C O M P A N Y P R O F I L E

1

Are the market leaders offering……….

• A complete construction solution encompassing Structural Steelwork, Platework,

Piping, Electrical and Instrumentation.

• Self sufficient services with regards to, plant, equipment, tools, etc.

• An accredited training institute with MERSETA as per the powers vested by SAQA

And certification for the …………

• SHEQ integrated management system ISO 9001; ISO 14001; OHSAS 18001.2

DETAILING

SERVICES

FABRICATION & CORROSION PROTECTION

ERECTION

COMMISSIONING

STRUCTURAL MECHANICAL ELECTRICAL INSTRUMENTATION PIPING PLATEWORK

TUBULAR STRUCTURAL

ENGINEERING (PTY) LTD

TUBULAR GENERAL

FABRICATORS (PTY) LTD`

ABEYLA

TRADING (PTY) LTD

TUBULAR ENGINEERING

SERVICES (PTY) LTD

TUBULAR CONSTRUCTION

PROJECTS (PTY) LTD

TUBULAR ELECTRICAL &

INSTRUMENTATION (PTY) LTD

TUBULAR TECHNICAL

CONSTRUCTION (PTY) LTD

TUBUTECH ZAMBIA

(PTY) LTD

TUBULAR

METALO – MECANICA

DE MOÇAMBIQUE (PTY) LTD

TUBULAR CONSTRUÇÕES

TECHNICAS (PTY) LTD

(ANGOLA)

TUBULAR PROPERTIES

(PTY) LTD

TUBULAR SCAFFOLDING

SERVICES (PTY) LTD

TUBULAR PLANT

HIRE (PTY) LTD

3

Our values

Initiative

Teamwork

Openness

Delivery

Customer focus

SHEQ

Integrity

Respect

Accountability

4

WITBANK PREMISES

TEL: 0861 882 8527 E-mail: [email protected]

FAX: (011) 450 2165 Web : www.tubular.co.za

JHB HEAD OFFICE

5

WORKSHOPS / FABRICATION FACILITIES (WITBANK)

BLASTING AND PAINTING FACILITIES (WITBANK)

• 20,000 m2 Workshops

• 3,500 Tonnes / Month Structural Steelwork

• 350 Tonnes / Month Platework

• CNC Peddinghaus Equipment's

• 2,000 m2 Workshop

• 35,000 m2 Open Lay-down Area

PIPING FACILITIES (WADEVILLE)

• 9,500 m2 Workshop

• 1,500 m2 Stock Warehouse

• 105,000 m2 Open Lay-down & Stock Yard Area

PLANT & MAINTENANCEFACILITIES (SUNDRA)

