    RP-TRANSCO-LVAC_I/C-1 - P

    OC1

    ABB

    REF615

    CT Ratio 2000:1

    IEC - Normal Inverse

    Pickup = 0.65 (0.3 - 5 xCT Sec)

    Time Dial = 0.14

    3x = 0.882 s, 5x = 0.599 s, 8x = 0.462 s

    RP-TRANSCO-LVAC_BS - P

    OC1

    ABB

    REF615

    CT Ratio 2000:1

    IEC - Normal Inverse

    Pickup = 0.65 (0.3 - 5 xCT Sec)

    Time Dial = 0.073x = 0.441 s, 5x = 0.3 s, 8x = 0.231 s

    RP-AADC-LVAC-O/G-1 - P

    OC1

    ABB

    REF615

    CT Ratio 2000:1

    IEC - Normal Inverse

    Pickup = 0.65 (0.3 - 5 xCT Sec)

    Time Dial = 0.13

    3x = 0.819 s, 5x = 0.556 s, 8x = 0.429 s

    RP-AADC-LVAC_I/C-1 - P

    OC1

    ABB

    REF615

    CT Ratio 2700:1IEC - Normal Inverse

    Pickup = 0.95 (0.3 - 5 xCT Sec)

    Time Dial = 0.2

    3x = 1.26 s, 5x = 0.856 s, 8x = 0.659 s

    RP-AADC-LVAC-BS - P

    OC1

    ABB

    REF615

    CT Ratio 2700:1

    IEC - Normal Inverse

    Pickup = 0.95 (0.3 - 5 xCT Sec)

    Time Dial = 0.15

    3x = 0.945 s, 5x = 0.642 s, 8x = 0.495 s

    10.5 1 10 100 1K3 5 30 50 300 500 3K 5K

    Amps X 1000 LVAC-TRANSCO-BUS_A (Nom. kV=0.415, Plot Ref. kV=0.415)

    10.5 1 10 100 1K3 5 30 50 300 500 3K 5K

    Amps X 1000 LVAC-TRANSCO-BUS_A (Nom. kV=0.415, Plot Ref. kV=0.415)

    1K

    .01

    .1

    1

    10

    100

    .03

    .05

    .3

    .5

    3

    5

    30

    50

    300

    500

    Seconds

    ETAP Star 12.5.0C

    N7733-ZAKHER CASE:4.1 EF

    Project: 220/33/11kV Zakher Grid

    Location: Zakher Area of Al Ain

    Contract: N7733

    Engineer: JM

    Filename: C:\ETAP 1250\N7733\N7733.OTI

    Date: 21-01-2016

    SN: LARSENTRN2

    Rev: Base

    Fault : Phase

    Circuit: LVAC