73
BUILDING PERFORMANCE ANALYSIS REPORT Newfound Properties & Leasing Pvt. Ltd

BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

BUILDING

PERFORMANCE

ANALYSIS

REPORT

Newfound Properties & Leasing Pvt. Ltd

Page 2: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

EXECUTIVE SUMMARY

This report has been prepared for Commercial Development at New Mumbai by New Found Properties & Leasing Pvt. Ltd. This report is part of a process towards obtaining Environmental Clearance from MOEF. The specific objective of this report is to evaluate annual energy usage and apply various energy efficiency measures for ECBC Compliance for maximum Energy Efficiency.

The building was analysed using hourly energy simulation to evaluate the performance in terms of energy consumption and thermal comfort of the occupants. The purpose of this report is to present the performance of the design building in comparison to a baseline budget building based on ECBC 2007.

It is observed via various analysis tools that the building is well insulated with efficient system design & has significant energy performance. It is determined via simulation that the project is anticipated to save 25% energy over the Conventional base case & 11% over ECBC 2007.

The report is structured as follows.

Climatic Analysis

Shading Analysis

Daylight Analysis

Heat Island Effect

Heat Gain Calculation

Energy Simulation

Page 3: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

Mumbai Psychrometric Chart above explains that, no other strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies like Direct evaporative cooling, Internal heat gain and High thermal mass are also effective, but for a lesser period. Around 30% of total comfort hours can be achieved by Sun Shading. Around 27% of total comfort hours can be achieved by Natural Ventilation. From all the above strategies around 50 % of total comfort hours can be achieved by Sun Shading and Natural Ventilation & for the rest 50% of the time air conditioning may be required. For this analysis, the Comfort Criterion was set at 20 to 26 degree C for dry bulb temperature & relative humidity upto 70%.

Climate Analysis

Page 4: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

Shading Analysis

Shading analysis shows that the

buildings and their openings remains

around 22% of time in shade due to

mutual shading. Maximum shading is

achieved on north facade due to

adjacent building. Though very less, but

the effect of the shading is observed

because of mutual shading & few design

features only.

Page 5: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

Simulation Method – Clear sky condition on 21st September at 12 noon, at working plane, 750 mm. Glass VLT – 50%, Reflectances – Ceiling 70%, Wall 50% Flooring 20%

Daylight Analysis

It is clearly seen from the results that

average lux level is more than 300 in more

than 75% of the total habitable area.

Typical Floor

Page 6: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

Heat Island Effect

From the results on the right it can be clearly seen that because of measures like heat reflective paint on exposed roof, Solar Panels, Open Grid Pavers, Shaded Streets, Maximum Green Area etc. there is a considerable decrease of 72% in the Surface Absorbed Radiation resulting is reduction of Cooling Loads.

Case 1: The case has been assumed with all the proposed buildings with convectional finish on top, asphalt road and dark colored paving on site without any green space.

Case 2: The case has been proposed with light coloured road surface and paver blocks with green space in open area areas which is help to reduce urban air temperature in surroundings.

High SRI Paints Light Colored Paver Block Light Coloured & Shaded Roads Green Open Area

Case 1: The case has been assumed with all the proposed buildings with convectional finish on top, asphalt road and dark colored paving on site without any green space.

Case 2: The case has been proposed with light coloured road surface and paver blocks with green space in open area areas which is help to reduce urban air temperature in surroundings.

High SRI Paints Light Colored Paver Block Light Coloured & Shaded Roads Green Open Area Solar PV Panels Green Area

High SRI Paint Grid Pavers

Page 7: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

Heat Gain Calculation

Base case Proposed Case

Base case Proposed Case

From the results above, it is clearly seen that there is significant reduction in the internal heat gain due to wall, roof, glass conduction + solar due to measures like insulation, double & fritted glass etc.

Page 8: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

End use Electricity consumption - 13 kWh / sq.ft / yr

Energy Performance Index (EPI) - Towards High performance EPI - kWh / sq.ft. / Yr.

Energy / Carbon Footprint Analysis

Annual Energy Projection for the Baseline office building - 71,025 MWh approx. for 54,38,330 sq.ft. area. GHG emissions from annual energy consumption, GHG emission factor – India 0.9 tCO2/MWh Annual GHG emissions for baseline = 63,922 tCO2

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

1 2 3 4 5 6 7 8 9 10

Page 9: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

view from south

02

04

06

08

10

12

14

16

18

20

22

Hr

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

W/m²

1000

900

800

700

600

500

400

300

200

100

0

INCIDENT SOLAR RADIATION - Average Daily NEW DELHI, IND

02

04

06

08

10

12

14

16

18

20

22

Hr

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

W/m²

1000

900

800

700

600

500

400

300

200

100

0

INCIDENT SOLAR RADIATION - Average Daily NEW DELHI, IND

02

04

06

08

10

12

14

16

18

20

22

Hr

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

W/m²

1000

900

800

700

600

500

400

300

200

100

0

INCIDENT SOLAR RADIATION - Average Daily NEW DELHI, IND

02

04

06

08

10

12

14

16

18

20

22

Hr

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

W/m²

1000

900

800

700

600

500

400

300

200

100

0

INCIDENT SOLAR RADIATION - Average Daily NEW DELHI, IND

tim

e o

f d

ay

Horizontal Roof North-West Facade

North-East Facade

South-West Facade

An

nu

al A

vera

ge R

adia

tio

n G

rap

h

Wh/sqm

month of year

EPI - 12.77 kWh / sq.ft. / Yr. Energy Consumption = 69,447 MWh GHG Emissions = 62,503 tCO2

Building Form & Shading

Special Design Features – Effective Shading Better Orientation Optimum WWR

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

1 2 3 4 5 6 7 8 9 10

Page 10: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

Efficient Envelope

EPI - 12.41 kWh / sq.ft. / Yr. Energy Consumption = 67,490 MWh GHG Emissions = 60,741 tCO2

Wall insulation. Double Wall - 8” AAC wall + Both Side Plaster ‘U’ Value – 0. 56 W/Sq.m.K Roof insulation. 2” XPS Roof insulation entirely above deck, ‘U’ Value – 0. 404 W/Sq.m.K High performance fenestration. ‘U’ Value - 5.7 W/Sq.m.K S.C. - 0.62 V.L.T. - 51 %

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

1 2 3 4 5 6 7 8 9 10

Page 11: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

Daylight Design

EPI - 11.07 kWh / sq.ft. / Yr. Energy Consumption = 60,202 MWh GHG Emissions = 54,182 tCO2

Light Shelves shade Vision Glazing.

Provide Natural Daylight to Interiors.

Work efficiently even on Cloudy Days.

Daylight not at cost of Thermal Gains.

Reaches darker interiors.

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

1 2 3 4 5 6 7 8 9 10

Page 12: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

Efficient Lighting Systems

EPI - 10.20 kWh / sq.ft. / Yr. Energy Consumption = 55,471 MWh GHG Emissions = 49,924 tCO2

Lower Lighting Power Density. LPD - 0.8 W / sq.ft. Daylight sensors in building perimeter areas. Occupancy sensors recommended in non regularly Occupied areas e.g. store, stairs, corridors, service areas etc. Uniform & glare free distribution of Artificial light.

