Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 1

NATARAJ HYDROCARBONS PVT. LTD.

PRE FEASIBILITY REPORT

Village: Belmuri, P.S.: Dhaniakhali, Mauza: Chhota Khanpur,

District: Hooghly, West Bengal

Page 2: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 2

TABLE OF CONTENT

1 EXECUTIVE SUMMARY 4

2 INTRODUCTION OF THE PROJECT /BACKGROUND INFORMATION

2.1 Identification of the project and project proponent 5

2.2 Brief Description of Nature of Project 8

2.3 Need for the Project & Importance to the Country 10

2.4 Demand and Supply gap 11

2.5 Imports Vs. Indigenous production 13

2.6 Export Possibility 13

2.7 Domestic/Export Markets 13

2.8 Employment Generation (Direct & Indirect) due to the project 14

3 PROJECT DESCRIPTION

3.1 Type of Project including Interlinked and Interdependent Projects, if any 14

3.2 Location (map showing general location, specific location and project

boundary & project site layout) with coordinates

15

3.3 Details of alternate sites considered and the basis of selecting the

proposed site, particularly the environmental consideration gone into should be highlighted.

17

3.4 Size and Magnitude of Operation 17

3.5 Project description with process details (a schematic diagram/flow chart showing the project layout, components of the project etc.

should be given)

18

3.6 Raw Material Required Along Estimated Quantity, Likely Source, and Marketing Area of Final Product/s Mode Of Transport Of Raw

Material And Finished Product.

19

3.7 Resource optimization/recycling and reuse envisaged in the project, if any, should be briefly outlined.

20

3.8 Availability of water its source, Energy/Power requirement and source should be given.

20

3.9 Quantity of waste to be generated (liquid and solid) and scheme for

their management/disposal.

21

4 SITE ANALYSIS

4.1 Connectivity 22

4.2 Land form, Land use and Land ownership 23

4.3 Topography (along with map) 24

4.4 Existing land use pattern 25

4.5 Existing Infrastructure 27

Page 3: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 3

4.6 Soil Classification 27

4.7 Climatic data from secondary sources 27

4.8 Social Infrastructure available 28

5 PLANNING BRIEF

5.1 Planning concept 29

5.2 Population Projection 29

5.3 Land use planning 30

5.4 Assessment of Infrastructure Demand (Physical & Social) 32

5.5 Amenities/Facilities 32

6 PROPOSED INFRASTRUCTURE

6.1 Industrial Area (Processing Area) 32

6.2 Resident Area (Non Processing Area) 32

6.3 Green Belt 32

6.4 Social Infrastructure 34

6.5 Connectivity (Traffic and transportation Road/Rail/Metro/Water ways etc)

34

6.6 Drinking Water Management (Source & supply of water) 34

6.7 Sewerage System 35

6.8 Industrial Waste Management 35

6.9 Solid waste Management 36

6.10 Power Requirement 36

7 REHABILITATION AND RESETTLEMENT(R&R PLAN) 36

8 PROJECT SCHEDULE AND COST ESTIMATES

8.1 (Likely date of start of construction and likely date of completion (time

schedule for the project to be given)

37

8.2 Estimated project cost and along with analysis in terms

of economic viability of the project.

37

9 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATION) 39

Page 4: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 4

1. EXECUTIVE SUMMARY

M/s. Nataraj Hydrocarbons Pvt. Ltd. (NHCPL) have proposed for setting up

manufacturing unit of Synthetic Resin viz. Unsaturated Polyester Resin (GP

Resin) and Alkyd Resin with total production capacity of 12 Tonnes/day at Village:

Belmuri, P.S. Dhaniakhali, Mauza : Chhota Khanpur, J.L. No-192, District: Hooghly,

West Bengal. The L.R. Dag numbers are 567,569 and 571. The company will

manufacture those products complying with the international quality standards.

Unsaturated polyester resins (UPR) are utilized in varied industry verticals, such as

building & constructions, marine, wind energy, electrical & electronics, pipes &

tanks, and automotive/transportation. Alkyd resins are very important

component for paint industry generally used for building paints, marine

paints, decorative paints, machine coatings and air drying industrial paints .

The Company’s corporate office is situated at 7A, Bentinck Street, Old Wing, 1st

floor, Kolkata-700001, West Bengal. The annual production capacity of the

proposed project is 1800 Tonnes of Unsaturated Polyester Resins and 1800

Tonnes of alkyd resins based on 300 working days and four shifts per day. Eight

(8) resin Kettles with production of 1.5 Tonne/Kettle/batch considering 300

working days/annum will be introduced. The manufacturing unit is located on a

freehold land of 98 Decimals (1 acre appx).

