ADDENDUM NO. 1 Date: 7/11/2017 Issued by: Sacramento City Unified School District Project: Field Improvements at West Campus High School You are hereby notified of the following changes, clarifications, or modifications to the original Contract Documents, Specifications, and Drawings. This Addendum shall supersede the original project documents, and shall take precedence over anything to the contrary therein. All Addenda shall be acknowledged in the Bid Form. Failure to do so may result in disqualification of the bid. All other conditions remain unchanged. Business Services Contracts Office 5735 47th Avenue Sacramento, CA 95824 (916) 643-2464 ______________________________________________________________________________________________________ Gerardo Castillo, Chief Business Officer Kimberly Teague, Contract Specialist

Business Services Contracts Office 5735 47th Avenue ... · 3. ad1-3 grading plan 4. ad1-4 pole base detail 5. ad1-5 site domestic water and field irrigation plan 6. ad1-6 paving plan

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Business Services Contracts Office 5735 47th Avenue ... · 3. ad1-3 grading plan 4. ad1-4 pole base detail 5. ad1-5 site domestic water and field irrigation plan 6. ad1-6 paving plan

ADDENDUM NO. 1 Date: 7/11/2017 Issued by: Sacramento City Unified School District Project: Field Improvements at West Campus High School You are hereby notified of the following changes, clarifications, or modifications to the original Contract Documents, Specifications, and Drawings. This Addendum shall supersede the original project documents, and shall take precedence over anything to the contrary therein. All Addenda shall be acknowledged in the Bid Form. Failure to do so may result in disqualification of the bid. All other conditions remain unchanged.

Business Services Contracts Office

5735 47th Avenue Sacramento, CA 95824 (916) 643-2464

______________________________________________________________________________________________________

Gerardo Castillo, Chief Business Officer Kimberly Teague, Contract Specialist

Page 2: Business Services Contracts Office 5735 47th Avenue ... · 3. ad1-3 grading plan 4. ad1-4 pole base detail 5. ad1-5 site domestic water and field irrigation plan 6. ad1-6 paving plan

SKW Job No. 04800.02 July 11, 2017DSA File No.: 34-H7

DSA Application No.: 02-115633

WEST CAMPUS HIGH SCHOOL 00 01 00-1Synthetic Practice Field & Road Improvements, Inc. 1 Addendum No. 1SKW Proj. No.: 04800.02 7/11/2017

ADDENDUM NO. 1

West Campus High SchoolSynthetic Practice Field & Road Improvements, Inc. 1

July 11, 2017

By _______________________________Patrick M. DericksonCA License C17107Stafford King Wiese Architects

A. Work described in this addendum is to be of the same quality as specified in the original documents.

B. ADDENDUM DRAWINGS

1. AD1-1 DEMOLITION PLAN2. AD1-2 DEMOLITION PLAN3. AD1-3 GRADING PLAN4. AD1-4 POLE BASE DETAIL5. AD1-5 SITE DOMESTIC WATER AND FIELD IRRIGATION PLAN6. AD1-6 PAVING PLAN7. AD1-7 FIELD LAYOUT PLAN8. AD1-8 FIELD FENCING AND EQUIPMENT PLAN9. AD1-9 FIELD FENCING SECTIONS AND DETAILS 10. C1.6.5 FIELD EQUIPMENT DETAILS11. C1.8.3 DETAILS AND SECTIONS

C. DRAWINGS

1. AD1-1 DEMOLITION PLANa. Note updated for SMUD meter to be relocated as well.

2. AD1-2 DEMOLITION PLANa. Backstops added to demolition.

3. AD1-3 GRADING PLANa. Existing light pole to be re-installed, location clarified.

4. AD1-4 POLE BASE DETAILa. Detail provided.

5. AD1-5 SITE DOMESTIC WATER AND FIELD IRRIGATION PLANa. Irrigation note added for clarification.

6. AD1-6 PAVING PLANa. Paving type added, paving type updated.

 

Page 3: Business Services Contracts Office 5735 47th Avenue ... · 3. ad1-3 grading plan 4. ad1-4 pole base detail 5. ad1-5 site domestic water and field irrigation plan 6. ad1-6 paving plan

