    CDVR CommissioningOctober 29 - 31, 2007

  • 7/28/2019 CDVR COMMISIONING

    2/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Outline

    Commissioning

    Product Physical Layout

    Information Needed

    Start up Procedure

    Testing and Adjusting

    CAT PC Software

    Gain Settings

  • 7/28/2019 CDVR COMMISIONING

    3/47

  • 7/28/2019 CDVR COMMISIONING

    4/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    CAUTION

  • 7/28/2019 CDVR COMMISIONING

    5/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Information Needed

    Generator Set Rating

    Voltage

    Current

    Frequency

    Power

    Power Factor

    Generator Time Constants (Td0 & Te)

    Protection Settings

    Generator Over / Under Voltage Trip Value and Time Delay

    Over Excitation Type, Trip Value and Time Setting

    Reverse kvar Trip Value and Time Delay Exciter Diode Monitor Ripple Current Trip Value

    Loss of Sensing Time Delay

  • 7/28/2019 CDVR COMMISIONING

    6/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Testing and Adjusting

    Startup Procedure

    Connect per Wiring Diagrams section of I/M

    Apply battery power

    Connect serial cables

    Install CAT PC Software if necessary (see I/M)

    Start PC Software

    Establish Communications

    Verify parameter settings

  • 7/28/2019 CDVR COMMISIONING

    7/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Testing and Adjusting

    Startup Procedure (contd)

    Changing Settings

    Press EEPROM button to save settings

    Start Engine, Make final adjustments

    Press EEPROM button to save settings

    Record all Settings

    Press Get From Unit verify all settings were saved

    Disable CAT PC Software Communications

    Verify Communications with CAT ET (CANbus)

    Enjoy benefit of electricity

  • 7/28/2019 CDVR COMMISIONING

    8/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Startup ConnectionsPMG Power, ABC Rotation 3-Phase Sensing

  • 7/28/2019 CDVR COMMISIONING

    9/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Startup ConnectionsPMG Power, 3-Phase Direct Sensing

  • 7/28/2019 CDVR COMMISIONING

    10/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Startup ConnectionsPMG Power, 1-Phase Sensing

  • 7/28/2019 CDVR COMMISIONING

    11/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Startup ConnectionsPMG Power, 1-Phase Direct Sensing

  • 7/28/2019 CDVR COMMISIONING

    12/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Startup Connections3-Phase Self Excited, 3-Phase Sensing

  • 7/28/2019 CDVR COMMISIONING

    13/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Startup Connections3- Phase Self Excited, 1-Phase Sensing

  • 7/28/2019 CDVR COMMISIONING

    14/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Startup ConnectionsSelf Excited, Direct L-N Connect, 1-Phase Sensing

  • 7/28/2019 CDVR COMMISIONING

    15/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Startup ConnectionsAREP Power, 3-Phase Sensing

  • 7/28/2019 CDVR COMMISIONING

    16/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Typical Cross Current Connection with 2 CDVRs

  • 7/28/2019 CDVR COMMISIONING

    17/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Typical Cross Current Connection with 3 CDVRs

  • 7/28/2019 CDVR COMMISIONING

    18/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Typical Cross Current Connection with 1 CDVR and 1 DVR

  • 7/28/2019 CDVR COMMISIONING

    19/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Typical Connection with Manual Voltage Control

  • 7/28/2019 CDVR COMMISIONING

    20/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Establish Communications

  • 7/28/2019 CDVR COMMISIONING

    21/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Establish Communications

    Password = CAT

  • 7/28/2019 CDVR COMMISIONING

    22/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Establish Communications

  • 7/28/2019 CDVR COMMISIONING

    23/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Communications Established

  • 7/28/2019 CDVR COMMISIONING

    24/47

  • 7/28/2019 CDVR COMMISIONING

    25/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

  • 7/28/2019 CDVR COMMISIONING

    26/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Testing and Adjusting

    Verify Parameter Settings Contd

    Settings

    Setpoint

    AVR Voltage (limited by Volt Adj Band, 120V default) VAR (% of rated, +/- 100%, 0% default)

    Power Factor (+/- 0.6, 1.0 default)

    AVR Voltage Control (CAN / Switch, CAN default)

    VAR/PF Control (CAN / Switch, Switch default)

    Load Compensation Mode (Off, Droop, LDC, Off default)

    Load Comp Setpoint (0 to +/-10%, 0% default)

    Voltage Adjustment Band (0 to +/- 15%, 15% default)

  • 7/28/2019 CDVR COMMISIONING

    27/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

  • 7/28/2019 CDVR COMMISIONING

    28/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Droop vs. Load Compensation

    Load Compensation

    96979899

    100

    101102103104105106

    -100 -50 0 50 100 150

    % Reactive Load

    %R

    ate

    dVoltage

    Voltage Droop

    99

    100

    101102

    103

    104

    105

    106

    -100 -50 0 50 100 150

    % Reactive Load

    %Rate

    dVoltage

    Shown with3% Droop

    Shown with5% Load

    Comp

  • 7/28/2019 CDVR COMMISIONING

    29/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Testing and Adjusting

    Verify Parameter Settings Contd

    Settings

    Startup

    Soft Start Mode Soft Start Bias (0 90%, 10% default)