Page 5: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 5

2. INTRODUCTION OF THE PROJECT /BACKGROUND INFORMATION

2.1. Identification of the project and project proponent.

Unsaturated Polyester Resin and Alkyd Resin are industrial resins which are

synthetic polymers having adhesive and useful reactive properties. Due to fast

industrialization and also of housing industry, there is a growing demand of paints

both. Indian Paint Industry has grown at a compounded annual growth rate

(CAGR) of 12-13% in the last ten years and decorative paints segment accounts

for nearly 65-70% of the Indian paint industry. Paints industry is mostly located in

western part of the country. So there is a huge gap of supply of raw materials in

the eastern part. This project will be a small attempt to supply that market in

eastern India. Unsaturated Polyester Resins are utilized by the fibre-glass industry

for building boats and car bodies, for coating concrete to give a smooth sterile

surface in food-manufacturing plants, for encapsulating electrical components.

Global demand for this resin is increasing rapidly. Looking the expected demand of

these resins in domestic as well as global market and growing volume of various

types of industrial resins manufacturing industries, the proposed project have

acceptability in the local and international market.

Page 6: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 6

The plant will propose the Following Machinery and Plant Equipments:

Particulars Proposed Capacity/ Size

Resin Kettle 1.5 Tonne/batch

Thermic Fluid Heater 200000 Kcal/hr

Blender 1.5KL

Diesel Generator 30KVA

The above mentioned equipments are utilized to manufacture

1. Unsaturated Polyester Resin: 150 Tonnes/Month

2. Alkyd Resin : 150 Tonnes/Month

Table 1: List of Products and Production Capacity

Sr. No

Name of Product Proposed Capacity (TPM)

1. Unsaturated Polyester Resin 150

2. Alkyd Resin 150

Total 300

Page 7: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 7

Table 2: Details of Products

Sr. No

Name of

Product

Purity (%wt)

Yield of Product (%)

Batch Size, Kg

Number of Batches per month

Use of Product

1. Unsaturated

Polyester

Resin

As per Req.

93-94 1500 200 FRP, Fiber Glass Industry

2. Alkyd Resin Paints and Coating

BACKGROUND OF THE PROMOTERS

The background of the promoters is given as follows:

Particulars Description

Name Sri Rajesh Kumar Bansal

Educational Qualification B.Com From Calcutta University

Address EC-166 Salt Lake, Kolkata -700064, West

Bengal

Experience More than 30 years

Promoter/Director other than

Nataraj Hydrocarbon Pvt. Ltd.

1) Nataraj cold storage (p) Ltd., 2) Snehalata

cold storage (p) Ltd., 3) Vaibhav Laxmi Agro

Food (p) Ltd.

Page 8: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 8

2.2. Brief Description of Nature of Project

However subsequently realizing the importance of economy of scale and higher

profitability the management has decided to go for the manufacture of the

following products:

Unsaturated Polyester Resin

Capacity, TPM : 150

Batch Size, MT : 1.5

No. of Batches/Day : 4

Working Days : 25

Name Sri Rahul Bansal

Educational Qualification M.Sc . in Finance & Management from

Cranfield University , U.K.

Address EC-166 Salt Lake, Kolkata -700064, West Bengal

Experience More than 8 years

Promoter/Director other than

Nataraj Hydrocarbon Pvt. Ltd.

1) Nataraj cold storage (p) Ltd.

Page 9: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 9

Table 3: Required Raw Materials for Unsaturated Polyester Resin Production

Sl. No. Raw Material Kg/Batch MT/Batch TPD TPM Remarks

INPUT

1.

Glycol (Mono Ethylene Glycol/Di ethylene Glycol/ Propylene

Glycol/ Di Propylene Glycol)

375 0.375 1.5 37.5

Raw Materials

2.

Acid Anhydride (Phthalic

Anhydride/Isophathalic Acid/ Purified

Terephathalic Acid (PTA))

351 0.35 1.4 35

3. Maleic Anhydride 240 0.24 0.96 24

4. Styrene Monomer 557 0.557 2.226 55.65

5. Additives 1 0 0 0.1 Catalyst

TOTAL 1524 1.524 6.096 152.4

OUTPUT

1 Unsaturated Polyester

Resin 1500 1.5 6 150

Finished Product

2 Wastewater 24 .02 .096 2.4 Evaporator

Total 1524 1.524 6.096 152.4

Alkyd Resin

Capacity, TPM : 150

Batch Size, MT : 1.0

No. of Batches/Day : 4

Working Days : 25

Page 10: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 10

Table 4: Required Raw Materials for Alkyd Resin Production

Sl. No. Raw Material Kg/Batch MT/Batch TPD TPM Remarks

INPUT

1. Castor Oil, Linseed Oil, Soybean Oil

428 0.429 1.7 42.5

Raw Materials

2.