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

1 2 3 4 5 6 7 8 9 10

Page 13: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

Space Cooling

EPI - 10.17 kWh / sq.ft. / Yr. Energy Consumption = 55,308 MWh GHG Emissions = 49,777 tCO2

Efficient Air-conditioning VRV System COP more than 4.0 Less Noise equipment

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

1 2 3 4 5 6 7 8 9 10

Page 14: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

Parking Ventilation

EPI - 10.11 kWh / sq.ft. / Yr. Energy Consumption = 54,982 MWh GHG Emissions = 49,483 tCO2

Use of CO Sensors Jet Fan Ventilation Less Fan Energy Effective Ventilation

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

1 2 3 4 5 6 7 8 9 10

Page 15: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

External Lighting Applications

EPI - 9.92 kWh / sq.ft. / Yr. Energy Consumption = 53,948 MWh GHG Emissions = 48,553 tCO2

Reducing external lighting load. Reduce façade lighting. Signage systems with LED’s. Use of timers & sensors. Use of efficient luminaries.

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

1 2 3 4 5 6 7 8 9 10

Page 16: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

Data Server Loads

Arranging racks in such a way to have every alternate aisle as cold aisle or hot aisle to save energy loss. With under floor air distribution, this can be achieved. Structured cabling & sealed plenums opening to prevent restriction to air flow & leakage of conditioned air.

EPI - 9.80 kWh / sq.ft. / Yr. Energy Consumption = 53,316 MWh GHG Emissions = 47,978 tCO2

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

1 2 3 4 5 6 7 8 9 10

Ambient Lights 1.46

Misc Equip 3.48

Hot Water 0.20

Space Cooling

2.71

Vent Fans 1.01

Exterior Usage 0.27

SAVINGS 3.20

Page 17: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

Solar PV

EPI - 9.72 kWh / sq.ft. / Yr. Energy Consumption = 52,861 MWh GHG Emissions = 47,575 tCO2

RETScreen is a widely used software for

renewable energy calculations. Considering

the Sun Path of Mumbai city, it is

recommended to install PV cells on south

side at an angle of 20 Degree facing South for

maximum average efficiency round the year.

It is calculated that, solar panels of 450 kWp

capacity will generate around 1750 KWh per

day electricity annually.

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

1 2 3 4 5 6 7 8 9 10

Page 18: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

Energy Savings

EPI - 9.72 kWh / sq.ft. / Yr. Energy Consumption = 52,861 MWh GHG Emissions = 47,575 tCO2

EPI - 13.0 kWh / sq.ft. / Yr. Energy Consumption = 71,025 MWh GHG Emissions = 63,922 tCO2

Sola

r Shadin

g

Daylight

Harv

esting

Natu

ral

Ventila

tion

Desig

ned

Lig

hting

Effic

ient

HVAC s

yste

m

Basem

ent

Ventila

tion

Sta

ndard

Perf

orm

ance

Sola

r Photo

voltaic

Inte

rnal

Loads

Exte

rnal

Loads

Ventila

tion

Loads

Standard Performance

Efficient Design

25% Reduction Over Conventional Case 11% Reduction Over ECBC Case

ECBC Performance

Page 19: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

Building Design Parameters

Sr.No. Model Input Parameter Baseline Case as per

Conventional Design

Baseline Case as per

ECBC Parameters Proposed Case

1. Exterior Wall Const U factor = 1.873 W/Sq.m.K U factor = 0.440 W/Sq.m.K U factor = 0. 56 W/Sq.m.K

2. Roof Construction U factor = 2.271 W/Sq.m.K U factor = 0.409 W/Sq.m.K U factor = 0. 404 W/Sq.m.K

3. Glazing

U Value : 5.7 W/Sq.m.K SC : 0.70 VLT : n/a

U Value : 5.7 W/Sq.m.K SC : 0.29 VLT : n/a

U Value : 5.7 W/Sq.m.K SC : 0.62 VLT : 51%

4. Wall Window Ratio 38 % 38 % 38%

5. Shading Devices Not Considered Not Considered As per Design

6. Lighting Power Density As per Building Area Method.

LPD : 2 W/ ft2

As per Building Area Method.

LPD : 1 W/ ft2

As per Building Area Method.

LPD : 0.8 W/ ft2

7. Occupancy Sensors Not Required Not Required Recommended in Non-Regularly

Occupied Areas

8. Daylight Sensors Not Required Not Required Recommended in building perimeter

habitable Areas

9. Ext. Lighting Efficacy 100 Lumen / W Efficacy 60 Lumen / W Efficacy 50 Lumen / W

10. Chiller Parameter VRV System Design, COP 3.5 Water Cooled Centrifugal Chillers,

COP 5.4 VRV System, COP 4.0

11. VSD’s on Chiller Not Applicable Not Applicable Not Applicable

12. Chilled Water Min.

Supply Temp Not Applicable 440F, ∆T = 120F Not Applicable

13. VFD’s on Cooling Tower Not Applicable Not Required Air Cooled System

14. Condenser Water Min.

Supply Temp Not Applicable 880F, Approach - 50F Not Applicable

15. Primary, Fire, Condenser

Pump Class Standard – 60% Standard – 60% Premium – 75%

Page 20: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

Building Design Parameters

Sr.No. Model Input Parameter Baseline Case as per

Conventional Design

Baseline Case as per

ECBC Parameters Proposed Case

16. Primary, Fire,

Condenser Motor Class Standard – 70% Standard – 70% Premium – 85%

17. HVAC System Split AC System Variable Air Volume System with reheat

Variable Refrigerant Volume

18. Heat Recovery Wheel Not Required Not Required Not Applicable

19. CO Sensors Not Applicable Not Required Recommended

20. Solar Hot Water Not Required No Hot Water Requirement No Hot Water Requirement

21. Renewable Energy Not Considered Not Required 450 kWp Proposed

22. Data Server Loads

Not Applicable Not Applicable Not Applicable

23. Process Load & EPD As per Design As per Design As per Design

24. Project EPI 13.06 kWh / Sq.ft. 10.94 kWh / Sq.ft. 9.72 kWh / Sq.ft. 25. % Savings 25.57% 11.15% -

Based on above Design & System Parameters, the project is anticipated to save 25% over the Conventional base case & 11% over ECBC 2007.

Page 21: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

THANK YOU

Page 22: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

TRAFFIC Impact Assessment Study

for

Expansion of Proposed Development of

Information Technology Park

by

Newfound Properties & Leasing Pvt. Ltd.