    Soft Start Time (0 120s, 5s default)

    Under Frequency Mode

    Knee Frequency (45 64Hz, 50Hz default)

    Freq. Dev. From Knee Freq.(5Hz - fixed)

    Slope #1 and #2 (0 10Hz, 2Hz default for both)

    Min Voltage (50 100%, 50% default)

    Min Frequency (20 40Hz, 25Hz default)

  • 7/28/2019 CDVR COMMISIONING

    30/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

  • 7/28/2019 CDVR COMMISIONING

    31/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Soft Start

    Vref

    SS bias

    SS time

    0

    generator voltage

  • 7/28/2019 CDVR COMMISIONING

    32/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Under Frequency Mode

  • 7/28/2019 CDVR COMMISIONING

    33/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Testing and Adjusting

    Verify Parameter Settings Contd

    Settings

    Control Gain

    PID Pre-Settings 1 20 pre-programmed, 1 custom PID settings

    PID Calculator

    AVR

    Kp, Ki, Kd (0 1000, 200/600/50 defaults)

    Td (0 1s, 0 default)

    Kg (0 1000, 50 default)

    VAR/PF

    Ki, Kg (1 1000, 5/2.5 & 5/3 defaults)

  • 7/28/2019 CDVR COMMISIONING

    34/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

  • 7/28/2019 CDVR COMMISIONING

    35/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Testing and Adjusting

    Verify Parameter Settings Contd

    PID Gains

    PID Calculator

    Tdo & Te required (2.0 & 0.33s defaults) Adjust Kg to achieve desired response

    Good generic values: PID = 80,20,10 then adj Kg as needed

  • 7/28/2019 CDVR COMMISIONING

    36/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

  • 7/28/2019 CDVR COMMISIONING

    37/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Testing and Adjusting

    Tdo from Generator Data Sheet

    Te ranges from 0.06s to 0.26s see Table 9

  • 7/28/2019 CDVR COMMISIONING

    38/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Testing and Adjusting

    Verify Parameter Settings Contd

    PID Gains

    var / PF Integral and Loop Gain Settings

    Use factory defaults as a staring point Increase Kg to increase speed of response (suggest

    keeping it slow)

    Increase Ki if var/PF regulation not acceptable

  • 7/28/2019 CDVR COMMISIONING

    39/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Testing and Adjusting

    Verify Parameter Settings Contd

    Protection

    Shutdown Override (Enable to override shutdowns, Disabled is

    default value) Function not affected:

    Gen. Overvoltage

    Gen. Undervoltage

    Reverse VAR Fault Reset too long

    Cannot be saved in EEPROM Cycling power causesfunction to become disabled on power up

    Generator Overvoltage (105 135%, 2 30s, 135%, 2s default) Generator Undervoltage (60 95%, 10 120s, 60%, 30s

    default)

  • 7/28/2019 CDVR COMMISIONING

    40/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Testing and Adjusting

    Verify Parameter Settings Contd

    Protection

    Over Excitation Threshold is default (0 12A, 0 10s, 12A

    & 10s default) Over Excitation Inv Time(0 12A, TD = 0 10, 12A & TD =

    10 default)

    Reverse VAR (10 100%, 0.1 9.9s, 10% & 3s to be

    defaults soon) Fault Reset Too Long

    Exciter Diode Monitor (1 10A, 2A default)

    Loss Of Sensing (0 25s, 2A default)

  • 7/28/2019 CDVR COMMISIONING

    41/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

  • 7/28/2019 CDVR COMMISIONING

    42/47

  • 7/28/2019 CDVR COMMISIONING

    43/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Testing and Adjusting

    Verify Parameter Settings Contd

    Settings

    Metering

    Gen Voltage Gen Current

    Gen Freq

    Gen Power

    Aux DC Input Exciter Field

    Operating Mode

    Fine Adjustment

    Setpoint

    Status

    Alarms

    Contact Inputs

  • 7/28/2019 CDVR COMMISIONING

    44/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

  • 7/28/2019 CDVR COMMISIONING

    45/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Testing and Adjusting

    Dont Forget

    Press EEPROM button to save settings

    Record all Settings

    Press Get From Unit verify all settings were saved Disable CAT PC Software Communications

  • 7/28/2019 CDVR COMMISIONING

    46/47

    EAME/CIS TC Conference EP/Petroleum - Malaga, October 2007

    Testing and Adjusting

    Wrap up

    Press EEPROM button to save settings

    Start Engine, Make final adjustments

    Press EEPROM button to save settings Record all Settings

    Press Get From Unit verify all settings were saved

    Disable CAT PC Software Communications

    Verify CAT ET operation