Ditjen EBTKE @djebtke www.ebtke.esdm.go.id @djebtke BIOENERGY POWER PLANT IN INDONESIA: Rules and Implementation MINISTRY OF ENERGY AND MINERAL RESOURCES DIRECTORATE GENERAL OF NEW, RENEWABLE ENERGY AND ENERGY CONSERVATION German Indonesia Business Forum Jakarta, 9th April 2019 Trois Dilisusendi Deputy Director for Program of Bioenergy

BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

Ditjen EBTKE @djebtke www.ebtke.esdm.go.id @djebtke

BIOENERGY POWER PLANT IN INDONESIA:

Rules and Implementation

MINISTRY OF ENERGY AND MINERAL RESOURCES DIRECTORATE GENERAL OF NEW, RENEWABLE ENERGY AND ENERGY CONSERVATION

German – Indonesia Business Forum Jakarta, 9th April 2019

Trois Dilisusendi Deputy Director for Program of Bioenergy

Page 2: BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

01 01 - INTRODUCTION

03 – CLOSING

02 – IMPLEMENTATION OF PALM OIL-BASED POWER PLANT

OUTLINE:

02

03

Page 3: BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

INTRODUCTION

ENERGY

01 - PRIORITY OF NATIONAL ENERGY

DEVELOPMENT

- INDONESIA’S RE

- RENEWABLE ENERGY TARGET AND

ACHIEVEMENT

- BIOENERGY DEVELOPMENT GOALS

- POLICY AND REGULATION FOR

BIOENERGY POWER PLANT

- ELECTRICITY TARIFF FOR BIOENERGY

POWER PLANT

Page 4: BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

@djebtke 4 Lintas EBTKE @djebtke www.ebtke.esdm.go.id

Use Coal as mainstay for national energy supply

Minimize the use of fossil oil

Utilize Nuclear as the last option

Optimize the use of natural gas

and new energy

Maximize the use of renewable

energy

PRIORITY OF NATIONAL ENERGY DEVELOPMENT BASED ON NATIONAL ENERGY POLICY

Page 5: BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

5 @djebtke @djebtke www.ebtke.esdm.go.id Ditjen EBTKE 5

Renewable Energy Target and Achievement

PRIMARY ENERGY MIX @ 2025

Gas

Coal

Oil

NRE

400 MMBOE

~ ~

GEOTHERMAL TARGET: 7.2 GW CAP : 1.81 GW

HYDRO TARGET : 17.9 GW

CAP : 5.12 GW

MINIHYDRO TARGET : 3 GW CAP : 0.21 GW

BIOENERGY TARGET : 5.5 GW

CAP : 1.84 GW

SOLAR PV TARGET : 6.5 GW CAP : 0.09 GWp

WIND POWER TARGET : 1.8 GW

CAP : 0.08 GW

92.2 MMBOE

23.0 MMBOE

45.2 GW

69.2 MMBOE

BIOMASS TARGET : 8.4 M TONS

UTILIZATON : N/A

BIOGAS TARGET :489.8 M M3

UTILIZATON : 25.96 M M3

C B M TARGET : 46.0 MMSCFD

UTILIZATION : -

BIOFUEL TARGET :13.8 M Kl

CAP : 3.41 M KL

NON-ELECTRICITY ELECTRICITTY

PRIMARY ENERGY MIX @ 2017

Page 6: BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

6 @djebtke @djebtke www.ebtke.esdm.go.id Ditjen EBTKE 6

01

02

03 04

05

06

BIOENERGY DEVELOPMENT GOALS

Reduce consumption

and import of fossil fuel

To support the domestic agriculture-based economy

Commitment to reducing emissions

to 29% below BAU by 2030

Meet the 23% target of renewable

energy in the National Energy

Mix by 2025 (Based on National

Energy Policy)

Increase energy security

and reliability

Accelerate modern energy

acccess for frontier,

outermost and least

developed regions

(3T regions)

Page 7: BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

@djebtke 7 Lintas EBTKE @djebtke www.ebtke.esdm.go.id

LAW No. 30/2007

on Energy

LAW No. 30/2009

on Electricity

GOVERNMENT REGULATION NO. 79/2014

on National Energy Policy

MEMR REGULATION NO. 50/2017

on The Utilization of Renewable Energy Resources for Electricity

MEMR REGULATION NO. 38/2016

on Acceleration of Rural Electrification through Small Scale Project

MEMR REGULATION NO. 10/2017

on Key Points of PPA

POLICIES AND REGULATIONS FOR BIOENERGY POWER PLANT

Page 8: BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

8 @djebtke @djebtke www.ebtke.esdm.go.id Ditjen EBTKE 8

ELECTRICITY TARIFF FOR BIOENERGY POWER PLANT

Regional Electricity

Generation Cost (Regional BPP)

