20
Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, 2005. Sn. Environmental Specialist. Lasse Ringius.

Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, 2005. Sn. Environmental Specialist. Lasse

Embed Size (px)

DESCRIPTION

Kyoto Protocol: Industrial countries must reduce GHG emissions by 5.2% compared to 1990 levels in the period

Citation preview

Page 1: Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, 2005. Sn. Environmental Specialist. Lasse

Accessing Carbon Finance

Workshop on Landfill Gas Development and the CDM

Denpasar, Indonesia. September 5-7, 2005.

Sn. Environmental Specialist. Lasse Ringius. World Bank

Page 2: Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, 2005. Sn. Environmental Specialist. Lasse

Overview of Presentation

- Kyoto Protocol/CDM- Baseline and monitoring methodologies - CDM project cycle - Overview of global carbon market

Page 3: Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, 2005. Sn. Environmental Specialist. Lasse

Kyoto Protocol: Industrial countries must reduce GHG emissions by 5.2% compared to 1990 levels in the period 2008-2012

90

95

100

105

110

115

120

1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002

GH

G E

mis

sion

s (In

dex

100

= 19

90)

EU15

Japan

Canada

Page 4: Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, 2005. Sn. Environmental Specialist. Lasse

-8%-6% -6%

-2%-3%

+20%

+12%

+9%

EU15

(228 MtCO2e)

Canada

(159 MtCO2e)

Japan

(214 MtCO2e)

Other Western Europe+ New Zealand

(19 MtCO2e)

Perc

ent o

f 199

0 em

issi

ons

leve

l

Kyoto TargetCurrent (2002) Emissions

Current Kyoto gaps

Page 5: Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, 2005. Sn. Environmental Specialist. Lasse

Annex BNon-Annex B

How to close the gap?

Joint Imple-

mentation

Emissions Allowance

Market

Clean Development Mechanism

Page 6: Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, 2005. Sn. Environmental Specialist. Lasse

Clean Development Mechanism (CDM)

• Project-based mechanism• Projects in developing countries earn

“credits” for reducing additional CO2, CH4, N2O emissions

• Verified GHG emission reductions have become an internationally tradable commodity Seller: Project investor Buyer: OECD governments and companies facing

GHG mitigation targets under the Kyoto Protocol

Page 7: Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, 2005. Sn. Environmental Specialist. Lasse

World Bank Carbon Finance Funds

Italian Carbon Fund. $15 million (open to Italian participation). Italian Multi-shareholder. Multipurpose.

Netherlands Clean Development Facility. $180 million.Netherlands Ministry of Environment. CDM energy projects.

BioCarbon Fund. $46.3 million (open). Multi-shareholder. JI and CDM LULUCF projects.

Community Development Carbon Fund. $128.6 million (closed). Multi-shareholder. Small-scale CDM energy projects.

Prototype Carbon Fund. $180 million (closed). Multi-shareholder. Multi-purpose.

Total funds under management: ~ US$ 875 mill.

Netherlands ECF

Netherlands European Carbon Facility. $60 million with IFC.Netherlands Ministry of Economic Affairs. JI projects.Spanish

CFSpanish Carbon Fund. $200 million (open to Spanish participation). Spanish Multi-shareholder. Multipurpose.

Danish CF Danish Carbon Fund. $64 million (open to Danish participation). Danish Multi-shareholder. Multipurpose.

Page 8: Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, 2005. Sn. Environmental Specialist. Lasse

How Indonesia can benefit from the CDM

Electricity

$$

Power Purchase Agreement

Certified Emission Reductions

$$

Emission Reduction Purchase Agreement

LFG to Energy Project

Page 9: Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, 2005. Sn. Environmental Specialist. Lasse

Organic methane (CH4)

• Forms when organic material decomposes under anaerobic conditions

• Avoidance of CH4 emissions through: Prevention Capture & Combustion

• When CH4 is avoided, CO2 is emitted• But: CO2 originating from the decay of

organic material is considered neutral to the atmosphere

Page 10: Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, 2005. Sn. Environmental Specialist. Lasse

ER estimationThe amount of credits that can be earned from

LFG projects is dependant upon several factors: Amount of waste; Waste composition (organic fraction); Waste management practices (e.g landfill

covering, compacting of waste, depth of landfill);

Moisture; Age of the landfill site; Efficiency of LFG collection system; and Amount of LFG collection mandated by law

Page 11: Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, 2005. Sn. Environmental Specialist. Lasse

