PRE-FEASIBILITY REPORT For PRIOR ENVIRONMENTAL CLEARANCE STORAGE CAPACITY ENHANCEMENT OF HPCL, LPG BOTTLING PLANT Capacity of MSV: 3 X 500 MT At Hindustan Petroleum Corporation Limited A B Road NH-3 Village- Rahukhedi , Dist: Manglia, Indore (M.P)-453771 Project Proponent: M/s. Hindustan Petroleum Corporation Limited, Manglia Environmental Consultant: February 2017

At - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Pre-Feasibility Report 7 | P a g e 3.3 Process Details At Plant LPG is received through Truck

  • Upload
    lymien

  • View
    219

  • Download
    3

Embed Size (px)

Citation preview

PRE-FEASIBILITY REPORT For

PRIOR ENVIRONMENTAL CLEARANCE STORAGE CAPACITY ENHANCEMENT OF

HPCL, LPG BOTTLING PLANT Capacity of MSV: 3 X 500 MT

At

Hindustan Petroleum Corporation Limited

A B Road NH-3 Village- Rahukhedi , Dist: Manglia,

Indore (M.P)-453771

Project Proponent:

M/s. Hindustan Petroleum Corporation Limited, Manglia

Environmental Consultant:

February 2017

Pre-Feasibility Report

1 | P a g e

1. EXECUTIVE SUMMARY

This is Storage capacity enhancement project of Existing HPCL LPG bottling Plant from 900 MT

to 2400 MT at Village Rahukhedi A B Road NH-3, Post Manglia Indore Madhya Pradesh. This

project falls under item no. 6 (b): Isolated storage & handling of hazardous chemicals under the

category “B” (general conditions apply) as per the EIA notification 2006 and its amendments.

The proposal will increase LPG storage capacity and enhance from 2.5 days cover to 6 days

cover.

2. INTRODUCTION OF THE PROJECT

2.1 Identification of the Project and Project Proponent

M/s Hindustan Petroleum Corporation Limited (HPCL), a Government of India Undertaking, is

engaged in Refining, Storage and Marketing of Petroleum Products. Hindustan Petroleum

Corporation Limited (HPCL) is a leading government owned PSU in India. Due to its strong

presence in the market for long time, it has acquired a sizeable share in the Indian market. The

company has already setup many bottling plants all over India. The Manglia LPG Bottling Plant

of M/s Hindustan Petroleum Corporation Ltd. (HPCL) was commissioned in the year 2004 and

the LPG Bottling Plant is situated in Manglia, the present setup has a bottling facility spread

over area of 34 acres. The nearest villages are Rahukhed and Lasudiya Parmar situated

approximately 0.40 KM and 1.30 KM at south-West and north-East respectively. Some industry

is at south-West side of the plant. Agriculture land at North, East and South side of the plant.

Agra-Bombay NH-3 Highway at West of the plant. Bottling plant is engaged in receiving bulk

tankers from Gail Vijaypur, Aegis Pipavav, ONGC Hazira, IOC Koyali, BPC Bina, Essar Vadinar,

RIL Jamnagar, Gail Gandhar etc. The bulk tankers are unloaded into three storage vessels of

total 900 MT (3x300 bullets) capacities. Plant is having Tank truck decantation unit with six bays

each having unloading arms. HPCL LPG Bottling Plant Manglia supplies packed LPG domestic

& non domestic filled cylinders in Twenty two revenue district of Madhya Pradesh.

2.2 Brief Description of nature of the Project

The proposed LPG storage capacity enhancement of LPG bottling plant from 900 MT to 2400

MT by constructing new 3 X 500 MT Mounded Storage Vessels within existing plant premises.

LPG will be coming to the Plant by road in trucks from Gail Vijaypur, Aegis Pipavav, ONGC

Hazira, IOC Koyali, BPC Bina, Essar Vadinar, RIL Jamnagar, Gail Gandhar etc. This is being

stored in bullets then filled in various capacities of the cylinders within the plant and sold

(dispatched) to the distributors spread in 22 districts of Madhya Pradesh.