Prepared by

Sustainable Approach for Green Environment LLP 205, Second Floor, Bhavani Industrial Estate,

Hare Krishna Road, Opp. Main Gate of IIT Bombay

Powai, Mumbai - 400076

Page 23: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

Contents

Contents ..................................................................................................................................... ii

List of Figures .......................................................................................................................... iv

List of Tables ............................................................................................................................. v

Chapter 1 Introduction ............................................................................................................ 1

1.1 Study Background ............................................................................................................ 1

1.2 Scope of the Study ............................................................................................................ 1

1.3 Report Structure ................................................................................................................ 2

1.4 Design Parameters ............................................................................................................ 3

1.5 Entry/Exit Lane Capacity ................................................................................................. 4

Chapter 2 Project Background ............................................................................................... 5

Chapter 3 Site Appreciation, Existing Transport Network and Base Traffic .................... 7

3.1 Survey Locations .............................................................................................................. 7

3.2 Schedule of Surveys for Data Collection ......................................................................... 8

3.3 Road Inventory Survey ..................................................................................................... 8

3.3.1 Thane-Belapur Road towards Juinagar Station 9

3.3.2 Ahilya Gokul Patil Road 11

3.3.3 Thane-Belapur Road towards D. Y. Patil Stadium 12

3.3.4 S. Central Road 14

Chapter 4 Traffic Data Analysis ........................................................................................... 16

4.1 Traffic Analysis .............................................................................................................. 16

4.2 Estimation of Capacity and LoS (for current scenario – 2016) ...................................... 19

4.3 Estimation of Capacity and LoS (after 5 years scenario-2021) ...................................... 21

4.4 Estimation of Capacity and LoS (after 15 years scenario-2031) .................................... 23

4.5 Estimation of Capacity and LoS (after 25 years scenario-2041) .................................... 25

4.6 Comparison for Traffic Impact Due To Proposed Development with Current Facility . 27

4.7 Mitigation Measures ....................................................................................................... 29

Chapter 5 Parking Study Report .......................................................................................... 30

5.1 General Development Layout ......................................................................................... 30

5.1.1 Background 30

5.2 Development Layout ...................................................................................................... 30

Chapter 6 Retrieval Analysis ................................................................................................. 33

6.1 Retrieval Time Calculation ............................................................................................. 34

Chapter 7 Swept Path Analysis ............................................................................................. 36

Chapter 8 Traffic Management Plan .................................................................................... 40

8.1 Introduction .................................................................................................................... 40

8.2 Purpose of Traffic Management Plans (TMP) ............................................................... 40

8.3 Basic Principles of Work Zones Traffic Management Plans (WTMP) .......................... 41

8.4 Planning of WTMP ......................................................................................................... 42

8.5 Traffic Calming .............................................................................................................. 43

8.6 Traffic Control Measures................................................................................................ 43

Page 24: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

iii

8.7 Traffic control measure for site ...................................................................................... 44

Chapter 9 Summary and Conclusion.................................................................................... 46

9.1 Summary ......................................................................................................................... 46

9.2 Concluding Remarks ...................................................................................................... 47

Page 25: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

List of Figures

Figure 2.1 Location of Proposed Plot (Newfound Properties & Leasing Pvt. Ltd.) .................. 5

Figure 3.1 Locations for Data Collection ................................................................................... 8

Figure 3.2 Categories Wise Hourly Traffic Distribution for Thane-Belapur Road towards

Juinagar Station .................................................................................................................. 9

Figure 3.3 Hourly Total PCU and Volume Distribution for Thane-Belapur Road towards

Juinagar Station ................................................................................................................ 10

Figure 3.4 Modal Split (vehicles) for Thane-Belapur Road towards Juinagar Station ............ 10

Figure 3.5 Categories Wise Hourly Traffic Distribution for Ahilya Gokul Patil Road ........... 11

Figure 3.6 Hourly Total PCU and Volume Distribution for Ahilya Gokul Patil Road ............ 11

Figure 3.7 Modal Split (vehicles) for Ahilya Gokul Patil Road ............................................... 12

Figure 3.8 Categories Wise Hourly Traffic Distribution for Thane-Belapur Road towards D.

Y. Patil Stadium ................................................................................................................ 12

Figure 3.9 Hourly Total PCU and Volume Distribution for Thane-Belapur Road towards

D.Y.Patil Stadium ............................................................................................................. 13

Figure 3.10 Modal Split (vehicles) for Thane-Belapur Road towards D. Y. Patil Stadium ..... 13

Figure 3.11 Categories Wise Hourly Traffic Distribution for S. Central Road........................ 14

Figure 3.12 Hourly Total PCU and Volume Distribution for S. Central Road ........................ 14

Figure 3.13 Modal Split (vehicles) for S. Central Road ........................................................... 15

Figure 4.1 Road Network for Traffic Analysis ......................................................................... 17

Figure 4.2 Effect by New Development on Thane-Belapur Road towards Juinagar Station ... 27

Figure 4.3 Effect of V/C by New Development on Ahilya Gokul Patil Road ......................... 27

Figure 4.4 Effect of V/C by New Development on Thane-Belapur Road near D. Y. Patil

Stadium ............................................................................................................................. 28

Figure 4.5 Effect of V/C by New Development on S. Central Road ....................................... 28

Figure 5.1 Ground Floor Parking Plan ..................................................................................... 31

Figure 5.2 Typical Parking Floor Plan ..................................................................................... 32

Figure 7.1 Detailed Design and Dimensions of Design Car Vehicle ....................................... 36

Figure 7.2 Detailed Design and Dimensions of Design Fire Engine Vehicle .......................... 37

Figure 7.3 Swept Path Analysis for Car ................................................................................... 38

Figure 7.4 Swept Path Analysis for Fire tender........................................................................ 39

Figure 8.1 Traffic Control Measures ........................................................................................ 45

Page 26: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

v

List of Tables

Table 1.1 Description of LoS Based on V/C Ratio .................................................................... 4

Table 2.1 Building Configuration ............................................................................................... 6

Table 2.2 Details of Parking Area .............................................................................................. 6

Table 3.1 Schedule of Survey ..................................................................................................... 8

Table 4.1 Estimation of LoS Value for Maximum Peak (current scenario 2016) .................... 19

Table 4.2 Estimation of LoS Value for Current Year 2016 (Morning 8 am – 11 am) ............. 20

Table 4.3 Estimation of LoS Value for Current Year 2016 (Evening 5 pm – 8 pm) ............... 20

Table 4.4 Estimation of LoS Value for Maximum Peak (Year 2021) ...................................... 21

Table 4.5 Estimation of LoS Value for Year 2021 (Morning 8am – 11am) ............................ 21

Table 4.6 Estimation of LoS Value for Year 2021 (Evening 5pm – 8pm)............................... 22

Table 4.7 Estimation of LoS Value for Maximum Peak (Year 2031) ...................................... 23

Table 4.8 Estimation of LoS Value for Year 2031 (Morning 8am – 11am) ............................ 23

Table 4.9 Estimation of LoS Value for Year 2031 (Evening 5pm – 8pm)............................... 24

Table 4.10 Estimation of LoS Value for Maximum Peak (Year 2041) .................................... 25

Table 4.11 Estimation of LoS Value for Year 2041 (Morning 8am – 11am) .......................... 25

Table 4.12 Estimation of LoS Value for Year 2041 (Evening 5pm – 8pm) ............................. 26

Table 6.1 Parking Statement – Retrieval Analysis ................................................................... 34

Table 6.2 Building No.4 Retrieval Analysis for Emergency Scenario (100%) ........................ 34

Table 6.3 Building No.4 Retrieval Analysis for Peak scenario (40%) ..................................... 35

Page 27: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

1

Chapter 1

Introduction

1.1 Study Background

Expansion of Proposed Development of Information Technology Park located at Plot no. Gen

2/1/D, Gen 2/1/E, Gen 2/1/F in Trans Thane Creek Industrial Area, Maharashtra Industrial

Development Corporation, Juinagar, Navi Mumbai has been proposed to construct Commercial

building by Newfound Properties & Leasing Pvt. Ltd. Conducting a TIA (Traffic Impact

Assessment) is a part of the basic requirements to get any new establishment approved by the

Ministry of Environment and Forestry (MoEF). The Ministry weighs the potential benefits of the

establishment on the surrounding transportation and environmental systems against the negative

impact and decides to approve or reject the construction of the proposed establishment.

