullah Daeng Sirua Road

Figure 10.7.4 summarizes the general financing methods studied for the Abdullah Daeng Sirua Road Project.

Since the Abdullah Daeng Sirua Road will not be categorized as a provincial road, the Makkassar portion of the road will be developed by the Makassar City using its own APBD II (Kota Budget) and possibly with the support of APBN and APBD I. The road section in Kabupaten Maros and Kabupaten Gowa is recommended to be developed as a strategic road of South Sulawesi Province as this is a direct access to the new satellite town, by financing from APBD I and support from APBN. As for the maintenance, APBD I will be used and at the same time the Road Fund may also be used in the same manner as planned for the Mamminasa Bypass and Hertasning Road Projects in future.

Source: JICA Study Team

MaintenanceConstruction

APBN / APBD I/ APBD II

Land Acquisition

Civil Works

ConsultancyServices

APBD I / APBD II Road Fund (in future)

APBD I / APBD II

Figure 10.7.4 General Financing Method for Abdullah Daeng Sirua Road Project

Page 30: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-30

As the Kabupaten Gowa/Maros section is an arterial road directly accessing to a satellite town, it might be possible to be constructed by a private investor who participates in the new satellite town development.

(2) Potential Funding Sources for the Development of Regional Roads

There are following potential funding sources which could be utilized for the development of regional roads:

1) Funding from the Line Ministry (APBN): The national budget of Bina Marga for the road sector (APBN) is allocated mainly for the development of national roads, but sometimes it is allocated for the development of provincial roads.

2) External Loan/Grant via the same route as above (APBN): The Ministry of Finance has already prepared the decrees on both cases of granting external loan from GOI to regional governments (PMK 52 /2006: Peraturan Menteri Keuangan, Nomor 52/PMK 010 /2006) and lending external loan (PMK 53 /2006). However, due to the limited financial capacity of the regional governments, only the external loan granting practice has been adopted so far. External loan granting may be extended to both provincial and Kabupaten/Kota governments. The ERITP II project is implemented on the granting basis with 30% - 90% of the project cost being provided by the central government.

3) DAK (Special Allocation Fund: APBD): DAK is one category of balancing fund from GOI to regional governments. DAK has been allocated to cover the road sector expenditures of Kabupaten/Kota governments in the last two years based on the proposal from these governments. However, DAK allocated to the road sector should be used in accordance with PU’s instruction (Peraturan Menteri Pekerjaan Umum Nomor: 39 /PRT/M/2006), that is 70% for the maintenance and 30% for the improvement/construction.

4) General Regional Budget (APBD I: Province and APBD II: Kabupaten/Kota): The General Regional Budget (APBD I and APBD II) is, although limited, the major funding source for both the development/improvement and maintenance of regional roads. APBD I and APDB II are financed by own regional tax/levy revenue and the balancing fund from GOI such as the Revenue Sharing, the General Allocation Fund (DAU) and the Special Allocation Fund (DAK).

5) Mamminasata Metropolitan Area: Strategic and priority infrastructures in the Mamminasata Metropolitan Area might be financed by the national budget in future.

(3) Financing Methods for the F/S Roads except the TSMR Project

Figure 10.7.5 shows the optional financing methods applicable for the Mamminasa Bypass, Hertasning Road and Abdullah Daeng Sirua Road projects. If preferable incentives and conditions are given and secured, private investors may participate in some part of the road development.

Page 31: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-31

Option 1: Public Investment

Note:

Note:

Option 2: Private Sector Participation

Note: Excluding VAT and Administration costSource: JICA Study Team

These road sections should bedesignated as provincial strategicroads for new satellite towndevelopment

Construction Operation andMaintenance

Applicable FS RoadSection

After construction, this road sectionbe changed to national road

External Soft Loan(100%)

GovernmentInvestment Land Acquisition

Civil Works

ConsultancyServices

GOI (APBD I & II)

GOI (APBD I & II)Land Acquisition

Civil WorksPrivate Sector

ConsultancyServices

Road Sections inand access to thenew satellite town

Provincial RoadSection

Private SectorInvestment forDeveloper ofSatellite Town

Private Sector

GovernmentInvestment Land Acquisition

Civil Works

ConsultancyServices

GOI (APBN / APBDI & II)

National RoadSection

GOI (APBN) Maros Town BypassSection

Mamminasa Bypass

GOI (APBN)

