Traffic SimulationTraffic Simulation ±±HajiHaji Ali JunctionAli Junction
MEDULLA-SOFT , THE REAL VIRTUAL
i3DVRSEi3DVRSEinteractive 3D Virtual Reality Simulated Environmentsinteractive 3D Virtual Reality Simulated Environments
Propelling India into the 21st Century
Medulla-SoftThe Real Virtual
8/8/2019 BMC Haji Ali Simulations
http://slidepdf.com/reader/full/bmc-haji-ali-simulations 2/22
HajiHaji Ali and Cadbury JunctionsAli and Cadbury Junctions ±±interactive 3D Virtual reality Simulated Environmentinteractive 3D Virtual reality Simulated Environmentand Micro Simulated analysisand Micro Simulated analysis
Objective of the exercise ±To understand the congestion problems at the Haji Ali to Cadbury junctionlinks and to use appropriate technologies for evaluating options to ease the problem and provide a platform for communication and decisionmaking
Activities undertaken ±
y Study of traff ic demand
y Travel times
y Micro Simulation, calibration and validation
y VR environment creation
y Scenario simulations ± Extension at Racecourse road, Car Decks,Extended Car Deck solution (proposed by Medulla-Sof t)
y Overall scenario analysis and recommendations
MEDULLA-SOFT , THE REAL VIRTUAL
8/8/2019 BMC Haji Ali Simulations
http://slidepdf.com/reader/full/bmc-haji-ali-simulations 3/22
HajiHaji Ali and Cadbury JunctionsAli and Cadbury Junctions ±±Critical points for Mumbai TrafficCritical points for Mumbai Traffic
MEDULLA-SOFT , THE REAL VIRTUAL
8/8/2019 BMC Haji Ali Simulations
http://slidepdf.com/reader/full/bmc-haji-ali-simulations 4/22
HajiHaji AliAli±±Cadbury LinkCadbury LinkA Capacity IssueA Capacity Issue
y Peak hour Straight and lef t moving traff ic demands denoted as v(SL) are clubbed together because of similar travel constraints
y Peak hour Right moving traff ic demand-v(R)- forms a complementary demandwhen there are a maximum of four legs to an intersection
y Together v(SL) and v(R) form Mutually Exclusive and Collectively Exhaustive (MECE) demand for link capacity
y Capacity per link is taken as 1800 vehicles per lane per hour (universal convention for high congestion links) eg: 3 lanes available for SL traff ic is
treated as a capacity of 5400 vehicles denoted as c(SL)y v/c ratio or Vehicle/ Capacity ratio is the ratio of demand f rom a particular
direction to available capacity for that directiony For a link to be able to provide a congestion f ree conduit under ideal
conditions, the sum of v/c ratios for all the MECE demands should be less than1 ie. v(SL)/c(SL) + v(R)/c(R) < 1
y If such condition is not satisf ied, then the congestion is inevitable during peakhour demands and the only solution is to try to ease congestion by makingmovement as seamless as possible
MEDULLA-SOFT , THE REAL VIRTUAL
8/8/2019 BMC Haji Ali Simulations
http://slidepdf.com/reader/full/bmc-haji-ali-simulations 5/22
HajiHaji AliAli±±Cadbury VolumesCadbury VolumesMEDULLA-SOFT , THE REAL VIRTUAL
8/8/2019 BMC Haji Ali Simulations
http://slidepdf.com/reader/full/bmc-haji-ali-simulations 6/22
HajiHaji AliAli ±± V/CV/C -- AMAM
Coming from -AM
Base Case Best Case 2 Car Decks
Worli ± R2560 5400 0.47 2560 5400 0.47 2560 5400 0.47
Worli-SL1656 5400 0.31 1656 5400 0.31 1656 5400 0.31
Cadbury ± SL2807 7200 0.39 2807 7200 0.39 2807 7200 0.39
Cadbury - R703 1800 0.39 703 1800 0.39 703 1800 0.39
Race Course ± SL2431 5400 0.45 2431 5400 0.45 2431 5400 0.45
Tardeo ± SL2314 7200 0.32 2314 7200 0.32 2314 7200 0.32
Tardeo ± R581 1800 0.32 581 1800 0.32 581 1800 0.32
Sum of Critical V /c
1.58 0.78 1.25
8/8/2019 BMC Haji Ali Simulations
http://slidepdf.com/reader/full/bmc-haji-ali-simulations 7/22
HajiHaji AliAli ±± V/CV/C ±± PMPM
Coming from -AM
Base Case Best Case 2 Car Decks
Worli ± R2823 5400 0.52 2823 5400 0.52 2823 5400 0.52