• 5,000 m2 Workshop

• 15 Hectares of Land

6

Description

Overhead Cranes

Plate Rollers

Guillotines

Press Brake

Drilling Machines

Profile Cutters

Cropper

Submerge Arc

Plasma Cutter

Beam Drill Line

Band Saw

Circular Saw

Angle Master

Copper Line

Plate Processing System

5 To 20 Tons

13mm to 16mm

45mm

10mm

CNC

400mm

200 To 600mm

CNC

CNC

CNC

Numbers

20

2

2

2

4

1

2

2

2

2

3

3

1

1

2

7

8

9

10

11

12

13

Description

Cranes Lattice

Cranes Hydraulic

Hydraulic Platforms

Trucks

Trailers

Lowbed

Forklifts

LDVs

Busses

Compressors

Mechanical Horse Truck Units

Welding Equipment

Offices / Portacamp

Site Stores / Containers

Transformers / DB Boards

Generators

Tractors

Dolly's

Diesel Bowser

Water Tankers

Small Trailers

45t to1200t mobile truck mounted

4.9t to 400t mobile truck mounted

Up to 22 meters

3t – 12t

60t, 100t & 120t

5 + 13t

850 cfm

20t / 30t

Argon, Tig and Arc

5/250 KVA

6.5 to 300KVA

Numbers

20

85

23

22

54

5

5

186

37

5

24

298

172

232

48

30

22

16

12

3

5

105

14

T.P.H. PLANT & MAINTENANCE YARD

15

T.P.H. PLANT & MAINTENANCE YARD

16

GOTTWALD RG912 800/1200 Ton Super lift

Main Boom 113m Fly & Jib 95m

17

DEMAG TC2000 400/600 Ton Super lift

Main Boom 90m Fly & Jib 72m

18

2 x GOTTWALD AK 210 225 Ton

Main Boom 93m Fly & Jib 65m

19

VOLVO FH12 460 HP

60 Ton LOWBED

20

VOLVO FH16 550 HP

120 Ton LOWBED

21

TRAINING AND DEVELOPMENT

• The Company is committed to the training and development of Human

Resources at all levels by investing in time and money.

• Tubular supports the principle of upliftment of skills and multi-skilling of

its employees.

• Upgrading and upliftment of skills will form an integral part of our

work/manpower utilisation on a planned and ongoing basis.

• Our philosophy is that the success of the Company depends on the

quality of its people.

• Tubular supports the notion that as a company, we have a social

responsibility towards general upgrading of skills of locals in the area

where the project is located.

22

Cert. No 332492 HO

ISO 3834 Part X23

Contractor Status

Enterprise CRS Number 176840Enterprise name TUBULAR TECHNICAL CONSTRUCTIONTrading name TUBULAR TECHNICAL CONSTRUCTION PTY LTD(T1C4)Registration 1979/004247/07Current Status RegisteredRegistration period 2009/10/07 To 2012/10/07

Next Annual due 2015/10/07Current Grades 9SL, 9ME

Grading Applications Application Date Status 2013/10/07 ACTIVE

Contact Details Initials & Surname MHLomasDesignation Engineering managerPostal Address P.O.Box 1342

BEDFORDVIEW JOHANNESBURG 2008 Gauteng

Physical Address 8 Hawley Road BEDFORDVIEW JOHANNESBURG 2007 Gauteng

Telephone 0115532068Fax 0114502160

24

25

26

SAFETY, HEALTH, ENVIRONMENTAL & QUALITY

POLICY

27

MAJOR PROJECTS

28

• Client : Advalloys

• Project : Machadodorp Furnace

Expansion

• Engineers : Bateman Titaco

• Contract Value : R 35,000,000.00

• Description of Works : Furnace Rebuild

& Sintering Furnace

Erection

29

• Client : SA Chrome

• Project : SA Chrome Horizon

• Engineers : Bateman Titaco

• Contract Value: : R 80,000,000.00

• Description of Works: Structural Steelwork,

Platework, Piping

Fabrication and

Erection for Chrome

Furnaces as well as

Structural Steelwork

Erection for the

Sintering Building and

Erection of Sintering

Machine.

30

• Client : Anglo Platinum

• Project : Mortimer Expansion

• Engineers : Townshend van der

Walt and Partners

• Contract Value: : R 35,000,000.00

• Description of Works : Structural Steelwork

and Platework Erection

as well as Erection of

Mechanicals,

Floatation cells and

Piping Fabrication and

Erection.

• Client : Anglo Platinum

• Project : Mortimer Larox

• Engineers : Townshend van der

Walt and Partners

• Contract Value: : R 4,000,000.00

31

• Client : Anglo Platinum

• Project : Polokwane Smelter

• Engineers : Greenblatt & Hutton

• Contract Value: : R 58,000,000.00

• Description of Works : Structural Steelwork,

Plate Work, Mechanical

Erection for two Complete

Flash Dryers Together with

Adjoining Conveyors,

Transfer Towers &

Concentrate Storage

Facilities.

• Client : Anglo Platinum

• Project : Slag Offloading Facility

& Matt Caster Machine

• Engineers : Greenblatt & Hutton

• Contract Value: : R 15,000,000.00

32

• Client : Anglo Platinum

• Project : Western Limb Tailings

Retreatment

• Engineers : Hatch Africa

• Contract Value: : R 12,500,000.00

• Description of Works : Structural Steelwork,

Platework, Piping and

Mechanical Erection of

Free Issued Items.

