C.E. Rago
Inj/Lin Design & Fabrication [email protected]
4_20_061
Injector / Linac Design & Fabrication
C.E. Rago
FAC Review
04_20_06
C.E. Rago
Inj/Lin Design & Fabrication [email protected]
4_20_062
Design & Fabrication-Difficulties
Identify Injector / Linac problems!Systematic and Specific
Review management actions to limit risk!
Answer reasonable questions!
C.E. Rago
Inj/Lin Design & Fabrication [email protected]
4_20_063
DesignLCLS Solid Modeling Solid Edge / Pro Engineering
First Large Project Experience at SLACProblems with:
General OrganizationLCLS Hierarchy / Drawing Tree (Advanced Planning)
Large Model AssembliesLead Designer Control
Single Source / Multiple User / Revision ControlPDM System / Share Point
SLAC StaffUniform Supervision / Central OfficesWeekly group MeetingsIncreased trainingChecking Staff
PerformanceManagement / Software / Network & CPU Hardware
C.E. Rago
Inj/Lin Design & Fabrication [email protected]
4_20_064
Front End Water
Injector through BC1Large Change to Existing SLAC Facilities
Problems with:LCLS CF Requirement
Multiple Circuits with tight regulation
Large Operating Bandwidth
Several Modes of LCLS / Linac Operation
Money & ScheduleTransferred Design Engineer with SLAC water experience
Validate proposals through SLAC CEF / AD
I/O interface with LCLS Controls
C.E. Rago
Inj/Lin Design & Fabrication [email protected]
4_20_065
LCLS Vacuum
Pressure Profile and ContaminationNo problems with pressure profile
Issues with Contamination:UHV at Injection Gun
Optics in vacuumAdopted SLAC design and fabrication specification
Uniform equipment to assist Operations and Maintenance
C.E. Rago
Inj/Lin Design & Fabrication [email protected]
4_20_066
Installation
Installation and ScheduleProblems with:
New SLAC Operating ProceduresSoft Base – Constant ImprovementPartners with AD / MD /MFD / Klystron Manufacturing / Metrology
Davis-Bacon ContractingClear Instruction from LCLS Project OfficeInj / Lin “Fill In Mode”
Storage Cleared MFD Bldg. 026 Rad Prep StorageInstituted Bar CodesMFD control procedures
QAShare Point
C.E. Rago
Inj/Lin Design & Fabrication [email protected]
4_20_067
Installation
Distributed FabricationANL / LBNL (OTRS1, Toroids, RF BPMs, Spectrometer Magnets)
Actual Delivery ScheduleKathleen Ratcliffe – Expanded P3 Delivery Dates
C.E. Rago
Inj/Lin Design & Fabrication [email protected]
4_20_068
Mechanical / Control Interface
MPS, PPS, BCS, Cable Plant, AC PowerProblems with:
ScheduleCommon understanding of P3
Consistent Priority between groups.
Location and Cable Interface with mechanical hardwareFuller interprets for LCLS Controls
Limited Hardware staffHamid has made great strides with staff and direction.
C.E. Rago
Inj/Lin Design & Fabrication [email protected]
4_20_069
Specific Components
Component of most concern:Bunch Length Monitors in BC1
GTL Fabrication
OTR /YAG Optics
BC1 Inter Bend Diagnostics
C.E. Rago
Inj/Lin Design & Fabrication [email protected]
4_20_0610
Independent Tracking
Shortcut (2) to Detailed Installation Schedule 030606.lnk
C.E. Rago
Inj/Lin Design & Fabrication [email protected]
4_20_0611
LTU
FY07 InstallationRemainder of the existing Linac
Linac to Undulator / Electron DumpIncreasing concern to articulate overall system
Schematic Released
Magnets moving forward
Instruments under general development
Tunnel Interface
Supports
Special Vacuum Chambers