Pre-Feasibility Report

2 | P a g e

2.3 Need for the Project and its importance

Based upon LPG consumption scenario, need is felt to enhance the LPG storage capacity at

Manglia LPG Bottling plant. To achieve the same, HPCL LPG Bottling Plant proposes to install

three new mounded storage vessels of capacity 500 MT each. This will improve the storage

capacity of LPG at existing plant with enhanced cover from 2.5 days to 6 days and distribution

network. Moreover Mounded Storage Vessel is the safest and proven storage in vogue.

2.4 LPG Import

At HPCL LPG Bottling Plant Manglia, LPG is being received from Gail Vijaypur, Aegis Pipavav,

ONGC Hazira, IOC Koyali, BPC Bina, Essar Vadinar, RIL Jamnagar, Gail Gandhar etc through

tanker trucks.

2.5 Cylinder Supply

HPCL LPG Bottling Plant Manglia supplies packed LPG domestic & non domestic filled

cylinders in twenty two district of Madhya Pradesh.

2.6 Employment Generation due to the Project

The proposed expansion project will provide indirect employment to about 20-25 persons during

the construction phase and also in transportation during construction phase.

3. PROJECT DESCRIPTION

3.1 Type of the Project

This is storage capacity enhancement project of existing HPCL LPG bottling Plant at Manglia

from 900 MT to 2400 MT. This project falls under item no. 6 (b): Isolated storage & handling of

hazardous chemicals under the category “B” (general conditions apply) as per the EIA

notification 2006 and its amendments.

3.2 Project Location

The Project site is located at village Rahukhedi, A B Road N H-3 Post Manglia Indore Madhya

Pradesh 453771. The distance between project site & Indore city is 15 KM.

Pre-Feasibility Report

3 | P a g e

3.3 Topography:

Manglia District is a district of Madhya Pradesh state in central India. The exact cartographic co-

ordinates of Manglia (Plant Location coordinates) are 22050’18.24” N 75056’55.16”E. It has an

average elevation of 537 meters (1762ft.).

FIGURE 1: LOCATION MAP OF HPCL LPG BOTTLING MANGLIA

Pre-Feasibility Report

4 | P a g e

FIGURE 2: PLANT LAYOUT HPCL, MANGLIA LPG BOTTLING PLANT

Pre-Feasibility Report

5 | P a g e

FIGURE 3: AERIAL VIEW HPCL, MANGLIA LPG BOTTLING PLANT

Pre-Feasibility Report

6 | P a g e

FIGURE 4: 10 KM RADIUS AERIAL VIEW HPCL, MANGLIA LPG BOTTLING PLANT

Pre-Feasibility Report

7 | P a g e

3.3 Process Details

At Plant LPG is received through Truck Tankers of generally 18 MT capacity from LPG is being

received from Gail Vijaypur, Aegis Pipavav, ONGC Hazira, IOC Koyali, BPC Bina, Essar Vadinar,

RIL Jamnagar, Gail Gandhar etc. There is 6 bay gantry for unloading of LPG. Further it is stored

in above ground bullets 3 X 300 MT. Maximum existing inventory of LPG at the plant is 900 MT.

Plant operates in two shifts. LPG from bullets is pumped with the help of LPG pumps to electronic

carousel for cylinder filling operation. Domestic and Commercial cylinders of sizes 5 Kg, 14.2 kg,

19 kg, 35 kg 47.5 kg are filled. HPCL LPG Bottling Plant supplies packed LPG domestic & non

domestic filled cylinders to the twenty two revenue district of Madhya Pradesh. Defective cylinders

are segregated for correction before dispatch to the market. All standard operating procedures

are followed as per OISD and best engineering practices.