Middle Section

Mamminasa Bypass

Kab.Maros & GowaSection

A.D. Sirua Road

GovernmentInvestment Land Acquisition

Civil Works

ConsultancyServices

GOI (APBD I & II)

Provincial RoadSection

GOI (APBD I) Middle North Section &South Section

Mamminasa Bypass

Kab.Maros & GowaSection

A.D. Sirua Road

GOI (APBN)

GOI (APBN / APBD I)

Section D

Hertasning Road

Mamminasa Bypass

Middle Section

GovernmentInvestment Land Acquisition

Civil Works

ConsultancyServices

GOI (APBD I & II)

Makassar CitySection

GOI (APBDII)

GOI (APBD I & II)

Makassar City Section

A.D. Sirua Road

APBN & APBD I

Private Sector

GOI (APBD I)

Note:These road sections might be constructed byprivate sector of new satellite town development.

Figure 10.7.5 Optional Financing Methods for Mamminasa Bypass, Hertasning Road and Abdullah Daeng Sirua Road Projects

Page 32: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-32

(4) Financing Plan for Mamminasa Bypass

There may be two possible funding options for the development and maintenance of the Mamminasa Bypass Project as illustrated in Table 10.7.5. Option A is to finance the project based on the use of as much local funding as possible, where the project will be developed and maintained as aprovincial road. On the other hand Option B utilizes the funding from GOI as much as possible.

In Option A, the provincial budget of South Sulawesi Province (APBD I) will be used for the construction and maintenance of the project whereas the land acquisition cost will be covered by both APBD I and APBD II (Maros, Gowa and Takalar) and the administration cost also will be covered by both APBD I and APBD II.

Table 10.7.5 Base Project Cost and Funding Options – Mamminasa Bypass Base Cost

Option A Option B B Rp.

1. Civil Works APBD I APBN/ExternalLoan 707.7

2. Consulting Services APBD I APBN/ExternalLoan 49.5

3. Land Acquisition APBD I/APBD II APBD I/APBD II 83.1

4. Administration Cost APBD I/APBD II APBD I/APBD II 14.2

Total 854.55. Routine Maintenance/yr APBD I APBD I 2.06. Periodic Maintenance /5yrs APBD I APBD I 40.4Note: VAT, Price Escalation and Contingency are not included.Source: JICA Study Team

Funding Option

However, the annual size of the road development budget for South Sulawesi Province has been Rp. 50 to Rp. 70 billion in recent years. As indicated in Table 10.7.6, the annual requirement of civil works cost alone for several years will exceed that budget level. The funding requirement of Rp 40 billion will also be heavy for South Sulawesi Province. Therefore, South Sulawesi Province seems to be in difficulty to finance the project by itself. The annual requirement of the land acquisition cost of Rp. 10 billion will also be very high for Kabupaten Maros, Gowa and Takalar since their total road sector budget has been at the Rp. 30 to Rp. 50 billion level.

Table 10.7.6 Annual Distribution of Base Project Cost – Mamminasa Bypass (B Rp.)

Total 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 20231. Civil Works 707.7 0.0 0.0 84.0 112.0 84.0 43.8 43.8 0.0 50.0 50.0 77.1 86.1 77.1

2. Consulting Services 49.5 0.0 4.9 4.9 4.9 6.7 2.1 2.1 2.9 2.9 4.5 4.5 4.5 4.5

3. Land Acquisition 83.1 9.6 19.2 19.2 2.2 4.3 4.3 1.9 3.7 6.7 6.1 6.1 0.0 0.0

4. Administration Cost 14.2 1.1 1.1 1.1 1.6 1.6 0.4 1.2 0.7 1.1 1.1 1.1 1.1 1.1

Total 854.5 10.7 25.2 109.2 120.6 96.6 50.7 48.9 7.3 60.7 61.6 88.7 91.7 82.7Note: VAT is not included.Source: JICA Study Team

In Option B, external soft loan funding will be used for the civil works and consultancy services by DGH and then provided on a granting basis to South Sulawesi Province. Both the land acquisition cost and the administration cost will be supported fully by APBD I.

Page 33: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-33

(5) Financing Plan for Hertasning Road (Section D)

There may be two possible funding options for the development and maintenance of the Hertasning Road Project as indicated in Table 10.7.7. Option A is to finance the project based on the use of as much local funding as possible, where the project will be developed and maintained as a provincial road. The provincial budget of South Sulawesi Province (APBD I) will be used for the construction and maintenance of the project whereas the land acquisition cost will be covered by both APBD I and APBD II (Gowa). The administration cost also will be covered by both APBD I and APBD II.