(SAGE) Sustainable Approach for Green Environment LLP has been commissioned by the

project proponent, Newfound Properties & Leasing Pvt. Ltd. to provide a Traffic Impact Study

for this project.

1.2 Scope of the Study

The entire study can broadly be broken into the following tasks:

Visit the site and understand the existing traffic pattern, traffic facilities and field

constraints.

Collect relevant traffic survey data through primary and secondary surveys for traffic

impact assessment.

Quantify the traffic volume and density for road network around the project with and

without extra demand for the coming project

Page 28: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

2

Project the traffic density for next 25 years for road network

Study the traffic impact of the development on the surrounding road network with the

consideration of future changes in the traffic and infrastructure.

Study the internal traffic within the site layout to demonstrate the vehicular speed and

space requirement.

Calculate the time requirement to exit the vehicles for disaster management plan during

peak hours.

Identify the adequacy of the transport infrastructure and the remedial measures to

improve the traffic plan.

Preparation of final report, submission and presentation to the committee.

1.3 Report Structure

The report has been organized in the following order:

Chapter 1: A brief introduction of the project

Chapter 2: Background of the project and the road network to be studied is provided

Chapter 3: The primary traffic surveys conducted to obtain the network traffic data

Chapter 4: The performance of the road network in terms of LoS for the current and the

projected future traffic and assess the impact of the proposed complex on the

LoS.

Chapter 5: Study of Parking space.

Chapter 6: Retrieval Time Calculation in case of emergency as well as peak hours.

Chapter 7: Analysis of Swept path

Chapter 8: Traffic Management Plan during the development as well as after completion

of proposed project for external and internal traffic.

Chapter 9: Summary and Conclusion.

Page 29: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

3

1.4 Design Parameters

The basic design parameters considered for the study has been illustrated below:

1. The social status as well as economic well-being of the residents plays an important role

in determining the parking demand for any residential project.

2. The visitors will expect a safe and efficient circulation with good levels of service i.e.

minimum waiting time at security check, proper traffic control at entry/exits, minimum

congestion delays and pleasing aesthetics.

3. A design vehicle is a vehicle whose dimensions and operational characteristics are used

to establish layout geometry. Toyota Innova (Big Car) and Maruti Swift (Small Car) and

Volvo 400 (Fire Tender) were chosen as the design vehicles.

4. The maximum number of traffic a road can carry is referred to as its Capacity or design

service volume. The service volumes considered for the project is given below:

Type of Roadway Road Capacity* Category

4-Lane Divided (Two Way) 3600 Arterial

8-Lane Divided (Two Way) 7200 Arterial *Indian Road Congress 106:1990 Urban Road Capacity

5. Level of Service (LoS) can be defined as a letter designation that describes a range of

operating characteristics on a given facility. Six Levels of Services are defined for

capacity analysis. They are given letter designations from A to F, with LoS ‘A’

representing best level of operational standards and LoS ‘F’ the worst.

Page 30: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

4

Table 1.1 Description of LoS Based on V/C Ratio

Level of Service

(LoS)

Volume / Capacity

Ratio (V/C) Level of Comfort Nature of flow

A <0.30 Highest Free flow

B 0.30 – 0.50 Reasonably free flow

C 0.50 – 0.70 Stable flow

D 0.70 – 0.90 Threshold Approaching

unstable flow

E 0.90 – 0.99 Unstable flow

F ≥1 Lowest Forced Flow

1.5 Entry/Exit Lane Capacity

Entry / Exit Lane Capacity for Car Parks

Sr.

No. Type of Entry

Capacity

(Veh/hour/lane)

1

Free flow access into internal distributor road/structure (no parking

spaces immediately after access i.e. Car Hoist distributing to several

levels of car park)

800

2 Free flow access 580

3 Lifting-arm barrier without ticket issue 550

4 Lifting-arm barrier with automatic ticket issue (push button) 360

5 Lifting-arm barrier with access card (slot-based) 235

6 Lifting-arm barrier with transponder (no slot – RFID etc.) 380

Sr.

No. Type of Exit

Capacity

(Veh/hour/lane)

1 Ticket on entry and payment at a manned exit 240

2 Lifting-arm barrier without ticket issue 550

3 Ticket on entry and variable payment to a machine linked to the exit

barrier 270

4 Ticket on entry and operation of the exit barrier by a prepaid ticket or

token 400

5 Free flow exit Analysis based on specific

road layout (i.e. yield etc.) *Rates based on: Design recommendations for multistory and underground car parks, Institute of Structural Engineers, 3rd

Edition, June 2002 and HBS 2001, FGSV Vertag, January 2002

As per international practices it is preferred to restrict the queue length to around 18m i.e. 3

vehicles. This is also linked with space availability at site for queuing.

Page 31: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

5

Chapter 2

Project Background

The plot is situated at Maharashtra Industrial Development Corporation, Juinagar, Navi Mumbai.

The plot is surrounded by different commercial buildings .The location of the plot is suitable for

commercial development.

The figure below shows the location of Newfound Properties & Leasing Pvt. Ltd. proposed site

by.

Figure 2.1 Location of Proposed Plot (Newfound Properties & Leasing Pvt. Ltd.)

Page 32: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

6

Table 2.1 Building Configuration

Building Number Number of Floors Proposed

1 Stilt + 3 Parking + 8 Office Floors. + Part 9th

2 Part Stilt + 4 Office Floors.+ Part 5th

3 Stilt + 3 Parking + 8 Office Floors.+ Part 9th

4 Basement + Stilt + 6 Parking + 12 Office Flrs. + Part 13th

5 Stilt + 1Parking + 8 Office Floors.

6 Stilt + 1Parking + 8 Office Floors.

7 Stilt + 1Parking + 8 Office Floors.

8 Stilt + 1Parking + 8 Office Floors.

9 (Existing Structure at site) Ground + 1 (Existing Structure at Site to be Retained)

10 Stilt + 1Parking + 8 Office Floors.

11 Stilt + 1 Parking + 7 Office Floors.

12 Stilt + 1 Parking + 7 Office Floors.

14 Stilt + 1 Parking + 7 Office Floors.

15 Stilt + 1 Parking + 7 Office Floors.

16 Stilt + 1 Parking + 7 Office Floors.

Table 2.2 Details of Parking No for bldg no. 4

Floor No. of Car Parking

Open Parking 126

Stilt Parking 453

1st - 6th Floor Podium 728

Total 907

Page 33: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

7

Chapter 3

Site Appreciation, Existing Transport Network and Base

Traffic

Extensive surveys were conducted on the road network around proposed project for getting the

primary data related to the road network. The extensive surveys include - Road Inventory

Surveys for network geometry.

