SmartAX MA5600 Multi-service Access Module Installation Manual
V300R002
Huawei Technologies Proprietary
SmartAX MA5600 Multi-service Access Module
Installation Manual
Manual Version T2-050419-20051230-C-3.20
Product Version V300R002
BOM 31042019
Huawei Technologies Co., Ltd. provides customers with comprehensive technical support and service. Please feel free to contact our local office or company headquarters.
Huawei Technologies Co., Ltd.
Address: Administration Building, Huawei Technologies Co., Ltd.,
Bantian, Longgang District, Shenzhen, P. R. China
Postal Code: 518129
Website: http://www.huawei.com
E-mail: [email protected]
Huawei Technologies Proprietary
Copyright © 2005 Huawei Technologies Co., Ltd.
All Rights Reserved
No part of this manual may be reproduced or transmitted in any form or by any means without the prior written consent of Huawei Technologies Co., Ltd.
Trademarks
, HUAWEI, C&C08, EAST8000, HONET, , ViewPoint, INtess, ETS, DMC,
TELLIN, InfoLink, Netkey, Quidway, SYNLOCK, Radium, M900/M1800, TELESIGHT, Quidview, Musa, Airbridge, Tellwin, Inmedia, VRP, DOPRA, iTELLIN, HUAWEI OptiX, C&C08 iNET, NETENGINE, OptiX, iSite, U-SYS, iMUSE, OpenEye, Lansway, SmartAX, infoX, and TopEng are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this manual are the property of their respective holders.
Notice
The information in this manual is subject to change without notice. Every effort has been made in the preparation of this manual to ensure accuracy of the contents, but all statements, information, and recommendations in this manual do not constitute the warranty of any kind, express or implied.
Huawei Technologies Proprietary
About This Manual
Release Notes
The current version of this manual applies to the SmartAX MA5600 Multi-service Access Module V300R002.
Related Manuals
The following manuals provide information about the MA5600.
Manual Content
SmartAX MA5600/MA5603 Multi-service Access Module Technical Manual
It provides an overall introduction to the MA5600 series, including the major features, system architecture, services and functions, maintenance, and networking applications.
SmartAX MA5600/MA5603 Multi-service Access Module Operation Manual
It provides information on general operations, data configuration, typical applications, and maintenance tasks of the MA5600 series.
SmartAX MA5600/MA5603 Multi-service Access Module Command Help
It introduces all commands of the MA5600 series. It is available only in the electronic form.
SmartAX MA5600 Multi-service Access Module Installation Manual
It provides information on the system installation of the MA5600.
SmartAX MA5600/MA5603 Multi-service Access Module Hardware Description Manual
It describes the components of the MA5600 series including cabinets, frames, boards, cables and other components (power module, lightning arrester, and signal transfer box).
Documentation CD ROM It contains the package of documentation.
Organization
The manual introduces installation of the MA5600. There are 14 parts in this manual.
Chapter 1 Equipment Overview introduces the hardware components and cabinet configuration of the MA5600.
Chapter 2 Preparing for the Installation describes preparation work for the installation.
Huawei Technologies Proprietary
Chapter 3 Installing the Cabinet on the Concrete Floor shows how to install the cabinet on the concrete floor.
Chapter 4 Installing the Cabinet on the Antistatic Floor shows how to install the cabinet on the antistatic floor.
Chapter 5 Installing the Dripping-proof Cover shows how to install the dripping-proof cover.
Chapter 6 Installing the Cabling Rack shows how to install the cabling rack.
Chapter 7 Installing the Frame and Board shows how to install the frame and board.
Chapter 8 Installing the Power Supply System shows how to install the power supply system.
Chapter 9 Connecting and Routing Cables shows how to connect and route subscriber cables and optical fibers.
Chapter 10 Powering on the System describes how to power on the system for debugging.
Appendix A Equipment Parameters provides equipment parameters, including physical parameters and power parameters.
Appendix B Cabinet Connection Diagrams provides the connection diagrams in different configurations.
Appendix C Cable Labels describes the regulations on cable labels.
Appendix D Environmental Requirements covers the environmental requirements of the MA5600.
Intended Audience
The manual is intended for the following readers:
l MA5600 hardware installation engineers l Technicians of carriers l MA5600 maintenance technicians
Conventions
The manual uses the following conventions.
Huawei Technologies Proprietary
I. General Conventions
Convention Description
Arial Normal paragraphs are in Arial.
Boldface Headings are in Boldface.
II. Symbols
Eye-catching symbols are also used in the manual to highlight the points that need special attention during the operation. They are defined as follows:
Caution, Warning: Means the reader be extremely careful during the
operation.
& Note: Means a complementary description.
Environmental Protection
This product has been designed to comply with the requirements on environmental protection. For the proper storage, use and disposal of this product, national laws and regulations must be observed.
Installation Manual SmartAX MA5600 Multi-service Access Module Safety Instructions
Huawei Technologies Proprietary
Safety Instructions
1. Overview
Caution:
l Before you perform any operation, read the instructions and precautions carefully to minimize the possibility of accidents.
l The personnel in charge of the installation and maintenance of the Huawei products should understand the basics of these safety instructions. Only trained and qualified personnel are allowed to install or maintain the product.
When you work on the product, please go through the following:
l The local safety regulations on the product. l The safety precautions and instructions on the product regulated by Huawei.
Safety precautions fall into four levels: Danger, Warning, Caution and Notice.
l Danger: Serious injury may occur. l Warning: Serious injury may occur. It may also damage the product. l Caution: Minor injury may occur. It may also damage the product or the product
environment. l Notice: A fault or a considerable impairment to operation may occur.
Warning symbol Meaning
General danger
Equipment sensitive to electrostatic discharge
Dangerous electrical voltage
Microwave
Laser radiation
Installation Manual SmartAX MA5600 Multi-service Access Module Safety Instructions
Huawei Technologies Proprietary
2. Electrical Safety
2.1 High Voltage
Danger:
Direct or indirect contact by some damp objects to the high voltage or mains may be fatal.
Observe the following during high voltage operations:
l When installing the product with AC power supply, follow the local safety recommendations. Only qualified personnel are allowed to install the product with AC power supply.
l Before working on the product, remove conductive rings, bracelets, necklaces, and watches.
l Turn off the power supply when you find water leakage in the cabinet. l Keep the product away from water in the humid environment.
Warning:
Improper operations with the product under high voltage may cause a fire hazard or electric strike. Only qualified personnel are allowed to perform high voltage operations.
2.2 Power Cable
Notice:
Do not connect or disconnect a power cable when the power switch is on. When the power cable touches a conductor, the electric spark or electrical arc can cause a fire hazard or harm the eyes.
Installation Manual SmartAX MA5600 Multi-service Access Module Safety Instructions
Huawei Technologies Proprietary
Note the following while connecting or disconnecting power cables:
l Switch off the power supply before connecting or disconnecting the power cables. l Before connecting the power cables, make sure that the cables and their labels
are correct.
2.3 Tools
Warning:
Use special tools when you work on the product under high voltage or AC power supply.
2.4 Drilling Holes
Warning:
l Do not drill holes on the cabinet without permission. l Improper drilling on the cabinet may damage the cabling inside the cabinet. It may
also damage the electromagnetic performance of the cabinet. l The scrap falling into the cabinet may cause short circuit of the card.
Note the following before drilling the hole.
l To drill holes on the cabinet, wear insulation gloves, and remove the cables inside the cabinet first.
l The splashing scrap while drilling the holes may hurt your eyes. Take care of your eyes.
l Prevent the scrap from falling into the cabinet. l Remove the scrap immediately after drilling the hole.
Installation Manual SmartAX MA5600 Multi-service Access Module Safety Instructions
Huawei Technologies Proprietary
2.5 Lightning
Danger:
Do not work on the system when there is lightning.
To avoid lightning strike, ground the equipment properly.
2.6 Static
Notice:
Electrostatic discharge (ESD) will damage the static-sensitive unit on the card.
