8/8/2019 BMC Haji Ali Simulations http://slidepdf.com/reader/full/bmc-haji-ali-simulations 1/22 Traffic Simulation Traffic Simulation ± Haji Haji Ali Junction Ali Junction MEDULLA-SOFT , THE REAL VIRTUAL i3DVRSE i3DVRSE interactive 3D Virtual Reality Simulated Environments interactive 3D Virtual Reality Simulated Environments P ropelling India into the 21 st Century Medulla-Soft The Real Virtual

BMC Haji Ali Simulations

Embed Size (px)

Citation preview

Page 1: BMC Haji Ali Simulations

8/8/2019 BMC Haji Ali Simulations

http://slidepdf.com/reader/full/bmc-haji-ali-simulations 1/22

Traffic SimulationTraffic Simulation ±±HajiHaji Ali JunctionAli Junction

MEDULLA-SOFT , THE REAL VIRTUAL

i3DVRSEi3DVRSEinteractive 3D Virtual Reality Simulated Environmentsinteractive 3D Virtual Reality Simulated Environments

Propelling India into the 21st Century

Medulla-SoftThe Real Virtual

Page 2: BMC Haji Ali Simulations

8/8/2019 BMC Haji Ali Simulations

http://slidepdf.com/reader/full/bmc-haji-ali-simulations 2/22

HajiHaji Ali and Cadbury JunctionsAli and Cadbury Junctions ±±interactive 3D Virtual reality Simulated Environmentinteractive 3D Virtual reality Simulated Environmentand Micro Simulated analysisand Micro Simulated analysis

Objective of the exercise ±To understand the congestion problems at the Haji Ali to Cadbury  junctionlinks and to use appropriate technologies for evaluating options to ease the problem and provide a platform for communication and decisionmaking

Activities undertaken ±

y Study of traff ic demand

y Travel times

y Micro Simulation, calibration and validation

y VR environment creation

y Scenario simulations ± Extension at Racecourse road, Car Decks,Extended Car Deck solution (proposed by Medulla-Sof t)

y Overall scenario analysis and recommendations

MEDULLA-SOFT , THE REAL VIRTUAL

Page 3: BMC Haji Ali Simulations

8/8/2019 BMC Haji Ali Simulations

http://slidepdf.com/reader/full/bmc-haji-ali-simulations 3/22

HajiHaji Ali and Cadbury JunctionsAli and Cadbury Junctions ±±Critical points for Mumbai TrafficCritical points for Mumbai Traffic

MEDULLA-SOFT , THE REAL VIRTUAL

Page 4: BMC Haji Ali Simulations

8/8/2019 BMC Haji Ali Simulations

http://slidepdf.com/reader/full/bmc-haji-ali-simulations 4/22

HajiHaji AliAli±±Cadbury LinkCadbury LinkA Capacity IssueA Capacity Issue

y Peak hour Straight and lef t moving traff ic demands denoted as v(SL) are clubbed together because of similar travel constraints

y Peak hour Right moving traff ic demand-v(R)- forms a complementary demandwhen there are a maximum of four legs to an intersection

y Together v(SL) and v(R) form Mutually Exclusive and Collectively Exhaustive (MECE) demand for link capacity

y Capacity per link is taken as 1800 vehicles per lane per hour (universal convention for high congestion links) eg: 3 lanes available for SL traff ic is 

treated as a capacity of 5400 vehicles denoted as c(SL)y v/c ratio or Vehicle/ Capacity ratio is the ratio of demand f rom a particular 

direction to available capacity for that directiony For a link to be able to provide a congestion f ree conduit under ideal 

conditions, the sum of v/c ratios for all the MECE demands should be less than1 ie. v(SL)/c(SL) + v(R)/c(R) < 1

y If such condition is not satisf ied, then the congestion is inevitable during peakhour demands and the only solution is to try to ease congestion by makingmovement as seamless as possible