Regional Electricity

Generation Cost (Regional BPP)> ≤

Avarage of National Electricity

Generation Cost (National BPP)

Avarage of National Electricity

Generation Cost (National BPP)

1 Biomass (PLTBm) Direct Selection Maximum 85% x Regional BPP Agreement between parties

2 Bogas (PLTBg) Direct Selection Maximum 85% x Regional BPP Agreement between parties

3 MSW (PLTSa)Direct Appointment (based on

local government auctions)Maximum 100% x Regional BPP

Agreement between parties

(Apply for Sumatera, Java and Bali)

4 Biofuels (PLT BBN) Direct Selection

PURCHASING MECHANISM Capacity ≤ 20 MW Capacity > 20 MW

5 MSW (PLTSa)Direct Appointment (based on

local government auctions)US$ 13.35 cent / kWh = 14.54 – (0.076 x contract capacity)

ELECTRICITY TARIFF FOR ACCELERATION PROJECT OF MSW POWER PLANT (Based On Presidential Regulation No. 35/2018)

TARIFF (Based on MEMR Regulation No. 50/2017 jo 53/2018)

NO PURCHASING MECHANISMBIOENERGY

POWER PLANT

Agreement between parties

Page 9: BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

9 @djebtke @djebtke www.ebtke.esdm.go.id Ditjen EBTKE 9

GENERAL PROVISIONS ON BIOENERGY UTILIZATION FOR ELECTRICITY

1 PT PLN is required to purchase electricity from the Renewable Energy Power Plants in accordance to the National Energy Policy and the General Plan of Electricity.

2

3

4

5

6

PT PLN purchases electricity from the Biogas or Biomass Plants which can guarantee the availability of feedstock during the PPA period.

The electricity purchase by PT PLN (Persero) from MSW Power Plants is intended to support the Local Government to overcome municipal waste problems.

Procurement method : BOOT (Build, Own, Operate, Transfer).

PPA period : maximum 30 years since COD,

depend on the type of power plant.

PROVISION OF TRANSACTION

Delivery or Pay If IPPs fail to deliver electricity according to the contract due to IPPs’ account IPPs shall pay penalty to PLN

Take or Pay If PLN fail to take the power generated according to contract due to PLN’s account PLN shall pay penalty to IPPs

PT PLN (Persero) can buy Excess Power from the Operating Permit’s Holders to strengthen the local electricity supply system.

The Excess Power Agreement may be less or more than 1 year based on local system conditions and power needs.

The price will be revisited annually to accommodate the change in Regional BPP.

7 EXCESS POWER

Page 10: BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

6,9

1

6,9

1

6,9

1

6,9

1

6,9

1

6,9

4

7,2

9

7,4

3

7,4

5 1

0,1

8

11

,61

11

,74

12

,53

12

,63

18

,82

8,2

5 1

0,5

8

10

,7

11

,8 13

,46

14

,17

14

,35

15

,17

16

,13

20

,81

21

,13

5,8

7

5,8

7

5,8

7

5,8

7

5,8

7

5,9

6,2

6,3

2

6,3

3

8,6

5

9,8

7

9,9

8

10

,65

10

,74

16

7,0

1

8,9

9

9,1

10

,03

11

,44

12

,04

12

,2

12

,89

13

,71

17

,69

17

,96

JAB

AR

JATE

NG

JAK

AR

TA

BA

NTE

N

BA

LI

JATI

M

LAM

PU

NG

SUM

BA

R

S2JB

SUM

UT

RIA

U

AC

EH

KEP

RI

BEL

ITU

NG

BA

NG

KA

SULS

ELR

AB

BA

R

KA

LTIM

RA

KA

LBA

R

KA

LSEL

TEN

G

SULU

TEN

GG

O

PA

PU

A B

AR

AT

NTB

PA

PU

A

MA

LUT

NTT

MA

LUK

U

100% BPP Setempat 85% BPP Setempat

7.86

Ave

rage

of

Nat

ion

al B

PP

Agreement Between Parties (B2B)

Max 100% of local BPP or Max 85% of local BPP

ELECTRICITY GENERATION COST (BPP) – 2018 (USD sen/kWh)

100% Local BPP 85% Local BPP

Based On MEMR Decree No. 55/2019 on Electricity Generation Cost of PT PLN (Persero) in 2018 10