Electrostatic discharge is generated when people move, take plastic products, or friction occurs between clothes, and between the shoes and the floor. The electrostatic discharge remains for a long time in the human body.
Wear an ESD wrist strap while working on ESD-sensitive units. Connect one end of the wrist to the earth ground properly.
Figure 1 ESD wrist strap
Installation Manual SmartAX MA5600 Multi-service Access Module Safety Instructions
Huawei Technologies Proprietary
3. Battery
Danger:
Before working on the battery, read through the safety instructions on battery operations.
Avoid battery short circuit or electrolyte leakage as it may lead to the erosion of metal parts and cards.
3.1 General Operations
Observe the following for battery installation and maintenance.
l Do not wear metal objects, such as watches, bracelets, or rings. l Use special insulating tools. l Wear eye-protecting devices. l Wear rubber gloves and apron, which prevents electrolyte leakage. l Keep the positive battery upright. Do not put it upside down or tilted.
3.2 Short Circuit
Caution:
Battery short circuit may cause injury. If possible, disable the battery supply before working on the equipment.
Installation Manual SmartAX MA5600 Multi-service Access Module Safety Instructions
Huawei Technologies Proprietary
3.3 Toxic Gas
Notice:
Do not use the unsealed lead-acid battery. Gas emitted from the battery will catch fire or erode the equipment. Have the battery laid stably and horizontally.
The battery that is working releases the flammable gas. So, take ventilation and fireproof measures in the place where the battery is stored.
3.4 Over Temperature
Notice:
Over-temperature of the battery may lead to battery distortion, damage or acid fluid leakage.
Check whether there is acid fluid leakage when the battery temperature is over 60°C. If any, handle the acid fluid in time.
3.5 Acid Fluid
Caution:
Absorb the acid fluid and neutralize it when there is any acid fluid leakage.
You can use the following materials to absorb and neutralize the acid fluid:
l NaHCO3 l Na2CO3 l Na2CO3·10H2O
Installation Manual SmartAX MA5600 Multi-service Access Module Safety Instructions
Huawei Technologies Proprietary
Follow the instructions from the battery manufacturers.
4. Laser Radiation
Warning:
Laser radiation may cause injury to your eyes. Never look into the end of an exposed optical fiber or optical connector.
5. Altitude Operations
Warning:
Avoid objects falling when making operations at an altitude.
Note the following for operations at an altitude.
l Only trained personnel are allowed to make operations at an altitude. l Avoid tools from falling. l Wear safety belts and helmets. l In cold areas, wear heat-retaining clothes before operations at an altitude.. l Check all the hoisting equipment before operations at an altitude..
6. Others
6.1 Lifting Heavy Objects
Warning:
Do not walk under objects that are being lifted.
Installation Manual SmartAX MA5600 Multi-service Access Module Safety Instructions
Huawei Technologies Proprietary
6.2 Handling Objects with Sharp Angles
Caution:
Wear gloves while moving equipment with sharp angles.
6.3 Unplugging and Plugging Card
Notice:
l Insert the card carefully to avoid distorting the pins on the backplane. l Insert the card along the slot guild. Avoid short circuit or scratch caused by contacts
between the circuit sides of the card and other cards l When holding the card, do not touch the card circuit, components, connector or
cabling trough.
6.4 Bundling Signal Cable
Notice:
The signal cable should be bundled separately from the strong-current or high-voltage cables. Leave at least a 20 cm space between them.
Installation Manual SmartAX MA5600 Multi-service Access Module Table of Contents
Huawei Technologies Proprietary
i
Table of Contents
Safety Instructions....................................................................................................................... i 1. Overview..............................................................................................................................i 2. Electrical Safety .................................................................................................................. ii
2.1 High Voltage.............................................................................................................. ii 2.2 Power Cable.............................................................................................................. ii 2.3 Tools ........................................................................................................................ iii 2.4 Drilling Holes ............................................................................................................ iii 2.5 Lightning................................................................................................................... iv 2.6 Static ........................................................................................................................ iv
3. Battery ................................................................................................................................v 3.1 General Operations....................................................................................................v 3.2 Short Circuit...............................................................................................................v 3.3 Toxic Gas ................................................................................................................. vi 3.4 Over Temperature .................................................................................................... vi 3.5 Acid Fluid.................................................................................................................. vi
4. Laser Radiation................................................................................................................. vii 5. Altitude Operations ........................................................................................................... vii 6. Others............................................................................................................................... vii
6.1 Lifting Heavy Objects ............................................................................................... vii 6.2 Handling Objects with Sharp Angles ....................................................................... viii 6.3 Unplugging and Plugging Card................................................................................ viii 6.4 Bundling Signal Cable............................................................................................. viii
Chapter 1 Equipment Overview............................................................................................... 1-1 1.1 About This Chapter ....................................................................................................... 1-1 1.2 MA5600 Hardware Components ................................................................................... 1-2
1.2.1 Overview ............................................................................................................ 1-2 1.2.2 Cabinet ............................................................................................................... 1-2 1.2.3 Service Frame .................................................................................................... 1-3 1.2.4 Splitter Frame ..................................................................................................... 1-5 1.2.5 List of Boards...................................................................................................... 1-6
1.3 MA5600 Cabinet Layouts .............................................................................................. 1-7 1.3.1 Layout Types ...................................................................................................... 1-7 1.3.2 Layout 1: AC-powered H66-18 Cabinet with the SPL Frame................................ 1-8 1.3.3 Layout 2: DC-powered H66-18 Cabinet with the SPL Frame ............................... 1-9 1.3.4 Layout 3: AC-powered H66-22 Cabinet with the SPL Frame...............................1-10 1.3.5 Layout 4: DC-powered H66-22 Cabinet with the SPL Frame ..............................1-11 1.3.6 Layout 5: DC-powered H66-18 Cabinet without the SPL Frame..........................1-12
Installation Manual SmartAX MA5600 Multi-service Access Module Table of Contents
Huawei Technologies Proprietary
ii
1.3.7 Layout 6: DC-powered H66-22 Cabinet without the SPL Frame..........................1-13
Chapter 2 Preparing for the Installation.................................................................................. 2-1 2.1 About This Chapter ....................................................................................................... 2-1 2.2 Preparing Tools and Meters .......................................................................................... 2-2 2.3 Checking Installation Conditions.................................................................................... 2-4 2.4 Unpacking Cases and Accepting the Products .............................................................. 2-7
2.4.1 Overview ............................................................................................................ 2-7 2.4.2 Checking Before Unpacking................................................................................ 2-7 2.4.3 Unpacking the Wooden Case.............................................................................. 2-8 2.4.4 Unpacking the Carton ........................................................................................2-10 2.4.5 Cautions for Unpacking Boards..........................................................................2-11 2.4.6 Accepting the Products ......................................................................................2-11
Chapter 3 Installing the Cabinet on the Concrete Floor ......................................................... 3-1 3.1 About This Chapter ....................................................................................................... 3-1 3.2 Checking Before Installation.......................................................................................... 3-2
3.2.1 Checking the Bottom Space Inside the Cabinet ................................................... 3-2 3.2.2 Precautions for Installation.................................................................................. 3-2
3.3 Marking Reference Lines .............................................................................................. 3-2 3.3.1 Overview ............................................................................................................ 3-2 3.3.2 Construction Plan Drawing for a Single Cabinet .................................................. 3-3 3.3.3 Construction Plan Drawing for a Row of Cabinets................................................ 3-3 3.3.4 Marking-off Plate................................................................................................. 3-5 3.3.5 Procedures ......................................................................................................... 3-5
3.4 Drilling Holes................................................................................................................. 3-6 3.4.1 Precautions......................................................................................................... 3-6 3.4.2 Procedure........................................................................................................... 3-6
3.5 Installing Expansion Bolts.............................................................................................. 3-6 3.5.1 Composition........................................................................................................ 3-6 3.5.2 Installation Procedure ......................................................................................... 3-7
3.6 Positioning the Cabinet ................................................................................................. 3-8 3.7 Levelling the Cabinet..................................................................................................... 3-9 3.8 Fastening the Cabinet ..................................................................................................3-10