MEDULLA-SOFT , THE REAL VIRTUAL

Page 5: BMC Haji Ali Simulations

8/8/2019 BMC Haji Ali Simulations

http://slidepdf.com/reader/full/bmc-haji-ali-simulations 5/22

HajiHaji AliAli±±Cadbury VolumesCadbury VolumesMEDULLA-SOFT , THE REAL VIRTUAL

Page 6: BMC Haji Ali Simulations

8/8/2019 BMC Haji Ali Simulations

http://slidepdf.com/reader/full/bmc-haji-ali-simulations 6/22

HajiHaji AliAli ±± V/CV/C -- AMAM

Coming from -AM

Base Case Best Case 2 Car Decks

Worli ± R2560 5400 0.47 2560 5400 0.47 2560 5400 0.47

Worli-SL1656 5400 0.31 1656 5400 0.31 1656 5400 0.31

Cadbury ± SL2807 7200 0.39 2807 7200 0.39 2807 7200 0.39

Cadbury - R703 1800 0.39 703 1800 0.39 703 1800 0.39

Race Course ± SL2431 5400 0.45 2431 5400 0.45 2431 5400 0.45

Tardeo ± SL2314 7200 0.32 2314 7200 0.32 2314 7200 0.32

Tardeo ± R581 1800 0.32 581 1800 0.32 581 1800 0.32

Sum of Critical V /c

1.58 0.78 1.25

Page 7: BMC Haji Ali Simulations

8/8/2019 BMC Haji Ali Simulations

http://slidepdf.com/reader/full/bmc-haji-ali-simulations 7/22

HajiHaji AliAli ±± V/CV/C ±± PMPM

Coming from -AM

Base Case Best Case 2 Car Decks

Worli ± R2823 5400 0.52 2823 5400 0.52 2823 5400 0.52

Worli-SL1956 5400 0.36 1956 5400 0.36 1956 5400 0.36

Cadbury ± SL4623 7200 0.64 4623 7200 0.64 4623 7200 0.64

Cadbury - R450 1800 0.25 450 1800 0.25 450 1800 0.25

Race Course ± SL2955 5400 0.55 2955 7200 0.41 2955 7200 0.41

Tardeo ± SL2797 7200 0.39 2797 7200 0.39 2797 7200 0.39

Tardeo ± R586 1800 0.33 586 1800 0.33 586 1800 0.33

Sum of Critical V /c

1.79 0.89 1.41

Page 8: BMC Haji Ali Simulations

8/8/2019 BMC Haji Ali Simulations

http://slidepdf.com/reader/full/bmc-haji-ali-simulations 8/22

CadburyCadbury ±± V/CV/C ±± AMAM

Coming from ± AM Base Case Best Case

From Peddar Road ± SL

3379 7200 0.47 3379 7200 0.47

From Haji Ali ± SL

4144 5400 0.77 4144 5400 0.77

From Haji Ali ± R

1235 1800 0.69 1235 1800 0.69

From Bhulabhai Desai ±SL

1387 3600 0.39 1190 3600 0.33

From Bhulabhai Desai - R

465 5400 0.09 535 5400 0.10

Sum of Critical V /c

1.54 0.87

Page 9: BMC Haji Ali Simulations

8/8/2019 BMC Haji Ali Simulations

http://slidepdf.com/reader/full/bmc-haji-ali-simulations 9/22

CadburyCadbury ±± V/CV/C ±± PMPM

Coming from ± AM Base Case Best Case

From Peddar Road ± SL

3405 7200 0.47 3405 7200 0.47

From Haji Ali ± SL

3021 5400 0.56 3021 5400 0.56

From Haji Ali ± R

1371 1800 0.76 1371 1800 0.76

From Bhulabhai Desai ±SL

1190 3600 0.33 1190 3600 0.33

From Bhulabhai Desai - R

535 5400 0.10 535 5400 0.10

Sum of Critical V /c

1.42 0.66

Page 10: BMC Haji Ali Simulations

8/8/2019 BMC Haji Ali Simulations

http://slidepdf.com/reader/full/bmc-haji-ali-simulations 10/22

Scenarios AnalyzedScenarios Analyzed

1. Existing scenario ± signalized intersections, right turn f rom for Vehicles coming f rom peddar road andBhulabhai Desai Rod to racecourse road and Tardeoto be taken through a u turn

