9
A CAMPAIGN FOR THE SCOTTSDALE COMMUNITY PREP Better Together

Better Together - Great Hearts Archway Scottsdale, … › wp...2 616 sq ft 2 592 sq ft 1 683 sq ft 598 sq ft 2 589 sq ft STO 109 sq ft STORAGE 115 sq ft 1 682 sq ft STAFF 69 sq ft

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Better Together - Great Hearts Archway Scottsdale, … › wp...2 616 sq ft 2 592 sq ft 1 683 sq ft 598 sq ft 2 589 sq ft STO 109 sq ft STORAGE 115 sq ft 1 682 sq ft STAFF 69 sq ft

A CAMPAIGN FOR THE SCOTTSDALE COMMUNITY PREP

Better Together

Page 2: Better Together - Great Hearts Archway Scottsdale, … › wp...2 616 sq ft 2 592 sq ft 1 683 sq ft 598 sq ft 2 589 sq ft STO 109 sq ft STORAGE 115 sq ft 1 682 sq ft STAFF 69 sq ft

A Daily MiracleEvery day on the campuses of Archway Scottsdale and Scottsdale Prep, a miracle occurs. In buildings that lay vacant only a few years before, families, students and teachers now come together to bring a school community to life. Dedicated to the pursuit of Truth, Goodness and Beauty, they engage a curriculum and academy model that was once found only in elite private schools.

Each day, every child is given a full Great Hearts education. The arts are not cut – they are magnified. The same is true for languages, music, math, science, athletics and clubs – everything that is needed to form “great-hearted” young men and women. This is all done in a public school setting that is tuition-free and open to all.

“”

Scottsdale Prep and Archway provide an incredible foundation and prepare students to become life-long learners. We were just missing one thing. Our family is thrilled at the prospect of finally having a complete

and permanent campus to call home.Janna & Matt Everroad

Better Together | Great Hearts1

Page 3: Better Together - Great Hearts Archway Scottsdale, … › wp...2 616 sq ft 2 592 sq ft 1 683 sq ft 598 sq ft 2 589 sq ft STO 109 sq ft STORAGE 115 sq ft 1 682 sq ft STAFF 69 sq ft

When Scottsdale Prep held its first open house in the spring of 2008, eight months before it was set to open its doors, it prepared a room for 150 interested parents, with an additional 100 chairs for overflow. When the headmaster rose to begin the program, the room was overflowing with more than 500 parents. For the opening of Archway Scottsdale a few years later, the school offered an online open-enrollment opportunity. It was first-come, first-served, and the new school was filled in 98 seconds, with hundreds of families left on the waitlist.

The founding of Great Hearts in the Scottsdale community met a broad and deep demand for a better vision of education, where everyone and everything – the teachers, the school culture, and the classical curriculum – is dedicated to forming great-hearted men and women.

The Founding Vision – Met with Community DemandFrom day one, the Scottsdale real estate market presented obstacles to the full growth and vision of the Great Hearts Scottsdale K-12 community. Perhaps more than anywhere else in Arizona, the North Scottsdale market comes with higher costs and limited availability of suitable properties. From the very beginning, the schools and families have worked shoulder to shoulder to meet and overcome these challenges.

In true partnership, the families have responded with good will, creativity and generosity at every turn. In 2008, they helped transform a former call center into the first campus. In 2011, they rose generously to the challenge of completing the beautiful new Scottsdale Prep campus on 92nd Street, and the new Archway families helped fund extensive improvements of their current campus.

But the challenges remain. Scottsdale Prep, with its thriving athletic program, does not have a home field of its own. Daily practices and home games are a continual struggle and a drain of time, money, and, most importantly, school spirit. Without a stretch of grass on campus, field days and many outdoor clubs are out of the question. It is a daily constraint on a world-class school.

A shining example of the Great Hearts mission, Archway Scottsdale is held back by its leased and space limited campus. Recess and “Field Days” are held in a parking lot. The school has no gymnasium for P.E. or athletic clubs, its playground is undersized for its student body, and

The Heart of Scottsdale

Our families have waited patiently for a new campus, dreaming of a larger, complete facility and hoping to also

get a little closer to Scottsdale Prep. This new campus exceeds all our dreams! Our families are excited for this true Kindergarten through twelfth grade experience that is now

possible on one contiguous campus.Lisa Armstrong, Headmaster - Archway Scottsdale

“”

A Great Community held back

it has no proper library. The tight campus struggles with noisy classrooms from nearby music and P.E. classes. Closets are used as “mini” classrooms. The 5th grade is housed three miles away at the Prep campus. There is a long waitlist of boys and girls who would likely never gain admission because there is simply not enough room.