3.1 Survey Locations

Page 34: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

8

Figure 3.1 Locations for Data Collection

3.2 Schedule of Surveys for Data Collection

Table 3.1 Schedule of Survey

Sr. No. Location Date

1 Thane-Belapur Road towards Juinagar Station 11/08/2016

2 Ahilya Gokul Patil Road 11/08/2016

3 Thane-Belapur Road towards D.Y.Patil Stadium 11/08/2016

4 S. Central Road 11/08/2016

3.3 Road Inventory Survey

Traffic survey was conducted for 12 hours to understand the hourly traffic variation for the

roads. The hourly traffic distribution for different vehicles for all the mentioned locations has

been illustrated in the below figures:

Page 35: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

9

3.3.1 Thane-Belapur Road towards Juinagar Station

Figure 3.2 Categories Wise Hourly Traffic Distribution for Thane-Belapur Road towards

Juinagar Station

Page 36: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

10

Figure 3.3 Hourly Total PCU and Volume Distribution for Thane-Belapur Road towards

Juinagar Station

Figure 3.4 Modal Split (vehicles) for Thane-Belapur Road towards Juinagar Station

Page 37: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

11

3.3.2 Ahilya Gokul Patil Road

Figure 3.5 Categories Wise Hourly Traffic Distribution for Ahilya Gokul Patil Road

Figure 3.6 Hourly Total PCU and Volume Distribution for Ahilya Gokul Patil Road

Page 38: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

12

Figure 3.7 Modal Split (vehicles) for Ahilya Gokul Patil Road

3.3.3 Thane-Belapur Road towards D. Y. Patil Stadium

Figure 3.8 Categories Wise Hourly Traffic Distribution for Thane-Belapur Road towards

D. Y. Patil Stadium

Page 39: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

13

Figure 3.9 Hourly Total PCU and Volume Distribution for Thane-Belapur Road towards

D.Y.Patil Stadium

Figure 3.10 Modal Split (vehicles) for Thane-Belapur Road towards D. Y. Patil Stadium

Page 40: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

14

3.3.4 S. Central Road

Figure 3.11 Categories Wise Hourly Traffic Distribution for S. Central Road

Figure 3.12 Hourly Total PCU and Volume Distribution for S. Central Road

Page 41: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

15

Figure 3.13 Modal Split (vehicles) for S. Central Road

Page 42: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

16

Chapter 4

Traffic Data Analysis

4.1 Traffic Analysis

The road network around proposed site was analysed to determine its performance in order to

observe the current traffic and the projected traffic for the coming 25 years. To measure the

network performance, volume by capacity ratio (V/C) and Level of Services (LoS) were

calculated as per IRC recommendations.

Urban network is also analysed in terms of V/C ratio and LoS. This analysis is done for the four

major and minor roads which will get affected by the traffic of proposed project.

Page 43: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

17

Figure 4.1 Road Network for Traffic Analysis

Roads on which analysis has been done are described below :

Thane-Belapur Road towards Juinagar Station.

Ahilya Gokul Patil Road.

Thane-Belapur Road towards D. Y. Patil Stadium.

S. Central Road.

Page 44: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

18

Methodology Adopted for the Traffic Analysis

1. The first step was to calculate the traffic of this road network for coming twenty years

with the growth rate of 5% per year.

2. Volume of the traffic is converted to PCU (Passenger Car Unit) based on the number of

vehicles and by using the appropriate conversion factor for each type of vehicle.

3. The relevant Design Service Volume (DSV) of each road has been taken as the capacity

as per IRC 106 – 1990.

4. Level of Services (LoS) is identified for each road for each study year on the basis of

Volume by Capacity ratio for the particular road.

5. The LoS has been calculated with and without the new development to identify the

impact of proposed complex on present as well as future traffic on the road network.

Page 45: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

19

4.2 Estimation of Capacity and LoS (for current scenario – 2016)

Following analysis is done by considering theoretical capacity of roads. In this analysis the

vehicles parked at the road side has not been considered.

Table 4.1 Estimation of LoS Value for Maximum Peak (current scenario 2016)

Road Type of

Carriageway

Road

Category

Total

PCU

(Without

Project)

Total

PCU

(With

Project)

V/C

(Without

Project)

V/C

(With

Project)

LoS

(Without

Project)

LoS

(With

Project)

Thane-Belapur

Road towards

Juinagar

Station

8-Lane

Divided Arterial 3545 6390 0.34 0.62 B C

Ahilya Gokul

Patil Road

4-Lane

Divided Arterial 1540 2840 0.30 0.55 A C

Thane-Belapur

Road near

D.Y.Patil

Stadium

8-Lane

Divided Arterial 3570 6765 0.35 0.66 B C

S. Central Road 4-Lane

Divided Arterial 1421 1886 0.28 0.37 A B

Page 46: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

20

Table 4.2 Estimation of LoS Value for Current Year 2016 (Morning 8 am – 11 am)

Road Type of

Carriageway

Road

Category

Total

PCU

(Without

Project)

Total

PCU

(With

Project)

V/C

(Without

Project)

V/C

(With

Project)

LoS

(Without

Project)

LoS

(With

Project)

Thane-Belapur

Road towards

Juinagar

Station

8-Lane

Divided Arterial 3353 6198 0.33 0.60 B C

Ahilya Gokul

Patil Road

4-Lane

Divided Arterial 1484 2784 0.29 0.54 A C

Thane-Belapur

Road near

D.Y.Patil

Stadium

8-Lane

Divided Arterial 3334 6529 0.32 0.63 B C

S. Central Road 4-Lane

Divided Arterial 1044 1509 0.20 0.29 A A

Table 4.3 Estimation of LoS Value for Current Year 2016 (Evening 5 pm – 8 pm)

Road Type of

Carriageway

Road

Category

Total

PCU

(Without

Project)

Total

PCU

(With

Project)

V/C

(Without

Project)

V/C

(With

Project)

LoS

(Without

Project)

LoS

(With

Project)

Thane-Belapur

Road towards

Juinagar

Station

8-Lane

Divided Arterial 3321 6166 0.32 0.60 B C

Ahilya Gokul

Patil Road

4-Lane

Divided Arterial 1515 2815 0.29 0.55 A C

Thane-Belapur

Road near

D.Y.Patil

Stadium

8-Lane

Divided Arterial 3357 6552 0.33 0.64 B C

S. Central Road 4-Lane

Divided Arterial 955 1420 0.19 0.28 A A

Page 47: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

21

4.3 Estimation of Capacity and LoS (after 5 years scenario-2021)

Table 4.4 Estimation of LoS Value for Maximum Peak (Year 2021)

Road Type of

Carriageway

Road

Category

Total

PCU

(Without

Project)

Total

PCU

(With

Project)

V/C

(Without

Project)

V/C (With

Project)

LoS

(Without

Project)

LoS

(With

Project)

Thane-Belapur

Road towards

Juinagar Station

8-Lane

Divided Arterial 4525 7370 0.44 0.72 B D

Ahilya Gokul

Patil Road

4-Lane

Divided Arterial 1965 3265 0.38 0.72 B D

Thane-Belapur

Road near

D.Y.Patil

Stadium

8-Lane

Divided Arterial 4556 7751 0.44 0.75 B D

S. Central Road 4-Lane

Divided Arterial 1813 2278 0.35 0.44 B B

Table 4.5 Estimation of LoS Value for Year 2021 (Morning 8am – 11am)