2. Extension of Racecourse ± lanes to be added3. Car decks ± Car deck at Cadbury f rom Haji ali

 junction to Bhulabhai Desai Road and Tardeo toWorli at Haji ali junction

4. Extended car deck solution ± car decks f rom a toHaji Ali Junction to Race course road and TardeoRoad

[Drive Experience]

MEDULLA-SOFT , THE REAL VIRTUAL

Page 11: BMC Haji Ali Simulations

8/8/2019 BMC Haji Ali Simulations

http://slidepdf.com/reader/full/bmc-haji-ali-simulations 11/22

ResultsResults ±± PMPM

Direction Base Case 1 Car Deck 2 Car deck Best

Worli To Peddar RoadTime in Sec. (No. of Vehicles in 15 min)

12.51 7.15 2.93 2.93

Worli To BhulabhaiDesai Road

12.39 7.13 2.61 2.64

Worli To Tardeo Road 8.87 5.64 1.93 0.93

Peddar Road to Worli 10.08 9.38 5.06 1.40

Peddar Road To Race Course

15.45 12.09 5.18 1.93

Peddar Road to TardeoRoad

14.29 13.02 5.8 1.97

Bhulabhai Desai TO Worli

8.47 7.46 3.3 1.25

MEDULLA-SOFT , THE REAL VIRTUAL

Page 12: BMC Haji Ali Simulations

8/8/2019 BMC Haji Ali Simulations

http://slidepdf.com/reader/full/bmc-haji-ali-simulations 12/22

ResultsResults ±± AMAM

Direction Base Case 1 Car Deck 2 Car deck Best

Worli To Peddar RoadTime in Sec. (No. of Vehicles in 15 min)

9.32 8.41 2.3 2.19

Worli To BhulabhaiDesai Road

9.24 8.15 1.96 2.08

Worli To Tardeo Road 6.87 7.18 1.75 0.94

Peddar Road to Worli 10.82 9.30 6.73 3.79

Peddar Road To Race Course

13.01 13.61 6.45 4.15

Peddar Road toTardeo Road

11.76 11.73 7.13 4.14

Bhulabhai Desai TO Worli

10.31 9.42 7.45 3.80

MEDULLA-SOFT , THE REAL VIRTUAL

Page 13: BMC Haji Ali Simulations

8/8/2019 BMC Haji Ali Simulations

http://slidepdf.com/reader/full/bmc-haji-ali-simulations 13/22

ResultsResults--10% Inc. in Traffic10% Inc. in Traffic--PMPMDirection Best Case -

Current2 Car deck -Current

Best -Future

2 Car deck- Future

Worli To Peddar RoadTime in Sec. (No. of Vehicles in 15 min)

2.93 2.93 3.93 5.95

Worli To Bhulabhai

Desai Road

2.64 2.61 3.67 5.68

Worli To Tardeo Road 0.93 1.93 1.19 5.09

Peddar Road to Worli 1.40 5.06 1.38 8.64

Peddar Road To Race 

Course

1.93 5.18 1.65 8.68

Peddar Road to TardeoRoad

1.97 5.8 1.82 9.52

Bhulabhai Desai TO Worli

1.25 3.3 1.22 8.07

MEDULLA-SOFT , THE REAL VIRTUAL

Page 14: BMC Haji Ali Simulations

8/8/2019 BMC Haji Ali Simulations

http://slidepdf.com/reader/full/bmc-haji-ali-simulations 14/22

Network PerformanceNetwork Performance -- PMPM

NetworkPerformance

CurrentScenario

2 Car Decks 3 Car Decks ±Best Solution

Average delay time per vehicle [s]

403 100 45

Average speed[km/h]

4 19 35

Total delay time [h] 472 132 60

Number of vehicles 

that have lef t the network(Every 15min)