33

• Client : Hernic Ferrochrome

• Project : F4/PS2 Furnace &

Palletising / Sintering

Plant

• Engineers : Metix

• Contract Value: : R 170,000,000.00

• Description of Works : Fabrication and

Erection of Structural

Steelwork, Platework,

Piping Installation of

Mechanicals Equipment

for Furnace No’ 4 and

the Sintering Furnace.

34

HERNIC FERROCHROME EXPANSION

35

• Client : Xstrata Alloys

• Project : Xstrata Lion Project

• Engineers : Greenblatt & Hutton

• Contract Value: : R 30,000,000.00

• Description of Works : Erection of Free Issued

Steelwork For Furnace

Building.

36

• Client : Holcim Cement

• Project : Raw Mill Ducting &

Pan, Bucket Conveyors

• Engineers : Townshend van der

Walt and Partners

• Contract Value: : R 60,000,000.00

• Description of Works : Fabrication & Erection

of Structural Steelwork

plus Dismantling &

Erection of Mechanicals,

Silos, Bins, Ducting and

Piping. Electrical &

Instrumentation Supply,

Installation &

Commissioning

37

• Client : International Ferro

Metals

• Project : Furnace Structural

Steel Fab. & Erection

• Engineers : Pyromet

• Contract Value : R 52,000,000.00

• Description of Works : Supply, Fabrication and Erection

of Structural Steelwork for the

two Furnace Building and the

Complete Erection of the

Sintering / Pellitising Furnace

together with Adjacent Small

Buildings, Conveyors, Piping,

Mechanicals etc. The Complete

Electrical and Instrumentation

for the Sintering Furnace and

Adjacent Areas.

38

• Client : Xstrata

• Project : Bokomoso Wonderkop

• Engineers : Metix

• Contract Value : R185,000,000.00

• Description of Works :Supply, Fabrication and

Erection of the Complete

Sinter Building for two

Pellitising Machines and the

Complete Mechanical

Erection for two Sintering

Furnaces together with

Ancillary Buildings and

Equipment including,

Conveyors, Bins, etc. The

Complete Electrical and

Instrumentation for both

Sintering Furnaces and

Ancillary Buildings.

39

• Client : International Ferro

Metals

• Project : Sinter Furnace & Palletising

Plant

• Engineers : Bateman Engineering

• Contract Value : R129,500,000.00

• Description of Works : Supply, Fabrication and Erection

of Structural Steelwork for the

two Furnace Building and the

Complete Erection of the

Sintering / Palletising Furnace

together with Adjacent Small

Buildings, Conveyors, Piping,

Mechanicals etc. The Complete

Electrical and Instrumentation

for the Sintering Furnace and

Adjacent Areas.

40

• Client : Anglo Platinum

• Project : PP Rust 600 KTPM Concentrator

Project

• Engineers : Vhumbanani Projects

• Contract Value : R202,000,000.00

• Description of Works : Supply and Erection of

Structural Steelwork, Platework

and Erection of Free Issue

Mechanical Items for the ROM

Materials Handling and Electrical

and Instrumentation Installation

41

• Client : Kumba Iron Ore

• Project : Sishen Expansion Project

• Engineers : Murray & Roberts

• Contract Value : R360,705,000.00

• Description of Works : Supply, Fabrication,

Manufacture, Delivery,

Installation/Erection and

assistance with commissioning of

Structural Steelwork, Mechanical

Items, Platework and Piping for

the J2, J4, J5 & J6 Areas

42

• Client : Assmang Iron Ore

• Project : Khumani Iron Ore Mine

• BKM Project

• Engineers : DRA

• Contract Value : R380,000,000.00

• Description of Works : Supply, Fabrication, Corrosion

Protection, Delivery to site of

Structural Steel & Platework.