Table 10.7.7 Base Project Cost and Funding Options - Hertasning Road

Base CostOption A Option B B Rp.

1. Civil Works APBD I APBN* 61.02. Consulting Services APBD I APBN* 4.33. Land Acquisition APBD I/APBD II APBD I/APBD II 9.84. Administration Cost APBD I/APBD II APBD I/APBD II 1.2

Total 76.35. Routine Maintenance/yr APBD I APBD I 0.26. Periodic Maintenance /5yrs APBD I APBD I 4.0Notes: 1. * as this road is used as access road to solid-waste land fill, it might be possible to be financed by APBN. 2. VAT, Price Escalation and Contingency are not included.

Funding Option

Option B is to use APBN since this road is constructed as a main access road for the solid waste landfill planned to be located behind Mt. Moncongloe in Kabupaten Gowa under the central government initiative.

(6) Financing Plan for Abdullah Daeng Sirua Road

1) Makassar City Section

The Abdullah Daeng Sirua Road would not have a status of provincial road in accordance with the Law No. 38 of 2004 concerning Roads. There may be two possible funding options for the development and maintenance of the Abdullah Daeng Sirua Road Project as illustrated in Table 10.7.8. Option A is to finance the project based on the use of as much local funding as possible, where the project will be developed and maintained as a Makassar City road. In Option A, Makassar City bears the construction, land acquisition and maintenance costs. On the other hand, Option B is to use the funding from South Sulawesi Province (APBD I) and/or APBN as much as possible.

Page 34: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-34

Table 10.7.8 Base Project Cost and Funding Options - Abdullah Daeng Sirua Road

Base Cost Base CostOption A Option B B Rp. Option A Option B B Rp.

1. Civil Works APBD II APBD I/APBDII 91.2 APBD II APBD I/APBN 124.22. Consulting Services APBD II APBD I/APBDII 6.4 APBD II APBD I/APBN 8.73. Land Acquisition APBD II APBD I/APBDII 31.5 APBD II APBD I/APBD II 5.44. Administration Cost APBD II APBD I/APBDII 1.8 APBD II APBD I/APBD II 2.2

Total 130.9 140.55. Routine Maintenance/yr APBD II APBD II 0.2 APBD II APBD I/APBD II 0.26. Periodic Maintenance /5yrs APBD II APBD I/APBD II 1.0 APBD II APBD I 3.9Note: VAT, Price Escalation and Contingency are not included.

Source: JICA Study Team

Makassar City Section Kabupaten Maros and Gowa SectionFunding Option Funding Option

The annual size of the road construction/betterment budget for Makassar has been Rp. 30 to Rp. 50 billion in recent years whereas the annual funding requirement for the civil works and the consultancy services of the project will be Rp 30 to Rp 40 billion. Therefore, it is not likely that Makassar City will be capable of funding the project by itself.

In Option B, APBN will be used for the civil works and consultancy services from DGH through South Sulawesi Province. Both the land acquisition cost and the administration cost will be supported by APBD I and II.

2) Kabupaten Maros and Gowa Section

Option A envisages project financing by Kabupaten Maros and Gowa by APBD II. However, Kabupaten Maros and Gowa do not have capacity for funding the project.

This road should be financed by the province (APBN I) as a provincial strategic road and/or by APBN as this is a strategic road for the Mamminasata Metropolitan Area. In Option B, APBN and APBD I will be used for the civil works and consultancy services from DGH through South Sulawesi Province. Both the land acquisition cost and the administration cost will be supported by APBD I/APBD II.

As the Maros/Gowa section of the Abdullah Daeng Sirua Road is for inducing the creation of a new satellite town, it might be possible to find private investors who participate in the town development to construct the Maros and Gowa section as an access road.

(6) Private Sector Investment

As the central section of the Mamminasa Bypass and the Kabupaten Maros/Gowa section of the Abdullah Daeng Sirua road are for inducing the creation of a new satellite town, it might be possible to find private investors who participate in the new town development to construct these roads as a part of the new town facilities.