SKW Job No. 04800.02 July 11, 2017DSA File No.: 34-H7

DSA Application No.: 02-115633

WEST CAMPUS HIGH SCHOOL 00 01 00-2Synthetic Practice Field & Road Improvements, Inc. 1 Addendum No. 1SKW Proj. No.: 04800.02 7/11/2017

7. AD1-7 FIELD LAYOUT PLANa. Ground sleeves and soccer lock down to be installed at both goal ends.

8. AD1-8 FIELD FENCING AND EQUIPMENT PLANb. Only goal sleeves to be installed, goal posts to be provided but not installed.

9. AD1-9 FIELD FENCING SECTIONS AND DETAILSc. Goal post to be provided but not installed.

10. C1.6.5 FIELD EQUIPMENT DETAILSd. Some equipment not used.

11. C1.8.3 DETAILS AND SECTIONSe. Field section detail updated.

D. QUESTIONS

1. Identify and/or locate required temporary power on the drawings?a. Refer to section 01 50 00 Temporary Facilities, 2.01 B for information about

temporary power. There is no information regarding temporary power on the drawings.

2. Identify and/or locate required lighting on the drawings?a. One light pole is to be relocated. See AD1-3 Grading Plan, note 24, and AD1-4 Pole

Base Detail.

E. ATTACHMENTS

Drawings:

AD1-1 DEMOLITION PLANAD1-2 DEMOLITION PLANAD1-3 GRADING PLANAD1-4 POLE BASE DETAILAD1-5 SITE DOMESTIC WATER AND FIELD IRRIGATION PLANAD1-6 PAVING PLANAD1-7 FIELD LAYOUT PLAN

AD1-8 FIELD FENCING AND EQUIPMENT PLANAD1-9 FIELD FENCING SECTIONS AND DETAILS C1.6.5 FIELD EQUIPMENT DETAILSC1.8.3 DETAILS AND SECTIONS

END OF ADDENDUM 1

Page 4: Business Services Contracts Office 5735 47th Avenue ... · 3. ad1-3 grading plan 4. ad1-4 pole base detail 5. ad1-5 site domestic water and field irrigation plan 6. ad1-6 paving plan

NO

RT

H

1 inch = 20 feet

20'0

Job No:

Ref:

C1.1.1

Scale:

Sheet No.

Date:

WCE No.16-171

1" = 20'-0"

7-11-2017

Title:

Project:

_____

SCUSD WEST CAMPUS

HIGH SCHOOL SCIENCE &

TECHNOLOGY BUILDING

INCREMENT 1

DEMOLITION PLAN

DEMOLITION NOTES

07/11/2017

AD1-1

Page 5: Business Services Contracts Office 5735 47th Avenue ... · 3. ad1-3 grading plan 4. ad1-4 pole base detail 5. ad1-5 site domestic water and field irrigation plan 6. ad1-6 paving plan

NO

RT

H

1 inch = 20 feet

20'0

Job No:

Ref:

C1.1.1

Scale:

Sheet No.

Date:

WCE No.16-171

1" = 20'-0"

7-11-2017

Title:

Project:

_____

SCUSD WEST CAMPUS

HIGH SCHOOL SCIENCE &

TECHNOLOGY BUILDING

INCREMENT 1

DEMOLITION PLAN

DEMOLITION NOTES

07/11/2017

AD1-2

Page 6: Business Services Contracts Office 5735 47th Avenue ... · 3. ad1-3 grading plan 4. ad1-4 pole base detail 5. ad1-5 site domestic water and field irrigation plan 6. ad1-6 paving plan

NO

RT

H

1 inch = 20 feet

20'0

GRADING PLAN

Job No:

Ref:

C1.3.1

Scale:

Sheet No.

