CASAFE CONSTRUCCIONES Y PROYECTOS, S.R.L. DE C.V., DESIGN OF DETAIL ENGINEERING, JOHNSON CONTROL’S PLANT—CELAYA, MEXICO (2016) Managing Director DESCRIPTION: Preparation of detail engineering design for the expansion of the existing plant in two additional sections, north and south; Approximately 1,750 m2. Topography, foundations, structures, horizontal and vertical decks, sanitary drainage, rainwater, potable water lines, floor slabs, sidewalks, kerbstone and architectural facades. Preparation of catalogs of concepts, for the bidding of the execution of the works. TOTAL GLOBAL VALUE: 2 million USD.

Breviary Photographic Projects

Embed Size (px)

Citation preview

Page 1: Breviary Photographic Projects

CASAFE CONSTRUCCIONES Y PROYECTOS, S.R.L. DE C.V., DESIGN OF DETAIL

ENGINEERING, JOHNSON CONTROL’S PLANT—CELAYA, MEXICO (2016)

Managing Director

DESCRIPTION:

Preparation of detail engineering design for the expansion of the existing plant in two additional sections, north and south; Approximately 1,750 m2. Topography, foundations, structures, horizontal and vertical decks, sanitary drainage,

rainwater, potable water lines, floor slabs, sidewalks, kerbstone and architectural facades.

Preparation of catalogs of concepts, for the bidding of the execution of the works.

TOTAL GLOBAL VALUE: 2 million USD.

Page 2: Breviary Photographic Projects

BUILDERS INTERNATIONAL, FSH FIVE STARS JEDDAH, KSA (2015)

Project Manager

DESCRIPTION: Builders International undertakes design/tender review, tender management and construction Supervision services. Builders International also undertakes these tasks to coordinate with external stakeholders, particu

larly the Utilities and Traffic Authority on behalf of (“MIDAD”).

The requirements for the design/tender review, tender management and construction Supervision services are defined in the Builders International-Engineering Consultants Group Contract (“BI-ECG”) between BI-ECG and

MIDAD.

The contract includes specifications, which provide much of the detail.

The works and services to meet these obligations are, for brevity, called the “Services” in Builders Interna- tional’s Contract Supervision System. These will be supplemented by Work Orders, which MIDAD may issue

from time to time.

TOTAL GLOBAL VALUE: 250 million USD / TOTAL CONTRACT VALUE: 250 million USD

Page 3: Breviary Photographic Projects

BUILDERS INTERNATIONAL, FSH FIVE STARS JEDDAH, KSA (2015)

Project Manager

Page 4: Breviary Photographic Projects

BUILDERS INTERNATIONAL, FSH FIVE STARS JEDDAH, KSA (2015)

Project Manager

Page 5: Breviary Photographic Projects

ICA INTERNACIONAL, COLOMBIA (2014)

Senior Project Manager

DESCRIPTION: Assure that the technical-economic proposals for the biddings 4G Projects (Concession Riddance and High ways) to be submitted to the national authority infrastructure (ANI), to be integrated under quality standards, planning and delivery times required by the client and also under quality standards and financial analysis de termined by ICA central offices, maintaining a solid customer-supplier relationship and effective. Bids submit

ted were for:

“Corredor Vial Girardot-Puerto Salgar-Honda” (200 km estimated cost 293 million USD to D.C.).

“Autopista Conexión Pacífico 1, 50 km Incluye 4 túneles a doble calzada y 14 Puentes” (estimated cost

958 million USD to D.C.).

“Corredor Vial Perimetral de Cundinamarca” (153 km estimated cost 728 million USD to D.C.).

“Corredor Vial Cartagena-Barranquilla y Circunvalar de la Prosperidad del Atlántico”, 150 km Incluye construcción de Puente sobre manglares de 117 km de desarrollo (estimated cost 753 million USD to

D.C.).

TOTAL GLOBAL VALUE: 2,730 million USD

Page 6: Breviary Photographic Projects

ICA INTERNACIONAL, COLOMBIA (2014)

Senior Project Manager

Page 7: Breviary Photographic Projects

D’APPOLONIA, EL CAIRO EGYPT (2013)

Senior Project Manager

DESCRIPTION: The company "Saudi Arabian Mining Company-Ma'aden", plans to start construction in 2014 and until 2016, a project of Center for Extraction and Processing of Calcium Phosphate called "Umm Wu'Al EPC" Desert of Sau di Arabia in an extension of approximately 260 km2 near the border with Jordan, contemplating the expansion

of existing facilities in Ras Al-Khair (RAK) on the coast of the Persian Gulf.