3.8.1 Overview ...........................................................................................................3-10 3.8.2 Fastening the Cabinet Bottom ............................................................................3-10 3.8.3 Attaching the Cabinet Top..................................................................................3-12 3.8.4 Checking the Installation ....................................................................................3-14
3.9 Testing Insulation.........................................................................................................3-14 3.9.1 Insulation Requirement ......................................................................................3-14 3.9.2 Procedure..........................................................................................................3-14
3.10 Outline of the Installed Cabinet...................................................................................3-15
Installation Manual SmartAX MA5600 Multi-service Access Module Table of Contents
Huawei Technologies Proprietary
iii
Chapter 4 Installing the Cabinet on the Antistatic Floor ........................................................ 4-1 4.1 About This Chapter ....................................................................................................... 4-1 4.2 S600A Support Series................................................................................................... 4-2
4.2.1 Application of Supports ....................................................................................... 4-2 4.2.2 Support............................................................................................................... 4-2 4.2.3 Slide Rail and Floor Holder ................................................................................. 4-3 4.2.4 Side Floor Holder................................................................................................ 4-4
4.3 Recommended Tools .................................................................................................... 4-5 4.4 Marking Reference Lines .............................................................................................. 4-5
4.4.1 Overview ............................................................................................................ 4-5 4.4.2 Construction Plan Drawing for a Single Cabinet .................................................. 4-6 4.4.3 Construction Plan Drawing for a Row of Cabinets................................................ 4-6 4.4.4 Marking-off Plate................................................................................................. 4-7 4.4.5 Procedures ......................................................................................................... 4-8
4.5 Drilling Holes................................................................................................................. 4-8 4.5.1 Precautions......................................................................................................... 4-8 4.5.2 Procedure........................................................................................................... 4-8
4.6 Installing Expansion Bolts.............................................................................................. 4-9 4.6.1 Composition........................................................................................................ 4-9 4.6.2 Installation Procedure ......................................................................................... 4-9
4.7 Installing Supports........................................................................................................4-10 4.7.1 Overview ...........................................................................................................4-10 4.7.2 Adjusting the Height of the Support ....................................................................4-10 4.7.3 Assembling the Support .....................................................................................4-11 4.7.4 Fastening the Support........................................................................................4-12
4.8 Installing Holder Fasteners...........................................................................................4-13 4.9 Positioning the Cabinet ................................................................................................4-13 4.10 Leveling the Cabinet...................................................................................................4-14 4.11 Fastening the Cabinet ................................................................................................4-15
4.11.1 Overview..........................................................................................................4-15 4.11.2 Fastening the Cabinet Bottom ..........................................................................4-15 4.11.3 Fastening the Cabinet Top ...............................................................................4-16 4.11.4 Checking the Installation ..................................................................................4-19
4.12 Testing Insulation.......................................................................................................4-19 4.12.1 Insulation Requirement ....................................................................................4-19 4.12.2 Procedure ........................................................................................................4-19
4.13 Recovering the Floor..................................................................................................4-20 4.13.1 Overview of Floor Recovery .............................................................................4-20 4.13.2 Installing the Floor Holder ................................................................................4-20 4.13.3 Adjusting the Holder.........................................................................................4-20 4.13.4 Recovering the Floor........................................................................................4-20
4.14 Outline of the Installed Cabinets.................................................................................4-21
Installation Manual SmartAX MA5600 Multi-service Access Module Table of Contents
Huawei Technologies Proprietary
iv
Chapter 5 Installing the Dripping-proof Cover........................................................................ 5-1 5.1 About This Chapter ....................................................................................................... 5-1 5.2 Introduction to the Dripping-proof Cover ........................................................................ 5-1 5.3 Installation Procedure.................................................................................................... 5-1
Chapter 6 Installing the Cabling Rack..................................................................................... 6-1 6.1 About This Chapter ....................................................................................................... 6-1 6.2 Installation Process....................................................................................................... 6-2 6.3 Assembling the Cabling Ladder..................................................................................... 6-2
6.3.1 Overview ............................................................................................................ 6-2 6.3.2 Precaution .......................................................................................................... 6-3 6.3.3 Procedure........................................................................................................... 6-3
6.4 Installing the Cabling Trough......................................................................................... 6-4 6.4.1 Overview ............................................................................................................ 6-4 6.4.2 Connecting the Cabling Troughs ......................................................................... 6-4 6.4.3 Procedure........................................................................................................... 6-5
6.5 Turning or Jointing the Cabling Ladder .......................................................................... 6-6 6.5.1 Overview ............................................................................................................ 6-6 6.5.2 Turning the Cabling Ladder................................................................................. 6-6 6.5.3 Jointing the Cabling Ladder................................................................................. 6-8
6.6 Mounting the Cabling Rack ........................................................................................... 6-9 6.6.1 Overview ............................................................................................................ 6-9 6.6.2 Wall Mounting..................................................................................................... 6-9 6.6.3 Ceiling Mounting or Floor Mounting....................................................................6-11 6.6.4 Over-cabinet Mounting.......................................................................................6-12
6.7 Installing the Accessories .............................................................................................6-14 6.7.1 Overview ...........................................................................................................6-14 6.7.2 Installing the Cable Manager..............................................................................6-14 6.7.3 Installing the Baffle Ring, End Cover and Trough Rim ........................................6-15
Chapter 7 Installing the Frame and Board .............................................................................. 7-1 7.1 About This Chapter ....................................................................................................... 7-1 7.2 Installing the Frame....................................................................................................... 7-2
7.2.1 Introduction to the Frame .................................................................................... 7-2 7.2.2 Procedure........................................................................................................... 7-2
7.3 Inserting and Removing the Board ................................................................................ 7-4 7.3.1 Preparation ......................................................................................................... 7-4 7.3.2 Precautions......................................................................................................... 7-5 7.3.3 Procedure for Inserting the Board........................................................................ 7-5 7.3.4 Procedure for Removing the Board ..................................................................... 7-6
Chapter 8 Installing the Power Supply System....................................................................... 8-1 8.1 About This Chapter ....................................................................................................... 8-1 8.2 Installation Components................................................................................................ 8-2
Installation Manual SmartAX MA5600 Multi-service Access Module Table of Contents
Huawei Technologies Proprietary
v
8.3 Introduction to Power and Ground Cables ..................................................................... 8-2 8.4 Making Power Cables on Site........................................................................................ 8-3 8.5 Installing the Lightning Arrester ..................................................................................... 8-3
8.5.1 Overview ............................................................................................................ 8-3 8.5.2 Recommended Tools .......................................................................................... 8-3 8.5.3 Preconditions...................................................................................................... 8-3 8.5.4 Installation Procedure ......................................................................................... 8-4