FIGURE 5: PROCESS FLOW DIAGRAM FOR HPCL, MANGLIA LPG BOTTLING PLANT

Bottling of LPG through electronic Carousel into 5, 14.2,

19, 35, 47.5 kg LPG Cylinders Empty Cylinders

Loading of Filled Cylinders into Packed Trucks

Dispatch of Filled Packed Cylinder Trucks to Dealers

Receipt of Bulk LPG from Road Tankers

Storage of LPG in above ground bullets

Pre-Feasibility Report

8 | P a g e

3.4 Risk Analysis and ERDMP

Since plant is having Hazardous chemical inventory exceeding threshold quantity as per MSIHC

Rule-1989, amendment 2000”. Quantitative Risk Analysis and DMP report has been prepared

and updated regularly. Same shall be reviewed and updated with augmented facility. ERDMP

report has also been prepared and shall be in compliance with PNGRB regulations-2010.

3.5 Liquid Waste Management

There is no manufacturing process as it is only storage and filling plant hence there will be no

generation of effluent. Sewage will be treated through septic tanks and soak pits. Effluent from

cylinder washings and soap solution/Lubricant used for conveyor belt will be treated in effluent

treatment plant and treated water will be used for gardening purpose.

3.6 Hazardous and solid waste Management

There will be no generation of any hazardous waste by the plant. Total Solid Waste Generated

from the proposed facility will be disposed through pollution control board approved vendor.

3.7 Fire Fighting Details

3.7.1 Fire Fighting System Description as per OISD 144 standard

Following are the type of fire protection systems for LPG bottling plant,

Automatic Fire Water Pumping System consisting of six firefighting engines & two jockey

pump.

External Hydrant & Water Monitor System covering the entire plant area for manual

firefighting.

Medium Velocity Water Spray System for Cylinder filling shed, Filled storage shed, Tank

truck gantry (six bays), LPG Pump /Compressor shed, above ground bullets,

Loading/Unloading shed, Cold Repair shed and Connecting platforms.

Fire Detection & Alarm System covering the entire plant area.

Portable Fire Extinguishers.

Personnel protective equipment.

Pre-Feasibility Report

9 | P a g e

3.8 Power Supply

For the existing project, power is received from Madhya Pradesh Paschim Kshetra Vidyut Vitran

Company Ltd. The power demand is 33 KV, 275 KVA. The power requirement shall be remain

same after the proposed capacity expansion. DG sets are available for emergency

Generators Capacity: 125 KVA - 1 No.

380 KVA - 1 No.

3.9 Communication System

Communication facility available at plant for internal and external communication purpose is as

follows

Telephones/mobile - 3 Nos.

VHF - 12 Nos.

Page phone - 12 Nos.

Hand siren - 7 Nos.

4. SITE ANALYSIS

4.1 Connectivity

The Plant site located around 15 Km away from Indore City

The connectivity of the site to airport, railway and road is as follows:

a. Airport connectivity- The nearest domestic airport is Devi ahilyabai Holkar airport Indor

which is about 18 Kilometers.

b. Rail connectivity- The nearest railway station is Indore, which is about 15 kilometers from

the site

c. Road connectivity- Nearest highway is Agra-Bombay highway.

d. Police Station – Shipra Thana, Indore, Madhya Pradesh.

e. Hospital- Primary Health Center, Which is about 6.78 Km .

5.0 PROJECT SCHEDULE AND COST ESTIMATES

5.1 Project schedule

The company has proposed to enhance the storage capacity of the LPG in the plant by 3 X 500

MT Mounded storage vessels to increase the storage capacity to 2250 MT. This will improve the

storage cover from existing 2.5 days to 6 days. Project execution will be started after approval of

EC. Implementation period will be approx. 18 month from EC approval.

Pre-Feasibility Report

10 | P a g e

5.2 Cost estimates

The total cost of the project is estimated to be 31.5 crores.

5.3 Corporate Social Responsibility (CSR) Policy

The company is actively involved in CSR related activities, budgetary provisions have been made

in the financial year 2016-2017 to spend on Corporate Social Responsibility (CSR) by HPCL head

office.