Date:

WCE No.16-171

1" = 20'-0"

7-11-2017

Title:

Project:

_____

SCUSD WEST CAMPUS

HIGH SCHOOL SCIENCE &

TECHNOLOGY BUILDING

INCREMENT 1

CONSTRUCTION NOTES

07/11/2017

AD1-3

Page 7: Business Services Contracts Office 5735 47th Avenue ... · 3. ad1-3 grading plan 4. ad1-4 pole base detail 5. ad1-5 site domestic water and field irrigation plan 6. ad1-6 paving plan

MATCH EXISTING

MATC

H EX

ISTI

NG

EXISTING POLE

POLE BASE DETAILWEST CAMPUS HIGH SCHOOL - PRACTICE FIELD & ROAD IMPROVEMENTS, INC 1.5022 58th StreetSacramento, CA 95820

02 - 115633

1

(A1.1)AD1-4

Page 8: Business Services Contracts Office 5735 47th Avenue ... · 3. ad1-3 grading plan 4. ad1-4 pole base detail 5. ad1-5 site domestic water and field irrigation plan 6. ad1-6 paving plan

NO

RT

H

1 inch = 20 feet

20'0

Job No:

Ref:

C1.4.2

Scale:

Sheet No.

Date:

WCE No.16-171

1" = 20'-0"

7-11-2017

Title:

Project:

_____

SCUSD WEST CAMPUS

HIGH SCHOOL SCIENCE &

TECHNOLOGY BUILDING

INCREMENT 1

SITE DOMESTIC WATER AND

FIELD IRRIGATION PLAN

IRRIGATION NOTE:

WATER AND IRRIGATION NOTES

07/11/2017

AD1-5

Page 9: Business Services Contracts Office 5735 47th Avenue ... · 3. ad1-3 grading plan 4. ad1-4 pole base detail 5. ad1-5 site domestic water and field irrigation plan 6. ad1-6 paving plan

Job No:

Ref:

C1.5.1

Scale:

Sheet No.

Date:

WCE No.16-171

1" = 20'-0"

7-11-2017

Title:

Project:

_____

SCUSD WEST CAMPUS

HIGH SCHOOL SCIENCE &

TECHNOLOGY BUILDING

INCREMENT 1

PAVING PLAN

PAVING LEGEND

NO

RT

H

07/11/2017

AD1-6

Page 10: Business Services Contracts Office 5735 47th Avenue ... · 3. ad1-3 grading plan 4. ad1-4 pole base detail 5. ad1-5 site domestic water and field irrigation plan 6. ad1-6 paving plan

Job No:

Ref:

C1.6.2

Scale:

Sheet No.

Date:

WCE No.16-171

1" = 20'-0"

7-11-2017

Title:

Project:

_____

SCUSD WEST CAMPUS

HIGH SCHOOL SCIENCE &

TECHNOLOGY BUILDING

INCREMENT 1

FIELD LAYOUT PLAN

07/11/2017

AD1-7

Page 11: Business Services Contracts Office 5735 47th Avenue ... · 3. ad1-3 grading plan 4. ad1-4 pole base detail 5. ad1-5 site domestic water and field irrigation plan 6. ad1-6 paving plan

NO

RT

H

1 inch = 20 feet

20'0

Job No:

Ref:

C1.6.3

Scale:

Sheet No.

Date:

WCE No.16-171

1" = 20'-0"

7-11-2017

Title:

Project:

_____

SCUSD WEST CAMPUS

HIGH SCHOOL SCIENCE &

TECHNOLOGY BUILDING

INCREMENT 1

FIELD FENCING AND

EQUIPMENT PLAN

FENCING NOTES

07/11/2017

AD1-8

Page 12: Business Services Contracts Office 5735 47th Avenue ... · 3. ad1-3 grading plan 4. ad1-4 pole base detail 5. ad1-5 site domestic water and field irrigation plan 6. ad1-6 paving plan

Job No:

Ref:

C1.6.4

Scale:

Sheet No.