A back-of-the-envelope-calculation*

• Methane generation potential of 1 ton of waste ranges from less than 100 to more than 200 m3, depending on the waste composition (IPCC Good practice guidelines 1996)

• With weight of methane equaling 0.7168 kg/m3: 150m3 of CH4 = 0.1 tons of CH4

• At a collection efficiency of 70%, 0.07 tons of CH4 can be recovered

• Multiplied with the GWP for CH4 (i.e., 21), one ton of waste yields 1.47 t CO2e emission reductions (ERs)

* based on gas yield methodology

Page 12: Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, 2005. Sn. Environmental Specialist. Lasse

Example: Carbon revenues from LFG recovery and methane

destruction

1 mio. tons of waste

6 mio. m3 LFG/yr

2,140 ton CH4/yr

1,500 ton CH4 recovered/yr

31,500 tCO2e US$ 140,000/yr* 21

1

2

Underlying assumptions:- 1 m3 LFG contains 357 g methane- 70% collection efficiency- US$ 4.50/t CO2e

Page 13: Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, 2005. Sn. Environmental Specialist. Lasse

Opportunities in the MSW sector

• CH4 is 21 times more potent than CO2. The “methane kick” significantly improves project economics.

• Projects which reduce CO2 or CH4 emissions against the baseline are eligible, e.g. Landfill gas recovery and utilization Composting Biodigestion

Page 14: Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, 2005. Sn. Environmental Specialist. Lasse

LFG methodologies

Page 15: Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, 2005. Sn. Environmental Specialist. Lasse

Approved LFG methodologiesProject Referenc

ePresented

bySalvador da Bahia (VEGA), Brazil

AM0002 ICF Consulting

Durban, Africa del Sur

AM0010 PCF

Nova Gerar (NCDF)

AM0003 NCDF /Ecosecurities

Onyx, Brazil AM0011 CERUPTABIL, India AM0012 PCF / IDFC

Biodigester

Page 16: Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, 2005. Sn. Environmental Specialist. Lasse

Elements of consolidated LFG methodology ACM0001• Builds on approved methodologies for

landfill projects• Does not replace previously approved

methodologies• Applicable to both flaring-only and gas

utilization projects

Page 17: Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, 2005. Sn. Environmental Specialist. Lasse

Elements of ACM0001 - Baseline

• Baseline is release of gas to the atmosphere, considering gas captured for other reasons (safety, regulations, contractual requirements)

• If no regulations apply, an Adjustment Factor shall be used and justified based on project context

• Approved additionality tool applies Step 2: Investment analysis:

• For flaring projects: a straightforward investment economics test

• For electricity generation projects: compare levelized electricity costs with least cost option in the system or show that IRR is below standard returns in the market.

Step 4: Common practice test can feed into Adjustment Factor

Page 18: Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, 2005. Sn. Environmental Specialist. Lasse

Elements of ACM0001 - Monitoring

• LFG projects allow for direct monitoring of emission reductions following the simple rationale that all methane captured would have been released in the absence of the project

• ER = (methane captured – x%) * 21with x = Regulations or Adjustment Factor

• Monitoring variables include: LFG recovered / flared through flow meters, methane content of LFG (continuous gas analyzer or periodic samples), flare efficiency, flare availability, electricity generation, etc.

• Furthermore: monitoring of regulations and adjustment of baseline scenario if regulations tighten

Page 19: Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, 2005. Sn. Environmental Specialist. Lasse

Which methodology to choose?

Methodology Electricity generation

?

Baseline

Salvador da Bahia (VEGA)

no Mandated collection in concession contract (20% eff)

Durban (PCF)

yes Existing safety curtain wells (7% eff., declining) +

monitoring of regulationsNova Gerar

(NCDF)yes, but not

creditedCollection efficiency in

bidding documents + safety margin (20%)

Onyx (CERUPT)

yes, but on-site use only

Coll. mandated by law or economically attractive (0%)

Consolidated Methodology

yes Existing Regulations or Adjustment Factor +

monitoring of regulations

Page 20: Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, 2005. Sn. Environmental Specialist. Lasse

MSW Project Examples in the Bank

Durban LFG-to-energy, RSA A. SanghviNova Gerar LFG-to-energy, Brazil

W. Kornexl

Shanghai LFG-to-energy, China

M. Anderson

Mexico LFG-to-Energy Umbrella

W. Vergara

Teheran LFG-to-Energy, Iran

A. Rotman

Olivarria LFG capture and flaring, Argentina

H. Terraza

Liepaja Energy Cell, Latvia A. HalldinABIL Biodigester, India D. Hoornweg