Grafton Golf Club and Driving Range 60 Main Street Grafton, MA 01519 CIVT 660 – Senior Capstone Design Presented By: Thomas Bryce, Samuel Giard, Zachary Kemmer, Kevin McCabe, Timothy Nietupski

4P - CAPSTONE FINAL POWERPOINT

Embed Size (px)

Citation preview

Page 1: 4P - CAPSTONE FINAL POWERPOINT

Grafton Golf Club and Driving Range

60 Main StreetGrafton, MA 01519

CIVT 660 – Senior Capstone Design

Presented By:

Thomas Bryce, Samuel Giard, Zachary Kemmer, Kevin McCabe, Timothy Nietupski

Page 2: 4P - CAPSTONE FINAL POWERPOINT

Boston Engineering & Design, Inc.5 Post Office Square Boston, MA 02115

(617) [email protected]

Page 3: 4P - CAPSTONE FINAL POWERPOINT

Project TeamResponsibility of Team Members:

Samuel Giard – Project Manager

Kevin McCabe – Municipal Engineer

Thomas Bryce – Environmental Engineer

Timothy Nietupski – Structural Engineer

Zachary Kemmer – Geotechnical Engineer

Page 4: 4P - CAPSTONE FINAL POWERPOINT

Project Description

Double-tiered Synthetic Turf Driving Range

Hydro range component in order to maximize distance

Pro-shop

Locker Rooms

Restaurant/bar facility

16.2 acre project site

Page 5: 4P - CAPSTONE FINAL POWERPOINT

Existing Site Conditions

Page 6: 4P - CAPSTONE FINAL POWERPOINT

Project Management

DESIGN PHASE: PLANNING/DESIGN

Time: Schedule

Cost: Budget

Safety Issues

Environmental & Public welfare concerns

Quality Control

CONTROLS

Meeting Minutes

Project Time Sheet (Billable vs non-billable)

Project Schedule

Page 7: 4P - CAPSTONE FINAL POWERPOINT

Project Management

ZONING REQUIREMENTS

Existing Overlay: “Fisherville Smart Growth Overlay District” (FSGOD)

Creation of dense residential/mixed use Affordable Housing (40B)

Process required to initiate “Community Business” (CB) Overlay

Initiate proposed amendment

Submission to planning board

Notify Public – “Notice of Public Hearing”

Hold Public Hearing

Submission of plans/amendments of proposed overlay to MA Attorney General for final approval

Page 8: 4P - CAPSTONE FINAL POWERPOINT

Project Management

BENEFITS TO THE COMMUNITY

Transforming a contaminated, decrepit site into a usable, community friendly complex

Provides recreational opportunities for local residents

Brings business to the surrounding community

Job opportunities for residents

Tax revenue for the City of Grafton

Page 9: 4P - CAPSTONE FINAL POWERPOINT

Site and Civil Design

Existing Site

Parcel size:

16.20 Acres

Work zone Roughly 8.4 Acres

Fisherville Pond

Blackstone

River

Page 10: 4P - CAPSTONE FINAL POWERPOINT

Site and Civil Design

PROPOSED SITE PLAN

Page 11: 4P - CAPSTONE FINAL POWERPOINT

Site and Civil Design

Stormwater BMPs (Better Management Practices )

Layout A: Grass Channel, Deep sump & Hooded catch Basin, Extended Dry Detention Basin

Layout B: Oil Grit Separator, Grass Channel, Extended Dry Detention Basin

Both Provide 81% Total Suspended Solids (TSS) Removal

Required 80% TSS Removal

A

B

Page 12: 4P - CAPSTONE FINAL POWERPOINT

Site and Civil Design

Page 13: 4P - CAPSTONE FINAL POWERPOINT

Site and Civil Design

• Proposed site conditions increase peak flow

approximately 30%

• “In a 50 year storm the peak storm water flows leaving

the premises will not be increased by more than 10%”

• Detention basin volume of approximately 15,000 ft3 to

offset the peak flow increase

Page 14: 4P - CAPSTONE FINAL POWERPOINT

Site and Civil Design

PARKING LOT

Compliance with Grafton Zoning By-Law section 4.2

One tree per 5 parking spaces

Drop Off area provided

3 Handicap spaces provided

Page 15: 4P - CAPSTONE FINAL POWERPOINT

Utilities Design

Water Service Connection Design

Purpose: To service Domestic Water and Fire Suppression Demands for the complex

Existing Conditions:

10” Asbestos Concrete (AC) Water Main on South side of Rt. 122A

Existing water service connection abandoned and capped in 1999

Calculations:

82 Fixture Units (FU) Demand = 39 GPM

Needed Fire Flow (NFF) =900 GPM for 4 hours

Total Flow = 939 GPM

5” Service Pipe serves 701-1199 GPM (Per MA State Plumbing Code)

Page 16: 4P - CAPSTONE FINAL POWERPOINT

Utilities Design Cont’d.