8.6 Installing the GEPS4845 Power Module ........................................................................ 8-5 8.6.1 Overview ............................................................................................................ 8-5 8.6.2 Introduction to GEPS4845 Power Module ........................................................... 8-5 8.6.3 Installation Procedure ......................................................................................... 8-6 8.6.4 Connecting the AC Input Cable ........................................................................... 8-6 8.6.5 Connecting the DC Output Cable ........................................................................ 8-8 8.6.6 Connecting the Battery Input Cable..................................................................... 8-9
8.7 Installing Batteries........................................................................................................8-10 8.7.1 Overview ...........................................................................................................8-10 8.7.2 Precautions........................................................................................................8-10 8.7.3 Preconditions for Installation ..............................................................................8-10 8.7.4 Installation Procedure ........................................................................................8-11 8.7.5 Checking the Battery Installation ........................................................................8-13
8.8 Installing the Signal Transfer Box .................................................................................8-13 8.8.1 Overview ...........................................................................................................8-13 8.8.2 Connecting to the GEPS4845 Monitor Unit.........................................................8-14 8.8.3 Connecting to Various Sensors ..........................................................................8-14
8.9 Installing the DC Power Distribution Unit ......................................................................8-14 8.9.1 Overview ...........................................................................................................8-14 8.9.2 DC Power Supply Layout ...................................................................................8-15 8.9.3 Installation Procedure ........................................................................................8-15 8.9.4 Connecting the –48 VDC Input Cable.................................................................8-16 8.9.5 Connecting the DC Load Output Cable...............................................................8-16
8.10 Installing the Environment Monitor Unit.......................................................................8-17 8.11 MDF Grounding Requirements...................................................................................8-18
Chapter 9 Connecting and Routing Cables............................................................................. 9-1 9.1 About this Chapter ........................................................................................................ 9-1 9.2 Cable Routing Rules ..................................................................................................... 9-2
9.2.1 Installing the Lug................................................................................................. 9-2 9.2.2 Curving Cables ................................................................................................... 9-2 9.2.3 Bundling Cables.................................................................................................. 9-2 9.2.4 Arranging Cables ................................................................................................ 9-3 9.2.5 Routing Cables ................................................................................................... 9-3
9.3 Cables Routing in the Cabinet ....................................................................................... 9-5 9.4 Connecting and Routing SCU Cables............................................................................ 9-6
Installation Manual SmartAX MA5600 Multi-service Access Module Table of Contents
Huawei Technologies Proprietary
vi
9.4.1 Relative Cables................................................................................................... 9-6 9.4.2 Cable for Local Maintenance Serial Port.............................................................. 9-6 9.4.3 Cable for Maintenance Network Port ................................................................... 9-6 9.4.4 Cable for FE/GE Electrical Port ........................................................................... 9-6 9.4.5 Optical Fiber for FE/GE Optical Port.................................................................... 9-6 9.4.6 Connected Cables .............................................................................................. 9-7
9.5 Connecting and Routing ADSL-SPL Cables .................................................................. 9-8 9.5.1 Relative Cables................................................................................................... 9-8 9.5.2 Connection Process............................................................................................ 9-8 9.5.3 Precautions......................................................................................................... 9-9 9.5.4 Connecting the ADSL-SPL Cable........................................................................ 9-9 9.5.5 Connecting the SPL Cable.................................................................................9-10 9.5.6 Jumpering the Subscriber Cable at the MDF ......................................................9-11
9.6 Connecting SHEA Cables ............................................................................................9-12 9.6.1 Relative Cables..................................................................................................9-12 9.6.2 Connection Procedure .......................................................................................9-12
9.7 Connecting and Routing ISU Cables ............................................................................9-13 9.7.1 Relative Cables..................................................................................................9-13 9.7.2 Connection Procedure .......................................................................................9-13
9.8 Connecting and Routing EIU Cables ............................................................................9-14 9.8.1 Relative Cables..................................................................................................9-14 9.8.2 Connection Procedure .......................................................................................9-14
9.9 Connecting and Routing AIUG Cables..........................................................................9-14 9.9.1 Relative Cables..................................................................................................9-14 9.9.2 Connecting the E8IT Cable ................................................................................9-14 9.9.3 Connecting the 155M Trunk Cable .....................................................................9-14 9.9.4 Connecting the Optical Fibers ............................................................................9-15
9.10 Connecting and Routing Optical Fibers.......................................................................9-15 9.10.1 Precautions......................................................................................................9-15 9.10.2 Connection and Routing Illustration..................................................................9-15
Chapter 10 Powering on the System ......................................................................................10-1 10.1 About This Chapter ....................................................................................................10-1 10.2 Checking Before Power-on.........................................................................................10-2
10.2.1 Cabinet ............................................................................................................10-2 10.2.2 Cable Distribution.............................................................................................10-2 10.2.3 Plugs and Sockets ...........................................................................................10-3 10.2.4 Label................................................................................................................10-4 10.2.5 Site Environment..............................................................................................10-4
10.3 Power-on Debugging for Lightning Arrester ................................................................10-4 10.4 Powering on the Frame ..............................................................................................10-5 10.5 Powering on the Board and Fan .................................................................................10-5 10.6 Powering on the Battery .............................................................................................10-6
Installation Manual SmartAX MA5600 Multi-service Access Module Table of Contents
Huawei Technologies Proprietary
vii
Appendix A Equipment Parameters ........................................................................................A-1 A.1 About this Appendix...................................................................................................... A-1 A.2 Dimensions and Weight ................................................................................................ A-1 A.3 Power Parameters ........................................................................................................ A-2
A.3.1 AC Input Parameters .......................................................................................... A-2 A.3.2 DC Input Parameters .......................................................................................... A-2
A.4 Power Consumption ..................................................................................................... A-2 A.4.1 Power Consumption of the Boards...................................................................... A-2 A.4.2 Power Consumption of the Fan Tray................................................................... A-3 A.4.3 Power Consumption of the Frame....................................................................... A-3
Appendix B Cabinet Connection Diagrams ............................................................................B-1 B.1 About This Appendix..................................................................................................... B-1 B.2 Cabinet Connection Diagram I ...................................................................................... B-2 B.3 Cabinet Connection Diagram II ..................................................................................... B-5 B.4 Cabinet Connection Diagram III .................................................................................... B-7 B.5 Cabinet Connection Diagram IV.................................................................................... B-9 B.6 Cabinet Connection Diagram V................................................................................... B-11 B.7 Cabinet Grounding Diagram ....................................................................................... B-13
Appendix C Cable Labels.........................................................................................................C-1 C.1 About This Chapter.......................................................................................................C-1 C.2 Introduction to Labels ...................................................................................................C-2
C.2.1 Material Features ...............................................................................................C-2 C.2.2 Types and Outline ..............................................................................................C-2 C.2.3 Printing Labels ...................................................................................................C-4 C.2.4 Writing Labels ....................................................................................................C-6 C.2.5 Affixing Labels....................................................................................................C-7 C.2.6 Information Carried on Labels.............................................................................C-9 C.2.7 Cautions for Using Labels.................................................................................C-10