Within the commissioned work were giving "Value Engineering Support" and design management to the Fields of civil works for camps and offices, hydraulic and sanitary infrastructure, storage structures of the products, infrastructure "Off-Site" and "On-Site" service public and site architecture, storage scope of work, scope of utility infrastructure require for "On-Site" and "Off-Site" for Wu'Al Umm EPC Project within the Pack

age No. 6 General Contract Work.

TOTAL GLOBAL VALUE: 450 million USD

Page 8: Breviary Photographic Projects

D’APPOLONIA, EL CAIRO EGYPT (2013)

Senior Project Manager

Page 9: Breviary Photographic Projects

CONAGUA PROJECT, MEXICO (2011 — 2012)

Project Director ATE — Issuer East Tunnel Construction - TEO (Túnel Emisor Oriente)

DESCRIPTION: "Túnel Emisor Oriente - TEO" (Issuer East Tunnel) is the most important deep drainage system project being developed in Mexico for the last 40 years, & today is the longest tunnel in the world (62.5 Km.) being built with

TBM EPB.

TEO´s includes 24 shafts going from 25 to 150 meters deep, these shafts are distributed in 6 tunnel sections to be excavated with 9.0m diameter TBM shield each & 7.0m diameter final section. The TEO will let conduct a waste water of 150 m

3/s. The Federal Government dependence in charge of this project is the CONAGUA,

“Comisión Nacional del Agua”.

Also the client needs that we perform the excavation risk management, the excavation system performance management, excavation system communication management & the evaluation excavation documentation

analysis for its integration in the tunnel global files.

CONTRACT: SDGAPDS-GCT-DFMXHGO-10-001 “Asistencia Tecnológica Especializada para los Sistemas de Excavación

que Sirven para la Construcción del Túnel Emisor Oriente”

TOTAL GLOBAL VALUE: 711 million USD / TOTAL CONTRACT VALUE: 10 million USD

Page 10: Breviary Photographic Projects

CONAGUA PROJECT, MEXICO (2011 — 2012)

Project Director ATE — Issuer East Tunnel Construction - TEO (Túnel Emisor Oriente)

Page 11: Breviary Photographic Projects

LYSA FRANCE PROJECTS — SAINT MARC & LES CAYES, HAITI (2010 —

2011) HAITI

Project Manager Senior Consultant

DESCRIPTION: Consultant Services regarding to potable water & sewer; Maintenance & Operation system at cities of Les

Cayes & Saint Marc in the Haiti Republique.

CONTRACT: The activities agreements were in accordance to the reconstruction program that ONU and international co-

munity’s, took the decision to establish operations in Haiti.

TOTAL GLOBAL VALUE: 120 million USD / TOTAL CONTRACT VALUE: 120 million USD

Page 12: Breviary Photographic Projects

LYSA FRANCE PROJECTS — SAINT MARC & LES CAYES, HAITI (2010 —

2011) HAITI

Project Manager Senior Consultant

Page 13: Breviary Photographic Projects

DESARROLLADORA HOMEX PROJECTS — MEXICO, INDIA, BRASIL

(2008 — 2010)

Urbanization & Infrastructure Director, National & International

DESCRIPTION: Negotation, Awarding, Hiring’s & Construction, national and international projects (around 1,600 different pro

jects), Mexico, India, Brazil, with respect to urbanization, infrastructure, equipment and electrification for divi

sion social, average residential, international tourism and to way of contracts of work to raised price.

Within my profits as area is to have initiated international operations in Srinagar India initiating with the con

struction of urbanization, infrastructure and equipment of 450 houses of interest mean-residential similar to

the system of life of the India, as well as in the City of San Jose Two Fields (90 km. of Sao Paulo), in the Re

public of Brazil for the construction of 1,450 Houses of Average Interest.

Implant continuous improvements in negotiations that they allowed savings on financial bullfights authorized

for his execution in the different projects defined in 2 years on watch by 92 Million USD, savings that benefit

ted directly to the operative margin authorized in Homex.

I was part of the Territorial Reserve Committee, the Project and Design Area of the company.

TOTAL GLOBAL VALUE: 6,320 million USD / TOTAL CONTRACT VALUE: 640 million USD

SOCIAL PROJECTS

Page 14: Breviary Photographic Projects

DESARROLLADORA HOMEX PROJECTS — MEXICO, INDIA, BRASIL

(2008 — 2010)

Urbanization & Infrastructure Director, National & International

TOURISM PROJECTS

Page 15: Breviary Photographic Projects

RESIDENTIAL PROJECTS AVERAGE INTEREST RATE

DESARROLLADORA HOMEX PROJECTS — MEXICO, INDIA, BRASIL

(2008 — 2010)

Urbanization & Infrastructure Director, National & International

Page 16: Breviary Photographic Projects

DESARROLLADORA HOMEX PROJECTS — MEXICO, INDIA, BRASIL

(2008 — 2010)