Glycerin/MEG/DPG/ Pentaerithritol/

Trimethanol Propane

288 0.288 1.15 28.75

3. Acid Anhydride

(PA/MA/AA/Rosin) 473 0.473 1.89 47.25

4. Xylene 364 0.364 1.46 36.25

TOTAL 1553 1.553 6.2 155.3

OUTPUT

1 Alkyd Resin 1500 1.5 6 150 Finished Product

2 Wastewater 53 .05 0.22 5.3 Evaporator

Total 1553 1.55 6.22 155.3

2.3. Need for the Project & Importance to the Country

High demand in Resin is due to their chemical properties and usage, like

production of adhesives, varnishes and food glazing agents. They are also

considered as an important raw material used for making organic synthesis. Keep

in mind the glowing requirements of the clients, the Manufacturers, Exporters and

Suppliers are offering quality Resin. Resin manufacturers process the product in

view of its utilization. Owing to these enormous usages, the resin suppliers,

exporters and sellers offer it at reasonable prices.

Page 11: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 11

The global epoxy resin market was valued at $6.0 billion in 2013, and is projected

to reach $9.2 billion by 2019, growing at a CAGR of 7.4% between 2014 and

2019.

The demand for resin market is supposed to rise in Asia-Pacific due to the robust

growth in end-user industries in China and India.

Industry is witnessing high growth due to increasing applications, technological

advancements, and growing demand in the Asia-Pacific region. The global wind

energy market development is one of the major market drivers for resins.

Polyester resin also constitutes more than half of the resin used in Indian

composite industry.

Rise in raw materials cost and increasing awareness of health hazards associated

with BPA-based products are the major stumbling blocks of the market. The

competitive environment of the resin market, for example growing demand of

alkyd and polyester resins, is providing opportunity for manufacturers in this

region. Rapid growth of the resin market is driven by the growth in end-user

industries.

2.4. Demand and Supply gap

Rising global demand for paints & coatings in various industrial applications is one

of the major drivers for growth of the resins market. Additionally, increasing

demand for resins from different industries is fuelling the resins market.

Transparency Market Research has published a new report titled “Epoxy Resins

Market - Global Industry Analysis, Size, Share, Growth, Trends and

Page 12: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 12

Forecast, 2014 - 2020.” According to the report, the global epoxy resins

market was valued at USD 6.64 billion in 2013 and is anticipated to reach USD

10.55 billion at the end of 2020, growing at a CAGR of 6.9% between 2014 and

2020. There is a rising demand of paints both due to rapid industrialization and

also of housing industry. In the last ten years, the Indian Paint Industry has grown

at a compounded annual growth rate (CAGR) of 12-13%. Decorative paints

segment accounts for nearly 65-70% of the Indian paint industry. Paints industry

is mostly located in western part of the country so there is a huge gap of supply of

raw materials in the eastern part. This project will be a small attempt to supply

that market in eastern India.

Unsaturated polyester resins (UPR) are known for their commercial usage in

fiberglass reinforced plastics (FRP) which are utilized in building & constructions,

marine, wind energy, electrical & electronics, pipes & tanks, and

automotive/transportation. The unsaturated polyester resin market in India is

suspended to grow substantially in the next five years. The market is mainly driven

by domestic consumption basically by government, NGOs, and civic bodies. The

Indian unsaturated polyester resin market showed strong growth in the last couple

of years due to strong GDP growth, increased manufacturing activity, and core

sector growth. According to market forecasts, Indian unsaturated polyester resin

market is expected to reach 445 million pounds by 2018.

Competition in the Indian market swells in recent years. This had many companies

opting out of low-margin segments, as competition resulted in lower prices. A gap

Page 13: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 13

between demand and supply is created. Such remarkable price hikes take place

when there is removal of some of the key competitors, which leads to demand

override and as a consequence prices start soaring in a free-pricing market.

2.5. Imports Vs. Indigenous production

The state and pattern of growth of the economy determine the resin requirement.

The requirements of resin may be fulfilled either through indigenous production

and/or through imports. It is not possible for a developing country to import huge

quantities of resin because of foreign exchange constraints where as it is better for

a country to be self-sufficient in its resin requirements. The products manufactured

will substitute the imports, saving foreign exchange to India. It is also proposed to

export 20-30% of the resin to Middle East and South East Asia.

2.6. Export Possibility

There may be large opportunities to become a global supplier of quality resin. Also

there exists abundant market opportunities in the neighboring regions of Asia,

Africa and the Middle East.

2.7. Domestic/Export Markets

The finished goods will be sold in domestic market and would be largely exported

to the Regulated International Market as per demand.

Page 14: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 14

2.8. Employment Generation (Direct & Indirect) due to the project

Total manpower for the project will be 22, details are given in Table below.