C.3 Labels for External Alarm Cables................................................................................C-10 C.4 Labels for Network Cables..........................................................................................C-11 C.5 Labels for Optical Fibers.............................................................................................C-13
C.5.1 Labels for the Fibers Connecting Two Cabinets................................................C-13 C.5.2 Labels for the Fiber Connecting the Cabinet and the ODF ................................C-15
C.6 Labels for Trunk Cables..............................................................................................C-16 C.6.1 Labels for the Trunk Cable Connecting Two Cabinets.......................................C-17 C.6.2 Labels for the Trunk Cable Connecting the Cabinet and the DDF......................C-18
C.7 Labels for Subscriber Cables......................................................................................C-19 C.8 Labels for Power Cables.............................................................................................C-20
C.8.1 Labels for DC Power Cables.............................................................................C-20 C.8.2 Labels for AC Power Cables.............................................................................C-22
Installation Manual SmartAX MA5600 Multi-service Access Module Table of Contents
Huawei Technologies Proprietary
viii
Appendix D Environment Requirements.................................................................................D-1 D.1 About This Appendix ....................................................................................................D-1 D.2 Environment Requirements for Equipment Room..........................................................D-2
D.2.1 Site Selection of Equipment Room .....................................................................D-2 D.2.2 Layout of Equipment Room ................................................................................D-3 D.2.3 Construction Requirements for Equipment Room................................................D-3 D.2.4 Requirements for Temperature and Humidity......................................................D-5 D.2.5 Requirements for Neatness ................................................................................D-5 D.2.6 Requirements for Corrosive Gases .....................................................................D-6 D.2.7 Requirements for Electromagnetic Environment .................................................D-6 D.2.8 Requirements for ESD Prevention ......................................................................D-7 D.2.9 Requirements for Lightning Proof Grounding ......................................................D-7
D.3 Requirements for Power Supply..................................................................................D-10 D.3.1 Requirements for AC Power Supply..................................................................D-10 D.3.2 Recommendations for AC Power Supply ..........................................................D-11 D.3.3 Requirements for DC Power Supply .................................................................D-12 D.3.4 Recommendations for DC Power Supply ..........................................................D-13
Index .......................................................................................................................................... i-1
Installation Manual SmartAX MA5600 Multi-service Access Module List of Figures
Huawei Technologies Proprietary
ix
List of Figures
Figure 1 Schematic of wearing ESD wrist strap .................................................................... iv
Figure 1-1 Outline of the MA5600 cabinet.......................................................................... 1-3
Figure 1-2 Layout of the service frame .............................................................................. 1-4
Figure 1-3 Outline of the service frame.............................................................................. 1-4
Figure 1-4 Layout of the SPL frame ................................................................................... 1-5
Figure 1-5 Outline of the SPL frame .................................................................................. 1-6
Figure 1-6 Layout for the AC-powered H66-18 cabinet with the SPL frame ........................ 1-8
Figure 1-7 Layout for the DC-powered H66-18 cabinet with the SPL frame........................ 1-9
Figure 1-8 Layout for the AC-powered H66-22 cabinet with the SPL frame ...................... 1-10
Figure 1-9 Layout for the DC-powered H66-22 cabinet with the SPL frame.......................1-11
Figure 1-10 Layout for the DC-powered H66-18 cabinet without the SPL frame ............... 1-12
Figure 1-11 Layout for the DC-powered H66-22 cabinet without the SPL frame ............... 1-13
Figure 2–1 Straightening the tongue.................................................................................. 2-8
Figure 2–2 Remove the cover ........................................................................................... 2-9
Figure 2–3 Remove wooden panels ................................................................................ 2-10
Figure 2–4 Unpacking procedure for the carton ................................................................2-11
Figure 3–1 Construction plan drawing for a single cabinet ................................................. 3-3
Figure 3–2 Construction plan drawing for a row of cabinets ............................................... 3-3
Figure 3–3 Construction plan drawing for back-to-back cabinets........................................ 3-4
Figure 3–4 Marking-off plate (for the concrete floor installation) ......................................... 3-5
Figure 3–5 Composition of the expansion bolt ................................................................... 3-6
Figure 3–6 Installing the expansion bolt............................................................................. 3-7
Figure 3–7 Positioning the cabinet..................................................................................... 3-8
Figure 3–8 Levelling the cabinet........................................................................................ 3-9
Figure 3–9 Fastening the cabinet bottom......................................................................... 3-10
Installation Manual SmartAX MA5600 Multi-service Access Module List of Figures
Huawei Technologies Proprietary
x
Figure 3–10 Connecting plate for attaching two cabinets ..................................................3-11
Figure 3–11 Attaching two cabinets with a connecting plate ............................................. 3-12
Figure 3–12 Cabinets attached by the connecting plates ................................................. 3-13
Figure 3–13 A single cabinet installed on the concrete floor ............................................. 3-14
Figure 3–14 A row of cabinets installed side by side on the concrete floor........................ 3-15
Figure 4–1 Outline of the S600A support ........................................................................... 4-3
Figure 4–2 Outline of the slide rail and floor holder assembly ............................................ 4-4
Figure 4–3 Outline of the slide rail ..................................................................................... 4-4
Figure 4–4 Outline of the side floor holder ......................................................................... 4-5
Figure 4–5 Construction plan drawing for a single cabinet ................................................. 4-6
Figure 4–6 Construction plan drawing for a row of cabinets ............................................... 4-6
Figure 4–7 Construction plan drawing for back-to-back cabinets........................................ 4-7
Figure 4–8 Marking-off plate for the antistatic floor installation ........................................... 4-7
Figure 4–9 Composition of the expansion bolt ................................................................... 4-9
Figure 4–10 Installing the expansion bolt......................................................................... 4-10
Figure 4–11 Positions of the height-locking bolt ................................................................4-11
Figure 4–12 Assembling the support and slide rail together ..............................................4-11
Figure 4–13 Fixing the support to the ground................................................................... 4-12
Figure 4–14 Installing the holder fastener ........................................................................ 4-13
Figure 4–15 Positioning the cabinet on the support.......................................................... 4-14
Figure 4–16 Levelling the cabinet on the antistatic floor ................................................... 4-15
Figure 4–17 Fastening the cabinet bottom on the antistatic floor...................................... 4-16
Figure 4–18 Connecting plate for combining two cabinets................................................ 4-17
Figure 4–19 Combining two cabinets with the connecting plate........................................ 4-18
Figure 4–20 Cabinets combined by the connecting plate ................................................. 4-19
Figure 4–21 Installing the floor holder.............................................................................. 4-20
Figure 4–22 A row of cabinets installed on the antistatic floor........................................... 4-21
Figure 5–1 Outline of the dripping-proof cover ................................................................... 5-1
Installation Manual SmartAX MA5600 Multi-service Access Module List of Figures
Huawei Technologies Proprietary
xi
Figure 5–2 Connecting plate on the cabinet top................................................................. 5-2
Figure 5–3 Installing the supporting bolts........................................................................... 5-2
Figure 5–4 The installed dripping-proof cover .................................................................... 5-3
Figure 6–1 Process of installing the cabling rack ............................................................... 6-2
Figure 6–2 Outline of the cabling ladder ............................................................................ 6-3
Figure 6–3 Assembling the cabling ladders........................................................................ 6-3
Figure 6–4 Connecting two cabling ladders ....................................................................... 6-4
Figure 6–5 Connect and fasten the cabling trough on a 200 mm or 400 mm cabling ladder 6-5
Figure 6–6 Connecting and fastening the cabling trough on a 600 mm cabling ladder........ 6-6
Figure 6–7 Horizontal turning of the cabling ladders without the cabling trough.................. 6-7
Figure 6–8 Horizontal turning of the cabling ladders with the cabling trough....................... 6-7
Figure 6–9 Front jointing of the cabling ladders.................................................................. 6-8
Figure 6–10 Side jointing of the cabling ladders................................................................. 6-8
Figure 6–11 Oblique jointing of the cabling ladders ............................................................ 6-9
Figure 6–12 Mounting the cabling ladder to the wall ........................................................ 6-10
Figure 6–13 Installing the triangular support .....................................................................6-11
Figure 6–14 Mounting the cabling rack to the ceiling and the floor ................................... 6-12
Figure 6–15 Installing the support on the cabinet............................................................. 6-13
Figure 6–16 Installing the cabling ladder to the cabinet-top support ................................. 6-13
Figure 6–17 Installing the cable manager when no cabling trough is used ....................... 6-14
Figure 6–18 Installing the baffle ring................................................................................ 6-15
Figure 6–19 Installing the end cover and the trough rim................................................... 6-15
Figure 7–1 Frame structure............................................................................................... 7-2