Road Type of

Carriageway

Road

Category

Total

PCU

(Without

Project)

Total

PCU

(With

Project)

V/C

(Without

Project)

V/C (With

Project)

LoS

(Without

Project)

LoS

(With

Project)

Thane-Belapur

Road towards

Juinagar

Station

8-Lane

Divided Arterial 4279 7124 0.42 0.69 B C

Ahilya Gokul

Patil Road

4-Lane

Divided Arterial 1894 3194 0.37 0.62 B C

Thane-Belapur

Road near

D.Y.Patil

Stadium

8-Lane

Divided Arterial 4255 7450 0.41 0.72 B D

S. Central Road 4-Lane

Divided Arterial 1333 1798 0.26 0.35 A B

Page 48: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

22

Table 4.6 Estimation of LoS Value for Year 2021 (Evening 5pm – 8pm)

Road Type of

Carriageway

Road

Category

Total

PCU

(Without

Project)

Total

PCU

(With

Project)

V/C

(Without

Project)

V/C (With

Project)

LoS

(Without

Project)

LoS

(With

Project)

Thane-Belapur

Road towards

Juinagar

Station

8-Lane

Divided Arterial 4239 7084 0.41 0.69 B C

Ahilya Gokul

Patil Road

4-Lane

Divided Arterial 1934 3234 0.38 0.63 B C

Thane-Belapur

Road near

D.Y.Patil

Stadium

8-Lane

Divided Arterial 4284 7479 0.42 0.73 B D

S. Central

Road

4-Lane

Divided Arterial 1219 1684 0.24 0.33 A B

Page 49: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

23

4.4 Estimation of Capacity and LoS (after 15 years scenario-2031)

Table 4.7 Estimation of LoS Value for Maximum Peak (Year 2031)

Road Type of

Carriageway

Road

Category

Total

PCU

(Without

Project)

Total

PCU

(With

Project)

V/C

(Without

Project)

V/C

(With

Project)

LoS

(Without

Project)

LoS

(With

Project)

Thane-Belapur

Road towards

Juinagar

Station

8-Lane

Divided Arterial 7371 10216 0.72 0.99 D E

Ahilya Gokul

Patil Road

4-Lane

Divided Arterial 3201 4501 0.62 0.88 C D

Thane-Belapur

Road near

D.Y.Patil

Stadium

8-Lane

Divided Arterial 7421 10616 0.72 1.03 D F

S. Central Road 4-Lane

Divided Arterial 2954 3419 0.57 0.66 C C

Table 4.8 Estimation of LoS Value for Year 2031 (Morning 8am – 11am)

Road Type of

Carriageway

Road

Category

Total

PCU

(Without

Project)

Total

PCU

(With

Project)

V/C

(Without

Project)

V/C (With

Project)

LoS

(Without

Project)

LoS

(With

Project)

Thane-Belapur

Road towards

Juinagar

Station

8-Lane

Divided Arterial 6971 9816 0.68 0.95 C E

Ahilya Gokul

Patil Road

4-Lane

Divided Arterial 3085 4385 0.60 0.85 C D

Thane-Belapur

Road near

D.Y.Patil

Stadium

8-Lane

Divided Arterial 6931 10126 0.67 0.98 C E

S. Central Road 4-Lane

Divided Arterial 2171 2636 0.42 0.51 B C

Page 50: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

24

Table 4.9 Estimation of LoS Value for Year 2031 (Evening 5pm – 8pm)

Road Type of

Carriageway

Road

Category

Total

PCU

(Without

Project)

Total

PCU

(With

Project)

V/C

(Without

Project)

V/C (With

Project)

LoS

(Without

Project)

LoS

(With

Project)

Thane-Belapur

Road towards

Juinagar

Station

8-Lane

Divided Arterial 6905 9750 0.67 0.95 C E

Ahilya Gokul

Patil Road

4-Lane

Divided Arterial 3150 4450 0.61 0.87 C D

Thane-Belapur

Road near

D.Y.Patil

Stadium

8-Lane

Divided Arterial 6978 10173 0.68 0.99 D E

S. Central

Road

4-Lane

Divided Arterial 1986 2451 0.39 0.48 B B

Page 51: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

25

4.5 Estimation of Capacity and LoS (after 25 years scenario-2041)

Table 4.10 Estimation of LoS Value for Maximum Peak (Year 2041)

Road Type of

Carriageway

Road

Category

Total

PCU

(Without

Project)

Total

PCU

(With

Project)

V/C

(Without

Project)

V/C (With

Project)

LoS

(Without

Project)

LoS

(With

Project)

Thane-Belapur

Road towards

Juinagar

Station

8-Lane

Divided Arterial 12006 14851 1.17 1.44 F F

Ahilya Gokul

Patil Road

4-Lane

Divided Arterial 5214 6514 1.01 1.27 F F

Thane-Belapur

Road near

D.Y.Patil

Stadium

8-Lane

Divided Arterial 12088 15283 1.18 1.49 F F

S. Central Road 4-Lane

Divided Arterial 4811 5276 0.94 1.03 E F

Table 4.11 Estimation of LoS Value for Year 2041 (Morning 8am – 11am)

Road Type of

Carriageway

Road

Category

Total

PCU

(Without

Project)

Total

PCU

(With

Project)

V/C

(Without

Project)

V/C (With

Project)

LoS

(Without

Project)

LoS

(With

Project)

Thane-Belapur

Road towards

Juinagar

Station

8-Lane

Divided Arterial 11354 14199 1.10 1.38 F F

Ahilya Gokul

Patil Road

4-Lane

Divided Arterial 5025 6325 0.98 1.23 F F

Thane-Belapur

Road near

D.Y.Patil

Stadium

8-Lane

Divided Arterial 11290 14485 1.10 1.41 F F

S. Central Road 4-Lane

Divided Arterial 3537 4002 0.69 0.78 C D

Page 52: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

26

Table 4.12 Estimation of LoS Value for Year 2041 (Evening 5pm – 8pm)

Road Type of

Carriageway

Road

Category

Total

PCU

(Without

Project)

Total

PCU

(With

Project)

V/C

(Without

Project)

V/C (With

Project)

LoS

(Without

Project)

LoS

(With

Project)

Thane-Belapur

Road towards

Juinagar Station

8-Lane

Divided Arterial 11248 14093 1.09 1.37 F F

Ahilya Gokul

Patil Road

4-Lane

Divided Arterial 5132 6432 1.00 1.25 F F

Thane-Belapur

Road near

D.Y.Patil

Stadium

8-Lane

Divided Arterial 11366 14561 1.11 1.42 F F

S. Central Road 4-Lane

Divided Arterial 3235 3700 0.63 0.72 C D

Page 53: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

27

4.6 Comparison for Traffic Impact Due To Proposed Development

with Current Facility

Effect of V/C new development on Thane-Belapur Road towards Juinagar Station

Figure 4.2 Effect by New Development on Thane-Belapur Road towards Juinagar Station

Effect of V/C new development on Ahilya Gokul Patil Road

Figure 4.3 Effect of V/C by New Development on Ahilya Gokul Patil Road

Page 54: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

28

Effect of V/C new development on Thane-Belapur Road near D. Y. Patil Stadium

Figure 4.4 Effect of V/C by New Development on Thane-Belapur Road near D. Y. Patil

Stadium

Effect of V/C new development on S. Central Road

Figure 4.5 Effect of V/C by New Development on S. Central Road

Page 55: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

29

4.7 Mitigation Measures

The Railway Project between Nerul and Belapur-Seawoods-Uran is approved by Ministry of

Railways and CIDCO which is in progress. The total length of the corridor is 27 km and consists

of 10 stations; 4 major bridges; 5 ROBs; Provisions are made for one arm of the railway line to go

to Belapur station from Sagarsangam (Kille). The distance from site to Nerul Railway station is

3.7 km.