Table 5: Personnel & Employment

Sl. No. Particulars Heads

1. Loading Unloading Labour Unskilled 8

2. Security Unskilled 3

3. Machine Helper Unskilled 4

4. Machine Operator Semi-skilled 2

5. Mess Unskilled 1

6. Manager Skilled 1

7. Chemist Skilled 1

8. Accountant Skilled 1

9. Sales Manager Skilled 1

Total 22

3. PROJECT DESCRIPTION

3.1. Type of Project including Interlinked and Interdependent Projects, if

any

M/s. Nataraj Hydrocarbons Pvt. Ltd. (NHCPL) have proposed for setting up

manufacturing unit of Synthetic Resins viz. Unsaturated Polyester Resin (GP

Resin) and Alkyd Resin with the total production capacity of 12 Tonnes/day at

Village: Belmuri, P.S. Dhaniakhali, Mauza : Chhota Khanpur, J.L. No-192, District:

Hooghly, West Bengal. The L.R. Dag numbers are 567,569 and 571.

Page 15: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 15

3.2. Location (map showing general location, specific location and project

boundary & project site layout) with coordinates.

The company has acquired 98 Decimal (3965.886 sqm) of land at Village: Belmuri,

P.S. Dhaniakhali, Mauza : Chhota Khanpur, J.L. No-192, District: Hooghly, West

Bengal. The L.R. Dag numbers are 567,569 and 571. The land is converted into

Factory Land and muted in company’s name. The factory will be constructed on

the said land. The land is within 50 KM from Kolkata and is well connected through

Durgapur Expressway, NH-2. Two Railway Stations namely Belmuri and

Dhaniakhali are within 1 K.M. from the location.

The latitude and longitude of the project site is 22°56'27.31"N, 88°08'58.13"E

respectively.

Figure1: Project Location

Page 16: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 16

Figure 2: Plant Layout

Page 17: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 17

3.3. Details of alternate sites considered and the basis of selecting the

proposed site, particularly the environmental consideration gone into should

be highlighted.

At a suitable distance from forest cover

Far from nearest habitation.

Well connected to NH-2

3.4. Size and Magnitude of Operation

Size and Magnitude of operation of the proposed projects include:

1. Unit will propose to manufacture of Resins.

i) Unsaturated Polyester Resins: 150 Tonnes/Month

ii) Alkyd Resins : 150 Tonnes/Month

Table 6: Details of Machineries and Utilities

Sl. No.

Equipment Qty. Type Size/ Capacity

1. Reactor Sets 4 SS reactor, SS column, SS condenser

1KL each

2. Reactor Sets 4 MS reactor, MS column, MS Condenser

1KL each

3. Blender 8 MS Vessel 1.5 KL each

4. Mono EthyleneGlycol 1 MS tank, zinc coated inside 50KL

5 Styrene Monomer 1 SS tank, insulated 50KL

6. Thermic Fluid Heater (TFH)

1 - 200000 Kcal/hr

7. Diesel Generator 1 - 30 KVA

Page 18: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 18

3.5. Project description with process details (a schematic diagram/flow chart

showing the project layout, components of the project etc. should be given)

Flow sheet of manufacturing process of unsaturated polyester resin and alkyd resin

as a whole

All quantities are expressed in Kg/batch

Glycol: 375

Acid Anhydride: 350

Maleic Anhydride: 240

Additives: 1

Reactor Water Distilled Out: 24

Blender Styrene Monomer: 557

1500 Kg of Unsaturated Polyester Resin

(Finished Product)

Linseed Oil, Castor Oil: 429

Glycerin/MEG/DPG/

Pentaerithritol/

Trimethanol Propane: 288

Acid Anhydride

(PA/MA/AA/Rosin): 473

Reactor Water Distilled Out: 53

Blender Xylene: 364

Monomer

1500 Kg of Alkyd Resin

(Finished Product)

Page 19: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 19

3.6. Raw Material Required Along Estimated Quantity, Likely Source, and

Marketing Area of Final Product/s Mode Of Transport Of Raw Material

And Finished Product.

For Unsaturated Polyester Resins

Glycol (Mono Ethylene Glycol/Di ethylene Glycol/

Propylene Glycol/ Di Propylene Glycol)

TPM 37.5

Acid Anhydride (Phthalic Anhydride/Isophathalic Acid/

Purified Terephathalic Acid (PTA)

TPM 35.0

Malleic Anhydride TPM 24.0

Styrene Monomer TPM 55.65

Additives TPM 0.1

For Alkyd Resin

Caster Oil/Linseed Oil/Soyabene Oil TPM 42.5

Glycerin/MEG/Pentaerithritol/ DPG/ Trimethalol Propane

TPM 28.75

Acid Anhydride (PA/MA/AA/Rosin) TPM 47.25

Xylene TPM 36.25

Page 20: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 20

3.7. Resource optimization/recycling and reuse envisaged in the project, if

any, should be briefly outlined.