Worli-SL1956 5400 0.36 1956 5400 0.36 1956 5400 0.36
Cadbury ± SL4623 7200 0.64 4623 7200 0.64 4623 7200 0.64
Cadbury - R450 1800 0.25 450 1800 0.25 450 1800 0.25
Race Course ± SL2955 5400 0.55 2955 7200 0.41 2955 7200 0.41
Tardeo ± SL2797 7200 0.39 2797 7200 0.39 2797 7200 0.39
Tardeo ± R586 1800 0.33 586 1800 0.33 586 1800 0.33
Sum of Critical V /c
1.79 0.89 1.41
8/8/2019 BMC Haji Ali Simulations
http://slidepdf.com/reader/full/bmc-haji-ali-simulations 8/22
CadburyCadbury ±± V/CV/C ±± AMAM
Coming from ± AM Base Case Best Case
From Peddar Road ± SL
3379 7200 0.47 3379 7200 0.47
From Haji Ali ± SL
4144 5400 0.77 4144 5400 0.77
From Haji Ali ± R
1235 1800 0.69 1235 1800 0.69
From Bhulabhai Desai ±SL
1387 3600 0.39 1190 3600 0.33
From Bhulabhai Desai - R
465 5400 0.09 535 5400 0.10
Sum of Critical V /c
1.54 0.87
8/8/2019 BMC Haji Ali Simulations
http://slidepdf.com/reader/full/bmc-haji-ali-simulations 9/22
CadburyCadbury ±± V/CV/C ±± PMPM
Coming from ± AM Base Case Best Case
From Peddar Road ± SL
3405 7200 0.47 3405 7200 0.47
From Haji Ali ± SL
3021 5400 0.56 3021 5400 0.56
From Haji Ali ± R
1371 1800 0.76 1371 1800 0.76
From Bhulabhai Desai ±SL
1190 3600 0.33 1190 3600 0.33
From Bhulabhai Desai - R
535 5400 0.10 535 5400 0.10
Sum of Critical V /c
1.42 0.66
8/8/2019 BMC Haji Ali Simulations
http://slidepdf.com/reader/full/bmc-haji-ali-simulations 10/22
Scenarios AnalyzedScenarios Analyzed
1. Existing scenario ± signalized intersections, right turn f rom for Vehicles coming f rom peddar road andBhulabhai Desai Rod to racecourse road and Tardeoto be taken through a u turn
2. Extension of Racecourse ± lanes to be added3. Car decks ± Car deck at Cadbury f rom Haji ali
junction to Bhulabhai Desai Road and Tardeo toWorli at Haji ali junction
4. Extended car deck solution ± car decks f rom a toHaji Ali Junction to Race course road and TardeoRoad
[Drive Experience]
MEDULLA-SOFT , THE REAL VIRTUAL
8/8/2019 BMC Haji Ali Simulations
http://slidepdf.com/reader/full/bmc-haji-ali-simulations 11/22
ResultsResults ±± PMPM
Direction Base Case 1 Car Deck 2 Car deck Best
Worli To Peddar RoadTime in Sec. (No. of Vehicles in 15 min)
12.51 7.15 2.93 2.93
Worli To BhulabhaiDesai Road
12.39 7.13 2.61 2.64
Worli To Tardeo Road 8.87 5.64 1.93 0.93
Peddar Road to Worli 10.08 9.38 5.06 1.40
Peddar Road To Race Course
15.45 12.09 5.18 1.93
Peddar Road to TardeoRoad
14.29 13.02 5.8 1.97
Bhulabhai Desai TO Worli
8.47 7.46 3.3 1.25
MEDULLA-SOFT , THE REAL VIRTUAL
8/8/2019 BMC Haji Ali Simulations
http://slidepdf.com/reader/full/bmc-haji-ali-simulations 12/22
ResultsResults ±± AMAM
Direction Base Case 1 Car Deck 2 Car deck Best
Worli To Peddar RoadTime in Sec. (No. of Vehicles in 15 min)
9.32 8.41 2.3 2.19
Worli To BhulabhaiDesai Road
9.24 8.15 1.96 2.08
Worli To Tardeo Road 6.87 7.18 1.75 0.94
Peddar Road to Worli 10.82 9.30 6.73 3.79
Peddar Road To Race Course
13.01 13.61 6.45 4.15
Peddar Road toTardeo Road
11.76 11.73 7.13 4.14
Bhulabhai Desai TO Worli
10.31 9.42 7.45 3.80
MEDULLA-SOFT , THE REAL VIRTUAL
8/8/2019 BMC Haji Ali Simulations
http://slidepdf.com/reader/full/bmc-haji-ali-simulations 13/22
ResultsResults--10% Inc. in Traffic10% Inc. in Traffic--PMPMDirection Best Case -
Current2 Car deck -Current
Best -Future
2 Car deck- Future
Worli To Peddar RoadTime in Sec. (No. of Vehicles in 15 min)
2.93 2.93 3.93 5.95
Worli To Bhulabhai
Desai Road
2.64 2.61 3.67 5.68
Worli To Tardeo Road 0.93 1.93 1.19 5.09
Peddar Road to Worli 1.40 5.06 1.38 8.64
Peddar Road To Race
Course
1.93 5.18 1.65 8.68
Peddar Road to TardeoRoad
1.97 5.8 1.82 9.52
Bhulabhai Desai TO Worli
1.25 3.3 1.22 8.07
MEDULLA-SOFT , THE REAL VIRTUAL
8/8/2019 BMC Haji Ali Simulations