Page 11: BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

ENERGY

02 - BIOENERGY DEVELOPMENT PROGRAM

- BIOMASS POTENTIAL FOR ELECTRICITY

- INDONESIA PALM OIL FACT

- INSTALLED CAPACITY OF BIOENERGY

POWER PLANT

- DISTRIBUTION OF BIOENERGY POWER

PLANT

- STRATEGIC PLANS TO ACHIEVE

BIOENERGY POWER PLANT TARGET

IMPLEMENTATION OF BIOENERGY POWER

PLANT PALM OIL-BASED

Page 12: BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

@djebtke 12 Lintas EBTKE @djebtke www.ebtke.esdm.go.id

BIOFUEL PROGRAMME

Mandatory of B20, B30, E2,

biodiesel for aviation and

Green Fuel.

BIOENERGY FOR ELECTRICITY

Power Plant from Biomass, Biogas, MSW and CPO

ENERGY FOREST

Utilize forest and non-forest land as well as degraded land for developing bioenergy.

02 01 03

BIOENERGY DEVELOPMENT PROGRAM FROM BIOMASS, INCLUDING PALM OIL

Page 13: BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

13 @djebtke @djebtke www.ebtke.esdm.go.id Ditjen EBTKE 13

Based on MEMR survey 2013

No Potential Sumatera Kalimantan Jamali Nusa Tenggara Sulawesi Maluku Papua

Total (Mwe)

1 Palm oil 8,812 3,384 60 - 323 - 75 12,654

2 Sugar cane 399 - 854 - 42 - - 1,295

3 Rubber 1,918 862 - - - - - 2,781

4 Coconut 53 10 37 7 38 19 14 177

5 Rice husk 2,255 642 5,353 405 1,111 22 20 9,808

6 Corn 408 30 954 85 251 4 1 1,733

7 Cassava 110 7 120 18 12 2 1 271

8 Wood 1,212 44 14 19 21 4 21 1,335

9 Cow dung 96 16 296 53 65 5 4 535

10 MSW 326 66 1,527 48 74 11 14 2,066

Total potential 15,588 5,062 9,215 636 1,937 67 151 32,654

Page 14: BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

@djebtke 14 Lintas EBTKE @djebtke www.ebtke.esdm.go.id

BIOENERGY POWER PLANT

ON GRID: 214.6 MW

TOTAL: 1,858.5 MW

OFF GRID: 1,643.9 MW

EXCESS POWER: 164.4 MW

IPP: 50.2 MW

ON GRID: 214,6 MW

OIL PALM WASTE: 129 MW

POME: 23.8 MW

WtE: 17.6 MW

OTHERS: 44.2 MW

NO. FEEDSTOCKS/INDUSTRY CAPACITY (MW)

1 OIL PALM INDUSTRY 460,9

2 POME 9

3 SUGAR INDUSTRY 219

4 PULP & PAPER INDUSTRY 955

TOTAL 1.643,9

Page 15: BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

@djebtke 15 Lintas EBTKE @djebtke www.ebtke.esdm.go.id

DISTRIBUTION OF BIOENERGY POWER PLANT TOTAL INSTALLED CAPACITY of Bioenergy Power Plant Until 2018:

1.856,6 MW

Aceh On-Grid : -

Off-Grid : 16 MW APBN : -

0,86%

0,11%

Papua On-Grid : -

Off-Grid : 2 MW APBN : -

Bengkulu On-Grid : 13 MW Off-Grid : 3 MW

APBN : -

Jambi On-Grid : 23,5 MW Off-Grid : 128 MW

APBN : 1 MW

Riau On-Grid : 29,7 MW Off-Grid : 942 MW

APBN : 1 MW

52,37%

1,11%

Sumbar On-Grid : 0,7 MW Off-Grid : 20 MW

APBN : -

9,51%

Sumut On-Grid : 76,2 MW Off-Grid : 98,5 MW

APBN : 2 MW

Kalbar On-Grid : 14,5 MW Off-Grid : 19 MW

APBN : 5 MW

1,80% 0,99%

Kalsel On-Grid : 3,4 MW Off-Grid : 14 MW

APBN : 1 MW

0,81%

Jabar On-Grid : -

Off-Grid : 15 MW APBN : -

Kaltim On-Grid : 7,36 MW Off-Grid : 29 MW

APBN : 1 MW

2,01% 0,22%

Sulbar On-Grid : -

Off-Grid : 4 MW APBN : -

Sulsel On-Grid : -

Off-Grid :8 MW APBN : -

0,05%

0,16%

Sulteng On-Grid : -

Off-Grid : 3 MW APBN : -

0,16%

Sultra On-Grid : -

Off-Grid :3 MW APBN : -

0,43%

NTT On-Grid : - Off-Grid : -

APBN : 1 MW

0,05%

Kep. Riau On-Grid: -

Off-Grid : 0,9 MW APBN : -

5,41%

Sumsel On-Grid : 4 MW

Off-Grid : 96 MW APBN : 0,5 MW

3,18%

Lampung On-Grid : 3 MW

Off-Grid : 56 MW APBN : 0,5 MW

1,70%

Babel On-Grid : 20 MW Off-Grid : 6,5 MW

APBN : 5 MW

0,24%

Gorontalo On-Grid : 0,5 MW Off-Grid : 4 MW

APBN : -

0,11%

Papua Barat On-Grid : -

Off-Grid : 2 MW APBN : -

0,11%

Bali On-Grid : 2 MW

Off-Grid : - APBN : -

0,05%

Banten On-Grid : -

Off-Grid : 1 MW APBN : -

Jateng On-Grid : -

Off-Grid : 30 MW APBN : -

1,62% 0,16%

DIY On-Grid : -

Off-Grid : 3 MW APBN : -

5,37%

Jatim On-Grid : 4,84 MW Off-Grid : 95 MW

APBN : - 15

0,86% 8,21%

Page 16: BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

@djebtke @djebtke www.ebtke.esdm.go.id Ditjen EBTKE 16

1.86 GW

2018

5.5GW

2025

STRATEGIC PLANS TO ACHIEVE BIOENERGY POWER PLANT TARGET

To convert Diesel-based Power Plants into CPO-based Power Plants

Encouraging the use of agro-industrial waste for electricity generation

(POME for electricity)

Encouraging agro industries with captive power to sell their electricity

surplus with excess power schemes

Develop energy crops/forests as sustainable feedstocks

Develop biomass co-firing with coal-based power plants

Ensure all parties involved to implement the commitment in developing Bioenergy Power Plant

as stated in RUPT 2019 – 2028. (794.1 MW)

Page 17: BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

ENERGY

03

- CHALLENGES IN BIOENERGY

DEVELOPMENT

- GOVERNMENT EFFORTS

CLOSING

Page 18: BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

@djebtke 18 Lintas EBTKE @djebtke www.ebtke.esdm.go.id

- Performance and Road Test prior the implementation of B20 for transportation sector

- Rail Test for Locomotive

GOVERNMENT EFFORTS

1

2

3

4

Sustainability of Feedstock

- Collaborate with related stakeholders to develop dedicated energy forest.

- Utilize degraded land/posy-mining land for energy crops.

Create Market - The Government requires PT PLN to purchase

electricity from Renewable Energy sources.

- Establish the acceleration of Waste to Energy project in 12 major cities

Pricing Policy - Provide certainty to (prospective) investors.

- Encourage the development of Renewable Energy to eastern part of Indonesia with higher electricity generation cost.

Incentives

Encourage investment in bioenergy development by providing incentives, both fiscal and non-fiscal.

- Performance and Road Test prior the implementation of B20 for transportation sector

- Rail Test for Locomotive

6

7

8

Advance Technology & National Standard

Increase the Utilization of Oil Palm-Based (Waste) for Electricity

- The government to encourage palm oil mills to utilize their waste to produce electricity.

- Develop CPO-based power plant and/or convert existing Diesel Power Plant to CPO-based power plant

- Carry out potential mapping and study with related stakeholder to develop Bioenergy based on local potential.

- Develop project-based road map for Bioenergy Power Plant.

RUPTL Commitment

Ensure all parties involved to implement the commitment in developing Bioenergy Power Plant as stated in RUPT 2019 – 2028.

- Collaborate with related stakeholders in conducting R&D for non-conventional feedstock.

- Establish national standard and specifications to ensure quality and safety of bioenergy conversion.

- Develop co-firing generation for biomass and low grade coal

Develop Local Potential & Project-Based Road Map

5

Page 19: BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

@djebtke 19 Lintas EBTKE @djebtke www.ebtke.esdm.go.id

Page 20: BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

@djebtke 20 Lintas EBTKE @djebtke www.ebtke.esdm.go.id

www.esdm.go.id www.ebtke.esdm.go.id

Kementerian ESDM Ditjen EBTKE

Kementerian ESDM Ditjen EBTKE

@kesdm @djebtke

@KementerianESDM @djebtke

@kementerian.esdm

Page 21: BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

21 @djebtke @djebtke www.ebtke.esdm.go.id Ditjen EBTKE 21

Based on MEMR survey 2013

IMPLEMENTATION OF BIOENERGY POWER PLANTS (1/2)

Biogas Power Plant

PLTBg PTPN V, Kebun Tandun, Riau.