The company has proposed for setting up Manufacturing unit of Synthetic

Organic Resins viz. Unsaturated Polyester Resin (GP Resin) and Alkyd Resin with

the production capacity of 6 Tonnes/day & 6 Tonnes/day respectively. No reuse is

predicted in the proposed project.

3.8. Availability of water its source, Energy/Power requirement and source

should be given.

Electricity: The contracted power is 32KVA. The same infrastructure may be

used to increase the demand upto 49 KVA. The power is obtained from

WBSEDCL. The main requirement for power is to drive TFH (10KVA), suction

pumps (2h.p.X4), Tube well (1h.p.), lighting and other utilities. Apart from this there

is a D.G. set for 30KVA as backup unit.

Water: The company will meet its entire water requirement from deep water tube

well. The company has already obtained the license for the same. The estimated

demand for water is 5KLD for meeting the entire requirements for domestic

consumption, gardening and Industrial uses.

The water requirement including for cooling & others and Domestic water is

projected Table 7.

Page 21: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 21

Table 7: Water Requirement

Sl. No. Particulars Water Requirement

(KLD)

1. Domestic 2.5

2. Gardening 2.0

3. Industrial

Process Nil

Cooling 0.3

Washing 0.2

Total 5.0

Fuel Requirement: The only fuel required is Diesel. It will be used for TFH

2,00,000 Kcal @ 21l/hr and D.G. set 30 KVA @ 7l/hr.

3.9. Quantity of waste to be generated (liquid and solid) and scheme for their

management/disposal.

Domestic wastewater (2 KLD) will be generated and discharged through septic

tank into soak pit. Total 0.6 KLD industrial wastewater will be collected, equalized

and completely evaporated in Thermic Fluid Evaporator.

Table 8: Source & Management of generated waste

Source Type of waste Quantity/Annum

Physical Form Management

Evaporator Evaporation Residue

0.1MT Solid & Inorganic

Collection, Storage & Disposal by Land filling

Plant & Machinery

Used / Spent Oil

0.1KL Liquid & Organic

Lubricant or Sell to approved Recyclers

Page 22: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 22

Raw Material Storage & Handling

Discarded Containers/ Barrels

600 kg Solid& Inorganic

Decontamination And Reuse or Sell to scrap vendors

Sewage

Sludge

- 200kg Solid To be given to Govt Approved incinerators

hich give infoon of E

4. SITE ANALYSIS

4.1 Connectivity

The area is connected by road to Durgapur town as well as to other industrial

town like Asansol, Raniganj, Dhanbad. It is 50 KM from Kolkata, and is well

connected through Durgapur Expressway, NH-2. Two Railway Stations namely

Belmuri and Dhaniakhali are within 1 KM from the location. All the civic amenities

like market, bus stand, hospital, school, college, hotel, restaurant etc. all are

available in the town which is about 5-7 KM from the site. Distance of important

Cities are given below.

Kolkata – 50 KM, Asansol – 146 KM, Burdwan – 78 KM,

Durgapur- 105 KM, Raniganj – 132 KM, Suri – 125 KM

Page 23: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 23

Figure 3: Map of Project site

4.2. Land form, Land use and Land ownership

The company has acquired 98 Decimal (3965.886 sqm) of land at Village: Belmuri,

P.S. Dhaniakhali, Mauza : Chhota Khanpur, J.L. No-192, District: Hooghly, West

Bengal. The L.R. Dag numbers are 567,569 and 571. The land is converted into

Factory Land and muted in company’s name. The factory will be constructed on

the said land.

Page 24: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 24

4.3. Topography (along with map)

The area has been marked on Survey of India Topo Map No. F45K1(79B/1).

The latitude and longitude of the project site is 22°56'27.31"N & 88°08'58.13"E

respectively.

Figure 4: Topo Map of Project site

Page 25: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 25

Figure 5: Google Map of Project site

4.4. Existing land use pattern (Agriculture, on-agriculture, forest, water

bodies (including area under CRZ), shortest distances from the periphery

of the project to the periphery of the forests, national park, wild life

sanctuary, eco sensitive areas, water bodies (distance from the HFL of

the river), CRZ in case of notified industrial area, a copy of the Gazette

notification should be industrial area, a copy of the Gazette notification

should be given.

Page 26: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 26

Existing General land use

Table 9: Land Utilization Statistics of Hooghly District (in ’000 ha.)

Source: Statistical Handbook, BAE & S, 2005

1 Reporting Area 312.22

2 Forest Area 0.53

3 Area under Non-Agricultural use 84.65

4 Barren and Unculturable Land 0.61

5 Permanent pasture and other grazing land

0.06

6 Land under Miscellaneous Tree Groves not included in Net Sown Area

3.18

7 Culturable Waste Land 1.83

8 Fallow Land other than Current Fallow 0.55

9 Current Fallow 1.08

10 Net Sown Area 219.73

The reported area as per above table under land utilization statistics of the

Hooghly district was 312.22 sq. km. 71 per cent of area was under net sown area

and 27 per cent under non-agricultural use. Forest area is less than one per cent.