Page 35: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-35

10.7.3 External Soft Loan for Mamminasa Bypass and Abdullah Daeng Sirua Road

(1) Base Cost

It may be possible to introduce an external soft loan for the central section of the Mamminasa Bypass and the Kabupaten Maros/Gowa section of the Abdullah Daeng Sirua Road as those are for inducing the creation of a new satellite town in accordance with the Mamminasata Spatial Plan.

Table 10.7.9 Base Project Cost for External Financing

Unit: Rp Bill.Item Mamminasa Bypass Abdullah Daeng Sirua

RoadTotal

Middle Section Kab. Maros/GowaSection

Civil Works 279.93 124.20 404.13Consulting Services 19.60 8.70 28.29Land Acquisition 47.91 5.43 53.33Administration Cost 5.60 2.21 7.81

Total 353.03 140.53 493.56Source: JICA Study Team

(2) Project Cost and Loan Amount

Table 10.7.10 shows the financing plan for the project utilizing the external soft loan prepared on the basis of the following assumptions:

* 100% of the costs of civil works, consulting services and contingencies are financed by an external soft loan

* GOI finances the land acquisition/resettlement, administration cost and tax (VAT), which are not eligible for the JBIC loan

* The assumed currency exchange rate is US$ 1.00=¥120=Rp.9,322.

The total project cost is estimated at Rp 814 billion. The loan amount for the project, which is the total cost of civil works, consulting services and contingencies, is estimated to be US$ 72.2 million. The rest of the project cost, namely the land acquisition cost, administration cost and tax cost, estimated to be Rp 150 billion, will be financed by the local budget (APBN and APBD). The loan can cover 81.5% of the project cost.

Page 36: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-36

Table 10.7.10 Project Cost and Loan Amount for Middle Section of Mamminasa Bypass and Kab.Maros/Gowa Section of A.D.Sirua Road (Option of External Loan)

Loan Amount (Allocation of Loan)Category Loan Amount % of Eligible Expenditure

(Million US$) to be financed(A) Civil Works $61.4 100%(B) Consulting Services $4.6 100%(C) Contingencies $6.1

Total $72.2

Breakdown of Loan AmountCategory F.Currency L.Currency Total

(Million US$) (Billion Rp.) (Equiv.Million US$)1. Civil Works $22.23 202.1 $44.452. Price Escalation $3.81 119.9 $16.993. Physical Contingency $2.60 32.2 $6.14 for Civil Works4. Consulting Services $1.99 24.1 $4.64 Incl. Contingencies5. Land Acquisition $0.00 76.4 $8.406. Administration Cost $0.00 7.8 $0.86 Not eligible for 7. Tax $0.00 66.4 $7.30 JBIC Loan

Total $30.62 528.8 $88.79Note: (Equiv. Rp. 807 billion)

Currency Exchange RatesRp 1.00 = ¥0.0130 = US$ 0.000110US$1.00= ¥120 = Rp. 9,322

Civil Works

(3) Annual Fund Requirements

The financing plan is further broken down by annual fund requirements based on the implementation schedule as indicated in Table 10.7.11. In the schedule, the foreign currency component is assumed to be 50% of the civil works and consultancy services costs and the rest is the local currency component. Price escalation is assumed to be 2% per year for the foreign currency component and 6% for the local currency component.

Page 37: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

10-37

Table 10.7.11 Disbursement Schedule for Middle Section of Mamminasa Bypass and Kab.Maros/Gowa Section of A.D.Sirua Road (Option of External Soft Loan)

Category Total 2007 2008 2009 2010 2011 2012 2013 2014 2015(I) Foreign Currency Portion (Mil US$)

Civil Works (Base Cost) 22.23 0.00 0.00 0.00 0.00 0.00 0.00 7.22 8.34 6.67Price Escalation 2.0% 3.81 0.00 0.00 0.00 0.00 0.00 0.00 1.07 1.43 1.30Physical Contingency 10.0% 2.60 0.00 0.00 0.00 0.00 0.00 0.00 0.83 0.98 0.80

Sub-Total 28.64 0.00 0.00 0.00 0.00 0.00 0.00 9.12 10.75 8.77Consulting Services (Base Cost) 1.56 0.00 0.00 0.00 0.00 0.00 0.39 0.39 0.39 0.39Price Escalation 2.0% 0.25 0.00 0.00 0.00 0.00 0.00 0.05 0.06 0.07 0.08Physical Contingency 10.0% 0.18 0.00 0.00 0.00 0.00 0.00 0.04 0.04 0.05 0.05