Proposed Design:

5” Ductile Iron Service Connection

Mechanical Joint Tapping Gate Valve with Curb Box

Neptune Protectus III Water Meter (To Split Service)

Installation Specs:

10’ horizontally from Sewer Main

2’ above Sewer Main

Page 17: 4P - CAPSTONE FINAL POWERPOINT

Utilities Design Cont’d.

Sewer Service Connection Design

Purpose: To adequately serve all Sewage Flow

Existing Conditions:

21” Reinforced Concrete (RC) Main on North side of Rt. 122A

Existing Sewer Connection to site abandoned and capped in 1999

Calculations:

Estimated Daily Flow = 7060 GPD

Estimated Peak Flow = 98 FU = 42 GPM at Peak

Page 18: 4P - CAPSTONE FINAL POWERPOINT

Utilities Design Cont’d.

Proposed Design:

6” PVC SDR 35 Sewer Service Connection (Min. Per Grafton Sewer Regulation)

110’ Length

Consistent 2% Slope

Self Cleaning Velocity = 2 ft./s

Installation 5’ Below grade at Foundation Slab

Saddle Connection to existing main

Sewer Drop Manhole at Main

Page 19: 4P - CAPSTONE FINAL POWERPOINT

Environmental Design

Site History/Environmental Remediation:

Mill destroyed by fire in 1999.

Deposited asbestos fire retardant materials to the immediate surrounding area.

All soils and materials exposed to asbestos still bearing under current MassDEP regulations.

North parcel to be encapsulated with a geo-synthetic clay layer to prevent infiltration and further contamination.

Above: MassDEP Pre - Construction Site Remediation

Page 20: 4P - CAPSTONE FINAL POWERPOINT

Environmental DesignWetland Resource Areas / Functions:

Shoreline of Fisherville Pond is composed of lacustrine wetlands.

Retains sediments and act as assimilators and bio-transformers of nutrients and wastes.

Natural balance of habitat species provides biological control within the ecosystem.

Golf ball collection system (floating debris fence) to be installed on the Fisherville Pond

Removal of shoreline wetlands to ensure safe and ease of access for golf ball retrieval

Top Right: Proposed Site ConditionsBottom Right: Floating Containment Boom Detail Bottom Left : Lacustrine Wetlands (North Parcel)

Page 21: 4P - CAPSTONE FINAL POWERPOINT

Environmental DesignProject Thresholds :

In accordance with the Massachusetts Environmental Policy Act (MEPA) regulations, project threshold impacts include and require a mandatory Environmental Notification Form (ENF):

301 CMR 11.03(1)(b)(2) – Creation of five or more acres of impervious area (Geo-synthetic Clay Liner)

301 CMR 11.00 (3)(a)(2) - Alteration requiring a variance in accordance with the Wetlands Protection Act

301 CMR 11.00 (3)(b)(1) - Alteration of 500 or more linear feet of bank along a fish run or inland bank. (Priority Concern)

Page 22: 4P - CAPSTONE FINAL POWERPOINT

Environmental DesignWetland Mitigation:

Proposed replication conditions to comply with General Performance Standards set forth in 310 CMR 10.55 (4)(b): Bordering Vegetated Wetlands (BVW’s).

4080 SF of BVW’s to be relocated within the Blackstone Canal, an adjacent hydraulic connection to the South parcel.

Replication design to meet the function of performance habitat mitigation to restore the natural balance of marine life within the watershed.

Page 23: 4P - CAPSTONE FINAL POWERPOINT

Environmental Design

Above: GIS Map of Fisherville Mill Site (Wetlands Delineation)– Grafton, MA

Top Right: North Parcel Wetland Removal

Bottom Right: South Parcel Wetland Replication

Page 24: 4P - CAPSTONE FINAL POWERPOINT

Environmental Design

Municipal/State/Federal Permits to be Filed:

Environmental Protection Agency (EPA) – Environmental Notification Form (ENF)

MassDEP – WPA Form 1 – Request for Determination of Applicability

MassDEP – WPA Form 3 – Notice of Intent

MassDEP – Bureau of Resource Protection – Waterways Regulation Program – Chapter 91 License

Grafton Conservation Commission – Notice of Intent and Application for Permit

U.S. Army Corps of Engineers – Application for Department of the Army Permit (Navigable Waterways Construction)

COE Wetlands Delineation Manual – Routine Wetland Determination

Page 25: 4P - CAPSTONE FINAL POWERPOINT

Geotechnical/Foundation Design

Site Conditions:

Underlying bedrock layers of Ponaganset and Hope Valley Alaskite Gneiss

Multiple course to fine sand layers

Heavy metal and petroleum contamination within soil

Ground water level 8 feet below grade with frost line at 4 feet

Page 26: 4P - CAPSTONE FINAL POWERPOINT

N – Values calculated from

boring logs

Internal Friction “Φ˚”

determined via approximate

relationships, per McCarthy

Groundwater Table based off

boring logs

4’ frost line traditionally

accepted as typical in MA

Dense, Coarse Sand

N = 35, Φ = 39˚, γ = 125

Dense, Coarse Sand

N = 29, Φ = 40˚, γ = 120

Medium, Coarse Sand

N = 35, Φ = 39˚, γ = 98

Ground Water

Frost Line

Bedrock

Geotechnical/Foundation Design

Page 27: 4P - CAPSTONE FINAL POWERPOINT

Lined Area

• 6.3 acres to be capped

• Bentonite Geosynthetic

Clay Liner (GCL)

• Astroturf to be placed over

GCL in field area (yellow)

• Area to be capped without

Astroturf (blue)

Geotechnical/Foundation Design

Field

Page 28: 4P - CAPSTONE FINAL POWERPOINT

1” - Astroturf

3” - Crushed Gravel

3” - Sand

Existing Subgrade

30ml – Polyurethane Sheet

1/4” – G.C.L.

Geotechnical/Foundation Design

Left: Engineered Cap

Hydrologic SealMetal Edging

Compacted Fill

Contaminated SubgradeRight: Anchor Trench

Astroturf LayersClean Fill

Page 29: 4P - CAPSTONE FINAL POWERPOINT

Geotechnical/Foundation Design

Below: Tension

Rebar Layout

Left: Light and

Netting Pole Design

8 – No. 18 bars

Poles Value (lbs./ft2)

Bearing Pressure 2,321

Ultimate Bearing Capacity 54,359

Allowable Bearing Capacity

18,120

Page 30: 4P - CAPSTONE FINAL POWERPOINT

Geotechnical/Foundation Design

Left: Foundation

G.C.L. Seal

Right: Pole G.C.L. Seal

Page 31: 4P - CAPSTONE FINAL POWERPOINT

Structural Design

Overview of Design:

Two-story structure with a single slope roof and gutter system

Structural steel framing, metal stud and drywall partitions, with reinforced concrete slabs on grade and on deck

Cantilevered driving stalls

CMU and brick cavity shear wall façade, glass curtain wall

Elevator shaft wall and stairwell shaft

5’ foundation wall and continuous footings

Design capacity of 125 people

The structure is fully compliant with ADA Standards

Best management practices for sustainability

Page 32: 4P - CAPSTONE FINAL POWERPOINT

Structural Design

Design of Structural Components:

Design in compliance with IBC 2009, ASCE/SEI 7-05 and AISC Steel Manual

Member design based off of design loads from building code, building use, building design

Mixed use occupancy, most conservative used

Beam, girder, column, shear wall, connections, reinforced concrete slab design complete with supporting calculations

All structural steel members designed with ASTM A992 steel

Connections to be shop welded with double angles, field bolted

All bolts to be 7/8” ASTM A325-N steel

Page 33: 4P - CAPSTONE FINAL POWERPOINT

Structural Design

Framing Plan:

Roof and floor framing plan layouts are identical

Different loadings

Page 34: 4P - CAPSTONE FINAL POWERPOINT

Structural Design

Member Schedule:

Load path through structural components – vertical and horizontal

Member Schedule

Element Symbol Shape Length (ft.) Weight (lbs.)

Beams

RSB1 W12x22 40 880

RSB2 W10x22 30 660

RB1 W14x30 40 1200

RB2 W10x22 30 660

SB1 W18x46 40 1840

SB2 W14x30 30 900

B1 W21x68 40 2720

B2 W16x45 30 1350

Girders

RSG1 W21x68 45 3060

RSG2 W10x45 15 675

RG1 W24x84 45 3780

RG2 W21x44 15 660

SG1 W33x141 45 6345

SG2 W24x117 15 1755

G1 W24x207 45 9315

G2 W24x192 15 2880

Columns

A3 W14x82 30 2460

A9 W14x82 30 2460

B3 W14x82 30 2460

B9 W14x82 30 2460

C3 W14x82 30 2460

C9 W14x82 30 2460

D3 W14x82 30 2460

D9 W14x82 30 2460

Page 35: 4P - CAPSTONE FINAL POWERPOINT

Structural Design

Floor Plans:

Building is 60’ x 110’

First Floor: Lobby, pro-shop, locker rooms

Second Floor: Kitchen, restaurant, bar

Page 36: 4P - CAPSTONE FINAL POWERPOINT

Structural Design

Drawings:

All drawings completed using “Revit Structure 2012” and “AutoCAD Civil 3D 2013” software

Page 37: 4P - CAPSTONE FINAL POWERPOINT

A special thanks to all of the following professors for their contributions and efforts with this final project

Prof. Anderson

Prof. Hopcroft

Prof. Davidson

Prof. Lambrechts

Prof. Duggan

Matt Gault – Aqua Greens

Page 38: 4P - CAPSTONE FINAL POWERPOINT

Questions? Golf Tips?