Lastly, and perhaps to greatest loss every day for the students, teachers, and families of the Scottsdale community, are all of the benefits, big and small, that come from a united and cohesive K-12 campus.

2 3Great Hearts | Better Together Better Together | Great Hearts

Page 4: Better Together - Great Hearts Archway Scottsdale, … › wp...2 616 sq ft 2 592 sq ft 1 683 sq ft 598 sq ft 2 589 sq ft STO 109 sq ft STORAGE 115 sq ft 1 682 sq ft STAFF 69 sq ft

After many years of unsuccessful attempts for a Prep sports field and a new Archway campus, an opportunity presented itself that would solve both challenges at the same time. Archway Scottsdale would have a permanent home of its own - a new campus designed for its programs and room for more students in grades K-5. At long last, a Scottsdale Prep would have a home field…not miles away, but right on campus.

How was this possible?

In September 2017, Headmasters Chaney and Armstrong wrote the Scottsdale Prep and Archway community with the news that a 9.8-acre site immediately to the northeast of the Scottsdale Prep campus had been secured at a cost of $21 million. It was a once-in-a-generation opportunity.

With the investment of an additional $5.7 million in charitable contributions, the site will be transformed into a new, united 16-acre campus for our K-12 community.

“ ”At first we shape our buildings,

then they shape us.Winston Churchill

A Once in a Generation Opportunity

SCOTTSDALE PREP

NEW ARCHWAY CAMPUS ANDSCHOOL ATHLETIC FIELD SITE

N

5Better Together | Great Hearts

Page 5: Better Together - Great Hearts Archway Scottsdale, … › wp...2 616 sq ft 2 592 sq ft 1 683 sq ft 598 sq ft 2 589 sq ft STO 109 sq ft STORAGE 115 sq ft 1 682 sq ft STAFF 69 sq ft

Project Highlights

With faith in the partnership of our families and friends in the community, together we will build a campus to unlock the full potential of great-hearted young men and women today and for generations to come. We are Better Together.

5 large special classrooms

for music, art and science labs

A dedicated library

Break out rooms for conferences and individual

student services

36 spacious and well-lit homerooms

AIA Regulation Sports Field with artificial turf and LED lighting

A full nurse’s suite

Ample administrative space and offices for

faculty and staff

A Multi-Purpose Room with food service area

17,000 sq. ft. available for future

improvements

A Gymnasium

6 7

Archway Scottsdale 2nd Floor

A K-5 Playground

Our families have waited patiently for a new campus, dreaming of a larger, complete facility and hoping

to also get a little closer to Scottsdale Prep. This new campus exceeds all dreams! The families are excited

for this true Kindergarten through twelfth grade experience that is now possible on one contiguous campus. As we grow the children’s hearts, souls,

and minds, we now get to see that growth come to fruition on a daily basis! Archway establishes a firm foundation for students. In the future we will be able

to see all that is built on upon it in the prep school and witness the amazing lifelong learners that result.

Lisa Armstrong, Headmaster-Archway Scottsdale

12345678

UP20RISE(6")

19RUN(11")

12345678

UP20RISE(6")

19RUN(11")

12345678

UP20RISE(6")

19RUN(11")

1

2

3

4

5

6

7

8

UP

20R

ISE

(6")

19R

UN

(11"

)

12345678

UP20RISE(6")

19RUN(11")

12345678

UP20RISE(6")

19RUN(11")

12345678

UP20RISE(6")

19RUN(11")

12345678

UP20RISE(6")

19RUN(11")

1

2

3

4

5

6

7

8

UP

20R

ISE

(6")

19R

UN

(11"

)

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

MB

TB TB

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

ART

797

sq ft

K69

3 sq

ftK

731

sq ft

168

1 sq

ft

K68

6 sq

ft

168

1 sq

ftLI

BRAR

Y88

1 sq

ft

168

3 sq

ft2

616

sq ft

259

2 sq

ft1

683

sq ft

259

8 sq

ft2

589

sq ft

STO

109

sq ft

STOR

AGE

115

sq ft

168

2 sq

ft

STAF

F69

sq

ftST

AFF

69 s

q ft

T60

sq

ft

K68

3 sq

ft

168

0 sq

ft

IDF

68 s

q ft

HOLD

ING

171

sq ft

K68

1 sq

ft

SPEC

IAL

765

sq ft

SPEC

IAL

765

sq ft

SPEC

IAL

766

sq ft

T74

sq

ft

WAI

T11

6 sq

ftNU

RSE

76 s

q ft

TOIL

ET45

sq

ft

LOBB

Y45

3 sq

ft

K69

0 sq

ft

FACU

LTY

418

sq ft

T61

sq

ft

T63

sq

ft

OPER

ATIO

NS31

0 sq

ft

SEC.