Sub-Total 1.99 0.00 0.00 0.00 0.00 0.00 0.48 0.49 0.50 0.51Total 30.62 0.00 0.00 0.00 0.00 0.00 0.48 9.61 11.25 9.28

(II) Local Currency Portion (Bil Rp.)Civil Works (Base Cost) 202.07 0.00 0.00 0.00 0.00 0.00 0.00 65.63 75.82 60.62Price Escalation 6.0% 119.87 0.00 0.00 0.00 0.00 0.00 0.00 33.05 45.02 41.80Physical Contingency 10.0% 32.19 0.00 0.00 0.00 0.00 0.00 0.00 9.87 12.08 10.24

Sub-Total 354.13 0.00 0.00 0.00 0.00 0.00 0.00 108.55 132.92 112.66Consulting Services (Base Cost) 14.15 0.00 0.00 0.00 0.00 0.00 3.54 3.54 3.54 3.54Price Escalation 6.0% 7.80 0.00 0.00 0.00 0.00 0.00 1.48 1.78 2.10 2.44Physical Contingency 10.0% 2.19 0.00 0.00 0.00 0.00 0.00 0.50 0.53 0.56 0.60

Sub-Total 24.14 0.00 0.00 0.00 0.00 0.00 5.52 5.85 6.20 6.57Land Acquisition and Resettlement 53.33 0.00 0.00 0.00 0.91 11.12 20.88 20.43 0.00 0.00Price Escalation 6.0% 23.02 0.00 0.00 0.00 0.24 3.76 8.74 10.29 0.00 0.00

Sub-Total 76.35 0.00 0.00 0.00 1.14 14.88 29.62 30.71 0.00 0.00Administration Cost 7.81 0.00 0.00 0.00 0.00 1.56 1.56 1.56 1.56 1.56

Total 462.43 0.00 0.00 0.00 1.14 16.44 36.70 146.67 140.69 120.79(III) VAT Tax Portion (Bil Rp.)

Civil Works (Base Cost) 40.93 0.00 0.00 0.00 0.00 0.00 0.00 13.29 15.36 12.28Price Escalation 15.54 0.00 0.00 0.00 0.00 0.00 0.00 4.31 5.84 5.39Physical Contingency 5.65 0.00 0.00 0.00 0.00 0.00 0.00 1.76 2.12 1.77

Sub-Total 62.11 0.00 0.00 0.00 0.00 0.00 0.00 19.36 23.31 19.44Consulting Services (Base Cost) 2.86 0.00 0.00 0.00 0.00 0.00 0.72 0.72 0.72 0.72Price Escalation 1.01 0.00 0.00 0.00 0.00 0.00 0.19 0.23 0.27 0.31Physical Contingency 0.39 0.00 0.00 0.00 0.00 0.00 0.09 0.09 0.10 0.10

Sub-Total 4.27 0.00 0.00 0.00 0.00 0.00 1.00 1.04 1.09 1.13Total 66.37 0.00 0.00 0.00 0.00 0.00 1.00 20.40 24.40 20.57

(IV) Total Project Cost (Bil Rp.)814.27 0.00 0.00 0.00 1.14 16.44 42.19 256.69 269.96 227.85

Eligible Portion (Loan Amount) 663.73 0.00 0.00 0.00 0.00 0.00 10.01 204.01 244.00 205.7181.5%

Note: Currency Exchange Rates US$ 1.00= Rp. 9,322 = 120 J.YenRp 1.00= US$ 0.00011 = 0.013 J.Yen

Source: JICA Study Team

Page 38: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

11-1

CHAPTER 11 CONCLUSIONS AND RECOMMENDATIONS

11.1 Conclusions on F/S Roads

11.1.1 Trans-Sulawesi Mamminasata Road

(1) The Study Team identified that the Trans-Sulawesi Mamminasata Road (TSMR) is the highest priority road link among the four F/S roads. It will directly contribute to the development of the Mamminasata Metropolitan Area by:

improving the present urban road network;

coping with the increasing traffic demand;

enhancing regional development; and

supporting logistic flow for inducing trade, investment and industrial development.

It also will indirectly contribute to:

expanding development to the whole eastern regions of Indonesia; and

reducing poverty and regional development gaps.

(2) The feasibility study for the TSMR has shown that the Project is highly viable in both technical and economic aspects (EIRR: 28.5-30.2%). Therefore, it is recommended that the Project be implemented at an earliest date for the benefit of national and regional economy.