Urbanization & Infrastructure Director, National & International

Page 17: Breviary Photographic Projects

DESARROLLADORA HOMEX PROJECTS — MEXICO, INDIA, BRASIL

(2008 — 2010)

Urbanization & Infrastructure Director, National & International

SN. JOSE DOS CAMPOS, BRAZIL (PAHINEIRAS I & II) PROJECTS

Page 18: Breviary Photographic Projects

DESARROLLADORA HOMEX PROJECTS — MEXICO, INDIA, BRASIL

(2008 — 2010)

Urbanization & Infrastructure Director, National & International

SRINAGAR & NEW DELHI, INDIA, PROJECTS

Page 19: Breviary Photographic Projects

AGUA DE MEXICO (GUTSA) PROJECTS, MEXICO (2006 — 2007)

Rehabilitation Manager, Potable Water & Sewer Networks

DESCRIPTION: To give fulfillment to agreements and work orders assigned to the company on the part of Government of the Federal District referred to construction & rehabilitation of Potable Water Networks with new applied tech

nologies.

To take care of that works were made in the decided time, with the right quality, taking care of the states of

debits and income of the management as much in the production area as in the technical area.

Agreements regarding to Substitution of Potable Water Pipe of Polyethylene of HD of 102, 154 and 305 mm (4

", 6 " and 12 ") of diameter.

TOTAL GLOBAL VALUE: 1.5 million USD / TOTAL CONTRACT VALUE: 1.5 million USD

Page 20: Breviary Photographic Projects

AGUA DE MEXICO (GUTSA) PROJECTS, MEXICO (2006 — 2007)

Rehabilitation Manager, Potable Water & Sewer Networks

Page 21: Breviary Photographic Projects

TRADECO INFRAESTRUCTURA PROJECTS, MEXICO (2005 — 2006)

Construction Superintendent

DESCRIPTION: Construction Superintendent in the management of special projects for the built of micro-tunnel 2.4 km. in length and a depth of 20 m on average using the constructive method of horizontal excavation team tunneling English (UNCLEMOLE TCP 1800 UP - SIZED TO 2206 OD MICROTUNNELLING MACHINE TO INSTALL 2195 OD x 1830 ID x 2.44 METRE LONG CONCRET JACKING PIPES), property of AGD EQUIPMENT, LTD for the installa tion of concrete pipe strengthened 1.83 m inside diameter and stations of inter - scrambling in sets of four pieces (point-point soul steel, elongated Spike, steel reel and sections of inter - scrambling steel), for abstract tion and conduction of rainwater in the construction of the terminal II International Airport “Benito Juárez” in

Mexico City. Estimated cost 30 Million USD.

The most significant challenges during construction of the project were:

To keep pressurized shield 24 hours a day, working on expansive clay, and therefore the implementation

of three work shifts was necessary.

Ensuring that were not affected operations Terminal 1 of the airport, due to construction activities day

and night.

Ensure geodetic alignment of the shield, although its weight of over 150 tons.

TOTAL GLOBAL VALUE: 40 million USD / TOTAL CONTRACT VALUE: 40 million USD

Page 22: Breviary Photographic Projects

TRADECO INFRAESTRUCTURA PROJECTS, MEXICO (2005 — 2006)

Construction Superintendent

Page 23: Breviary Photographic Projects

TRADECO INFRAESTRUCTURA PROJECTS, MEXICO (2005 — 2006)

Construction Superintendent

Page 24: Breviary Photographic Projects

ONDEO DE Puerto Rico, SUEZ Lyonnaise des Eaux Management & Services

Projects — Puerto Rico, Mexico (2000 — 2004)

Deputy, Infrastructure Director

DESCRIPTION: Deputy, Infrastructure Director "Water for All" implementation program and management of 650 projects infra

structure water throughout the Porto Rico Island (about 450 Millions USD business unit).

Development and presentation of the hydrants for the Porto Rico Island (about 30 Millions USD business unit)

project.

Development and presentation of recruitment for the 'Water for All' projects with business subcontractors of

the Porto Rico Island scheme (120 company outsourced).

Senior Director for control of works at the Puerto Rico Island.

Technical audit 157 projects of the authority for the financing of the infrastructure (AFI), which are candidates to be delivered in management and direction of Ondeo Porto Rico, developing technical opinions of each pro ject, identifying improvements and necessities required for a proper operating performance (100 millions USD

business unit).

TOTAL GLOBAL VALUE: 6,500 million USD / TOTAL CONTRACT VALUE: 580 million USD

Page 25: Breviary Photographic Projects

ONDEO DE Puerto Rico, SUEZ Lyonnaise des Eaux Management & Services

Projects — Puerto Rico, Mexico (2000 — 2004)

Deputy, Infrastructure Director