Figure 7–2 Installing the slide rail ...................................................................................... 7-2
Figure 7–3 Installing the frame .......................................................................................... 7-3
Figure 7–4 Wearing an ESD wrist strap correctly............................................................... 7-4
Figure 7–5 Installing the board .......................................................................................... 7-6
Figure 8–1 Connection diagram of the SPD28SZ .............................................................. 8-4
Installation Manual SmartAX MA5600 Multi-service Access Module List of Figures
Huawei Technologies Proprietary
xii
Figure 8–2 Outline of the GEPS4845................................................................................. 8-5
Figure 8–3 Connecting terminals of the GEPS4845........................................................... 8-7
Figure 8–4 DC output terminals......................................................................................... 8-8
Figure 8–5 Outline of the battery shelf ..............................................................................8-11
Figure 8–6 Batteries installed in the battery shelf ..............................................................8-11
Figure 8–7 Connection of one group of batteries ............................................................. 8-12
Figure 8–8 Connection of two groups of batteries ............................................................ 8-12
Figure 8–9 Front panel of the GEPS4845 monitor unit ..................................................... 8-14
Figure 8–10 Connection diagram of external power and ground cables for the DC-powered cabinet ..................................................................................................................... 8-15
Figure 9-1 Installing the lugs.............................................................................................. 9-2
Figure 9-2 Bundling cables correctly at the turning............................................................. 9-3
Figure 9-3 Cable routing through the cabling ladder........................................................... 9-4
Figure 9-4 Cable routing at the side of the cabling trough .................................................. 9-4
Figure 9-5 Routing SCU cables ......................................................................................... 9-7
Figure 9-6 Cable connection of the ADSL board and the SPL board................................... 9-9
Figure 9-7 Connecting the ADSL-SPL cable .................................................................... 9-10
Figure 9-8 Connecting the SPL cable ...............................................................................9-11
Figure 9-9 Jumpering the subscriber cable at the MDF.................................................... 9-12
Figure 9-10 Connecting the SHEA cable.......................................................................... 9-13
Figure 9-11 Connection and routing of the optical fibers................................................... 9-15
Figure B–1 Connection diagram of the AC-powered H66-18/22 cabinet with the SPL frameB-3
Figure B–2 Grounding diagram of the AC-powered H66-18/22 cabinet with the SPL frame B-4
Figure B–3 Connection diagram of the DC-powered H66-18 cabinet with the SPL frame ...B-5
Figure B–4 Grounding diagram of the DC-powered H66-18 cabinet with the SPL frame.....B-6
Figure B–5 Connection diagram of the DC-powered H66-22 cabinet with the SPL frame ...B-7
Figure B–6 Grounding diagram of the DC-powered H66-22 cabinet with the SPL frame.....B-8
Figure B–7 Connection diagram of the DC-powered H66-18 cabinet without the SPL frameB-9
Figure B–8 Grounding diagram of the DC-powered H66-18 cabinet without the SPL frameB-10
Installation Manual SmartAX MA5600 Multi-service Access Module List of Figures
Huawei Technologies Proprietary
xiii
Figure B–9 Connection diagram of the DC-powered H66-22 cabinet without the SPL frameB-11
Figure B–10 Grounding diagram of the DC-powered H66-22 cabinet without the SPL frameB-12
Figure B–11 Grounding diagram of the cabinet................................................................B-13
Figure C–1 Label for signal cables ....................................................................................C-3
Figure C–2 Label for the power cable................................................................................C-4
Figure C–3 Warning prompt before printing .......................................................................C-5
Figure C–4 Writing direction of the label ............................................................................C-7
Figure C–5 Sticking the label onto proper position of the signal cable ................................C-7
Figure C–6 Sticking the label onto the signal cable ............................................................C-8
Figure C–7 Appearance of the affixed label on the power cable.........................................C-9
Figure C–8 Text parts on the label for signal cables ...........................................................C-9
Figure C–9 Example of the label on the alarm cable ........................................................ C-11
Figure C–10 Example of the label for the network cable ..................................................C-12
Figure C–11 Example of the label on the optical fiber between two cabinets ....................C-14
Figure C–12 Example of the label on the optical fiber from the cabinet to the ODF ..........C-16
Figure C–13 Example of the label on the trunk cable that connects two cabinets .............C-17
Figure C–14 Example of the label on the trunk cable connecting the cabinet and the DDFC-19
Figure C–15 Example of the label for the subscriber cable...............................................C-20
Figure C–16 Example of the labels on the DC power cable..............................................C-21
Figure C–17 Example of the labels on the AC power cable..............................................C-23
Figure D–1 Layout of the equipment room.........................................................................D-3
Figure D–2 Internal partition wall inside the equipment room .............................................D-5
Installation Manual SmartAX MA5600 Multi-service Access Module List of Tables
Huawei Technologies Proprietary
xiv
List of Tables
Table 1-1 Cabinet description ............................................................................................ 1-2
Table 1-2 Specifications of the service frame ..................................................................... 1-3
Table 1-3 Specifications of the SPL frame.......................................................................... 1-5
Table 1-4 Boards supported by the MA5600 service frame ................................................ 1-6
Table 1-5 Boards supported by the MA5600 SPL frame..................................................... 1-7
Table 1-6 Layout types of the MA5600 cabinet .................................................................. 1-7
Table 2–1 Checklist of the installation environment ............................................................ 2-4
Table 2–2 Checking the equipment before unpacking ........................................................ 2-7
Table 4–1 Height ranges of the S600A supports................................................................. 4-2
Table 8–1 List of MA5600 power supply components ......................................................... 8-2
Table 8–2 Color and types of power and ground cables ..................................................... 8-2
Table 8–3 Description of the DC output terminals............................................................... 8-7
Table 8–4 Load connecting terminals and the control switches......................................... 8-17
Table 9-1 ADSL-SPL cables............................................................................................... 9-8
Table 1-1 Checklist for the cabinet ..................................................................................... 1-2
Table 1-2 Checklist for the cable distribution ...................................................................... 1-3
Table 1-3 Checklist for plugs and sockets .......................................................................... 1-3
Table 1-4 Checklist for the site environment....................................................................... 1-4
Table A–1 Dimensions and weight of the MA5600 cabinet .................................................A-1
Table A–2 AC input parameters of the MA5600 .................................................................A-2
Table A–3 DC input parameters of the MA5600 .................................................................A-2
Table A–4 Power consumption of the boards.....................................................................A-2
Table B–1 Connection description of the AC-powered H66-18/22 cabinet with the SPL frameB-4
Table B–2 Connection description of the DC-powered H66-18 cabinet with the SPL frame.B-6
Table B–3 Connection description of the DC-powered H66-22 cabinet with the SPL frame.B-8
Installation Manual SmartAX MA5600 Multi-service Access Module List of Tables
Huawei Technologies Proprietary
xv
Table B–4 Connection description of the DC-powered H66-18 cabinet without the SPL frame.................................................................................................................................B-10
Table B–5 Connection description of the DC-powered H66-22 cabinet without the SPL frame.................................................................................................................................B-12
Table B–6 Description of the cabinet grounding ...............................................................B-13
Table C–1 Standard typeface for handwriting.....................................................................C-7
Table C–2 Information on the label for the external alarm cable .......................................C-10
Table C–3 Information on two sides of the label for the network cable.............................. C-11
Table C–4 Information on two sides of the label for the optical fiber connecting two cabinetsC-13
Table C–5 Information on two sides of the label for the optical fiber connecting the cabinet and the ODF....................................................................................................................C-15
Table C–6 Information on two sides of the labels for the trunk cable connecting two cabinetsC-17
Table C–7 Information on labels for the trunk cable that connects the cabinet and the DDFC-18
Table C–8 Information on the labels for the subscriber cable ...........................................C-19
Table C–9 Information on the labels for the DC power cable ............................................C-20
Table C–10 Information on the labels for the AC power cable ..........................................C-22
Table D–1 Construction requirements for the equipment room ...........................................D-3
Table D–2 Requirements for temperature and humidity......................................................D-5
Table D–3 Requirements for dust particles in the equipment room.....................................D-6
Table D–4 Requirements for corrosive gas concentration...................................................D-6
Table D–5 Requirements for electromagnetic environment ................................................D-7
Table D–6 Requirements for lightning proof grounding.......................................................D-7
Table D–7 AC voltage and frequency...............................................................................D-10
Table D–8 Specifications for the DC power supply ...........................................................D-12
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 1 Equipment Overview
Huawei Technologies Proprietary
1-1
Chapter 1 Equipment Overview
1.1 About This Chapter
This chapter introduces the SmartAX MA5600 Multi-service Access Module. This chapter includes the following:
l MA5600 Hardware Components, 1-2 l MA5600 Cabinet Layouts, 1-7
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 1 Equipment Overview
Huawei Technologies Proprietary
1-2
1.2 MA5600 Hardware Components
1.2.1 Overview
The MA5600 hardware consists of cabinet, frame and board.
The frame includes service frame and splitter frame.
1.2.2 Cabinet
Table 1-1 describes the MA5600 cabinet.