(3) As to the construction plan, a full access-controlled express highway for the Middle Ring Road section under PPP (Public Private Partnership) scheme is judged not feasible because its FIRR is only 6.5%. Thus this project should better be implemented in the category of public financing (Government) projects.

(4) Collection of low user charges at the toll gates installed at access points (Tallo River Bridge and Jeneberang River Bridges) to Makassar City could raise a sufficient fund for covering the maintenance costs required for the TSMR.

(5) The current progress of ROW acquisition for the Middle Ring Road (Section B) is approximately 60-70%.

(6) EIA (AMDAL) report on the TSMR Project was approved by the Governor of South Sulawesi Province in September 2007.

Page 39: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

11-2

11.1.2 Mamminasa Bypass

(1) The Study Team identified that the Mamminasa Bypass is the second highest priority road link among the four F/S roads.

(2) The Mamminasa Bypass should be constructed as a new road. The appropriate route is that passing through appropriate topography and location where a new satellite town can be developed. The north section of the Mamminasa Bypass should be planned as a bypass for Maros Town while avoiding a planned flood retarding basin of the Maros River. The southern route should be connected to Jl.Tj.Metro Bunga where many development projects are in progress or under planning.

(3) It will directly contribute to the development of the Mamminasata Metropolitan Area by:

inducing a new satellite town at the east of Makassar City and the west foot of Mt. Moncongloe, where flood free 4,000 ha of land could be available for regulated urban development; and

enhancing regional development, especially contributing to the development of KIWA (planned new industrial area of Gowa Regency).

(4) The feasibility study for the Mamminasa Bypass has shown that the Project is viable on both technical and economic aspects (EIRR: 22.4%). Therefore, it is recommended that the Project be implemented at an earliest date for the benefit of national and regional economy.

(5) As the middle section of the Mamminasa Bypass and the Maros/Gowa Regency section of the Abdullah Daeng Sirua Road are intended to serve directly the planned new satellite town, they might be constructed with cooperation of private investors who will participate in the new satellite town development.

(6) EIA (AMDAL) report on the Mamminasa Bypass Project needs to be approved by the Governor of South Sulawesi Province.

11.1.3 Hertasning Road

(1) The Study Team identified that the Hertasning Road is an important arterial road link for the Mamminasata Metropolitan Area.

(2) The Hertasning Road construction project is an ongoing development project under South Sulawesi Government. It is divided into four sections: Sections A, B, C and D. Section A has already been completed and Section B is under construction. The detailed design for Section C has been completed. Therefore, only Section D was subject to F/S.

Page 40: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

11-3

(3) The Hertasning Road has the following functions:

Direct access road from the east suburbs to the Makassar City center as one of the radial roads.

A main access road to TPA (new final waste disposal area planned at Pattallassang in Gowa Regency).

Enhancement of regional development, especially contributing to the development of KIWA (new industrial area of Gowa Regency).

A short cut route for the Bili-bili Dam and Malino.

(4) The feasibility study for the Hertasning Road has shown that the Project is viable on both technical and economic aspects (EIRR: 33.8%) and it will contribute to national and regional economy.

11.1.4 Abdullah Daeng Sirua Road

(1) The Study Team identified that the Abdullah Daeng Sirua Road is one of the important arterial road links for the Mamminasata Metropolitan Area.

(2) The Abdullah Daeng Sirua Road construction project is an ongoing development project under Makassar City. It is divided into six sections: Sections A, B, C, D, E and F, and Section B is under construction. Sections E and F are in the Maros/Gowa Regency

(3) It will directly contribute to the development of the Mamminasata Metropolitan Area by:

inducing a new satellite town at the east of Makassar City and the west foot of Mt. Moncongloe, where flood free 4,000 ha of land could be available for regulated urban development;

providing direct access for the residents staying in the east suburbs of Makassar City; and

enhancing regional development, especially contributing to the development of KIWA (new industrial area of Gowa Regency).

(4) The feasibility study for the Abdullah Daeng Sirua Road has shown that the Project is viable on both technical and economic aspects (EIRR: 31.0%). Therefore, it is recommended that the Project be continued for the benefit of national and regional economy.

(5) As the Maros and Gowa Regency sections are intended to serve directly the planned new satellite town, they might be constructed with cooperation of private investors who will participate in the new satellite town development.