http://slidepdf.com/reader/full/bmc-haji-ali-simulations 14/22
Network PerformanceNetwork Performance -- PMPM
NetworkPerformance
CurrentScenario
2 Car Decks 3 Car Decks ±Best Solution
Average delay time per vehicle [s]
403 100 45
Average speed[km/h]
4 19 35
Total delay time [h] 472 132 60
Number of vehicles
that have lef t the network(Every 15min)
2036 3849 4413
Total travel time [h] 502 182 119
MEDULLA-SOFT , THE REAL VIRTUAL
8/8/2019 BMC Haji Ali Simulations
http://slidepdf.com/reader/full/bmc-haji-ali-simulations 15/22
Network PerformanceNetwork Performance -- PMPMNetworkPerformance
CurrentScenario
2 Car Decks 3 Car Decks ±Best Solution
Average delay time per vehicle [s]
352 138 77
Average speed[km/h] 5 15 25
Total delay time [h]
420 160 86
Number of vehicles
that have lef t the network (Every 15min)
2055 3324 3386
Total travel time [h] 454 204 135
MEDULLA-SOFT , THE REAL VIRTUAL
8/8/2019 BMC Haji Ali Simulations
http://slidepdf.com/reader/full/bmc-haji-ali-simulations 16/22
Network PerformanceNetwork Performance±±10% Inc.10% Inc.To be expected in either 2 years or potentially throughTo be expected in either 2 years or potentially throughthe sea link extension atthe sea link extension at WorliWorli
Network Performance 2 Car Decks 3 Car Decks ± BestSolution
Average delay time per vehicle [s]
217 64
Average speed [km/h] 9 28
Total delay time [h] 310 95
Number of vehicles that have lef t the network(Every 15 min)
3711 4649
Total travel time [h] 359 158
MEDULLA-SOFT , THE REAL VIRTUAL
Results strongly indicate that the Extended Car Deck solution is the only sustainable solution for easing congestion
8/8/2019 BMC Haji Ali Simulations
http://slidepdf.com/reader/full/bmc-haji-ali-simulations 17/22
Best Case VideosBest Case Videos
y Video - 2 Car Decks
y Video ± 3 Car Decks
y Video Car Deck Drive Through
MEDULLA-SOFT , THE REAL VIRTUAL
8/8/2019 BMC Haji Ali Simulations
http://slidepdf.com/reader/full/bmc-haji-ali-simulations 18/22
RecommendationsRecommendations -- SummarySummary
y The Haji Ali junction & Cadbury junction f aces
capacity constraint that will worsen with increasing demand
y Eff ect of optimized signal timings during the peak hours is minimized due to this capacity
constraint
y Creating seamless connections betweendiff erent traff ic directions is the best way toreduce congestion during peak hour traff ic
8/8/2019 BMC Haji Ali Simulations
http://slidepdf.com/reader/full/bmc-haji-ali-simulations 19/22
RecommendationsRecommendations -- SummarySummary
y Extension of Race Course road and constraining f ree
lef t towards Cadbury coming f rom Tardeo does not help in easing traff ic
y Use of 2 car decks as per proposal being evaluated by BMC can help in easing traff ic but does not completely eliminate conf licts in traff ic demand
directions.
y This will lead to signif icant congestion problems as the traff ic demands increase - congestion always takes a small time to build but a very long time toclear
8/8/2019 BMC Haji Ali Simulations
http://slidepdf.com/reader/full/bmc-haji-ali-simulations 20/22
RecommendationsRecommendations -- SummarySummary
y The solution proposed by Medulla-Sof t (3car decks) can be highly eff ective inmitigating the eff ect of congestion and
can also handle increased traff ic volumes caused by addition of vehicles to the city traff ic or by other changes such as extension of sea Link near Haji Ali
8/8/2019 BMC Haji Ali Simulations
http://slidepdf.com/reader/full/bmc-haji-ali-simulations 21/22
RecommendationsRecommendations -- SummarySummary
y For an even more sustainable solution,network level analysis and sensitivity analysis needs to be connected wherein
rerouting network f low can result insignif icant enhancement of traff ic throughput and reduction of congestion.