The land utilization statistics of the district thus show enough scopes for both

agricultural and non-agricultural activities of the district.

Shortest Distance From Following Particulars:

Periphery of the project to periphery of the forests - Within 10 km

Wild Life Sanctuary: - None (within 10 km)

Eco sensitive area: - None (within 10 km)

Water bodies (distance from the HFL of the river)- None (within 10 km)

Notified industrial area: - None (within 10 Km)

Page 27: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 27

4.5. Existing Infrastructure

This is a new project. The land is converted into Factory Land and muted in

company’s name. The land is at clear possession.

4.6. Soil Classification

Hooghly district is built up with mixed alluvium. Subsurface lithologies down to a

depth of 150 m from the surface consist of mainly clay, silt and sand of different

grades varying from fine to coarse, occasionally mixed with fine gravel. The

eastern parts of the district are clayey, stiff and deep; although the western parts

are loamy, permeable and easily friable. The 0-0.2 m layer is mainly loam in

texture (53.9%) followed by silty clay (23.3%), silty clay loam (23.1%) and sandy

loam (0.71%) in nature. Surface soils of 72% area of the district are acidic.

Organic carbon status is usually low to medium, with a range of 1.2 to 7.4 g kg -1.

4.7. Climatic data from secondary sources

Hooghly experiences a tropical savanna climate. March to May is dry summer

intervened by tropical cyclonic storms. June to September is wet summer while

October is autumn. The normal trend is - winter season starts from about the

middle of November and continues till the end of February. The average annual

temperature is 26.8°C and its monthly temperatures range from 16°C to 33°C and

maximum temperature often exceed to 38°C. Average rainfall is 1500 millimetres.

Maximum rainfall occurs in August. Summer is dominated by strong southwesterly

Page 28: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 28

winds. Winters are really comfortable. Its temperatures vary between 11°C to

17°C.

4.8. Social Infrastructure available

As per provisional reports of Census India, population of Hooghly in 2011 is

5,519,145; whereas male and female are 2,814,653 and 2,704,492 respectively.

Sex ratio (per 1000) is 961, whereas child sex ratio (0-6 Age) is 952. Total

population in Dhaniakhali Block is 320,534; of which 160,789 are males and

159,745 are females.

Details of Population in Dhaniakhali are given below in Table 10.

Table 10: Details of Population in Dhaniakhali

Total Male Female

Population 320,534 160,789 159,745

Population in the age-group 0-6 31,228 15,918 15,310

Scheduled Castes population 105,811 52,718 53,093

Scheduled Tribes population 45,715 22,275 23,440

Literates 218,902 119,539 99,363

Total workers 144,082 101,608 42,474

Main workers 101,371 79,922 21,449

Cultivators 22,213 20,808 1,405

Page 29: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 29

5. PLANNING BRIEF

5.1. Planning concept (type of industries, facilities, transportation etc) town

and country planning/Development authority Classification.

The project is at Village: Belmuri, P.S. Dhaniakhali, Mauza : Chhota Khanpur, J.L.

No-192, District: Hooghly, West Bengal. Necessary development will be made.

5.2. Population Projection

As per 2011 census, 38.57 percent of total Hooghly population lives in urban

regions of district. In total 2,128,499 people lives in urban areas of which males

are 1,091,708 and females are 1,036,791. Out of total Hooghly population for

2011 census, 61.43 % population of Hooghly districts lives in rural areas of

villages. The total Hooghly district population living in rural areas is 3,390,646 of

which males and females are 1,722,945 and 1,667,701 respectively. Average

literacy rate of Hooghly in 2011 were 81.80 compared to 75.11 of 2001. Density of

Hooghly district for 2011 is 1,753 people per sq. km. In case of sex ratio in

Hooghly, it stood at 961 per 1000 male compared to 2001 census figure of 947. As

per census 2011, child sex ratio is 952 compared to 951 of census 2001. The child

population comprises 10.33 % of total rural population of Hooghly district. Literacy

rate in rural areas of Hooghly district is 78.53 % as per census data 2011. Religion

data of Hooghly is given in Table 11.

Page 30: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 30

Table 11: Religion data of Hooghly

Description %

Hindu 82.89 %

Muslims 15.77 %

Christian 0.13 %

Sikh 0.05 %

Buddhist 0.03 %

Jain 0.04 %

Others 0.89 %

Not Stated 0.21 %

5.3. Land use planning (breakup along with green belt etc.)

The Nataraj Hydrocarbons Pvt. Ltd. occupies about 98 Decimal (nearly

3965.886 sqm) of land at Village: Belmuri, P.S. Dhaniakhali, Mauza: Chhota

Khanpur, J.L. No-192, District: Hooghly, West Bengal. Two Railway Stations

namely Belmuri and Dhaniakhali are within 1 K.M. from the location. Thus it is well

connected through rail and roads. Area breakup along with green belt is given in

Table below.