Page 41: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

11-4

11.2 Recommendations on F/S Roads

11.2.1 Trans-Sulawesi Mamminasata Road

(1) The Trans-Sulawesi Mamminasata Road Project (the TSMRP) should be implemented as a national strategic road link since it is a part of the Trans-Sulawesi West Corridor and an arterial road for the Mamminasata Metropolitan Area.

(2) The TSMRP should be implemented in two phases: Phase 1 for Sections B and C (Middle Ring Road and its southern extension), and Phase 2 for Section A (Maros-Jl.Tol.Ir.Sutami IC) and Section D (Sungguminasa - Takalar).

(3) The Directorate General of Highways (DGH) should request Bappenas to list the TSMRP in the Blue Book for foreign funding assistance.

(4) DGH should conduct an appropriate project evaluation process and propose, preferably to the Government of Japan, for extension of a soft loan for the implementation of the TSMRP, through PU, Bappenas and MOF as soon as possible.

(5) The central and regional governments should negotiate and allocate sufficient budget required for ROW acquisition and resettlement for the project preparation. The ROW acquisition for the Middle Ring Road should be continued.

(6) DGH should make environmental management and monitoring in accordance with the environmental management and monitoring plans established in the EIA Report in cooperation with the agencies concerned.

11.2.2 Mamminasa Bypass

(1) The Mamminasa Bypass Project (the MBP) should be implemented as a provincial strategic road or a national strategic road since it is an arterial road for inducing the creation of a new satellite town for the Mamminasata Metropolitan Area.

(2) The MBP should be implemented in four phases. The middle part of the Mamminasa Bypass should be constructed in the first phase since it is an arterial road for the planned new satellite town.

(3) An external funding would be necessary and, therefore, South Sulawesi Government should request Bappenas to list the MBP in the Blue Book.

(4) A separate study should be conducted for establishment of a satellite town development plan. The private sector should be encouraged to participate in the required infrastructure construction, including access road for the new satellite town development.

(5) The regional governments should control housing and other development on the route of

Page 42: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

11-5

the Mamminasa Bypass and the planned new town area to secure the land for these developments.

(6) The regional governments should make environmental management and monitoring in accordance with the environmental management and monitoring plans established in the EIA Report in cooperation with the agencies concerned.

11.2.3 Hertasning Road

(1) Implementation of the Hertasning Road Project (the HRP) should be continued by South Sulawesi Province as a provincial strategic road since it is an arterial road of the Mamminasata Metropolitan Area.

(2) The remaining sections of the HRP (Sections C and D) might be implemental as an access road for TPA (new final waste disposal area planned at Pattallassang in Gowa Regency).

(3) A stage construction approach might be applied for Sections C and D of HRP taking tight budget required for both ROW acquisition and construction into consideration. The 1st Stage is widening of the existing 4.5m travelway (carriageway) to a 7.0 m standard road. The 2nd stage is further widening from 2 lanes to 4 lanes with a median.

(4) The regional governments should control housing and other developments within the planned ROW.

(5) The regional governments should make environmental management and monitoring in accordance with the environmental management and monitoring plans etablished in the EIA Report in cooperation with the agencies concerned.

11.2.4 Abdullah Daeng Sirua Road

(1) Makassar City Section

1) Implementation of the Abdullah Daeng Sirua Road Project (the ADSRP) should be continued by Makassar City up to the border of Makassar City and Gowa Regency as a strategic road.

2) Financial assistance by both provincial and central governments should be made since this is an arterial road of the Mamminasata Metropolitan Area.

3) As ROW acquisition is difficult for the beginning section of the ADSRP (Section A) which is located in a densely populated urban area, one-way traffic control should be applied rather than widening it to a 4-lane road, considering the environmental aspect.

4) The construction of the road sections in the semi-urban and residential area should be made by utilizing the ROW of PDAM as much as possible. However, the PDAM canal

Page 43: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

11-6

should be kept open as much as possible for securing a green and water front environment.

5) The regional governments should make environmental management and monitoring in accordance with the environmental management and monitoring plans established in the EIA Report in cooperation with the agencies concerned.

(2) Maros/Gowa Regency Section

1) The ADSRP in the Maros/Gowa Regency section should be implemented as a provincial strategic road or a national strategic road since it is an arterial road for inducing the creation of a new satellite town for the Mamminasata Metropolitan Area.