Also Five Metro Rail Corridors have been finalized in Navi Mumbai by Govt. of Maharashtra.

NMMC is implementing authority for Corridor IV Dighe-Turbhe-Belapur. The total length of

corridor is 20 km.

These upcoming public transport alternatives are expected to reduce the PCU load and improve

the LOS.

Page 56: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

30

Chapter 5

Parking Study Report

5.1 General Development Layout

5.1.1 Background

Newfound Properties & Leasing Pvt. Ltd, has planned Commercial development at Juinagar Navi

Mumbai. This site is well accessed by Public Transport i.e. Railway station, Bus stand.

5.2 Development Layout

The details of the Proposed Commercial Development are given below:

The total parking facility proposed for this development is some 1320 parking bays for

Building No.4.

The parking statement of vehicles is presented in Table 2.2

The internal traffic circulation and the parking facility at Ground level are presented in following

figures.

Figures 5.1, Figure 5.2, represent the Ground Floor Parking Plan and Typical Parking

Floor Plan respectively.

Page 57: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

31

Figure 5.1 Ground Floor Parking Plan

Page 58: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

32

Figure 5.2 Typical Parking Floor Plan

Page 59: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

33

Chapter 6

Retrieval Analysis

It is important to ensure the safety of each of the occupant of the project during an emergency via

proper DMP. In addition to safety of residents, the vehicles from each parking floor should be also

be retrieved in a systemic manner. The planning of this retrieval is necessary in case of multilevel

parking’s to ensure smooth retrieval in quickest possible time.

The main objective of this analysis is to determine the total time required to vacate the entire

parking area. In this project, 1320 parking spaces are provided for Building No.4.

Assumptions:

1. Speed for Cars = 15 kmph on straight 10 kmph at curves

2. Headway for Cars = 1 m

3. During an emergency, all Car exits will be used for evacuation (exit)

4. During emergency, there will be simultaneous retrieval from multiple Exits

5. During emergency, the adjoining area will be cordoned off with help of police and

Retrieval will be marshalled with help of security wardens

6. Cars will be retrieved one level after other

7. Retrieval Time for each car includes the backup manoeuvre and slow down at turns

8. The principle of LIFO (Last In First Out) will be applied

9. Initial Delay and Circulation Delay time is considered

Sr. No. Description Value

1 Average speed of vehicle within parking lot 15 kmph (4.1 m/sec)

2 Average speed of vehicles on Car Hoists/turns 10 kmph (2.8 m/sec)

3 Space headway considered 1 m

4 Time headway considered 0.4 second (@10 kmph)

Page 60: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

34

Table 6.1 Parking Statement – Retrieval Analysis (Building 4)

Floor No. of Car Parking Remarks

Open Parking 126 Direct exit

Stilt Parking 453 Direct exit

1st - 6th Floor Podium 728 Via Ramp

Total 907

6.1 Retrieval Time Calculation

During peak morning hour, when office going traffic will be predominant, there will be a high

demand of vehicles, i.e. it would be required to retrieve 40% of total vehicles. The total time taken

for retrieval of cars from each floor was calculated. This has been illustrated in Table No. 6.2 and

table No.6.3.

Table 6.2 Building No.4 Retrieval Analysis for Emergency Scenario (100%)

Building No.4 No. of cars in

lane width

Total

cars Exit lane Retrieval Time

Open Parking 2 126 2 1.67

Stilt parking 2 453 2 3.7

1st - 6th Floors Podium 2 728 2 22.2

Total 27

Page 61: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

35

Table 6.3 Building No.4 Retrieval Analysis for Peak scenario (40%)

Building No. No. of cars in lane width Total cars Exit lane Retrieval Time

Open Parking 2 50 1 1.53

Stilt parking 2 181 1 3.5

1st - 6th Floors Podium 2 291 1 21.0

Total 26

Considering simultaneous retrieval of Cars for circulation issue and unforeseen delays, retrieval

time of cars from Ground Floor is 27 minutes during Emergency for cars and 26 minutes during

Peak hours.

Page 62: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

36

Chapter 7

Swept Path Analysis

It is the analysis of the path of the design vehicle undertaking a moment and/or a turning

manoeuvre. At a basic level this includes calculating the Thread of each wheel during the turn and

also calculating the manoeuvring space needed by the vehicle body (front & rear overhang). This

is carried out using swept path analysis which demonstrates the following analysis:

1. To study the internal traffic plan layout for movement of the designed vehicle and space

requirement.

2. To carry out the swept path analysis of vehicular movement for the proposed site layout at

turning point of plan layout.

3. To suggest the solutions for free flow movement of internal traffic and possible geometric

congestions at the site.

Figure 7.1 Detailed Design and Dimensions of Design Car Vehicle

Page 63: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

37

Figure 7.2 Detailed Design and Dimensions of Design Fire Engine Vehicle

Note: Speed for fire tender movement = 10 kmph on straight 5 kmph at curves.

Page 64: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

38

Figure 7.3 Swept Path Analysis for Car

Page 65: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

39

Figure 7.4 Swept Path Analysis for Fire tender

Page 66: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

40

Chapter 8

Traffic Management Plan

8.1 Introduction

The road construction and maintenance activities are the integral part of road network

development particularly for developing and transitional economies. The road work zones are

areas of conflict between normal operating traffic, construction workers, road building

machineries and construction traffic. Work zone accidents are caused by several factors such as

frequently changing environment that occurs during road work whereby the driver is often

surprised, insufficient warning signs foe normal and construction traffic, lack of audible warning

to workers and inadequate provisions of safety devices to protect workers. An ideal way to reduce

work zone accidents is to create a working area that does not influence the normal traffic flow by

segregating and shielding the site.

To ensure safety of all, there is a need to adopt an efficient and effective plan for management of

traffic. Work Zone Traffic Management Plans (WZTMP) are required to meet the safety needs of

regular traffic as well as work traffic, ensuring minimum disruption in access to properties and

movement of pedestrians.

8.2 Purpose of Traffic Management Plans (TMP)

The primary purpose of the Traffic Management Plans is to provide for the reasonably safe and

efficient movement of road users through or around the work zones while reasonably protecting

the workers and equipment. When the normal function of the roadway is affected with the

presence of workers and equipment, the TMP provides for continuity of the movement for motor

vehicle, bicycle and pedestrian traffic, transit operations and access to properties and utilities.