2036 3849 4413

Total travel time [h] 502 182 119

MEDULLA-SOFT , THE REAL VIRTUAL

Page 15: BMC Haji Ali Simulations

8/8/2019 BMC Haji Ali Simulations

http://slidepdf.com/reader/full/bmc-haji-ali-simulations 15/22

Network PerformanceNetwork Performance -- PMPMNetworkPerformance

CurrentScenario

2 Car Decks 3 Car Decks ±Best Solution

Average delay time per vehicle [s]

352 138 77

Average speed[km/h] 5 15 25

Total delay time [h]

420 160 86

Number of vehicles 

that have lef t the network (Every 15min)

2055 3324 3386

Total travel time [h] 454 204 135

MEDULLA-SOFT , THE REAL VIRTUAL

Page 16: BMC Haji Ali Simulations

8/8/2019 BMC Haji Ali Simulations

http://slidepdf.com/reader/full/bmc-haji-ali-simulations 16/22

Network PerformanceNetwork Performance±±10% Inc.10% Inc.To be expected in either 2 years or potentially throughTo be expected in either 2 years or potentially throughthe sea link extension atthe sea link extension at WorliWorli

Network Performance 2 Car Decks 3 Car Decks ± BestSolution

Average delay time per vehicle [s]

217 64

Average speed [km/h] 9 28

Total delay time [h] 310 95

Number of vehicles that have lef t the network(Every 15 min)

3711 4649

Total travel time [h] 359 158

MEDULLA-SOFT , THE REAL VIRTUAL

Results strongly indicate that the Extended Car Deck solution is the only sustainable solution for easing congestion

Page 17: BMC Haji Ali Simulations

8/8/2019 BMC Haji Ali Simulations

http://slidepdf.com/reader/full/bmc-haji-ali-simulations 17/22

Best Case VideosBest Case Videos

y Video - 2 Car Decks

y Video ± 3 Car Decks

y Video Car Deck Drive Through

MEDULLA-SOFT , THE REAL VIRTUAL

Page 18: BMC Haji Ali Simulations

8/8/2019 BMC Haji Ali Simulations

http://slidepdf.com/reader/full/bmc-haji-ali-simulations 18/22

RecommendationsRecommendations -- SummarySummary

y The Haji Ali  junction & Cadbury  junction f aces 

capacity constraint that will worsen with increasing demand

y Eff ect of optimized signal timings during the peak hours is minimized due to this capacity 

constraint

y Creating seamless connections betweendiff erent traff ic directions is the best way toreduce congestion during peak hour traff ic

Page 19: BMC Haji Ali Simulations

8/8/2019 BMC Haji Ali Simulations

http://slidepdf.com/reader/full/bmc-haji-ali-simulations 19/22

RecommendationsRecommendations -- SummarySummary

y Extension of Race Course road and constraining f ree 

lef t towards Cadbury coming f rom Tardeo does not help in easing traff ic

y Use of 2 car decks as per proposal being evaluated by BMC can help in easing traff ic but does not completely eliminate conf licts in traff ic demand

directions.

y This will lead to signif icant congestion problems as the traff ic demands increase - congestion always takes a small time to build but a very long time toclear

Page 20: BMC Haji Ali Simulations

8/8/2019 BMC Haji Ali Simulations

http://slidepdf.com/reader/full/bmc-haji-ali-simulations 20/22

RecommendationsRecommendations -- SummarySummary

y The solution proposed by Medulla-Sof t (3car decks) can be highly eff ective inmitigating the eff ect of congestion and

can also handle increased traff ic volumes caused by addition of vehicles to the city traff ic or by other changes such as extension of sea Link near Haji Ali

Page 21: BMC Haji Ali Simulations

8/8/2019 BMC Haji Ali Simulations

http://slidepdf.com/reader/full/bmc-haji-ali-simulations 21/22

RecommendationsRecommendations -- SummarySummary

y For an even more sustainable solution,network level analysis and sensitivity analysis needs to be connected wherein

rerouting network f low can result insignif icant enhancement of traff ic throughput and reduction of congestion.