STO

R10

2 sq

ftRC

PT/W

ORK

241

sq ft

258

9 sq

ft2

589

sq ft

MEE

TING

154

sq ft

OFFI

CE17

5 sq

ft

OFFI

CE13

0 sq

ft

OFFI

CE11

6 sq

ftOF

FICE

118

sq ft

JAN

81 s

q ft

T56

sq

ftW

ORK

196

sq ft

RGST

R77

sq

ft

OFFI

CE13

3 sq

ft

ART

STOR

.13

8 sq

ft

HALL

Arc

hway

Sco

ttsda

le –

Firs

t Flo

or

DO

WN

DO

WN

DO

WN

DOWN DO

WN

DO

WN

DO

WN

DO

WN

DOWN

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

MB

TBTB

IT50

sq

ft

TOTA

L LO

CKER

COU

NT: 1

50

363

4 sq

ft3

601

sq ft

459

6 sq

ft

559

0 sq

ft5

590

sq ft

559

3 sq

ft

460

4 sq

ft4

601

sq ft

460

2 sq

ft4

602

sq ft

460

2 sq

ft

359

3 sq

ft3

596

sq ft

359

7 sq

ft

359

2 sq

ft

559

2 sq

ft

COPY

ROO

M20

9 sq

ft

STAF

F RR

81 s

q ft

STAF

F80

sq

ft

STAF

F81

sq

ft

CONF

EREN

CE26

4 sq

ft

SPEC

IAL

791

sq ft

ESS

89 s

q ft

TOIL

ET83

sq

ftTO

ILET

43 s

q ft

TOIL

ET93

sq

ft

TOIL

ET49

sq

ft

ESS

246

sq ft

LIT

127

sq ft

LIT

127

sq ft

RCPT

77 s

q ft

ESS

103

sq ft

ESS

103

sq ftES

S82

sq

ft

STO

82 s

q ft

559

6 sq

ft5

596

sq ft

Arc

hway

Sco

ttsda

le –

Sec

ond

Floo

r

1

2

3

4

5

6

7

8

UP

20R

ISE

(6")

19R

UN

(11"

)

1

2

3

4

5

6

7

8

UP

20R

ISE

(6")

19R

UN

(11"

)

1

2

3

4

5

6

7

8

UP

20R

ISE

(6")

19R

UN

(11"

)

12345678

UP20RISE(6")

19RUN(11")

1

2

3

4

5

6

7

8

UP

20R

ISE

(6")

19R

UN

(11"

)

1

2

3

4

5

6

7

8

UP

20R

ISE

(6")

19R

UN

(11"

)

1

2

3

4

5

6

7

8

UP

20R

ISE

(6")

19R

UN

(11"

)

1

2

3

4

5

6

7

8

UP

20R

ISE

(6")

19R

UN

(11"

)

12345678

UP20RISE(6")

19RUN(11")