Table 1-1 Cabinet description
Item Description
Cabinet type H66
H66-22 H66-22: 600 mm x 600 mm x 2200 mm (W x D x H) Dimensions
H66-18 H66-18: 600 mm x 600 mm x 1800 mm (W x D x H)
Outline Except the height, the H66-22 outline is the same as the H66-18 outline. See Figure 1-1.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 1 Equipment Overview
Huawei Technologies Proprietary
1-3
Figure 1-1 Outline of the MA5600 cabinet
1.2.3 Service Frame
Table 1-2 describes the service frame.
Table 1-2 Specifications of the service frame
Item Description
Function Provides service access and processing
Dimensions 19-inch front access frame 436 mm (width) x 420 mm (depth) x 441.8 mm (height)
Slot number 16
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 1 Equipment Overview
Huawei Technologies Proprietary
1-4
Item Description
Slot description
l Main control board (SCU): resides in slots 7 and 8. Two SCUs can be configured to manage and control the system.
l Intelligent service unit (ISU): resides in slots 14 and 15. l Service boards (ADEF, ADBF and SHEA): reside in slots
0–6 and 9–15. l Interface board (AIUG): resides in slots 0–6 and 9–15. l Interface board (EIUB): resides in slots 9–15. See Figure 1-2.
Outline See Figure 1-3.
0 157 8
SCU
Service board/Interface board
Fan tray
Service board/Interface board
Service board/Interface board
Service board/Interface board
Service board/Interface board
Service board/Interface board
Service board/Interface board
SCU
Service board/Interface board
Service board/Interface board
Service board/Interface board
Service board/Interface board
Service board/Interface board
Service board/IS
U/Interface board
Service board/ISU
/Interface board
Figure 1-2 Layout of the service frame
Figure 1-3 Outline of the service frame
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 1 Equipment Overview
Huawei Technologies Proprietary
1-5
& Note:
All boards in the service frame are hot swappable.
1.2.4 Splitter Frame
Table 1-3 describes the splitter (SPL) frame.
Table 1-3 Specifications of the SPL frame
Item Description
Function Separates the ADSL2+ signals from POTS or ISDN signals.
Dimensions 19-inch front access frame 439 mm (width) x 420 mm (depth) x 397.35 mm (height)
Slot number 16
Slot description The SPL frame can contain 14 SPL boards. Slots 7 and 8 cannot accommodate the SPL board. See Figure 1-4.
Outline See Figure 1-5.
0 157 8
SPL
SPL
SPL
SPL
SPL
SPL
SPL
SPL
SPL
SPL
SPL
SPL
SPL
SPL
Figure 1-4 Layout of the SPL frame
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 1 Equipment Overview
Huawei Technologies Proprietary
1-6
Figure 1-5 Outline of the SPL frame
1.2.5 List of Boards
Table 1-4 describes the boards supported by the MA5600 service frame.
Table 1-4 Boards supported by the MA5600 service frame
Name Type Description Port
SCU Super control unit Serves as the main control board to implement system control and IP uplink.
1 maintenance port 1 serial port 1 environment monitoring port 6 GE/FE ports
ISUA Intelligent service unit
Implements authentication and accounting.
8 FE ports, or 4 FE ports + 2 GE ports
ISUE Intelligent service unit
Implements authentication and accounting.
8 FE ports, or 4 FE ports + 2 GE ports
ADEF 64-port ADSL2+ over POTS board
Supports: l External splitter l ADSL2+ over POTS l GE bus l Line protection
64 ADSL2+ ports
ADBF 64-port ADSL2+ over ISDN board
Supports: l External splitter l ADSL2+ over ISDN l GE bus l Line protection
64 ADSL2+ ports
SHEA 32-port SHDSL board
Supports: l SHDSL l GE bus l Line protection
32 SHDSL ports
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 1 Equipment Overview
Huawei Technologies Proprietary
1-7
Name Type Description Port
AIUG ATM interface board Provides STM-1 ports l 4 STM-1 ports l 8 IMA E1 ports l 1–2 E3 ports
EIU Ethernet board Provides Ethernet ports 2 GE or FE ports or 4 GE ports
Table 1-5 describes the boards supported by the MA5600 SPL frame.
Table 1-5 Boards supported by the MA5600 SPL frame
Name Type Description Port
SPLF 64-port ADSL2+ over POTS splitter board
Separates POTS signal from ADSL2+ signal 600 Ω impedance
64 ADSL2+ ports 64 LINE ports 64 POTS ports
SPLL 64-port ADSL2+ over ISDN splitter board
Separates POTS signal from ADSL2+ signal Complex impedance
64 ADSL2+ ports 64 LINE ports 64 POTS ports
SPLH 64-port ADSL2+ over ISDN splitter board
Separates ISDN signal from ADSL2+ signal (2B1Q and 4B3T)
64 ADSL2+ ports 64 LINE ports 64 ISDN ports
1.3 MA5600 Cabinet Layouts
1.3.1 Layout Types
The MA5600 cabinet may have six types of layout, as shown in Table 1-6.
Table 1-6 Layout types of the MA5600 cabinet
Cabinet Power supply Service frame quantity SPL frame configured or not
2 Yes DC
3 No H66-22
AC 1 Yes
1 Yes DC
2 No H66-18
AC 1 Yes
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 1 Equipment Overview
Huawei Technologies Proprietary
1-8
1.3.2 Layout 1: AC-powered H66-18 Cabinet with the SPL Frame
Service frame 10 U
SPL frame 9 U
Filler panel 2 U
Filler panel 6 U
Cooling vent 2 U
GEPS4845 3 U
Filler panel or modem 1 U
Filler panel or signal transfer
Cooling vent andcabling space 3 U
box 1 U
1 U = 44.45 mm
Figure 1-6 Layout of the AC-powered H66-18 cabinet with the SPL frame
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 1 Equipment Overview
Huawei Technologies Proprietary
1-9
1.3.3 Layout 2: DC-powered H66-18 Cabinet with the SPL Frame
Service frame 10 U
SPL frame 9 U
Filler panel 2 U
Filler panel 9 U
PDU 2 U
Filler panel or modem 1 U
Filler panel or EMU 1 U
Cooling vent andcabling space 3 U
Figure 1-7 Layout of the DC-powered H66-18 cabinet with the SPL frame
In Figure 1-7, PDU stands for the power distribution unit, and EMU stands for the environment monitor unit.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 1 Equipment Overview
Huawei Technologies Proprietary
1-10
1.3.4 Layout 3: AC-powered H66-22 Cabinet with the SPL Frame
Service frame 10 U
SPL frame 9 U
Filler panel 2 U
Filler panel 15 U
Cooling vent 2 U
GEPS4845 3 U
Filler panel or modem 1 U
Filler panel or signal transfer
Cooling vent andcabling space 3 U
box 1 U
Figure 1-8 Layout of the AC-powered H66-22 cabinet with the SPL frame
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 1 Equipment Overview
Huawei Technologies Proprietary
1-11
1.3.5 Layout 4: DC-powered H66-22 Cabinet with the SPL Frame
PDU 2 U
Service frame 10 U
SPL frame 9 U
Cooling vent andcabling space 3 U
Service frame 10 U
SPL frame 9 U
Cooling vent andcabling space 3 U
Figure 1-9 Layout of the DC-powered H66-22 cabinet with the SPL frame
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 1 Equipment Overview
Huawei Technologies Proprietary
1-12
1.3.6 Layout 5: DC-powered H66-18 Cabinet without the SPL Frame
Service frame 10 U
Service frame 10 U
Filler panel 2 U
Filler panel 5 U
PDU 2 U
Filler panel or modem 1 U
Filler panel or signal transfer
Cooling vent andcabling space 3 U
box 1 U
Cooling vent andcabling space 3 U
Figure 1-10 Layout of the DC-powered H66-18 cabinet without the SPL frame
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 1 Equipment Overview
Huawei Technologies Proprietary
1-13
1.3.7 Layout 6: DC-powered H66-22 Cabinet without the SPL Frame
PDU 2 U
EMU or Modem 1 U
Service frame 10 U
Cooling vent andcabling space 3 U
Cabling space 3 U
Filler panel 4 U
Service frame 10 U
Service frame 10 U
Cooling vent andcabling space 3 U
Figure 1-11 Layout of the DC-powered H66-22 cabinet without the SPL frame
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 2 Preparing for the Installation
Huawei Technologies Proprietary
2-1
Chapter 2 Preparing for the Installation
2.1 About This Chapter
This chapter covers the following:
l Preparing Tools and Meters, 2-2 l Checking Installation Conditions, 2-4 l Unpacking Cases and Accepting the Products, 2-7
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 2 Preparing for the Installation
Huawei Technologies Proprietary
2-2
2.2 Preparing Tools and Meters
Prepare the following tools and meters for installation.