Page 67: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

41

Work zones present constantly changing conditions that are not expected by the road users, which

creates an even higher degree of vulnerability for the workers present near the roadway. A

concurrent objective of the TMP is the efficient construction and maintenance of the highway, as

well as efficient resolution of traffic incidents, if any, likely to occur in the work zone. The TMP,

therefore, should facilitate the smooth and efficient flow of traffic as well as safe working

environment.

8.3 Basic Principles of Work Zones Traffic Management Plans

(WTMP)

The basic safety principles governing the design of roadways should also govern the design of

Work Zones Traffic Management Plans (WTMP). While designing the WTMP, all care needs to

be taken so that anyone coming along the road or the footpath from any direction understands

exactly what is happening and what is expected of him/her.

The aim should be to facilitate the passage of road users through such work zones using roadway

geometrics, roadside features and Traffic Control (TC) devices comparable to those for normal

highway operations. Thus, road user movement should be free from any hazard with the following

aspects in view:

WTMP at work sites should be designed on the assumption that drivers will only reduce

their speeds if they clearly perceive a need to do so. Frequent and abrupt changes in

geometrics such as lane narrowing, dropped lanes, or main roadway transitions, that

require rapid manoeuvres, need to be avoided.

Provisions should be made for the safe operation of work, particularly on high-speed, high-

volume roads.

Bicyclists and pedestrians, including those with disabilities, should be provided with access

and safe passage through the work zones. Bicyclists and pedestrians should be guided in a

clear and positive manner while approaching and traversing the work zones.

Page 68: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

42

Roadway occupancy (i.e. using the roadway for construction activities) should be

scheduled during off-peak hours, and if necessary, night work should be considered after

carefully assessing its pros and cons.

Road users and worker safety and accessibility in work zones should be an integral and

high-priority element of every project, from planning through design and construction.

Early co-ordination with officials having jurisdiction over the affected cross streets and

those providing emergency services, should take place before roadway or side street

closings.

Special plan preparation and co-ordination with transit, other highway agencies, law

enforcement and other emergency units, utilities, schools and railways are needed for

reducing unexpected and unusual road users resistance.

Special attention may be needed to regulate and control heavy commercial vehicle traffic

in the work zones.

8.4 Planning of WTMP

The planning and designing of WTMP should be based on some of the important considerations:

1. Provide safety for road users and workers

2. Minimize hindrance or delay to road users

3. Provide clear and positive guidance to road users

4. Ensure roadside safety maintenance

5. Ensure that planners and decision makers have the necessary knowledge

6. Provide good public relations

Page 69: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

43

8.5 Traffic Calming

A Traffic Management plan indicating traffic circulation, traffic calming and traffic control is

indicated. Traffic calming is intended to slow and control motor-vehicle traffic in order to improve

safety for pedestrians and bicyclists. Traffic calming measures are of various types like speed

tables, curb extension, chicane etc. These are mitigation measures to ensure safety.

8.6 Traffic Control Measures

The internal roads are undivided to maintain flexibility of traffic lanes. Minimum 6m wide

roadway width has been provided for the movement of vehicles. Recommended design speed on

the internal road is 15kmph and on the turns is 10kmph. Speed tables will be provided near the

entrance/exit point to control traffic and regulate speed of vehicles. An illustrative picture is also

shown in Figure 7.1. Additionally, the following shall be required to maintain traffic flow at

required level of service.

Road Markings and Signages: Proper road markings (edge, median, arrows, turning, Kerb)

and Signages (direction, turning, speed, and pedestrian crossings) will be installed and

maintained on all roads in the vicinity of project premises.

On-street parking will be prohibited on all external and internal streets.

Pick and drop at designated places only.

Preferably no U-Turn on roadway

Traffic calming measures – speed tables, signage Apart from internal signage – it will be

requested to provide necessary signage and traffic control measures, on neighbouring

roads, – such as Speed limit, Left hand curve, pedestrian crossing etc.

Page 70: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

44

8.7 Traffic control measure for site

The plot is situated at Shahad, Kalyan. The plot is surrounded by commercial and residential

buildings. The location of the plot is suitable for commercial and residential development. To

Provide Safety within the layout of the project some internal traffic control measures are given

below.

1. Speed Bumps will be provided at entry/exits as well as on longer distances.

2. Safety Mirrors at curve ends will be installed as safety measure and to give a proper view

of the approaching vehicles.

3. Signage’s to specify speed limit on curves and straight road, no parking zones, disabled

parking etc. will be installed at respective locations.

4. Fire Extinguisher will be installed at multiple points in case of emergency.

5. Floor Markings will be provided to denote the parking space, reserve parking, visitors

parking, etc.

6. Sufficient Lights at proper distances will be installed to prevent collision and accidents

during night time.

7. Pedestrian Crossing will be marked for safe road crossing.

Page 71: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

45

Figure 8.1 Traffic Control Measures

Page 72: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

46

Chapter 9

Summary and Conclusion

9.1 Summary

The first chapter provided a brief introduction to the presented study and the study area. All the

steps needed to be done in the project were also listed, and the structure of the report was

provided.

The second chapter provided basic information regarding the proposed establishments. The

connectivity of the study area was discussed. Background of the study road network was also

provided.

The third chapter listed down the surveys conducted to generate the basic and primary traffic data

for the study network as well as the residential complex. The summaries of the surveys were

presented.

The fourth chapter dealt with the congestion and LoS analysis of the roads in the network. The

impact of the new development was quantified in terms of V/C ratio. Also, impact analyses for

long term period were carried out with project and without project. Here, it has been analysed for

the coming 25 years with the 10-year intervals. The years in which any road was reaching its

theoretical capacity was also identified.

The fifth chapter is all about parking space proposed for this project.

The sixth chapter gives the retrieval time in case of emergency as well as for peak hours for

proposed project.

The Seventh Chapter gives the ideal movement of car and Fire truck for free movement in parking

at straight path and at curves

Page 73: BUILDING PERFORMANCE ANALYSIS REPORTenvironmentclearance.nic.in/writereaddata/online/... · strategy is effective for passive comfort except Solar Shading & Natural Ventilation. Strategies

47

The eighth chapter is giving idea about traffic management plan during the project development

and after completion of proposed project.

9.2 Concluding Remarks

Traffic Impact (Current Scenario):

Traffic impact analysis shows that, generated traffic from the proposed new development will not

have considerable impact because road width is wider and traffic density is lower. Also, maximum

LoS of each road of the this road network is good as presented in Table 4.1 on the surrounding road

network in terms of V/C ratio and Level of Service (LoS). It was also noted that, with all these

changes, most of the roads are providing acceptable level of service. LoS C represents a condition of

stable flow with average travel speed. Peak hour traffic impact of the entire residential development

on the roads is between 8 am to 11 pm (morning peak hours) and 5 pm to 8 pm (evening peak hours).

All the analysed roads i.e. Thane-Belapur Road towards Juinagar Station, Ahilya Gokul Patil Road,

Thane-Belapur Road towards D. Y. Patil Stadium and S.Central Road have Level of Service between

B to D for without project estimation.

Traffic Impact (Future Scenario):

Traffic congestion level for future scenario at study area was analysed and their results shows the

changes in V/C ratio and Level of Service. This would have significant impact on the future traffic

scenario which will be mitigated as per the measures provided in Chapter 4.7.