MB

TB

TB

MB

TB

TB

MB

TB

TB

MB TBTB

MB

TB

TB

MB

TB

TB

MB

TB

TB

MB

TB

TB

MBTB TB

MB

TB

TB

MB

TB

TB

MB

TB

TB

MB

TB

TB

MB

TB

TB

MB

TB

TB

MB

TB

TB

MB

TB

TB

ART797 sq ft

K693 sq ftK

731 sq ft

1681 sq ft

K686 sq ft

1681 sq ft

LIBRARY881 sq ft

1683 sq ft

2616 sq ft

2592 sq ft 1

683 sq ft

2598 sq ft

2589 sq ft

STO109 sq ft

STORAGE115 sq ft

1682 sq ft

STAFF69 sq ft

STAFF69 sq ft

T60 sq ft

K683 sq ft

1680 sq ft

IDF68 sq ftHOLDING

171 sq ft

K681 sq ft

SPECIAL765 sq ft

SPECIAL765 sq ft

SPECIAL766 sq ft

T74 sq ft

WAIT116 sq ft

NURSE76 sq ft

TOILET45 sq ft

LOBBY453 sq ft

K690 sq ft

FACULTY418 sq ft

T61 sq ft

T63 sq ft

OPERATIONS310 sq ft

SEC. STOR102 sq ft

RCPT/WORK241 sq ft

2589 sq ft

2589 sq ft

MEETING154 sq ft

OFFICE175 sq ft

OFFICE130 sq ft

OFFICE116 sq ft

OFFICE118 sq ft

JAN81 sq ft

T56 sq ft

WORK196 sq ft

RGSTR77 sq ft

OFFICE133 sq ft

ART STOR.138 sq ft

HALL

Archway Scottsdale – First Floor

DOWN

DOWN DOWN

DO

WN

DOWNDOWN

DOWN DOWN

DO

WN

MB

TB

TB

MB

TB

TB

MB

TB

TB

MB

TB

TB

MB

TB

TB

MB

TB

TB

MB

TB

TB

MB

TB

TB

MBTB TB

MB

TB

TB

MB

TB

TB

MB

TB

TB

MB

TB

TB

MB

TB

TB

MB

TB

TB

MB

TB

TB

MB

TB

TB

MB

TB

TB

IT50 sq ft

TOTAL LOCKER COUNT: 150

3634 sq ft

3601 sq ft

4596 sq ft

5590 sq ft

5590 sq ft

5593 sq ft

4604 sq ft

4601 sq ft

4602 sq ft 4

602 sq ft4

602 sq ft

3593 sq ft

3596 sq ft

3597 sq ft

3592 sq ft

5592 sq ft

COPY ROOM209 sq ft

STAFF RR81 sq ft

STAFF80 sq ft

STAFF81 sq ft

CONFERENCE264 sq ft

SPECIAL791 sq ft

ESS89 sq ft

TOILET83 sq ftTOILET

43 sq ftTOILET93 sq ft

TOILET49 sq ft

ESS246 sq ft

LIT127 sq ft

LIT127 sq ft

RCPT77 sq ft

ESS103 sq ft

ESS103 sq ft

ESS82 sq ft

STO82 sq ft

5596 sq ft

5596 sq ft

Archway Scottsdale – Second Floor

Archway Scottsdale 1st Floor

Better Together | Great Hearts

Page 6: Better Together - Great Hearts Archway Scottsdale, … › wp...2 616 sq ft 2 592 sq ft 1 683 sq ft 598 sq ft 2 589 sq ft STO 109 sq ft STORAGE 115 sq ft 1 682 sq ft STAFF 69 sq ft

Great Hearts | Better Together8

Archway Classroom

Page 7: Better Together - Great Hearts Archway Scottsdale, … › wp...2 616 sq ft 2 592 sq ft 1 683 sq ft 598 sq ft 2 589 sq ft STO 109 sq ft STORAGE 115 sq ft 1 682 sq ft STAFF 69 sq ft

A new Call for FoundersBetter Together – A Campaign for the Scottsdale Community - is a new call for founders. It is a call to help make this shared vision a reality. It is a call for joyful giving.

The success of this campaign will transform both the Archway and the Prep and improve the daily lives of our children in countless ways. It will establish Great Hearts-Scottsdale today and for generations to come as a place that builds young women and men of character and a purpose beyond themselves. The successful campaign will require the selfless generosity of all those who hold our mission dear.

Please join us now in Better Together – A Campaign for the Scottsdale Community

10 11Better Together | Great HeartsGreat Hearts | Better Together

Archway Finishes

Page 8: Better Together - Great Hearts Archway Scottsdale, … › wp...2 616 sq ft 2 592 sq ft 1 683 sq ft 598 sq ft 2 589 sq ft STO 109 sq ft STORAGE 115 sq ft 1 682 sq ft STAFF 69 sq ft

Campaign Elements Budget

Athletic Field $2,800,000

FF&E (Furniture, Fixtures & Equipment) $800,000

Special Rooms $500,000

Complete Gymnasium/Multi-Purpose Room $500,000

ESS Rooms $420,000

Playground $400,000

Administrative Space Buildout $200,000

Library Buildout $100,000

Total $5,720,000

12

Now in our 10th year, Scottsdale Prep will finally see the long-anticipated arrival of a football and soccer field on our very own campus. Athletics are a pillar of our

academy culture, and we eagerly await the opportunity to provide this much-needed amenity for our student athletes. Our combined Archway and Scottsdale

Prep campuses will ultimately have their own “home field” to celebrate many athletic and community events for years to come.

Alison Chaney, Headmaster-Scottsdale Prep

“”

CAMPAIGN ELEMENTS BUDGETElements Cost

Elements Cost

Great Hearts | Better Together Better Together | Great Hearts

Archway Playground

Page 9: Better Together - Great Hearts Archway Scottsdale, … › wp...2 616 sq ft 2 592 sq ft 1 683 sq ft 598 sq ft 2 589 sq ft STO 109 sq ft STORAGE 115 sq ft 1 682 sq ft STAFF 69 sq ft