2) An external funding would be necessary for the Maros/Gowa Regency section and, therefore, South Sulawesi Government should request Bappenas to list up the ADSRP on the Blue Book, as a package with the middle part of the Mamminasa Bypass.

3) The regional governments should control housing and other developments within the planned ROW.

4) The regional governments should make environmental management and monitoring in accordance with the environmental management and monitoring plans established in the EIA Report in cooperation with the agencies concerned.

11.3 Conclusion and Recommendations on Other Roads

11.3.1 Outer Ring Road

(1) The Outer Ring Road is one of the important links in the Mamminasata Metropolitan Area arterial road network and its expected functions are as follows:

Ring road to contribute to harmonizing urban development;

Logistic route for the coming in and out traffic from/to the southern area of South Sulawesi Province to/from KIMA, Makassar Port, new industrial areas along Jl.Tol.Ir.Sutami; and

Connection between the north educational center and the south educational center.

(2) The Outer Ring Road consists of three parts. The north section is the part accessing to KIMA, Jl.Tol.Ir.Sutami and Makassar Port. The middle section runs along the Tallo River and the south section is a connection to the Sungguminasa and Mamminasa Bypass. The Outer Ring Road and the Mamminasa Bypass share the same road at their southern part to connect to the Tj. Bunga Development Area.

(3) The northern section between Jl.Tol.Ir.Sutami and Jl. Perintis Kemerdekaan through the New Industrial Area (Kawasan Pergudangan dan Industri Parangloe Indah) is under

Page 44: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

11-7

construction by a private investor and will be completed as planned.

(4) Intersections for Jl.Tol.Ir.Sutami and the Outer Ring Road should be constructed under the on-going BOT project.

(5) A 500-700 m buffer zone should be provided between the route of the on-going north section and the Tallo River to avoid negative effects to the river environment.

(6) As the project is vital on both technical and economic aspects (EIRR: 27%), it is recommended to conduct a feasibility study including EIA for its implementation .

11.3.2 Tj.Bunga – Takalar Road (Jalan Lintas Barat Makassar - Takalar)

(1) As floods do not occur at the Jeneberang River estuary after the Bili-bili dam construction, many development projects have been implemented. Since the completion of a bridge at the mouth of the Jeneberang River in 2005, development has expanded to the south. An earliest improvement of the Tj.Bunga - Takalar Road (Lintas Barat) is recommended to regulate the sprawled urban development in the area.

(2) This road link constitutes one of the radial roads (south radial road) in the Mamminasata Urban Arterial Road Network System and it connects the Galesong Port in Takalar. It is recommended to upgrade this road status from Kabupaten road to provincial road as it connects Makassar City to Takalar (Capital of Takalar Regency) along the west coast.

(3) This road will be an alternative route of the Trans-Sulawesi Road from/to Makassar City to/from the southern part of South Sulawesi Province and contribute to reducing the traffic jam at Sungguminasa.

(4) As the economic analysis has shown a very high EIRR of 41.4%, it is recommended that the Project be implemented for the benefit of national and regional economy

(5) Financing for the project implementation should be made by both provincial and central governments since this is an arterial road of the Mamminasata Metropolitan Area.

11.4 Recommendation on Establishment of Coordination Committee for Project Implementation of the F/S Roads

The Study Team understands that good cooperation and coordination between the central governments (Bappenas, MOF and MPW) and regional governments (South Sulawesi Province, Makassar City and Regencies of Maros, Gowa and Takalar) are very important for implementation of the F/S road projects as these are part of the arterial road network for the Mamminasata Metropolitan Area.

The Study Team recommends establishment of a “Project Implementation Committee for Arterial Road Network Development for the Mamminasata Metropolitan Area”. The committee, comprised of the representatives of concerned central and regional governments,

Page 45: CHAPTER 10 IMPLEMENTATION PLANopen_jicareport.jica.go.jp/pdf/11881349_13.pdf15.9 461 New 6 & 4 External Soft Loan (APBN) 2010-2012 31.2 379 Widening 6 & 4 External Soft Loan (APBN)

Final Report The Study on Arterial Road Network Development Plan for Sulawesi Island and Feasibility Study on Priority Arterial Roads in South Sulawesi Province March 2008

11-8

holds periodic meetings for monitoring progress of the project implementation, discusses on problems and measures to solve and takes required actions for smooth implementation of the projects.