Erection of Free Issue Mechanical

Equipment and Weba Chutes

43

44

• Client : Equinox Minerals Ltd

• Project : Lumwana Copper Project

• Engineers : AB Ventures (Pty) Ltd

• Contract Value : R191,821,515.31

• Description of Works : Steelwork, Platework, Mechanical

Installation and Electrical &

Instrumentation Installation

AB VENTURES LTD

45

• Client : Holcim Cement

• Project : Mill 8 Project

• Engineers : Engineering Project Company

• Contract Value : R 63,000,000.00

• Description of Works : Steelwork, Platework, Mechanical

Installation and Electrical &

Instrumentation Installation

46

• Client : Anglo Platinum

• Project : Amandelbult 75-210 KTPM

• Engineers : Vhumbanani

• Contract Value : R 180,000,000.00

• Description of Works : Steelwork, Platework, Mechanical

& Piping Installation.

47

• Client : ASA Metals

• Project : Furnace 3 & 4

• Engineers : Tenova PYROMET

• Contract Value : R 200,000,000.00

• Description of Works : Steelwork, Platework, Mechanical

ASA METALS

DILOKONG CHROME

48

• Client : Anglo Platinum

• Project : MIG & UFG Project

• Engineers : Vhumbanani

• Contract Value : R 130,000,000.00

• Description of Works : Steelwork, Platework, Mechanical

& Piping Installation.

49

• Client : Anglo Platinum

• Project : Amandelbult A-Frame

• Engineers : Vhumbanani

• Contract Value : R 66,400,000.00

• Description of Works : Structural Steel, Mechanical,

Piping & Platework

50

• Client : Kalagadi

• Project : Main Shaft & Vent Shaft Headgear

• Engineers : Shaft Sinkers

• Contract Value : R 40,100,000.00

• Description of Works : Steelwork

51

• Client : Zondagsfontein Colliery

• Project : Colliery

• Engineers : Venn & Milford Inc

• Contract Value : R 50, 000,000.00

• Description of Works : Construction of MV/LV reticulation

52

• Client : KHUMBA

• Project : Sishen South Project

• Engineers : Hatch

• Contract Value : R250 000 000.00

• Description of Works : Supply/ Fabrication and erection of

Structural Steel Work, Platework

and piping

53

• Client : SENET

• Project : Sishen South

• Engineers : Hatch

• Contract Value : R 15 684 686 .81

• Description of Works : Install Conveyor Steelwork &

Mechanicals

54

• Client : ESKOM

• Project : Medupi Coal Stockyard Project

• Engineers : ThyssenKrupp

• Contract Value : R83 686 634.00

• Description of Works : Supply/ Fabrication, Install Conveyor

Steelwork & Free Issue Mechanical

56

• Client : Xstrata Alloys

• Project : Xstrata Lion Phase 2 Project

• Engineers : Greenblatt & Hutton

• Contract Value: : R 310,000,000.00

• Description of Works :Supply Fabrication & Erection of

Free Issued Steelwork For Furnace

Building.

57

• Client : EXXARO

• Project : Medupi Grootegeluk Expansion Project

• Engineers : Engineering & Projects Company

• Contract Value : R 820,000,000.00

• Description of Works : Supply, Fabrication, Corrosion

Protection, Delivery to site of Structural

Steel, Platework & Pipe Work. Erection

of Free Issue Mechanical Equipment

• Client : EXXARO

• Project : Medupi Grootegeluk & Filter Plant

• Engineers : Engineering & Projects Company

• Contract Value : R60 000 000.00

• Description of Works : Supply, Fabrication, Corrosion

Protection, Delivery to site of Structural

Steel, Platework & Pipe Work. Erection

of Free Issue Mechanical Equipment

58

• Client : Kalagadi

• Project : SMPP Project

• Engineers : MDM Engineering

• Contract Value : R 420,000,000.00

• Description of Works : Supply, Fabrication, Corrosion

Protection, Delivery to site of Structural

Steel, Platework & Pipe Work. Erection

of Free Issue Mechanical Equipment

59