Biogas: 850 m3/hour (60% CH4). Capacity : 1 MW

PLTBg PT Austindo Nusantara Jaya - Belitung.

The first on-grid POME-based Biogas Power Plant (1.2 MW)

Biomass Power Plant MSW Power Plant

PLTBm PT Rezeki Perkasa Sejahtera Lestari – West Kalimantan

IPP : 10 MW – Feedstock : Palm Waste, Woodchip

PLTBm PT Growth Asia - Medan, NorthSumatera.

Excess Power : 2 x 10 MW – Feedstock : Palm Waste

PLTSa Benowo - Surabaya City, East Java

Unit 1 : 1.6 MW, Landfill Gas, COD : 2015

Unit 2 : 9 MW, Gasification, COD : Semester II 2019

POME-based Biogas Power Plant

Page 22: BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

22 @djebtke @djebtke www.ebtke.esdm.go.id Ditjen EBTKE 22

Based on MEMR survey 2013

IMPLEMENTATION OF BIOENERGY POWER PLANTS (2/2)

TOSS (TEMPAT OLAH SAMPAH SETEMPAT)

Developed from collaborative project of STT PLN, PT Indonesia

Power and Klungkung Regency Government, Bali Province.

Tempat Olah Sampah Setempat (TOSS) is a waste management

initiatives to peletizing waste to fuel the gasification power plant

with capacity 10 – 150 kW.

TOSS is expected to become a solution for municipal waste

management as well as a solution to meet electricity needs,

particularly in remote areas of Indonesia.

PT Indonesia Power will develop the TOSS Project in West Sumba

Regency to fuel PLTBm Bodohula (1 MW).

PLTBn CPO

BELITUNG

Bangka Island

A CPO – based power plant that built by Indonesian government in 2016. Total investment : USD 6.4 Million.

Located in Belitung Regency, Bangka Belitung.

Installed capacity 2 x 2.8 MW Contract Capacity : 5 MW.

Status : Commissioning. The plan to fully operated in 2019 by PT. Belitong Mandiri (a Regional Owned Enterprise)

Page 23: BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

23 @djebtke @djebtke www.ebtke.esdm.go.id Ditjen EBTKE 23

WASTE TO ENERGY ACCELERATION PROJECT

Manado City Waste : 1,000 ton

15 - 20 MW

Makassar City Waste : 1,400 ton

15 - 20 MW

Denpasar City Waste : 1,200 ton

15 - 20 MW

DKI Jakarta Waste : 2,200 ton

35 MW

South Tangerang Waste : 1000 ton

15 - 20 MW

Palembang City Waste : 1,200 ton

20 MW

Tangerang City Waste : 2,000 ton

15 - 20 MW

Surakarta City Waste : 450 ton

12 MW

Semarang City Waste : 1000 ton

15 - 20 MW

Bekasi City Waste : 2,200 ton

9 MW

West Java Waste : 1,820 ton

15 - 20 MW

Surabaya City Waste : 1,400 - 1500 ton

11 MW

Already had Developer/ On Bidding Process

Bidding Preparation

Page 24: BIOENERGY POWER PLANT IN INDONESIA: Rules and … · electricity from Renewable Energy sources. -Establish the acceleration of Waste to Energy project in 12 major cities Pricing Policy

@djebtke 24 Lintas EBTKE @djebtke www.ebtke.esdm.go.id

2018 2019 2020 2021 2022 2023 2024 2025

GW

RUEN’s TARGET AND BIOENERGY SHARE IN RUPTL 2019 - 2028

RUEN RUPTL 2019 - 2028

2.03 2.2 2.5

2.9

3.4

3.9

4.7

5.5

1.859 1.871 2.01 2.07 2.427 2.477 2.579 2.598

2.902

48%

1%

33%

16% 2%

CPO-Based PP 5 MW

MSW PP 258.5 MW

Biomass PP 127.1 MW

Biogas PP 19.9 MW

All Type of Bioenergy PP

383.6 MW

794.1 MW

RUEN’s TARGET AND RUPTL 2019 - 2028 RUEN = Rencana Umum Energi Nasional = General Plan of National Energy

RUPTL = Rencana Usaha Penyediaan Tenaga Listrik = Electricity Supply Business Plan