Table 12: Area breakup

Sl. No. Particulars Area(sqm) Percentage

1 Process Plant 148.6 3.76%

2 Raw Material 223 5.64%

3 Utility 18.5 0.46%

4 Hazardous Waste Storage 27.87 0.7%

5 Staff Quarter 46.45 1.17%

Page 31: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 31

6 Office /Lab 37.16 0.9%

7 Road 592.5 15%

8 Green Belt 1319 33.16%

9 Undeveloped 1,551.92 39.28%

Total 3965 100%

Figure 6: Green Belt Development

Page 32: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 32

5.4. Assessment of Infrastructure Demand (Physical & Social)

Physical & Social Infrastructure

Secondary survey has revealed that drinking water facility is a satisfactory to the

local people as all the villages are having either well or tube well as source of

drinking water. Under medical facilities all the system such as allopathic,

homeopathic and ayurvedic medicines are available at area at a distance of 2-3

kms. Most of the villages are connected by kuchha roads to district headquarter.

There is educational facility in the area. There is electricity in most of the villages.

This project will provide employment for about 22 people.

5.5. Amenities/Facilities

Greenbelt area may be developed in the surrounding project site. Drinking water

and power is available at nearby villages. First aid box with all necessary materials

will kept all time in the office building for use as and when required.

6. PROPOSED INFRASTRUCTURE

6.1. Industrial Area (Processing Area)

Developing of Greenbelt area inside the plant and surrounding the area.

6.2. Resident Area (Non Processing Area)

No residential area is proposed.

6.3. Green Belt

An extensive plantation within the boundary limits of the plant is considered during

expansion project work by planting about 2300 saplings making a two row deep

green belt along the periphery (spacing 2.0 m x 2.0 m) and all along internal roads

Page 33: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 33

iron ore storage areas, ground hoppers and dumps leaving only adequate truck

access. The total land area covered for greenbelt will be 33% of the total area i.e.,

1319 sqm.

Table 13: List of big trees for proposed plantation

No. Common name Scientific name Family

01. Radhachura Delonix regia Caesalpinaceae

02. Arjun, Arjuna Terminalia arjuna Combretaceae

03. Chatim Alstonia scholaris Apocynaceae

04. Jhaun Casuarina equisetifolia Casuarinaceae

05. Nim Azadirachta indica Meliaceae

06. Ghoranim Melia azedarch Meliaceae

07. Tantul, Tentuli Tamarindus indica Caesal pinaceae

08. Krishnachura Caesalpinia pulcherrima Caesalpinaceae

09. Akashmoni Acacia moniliformis Mimosaceae

10. Aam Mangifera indica Anacardiaceae

11. Sisso Dalbergia sissoo Papilionaceae

12. Pakur Ficus infectoria Moraceae

13. Sirish Albizia Lebbeck Mimosaceae

14. Jarul Lagerstroemia speciosa Lythraceae

15. Karanj Derris indica Fabaceae

16. Debdaru Polyalthia longifolia Anonaceae

17. Bot Ficus benghalensis Moraceae

18 Ashwatha Ficus religiosa Moraceae

Page 34: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 34

6.4. Social Infrastructure

See section 4.8.

6.5. Connectivity (Traffic and transportation Road/Rail/Metro/Water ways

etc)

The area is connected by road to Durgapur town as well as to other industrial town

like Asansol, Raniganj, Dhanbad. It is 50 KM from Kolkata, and is well connected

through Durgapur Expressway, NH-2. Two Railway Stations namely Belmuri and

Dhaniakhali are within 1 KM from the location. The place is well connected to

railway station and towns by bus, jeeps, taxi and rickshaw. All the civic amenities

like market, bus stand, hospital, school, college, hotel, restaurant etc. all are

available in the town which is about 5-7 KM from the site. Distance of important

Cities are given below.

Kolkata – 180 KM Asansol – 42 KM Burdwan – 63 KM

Raniganj – 22 KM Dhandbad – 94 KM Suri – 52 KM

6.6. Drinking Water Management (Source & supply of water)

Water: The company will meet its entire water requirement from deep water tube

well. The company has already obtained the license for the same. The estimated

demand for water is 5KLD for meeting the entire requirements for domestic

consumption, gardening and Industrial uses.

The water requirement including for cooling & others and Domestic water is

projected as follows:

Page 35: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 35

Table 14: Water Requirement

The water will be available from Rain Water Harvesting (RWH) system and rest part

will be available from deep water tube well.