Date:

WCE No.16-171

1" = 20'-0"

7-11-2017

Title:

Project:

_____

SCUSD WEST CAMPUS

HIGH SCHOOL SCIENCE &

TECHNOLOGY BUILDING

INCREMENT 1

FIELD FENCING SECTIONS

AND DETAILS

FIELD FENCING ELEVATION - SOUTH END7

07/11/2017

AD1-9

Page 13: Business Services Contracts Office 5735 47th Avenue ... · 3. ad1-3 grading plan 4. ad1-4 pole base detail 5. ad1-5 site domestic water and field irrigation plan 6. ad1-6 paving plan

C1.6.5

LIC.# C17107

REN. 2/28/17

S

T

A

T

E

O

F

CA

L

I

F

O

R

N

I

A

L

I

C

E

N

S

E

D

AR

C

H

I

T

E

C

T

PA

T

R

I

C

K

M

.D

E

R

I

C

K

S

O

N

THE ARCHITECTS DO NOT REPRESENT THAT

THESE PLANS OR THE SPECIFICATIONS IN

CONNECTION THEREWITH ARE SUITABLE,

WHETHER OR NOT MODIFIED, FOR ANY OTHER

SITE THAN THE ONE FOR WHICH THEY WERE

SPECIFICALLY PREPARED. THE ARCHITECTS

DISCLAIM RESPONSIBILITY FOR THESE PLANS

AND SPECIFICATIONS IF THEY ARE USED IN

WHOLE OR PART AT ANY OTHER SITE.

CONSULTANT STAMP

622 20TH STREET

SACRAMENTO CALIFORNIA 95811

(916) 930-5900 FAX (916) 930-5800

EMAIL: [email protected]

02- 115633

REVISIONS

DESCRIPTIONDATENO.

SUBMITTAL

PROJECT NO.

DRAWN BY

ISSUE DATE

CHECKED BY

SHEET NAME

KEY PLAN

AGENCY APPROVAL

FILE NO.

IDENTIFICATION STAMP

DIV. OF THE STATE ARCHITECT

OFFICE OF REGULATION SERVICES

AC FLS SS

DATE

SCUSD WEST CAMPUS

HIGH SCHOOL SCIENCE &

TECHNOLOGY BUILDING

CONSTRUCTION DOCUMENTS

04800

6/20/17

5022 58TH STREET

SACRAMENTO, CA 95820

SMN TF

INCREMENT 1

34-H7

FIELD EQUIPMENT

DETAILS

Page 14: Business Services Contracts Office 5735 47th Avenue ... · 3. ad1-3 grading plan 4. ad1-4 pole base detail 5. ad1-5 site domestic water and field irrigation plan 6. ad1-6 paving plan

DETAILS AND

SECTIONS

C1.8.3

LIC.# C17107

REN. 2/28/17

S

T

A

T

E

O

F

CA

L

I

F

O

R

N

I

A

L

I

C

E

N

S

E

D

AR

C

H

I

T

E

C

T

PA

T

R

I

C

K

M

.D

E

R

I

C

K

S

O

N

THE ARCHITECTS DO NOT REPRESENT THAT

THESE PLANS OR THE SPECIFICATIONS IN

CONNECTION THEREWITH ARE SUITABLE,

WHETHER OR NOT MODIFIED, FOR ANY OTHER

SITE THAN THE ONE FOR WHICH THEY WERE

SPECIFICALLY PREPARED. THE ARCHITECTS

DISCLAIM RESPONSIBILITY FOR THESE PLANS

AND SPECIFICATIONS IF THEY ARE USED IN

WHOLE OR PART AT ANY OTHER SITE.

CONSULTANT STAMP

622 20TH STREET

SACRAMENTO CALIFORNIA 95811

(916) 930-5900 FAX (916) 930-5800

EMAIL: [email protected]

02- 115633

REVISIONS

DESCRIPTIONDATENO.

SUBMITTAL

PROJECT NO.

DRAWN BY

ISSUE DATE

CHECKED BY

SHEET NAME

KEY PLAN

AGENCY APPROVAL

FILE NO.

IDENTIFICATION STAMP

DIV. OF THE STATE ARCHITECT

OFFICE OF REGULATION SERVICES

AC FLS SS

DATE

SCUSD WEST CAMPUS

HIGH SCHOOL SCIENCE &

TECHNOLOGY BUILDING

CONSTRUCTION DOCUMENTS

04800

6/20/17

5022 58TH STREET

SACRAMENTO, CA 95820

SMN TF

INCREMENT 1

34-H7