6.7. Sewerage System

There will not be any process waste water (or) cooling water blow down. As

Industrial effluent from process, cooling and washing activity is taken into raw

effluent collection tank cum equalization tank and after proper equalization, it is

completely evaporated by Thermic Fluid Evaporator (Capacity: 100L/hr) within the

premises. Hence, the unit maintains “Zero Effluent Discharge”.

Sanitary waste water will be treated in septic tank followed by soak pit.

6.8. Industrial Waste Management

The main source of hazardous waste generation is evaporation residue from

Thermal Fluid Evaporator due to evaporation of liquid effluent. The other sources

of hazardous waste are discarded containers/Barrel from storage and handling of

raw materials and spent/used oil generation from plant machinery. The unit will

Particulars Water Requirement (KLD)

Domestic 2.5

Gardening 2.0

Industrial

Process Nil

Cooling 0.3

Washing 0.2

Page 36: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 36

provided dedicated storage area of 28 m2 for the hazardous waste storage within

premises having impervious floor and roof cover with leachate collection system.

These solid Hazardous wastes will be given to the Govt. authorized agency.

6.9. Solid waste Management

The solid waste generation is proposed to be disposed off as follows:

Table 15: solid waste generation and Management

Type of Solid Waste Estimated Generation

(kg/Month)

Process of Disposal

Discarded Containers/

Barrels

50 Decontamination and reuse or cell to scrap vendors

Evaporation Residue 8 Collection, Storage & Disposal

Sewage Sludge 16 To be given to Govt.

approved incinerators

6.10. Power Requirement

The contracted power is 32KVA. The same infrastructure may be used to increase

the demand upto 49 KVA. The power is obtained from WBSEDCL. The main

requirement for power is to drive TFH (10KVA), suction pumps (2h.p.X4), Tube

well (1h.p.), lighting and other utilities. Apart from this there is a D.G. set for

30KVA as backup unit.

7. REHABILITATION AND RESETTLEMENT(R&R PLAN)

(Policy to adopted (Central State) in respect of the project affected

person including home oustees, land oustee and landless labour (A brief

outline to be given).

Page 37: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 37

No, R&R Plan is proposed.

8. PROJECT SCHEDULE AND COST ESTIMATES

8.1. (Likely date of start of construction and likely date of completion (time

schedule for the project to be given)

The Schedule Of Implementation For The Proposed Project Is Given Below

Activity Commencement Completion

Land acquisition and development Acquired and developed land

Civil works, Buildings, Foundation of

Machineries

July 2016 September 2016

Structural fabrication and erection of

technological structures

August 2016 October 2016

Placement of Orders of Plant and Machinery August 2016 November 2016

Erection of Equipments December 2016 January 2017

Trial Run and Commissioning January 2017 February 2017

Commercial Operation Date February 2017

8.2. Estimated project cost and along with analysis in terms of economic

viability of the project.

The cost of the project and means of finance is proposed to be as follows:

Sl.

No.

Item Cost

(Rs Lacs)

1. Land & Land Development 0.00

2. Building & Civil works 232.00

Page 38: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 38

3. Plant & Machinery 570.00

4. Contingencies & Others 65.00

5. Interest during construction 70.00

6. Pre-operative Expenses 44.00

7. Security Deposit- Power Connection 24.00

8. Miscellaneous Fixed Assets 20.00

Total 1025.00

The project cost is felt reasonable and comparable as per opinion in the current

date of assessment and made sample checks from the market and also discussed

with the industry experts on similar field.

Means of Finance

The means of finance for the proposed project is as follows:

Particulars Rs lacs

Fixed Capital 425.00

Term Loan 200.00

Working Capital Loan 400.00

Total 1025.00

Page 39: PRE FEASIBILITY REPORT - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...Market - Global Industry Analysis, Size, Share, Growth, Trends and Nataraj

Nataraj Hydrocarbons Pvt. Ltd.

Vill-Belmuri, District – Hooghly, West Bengal __________________________________________________________________________

Page No. 39

9. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATION)

CONCLUSION

The technical feasibility and financial viability of the project has been reviewed

with reference to the new project with reference to overall company as a whole.

Our review has been done on the basis of the present scenario and documents

made available to us by the company. We have made the assessment afresh and

made the changes in assumptions wherever felt required.

Based on our analysis it may be inferred that

a) The project is technically feasible and financially viable.

b) The overall financial liquidity and profitability parameters of the project appeared

to reasonable and satisfactory.

c) We conclude the capital expenditure of the company as a viable option subject to

the weakness and threats associated with a business venture.

d) The operation of plant has significant positive impact on the socio-economic

environment of the area. It helps to sustain the development of this area including

further development of physical infrastructure facilities.

In the interest of development and improve the social conditions of the local

habitants this project should be allowed after considering all the environment