I. Measuring and Marking Tools
l Measuring tape l Ruler (1 m) l Marker pen l Powder marker l Pencil l Industrial spirit level l Angle square
II. Drilling Tools
l One percussion drill l Matched drill bits l One cleaner
III. Clamping Tools
l Flathead screwdrivers: M3–M6 l Cross screwdrivers: M3–M6 l Adjustable wrench l Socket wrenches: M6, M8, M12, M14, M17 and M19 l Double offset ring spanners: M6, M8, M12, M14, M17 and M19
IV. Pliers
l Sharp-nose pliers l Diagonal pliers l Pliers l Hand-held electric drill l File l Handsaw and crowbar
V. Auxiliary Tools
l Brush l Tweezers l Paper cutter l Bellow l Electric soldering iron l Tin wire l Forklift l Ladder
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 2 Preparing for the Installation
Huawei Technologies Proprietary
2-3
l Rubber hammer l Claw hammer
VI. Special to$ols
l Earth resistance tester l Antistatic wrist l Antistatic gloves l Wire stripper l Wire crimping tool l RJ-45 connector crimping pliers l Optical connectors l Wire cutter
VII. Meters
l Multimeter l 500 V megaohm meter (for insulation resistance testing) l 2 M port BER tester l Optical power meter
& Note:
l Huawei shall provide the list of tools and meters and would consult with the customer to decide who will provide the tools and meters.
l Before the use of the meters, they must be calibrated and proven to be qualified.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 2 Preparing for the Installation
Huawei Technologies Proprietary
2-4
2.3 Checking Installation Conditions
The project supervisor should:
l Check the construction conditions. l Fill out the Installation Environment Checklist. l Sign off the Kickoff Agreement with the buyer if all the items are ready. l Draft the Project Installation Plan.
Table 2–1 is the checklist for the installation environment.
Table 2–1 Checklist of the installation environment
No. Item Requirements
1 Site
The equipment room must not be located at a place with high temperature, dust, harmful gas, inflammable material, explosive material, electromagnetic interference, unsteady voltage, shocks or sharp noise. Select a suitable place for the equipment room according to the telecom network plan and telecom equipment requirements.
2 Civil engineering
The equipment room must be large enough for equipment installation and future expansion. The floor should support the product weight. The construction of cabling trough, cabling ladder and cable hole must be complete.
3 Air conditioner If the temperature in the room exceeds 35oC, install the air conditioner (which can be restarted after power-off). Do not let the air conditioner blow directly to the equipment.
4 Moisture-proof measures
If the relative humidity is greater than 70%, install the dehumidifying device, such as air conditioner with dehumidification function or special dehumidifier. The equipment room must be free from creepage, drippage or moisture
5 Heating
In a year if the average temperature is lower than 5°C for 90 days or more, install the heating system. If it is between 60 and 90 days, installation of the heating system is optional.
6 Dust-proof measures
If the equipment room is near a dust source, seal the window properly, and use an anti-theft and fireproof door. Separate the equipment from the door of the room with a partition board.
7 Lightning proof measures
The room must have surge protection devices, such as lightning proof rod or lightning proof strip. The lightning protection ground and the protection ground of the room must share one grounding body.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 2 Preparing for the Installation
Huawei Technologies Proprietary
2-5
No. Item Requirements
8 Grounding resistance
The equipment room must have a combined grounding (the equipment working ground, the protection ground and the lightning protection ground share one grounding body). The communication equipment and power supply in the equipment room should share one grounding bar if possible. The grounding resistance of the grounding system is recommended to be less than 10 ohms, and the equipment grounding must be in accordance with national and local electrical codes as well.
9 Grounding lead-in cable
Connect the grounding bar reliably with the grounding network. Use the 40 x 4 mm2 (or above) galvanized flat steel to connect them; or use the cable with the sectional size more than 95 mm2 and the length more than 30 m. Adopt insulation and anti-corrosive measures to both the galvanized flat steel and the cable. The breaking-point must not be at the middle of the cable. Protect the part protruding out of the ground.
10 AC voltage The AC voltage for the equipment room must be in the range of 150 V to 280 V (for 220 V) or 88 V to 143 V (for 110 V). Install the AC distribution switch and AC power cable properly.
11 AC grounding Do not connect the neutral line of the power cable to the protection ground of the communication devices.
12 AC lightning proof
Install a lightning arrester with a nominal discharging current not less than 20 kA. Ground the lightning arrester reliably.
13 DC voltage
The DC voltage in the equipment room must be in the range of –38.4 V to –72 V (for –60 V) or –38.4 V to –57.6 V (for –48 V). The battery should meet the power supply requirements of the equipment. Arrange the –48 V or –60 V power cable near the DC power distribution unit.
14 DC grounding Connect the working ground in the DC power distribution cabinet to the protection ground in the equipment room, with a cable of cross-sectional area greater than or equal to 95 mm2.
15 Subscriber cable
Ground the metal jackets of all external subscriber cables at the Main Distribution Frame (MDF) or connect them to the protection grounding bar.
16 Trunk cable
Do not place the trunk cable outside. If it has to be placed outside, use the double-layered shielded cable or the cable with the metallic outer jacket, and connect the external shielding layer or the metallic outer jacket of the cable properly with the protection grounding bar.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 2 Preparing for the Installation
Huawei Technologies Proprietary
2-6
No. Item Requirements
17 MDF
The terminal capacity of the MDF must meet the engineering requirements. Install a protective unit for each pair of subscriber lines in the MDF. Connect the grounding connector of the protective unit and the busbar of the MDF reliably. Connect the MDF ground cable properly to the indoor grounding bar; the sectional size of the MDF ground cable must not be less than 16 mm2. To avoid oxide corrosion, connect the MDF grounding busbar properly to the protection grounding bar. If the MDF is close to the remote module, connect it to the same grounding bar.
18 DDF
The Digital Distribution Frame (DDF) must have been installed, and its terminal capacity must meet the requirements. The sectional size of the ground cable must not be less than 10 mm2. The ground cable must be connected reliably to the indoor grounding bar. The busbar of the DDF must be connected reliably to the protection-grounding bar to avoid oxide corrosion.
19 ODF
The installation of the external optical fiber must be complete. The Optical Distribution Frame (ODF) or the fiber distribution box must be installed. The fiber must be welded.
20 Transmission system
The transmission system must have been commissioned. Its capacity must meet the engineering requirements. The protection ground must be connected properly to the indoor grounding bar.
Also, pay attention to the following:
l Provide the installation certificate to the local property management office. l Ensure that the passage space is large enough. l Confirm the product delivery time and installation time.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 2 Preparing for the Installation
Huawei Technologies Proprietary
2-7
2.4 Unpacking Cases and Accepting the Products
2.4.1 Overview
This section describes the process of unpacking and cautions for unpacking boards.
Unpacking involves the following:
l Checking before unpacking l Unpacking the wooden case l Unpacking the carton l Accepting the products
In actual application, only the wooden case or carton may be used.
2.4.2 Checking Before Unpacking
After arrival at the site, the project supervisor shall check the products together with the customer according to Table 2–2.
Table 2–2 Checking the equipment before unpacking
No. Description
1 The total number of packages is consistent with the packing list attached to the packing case.
2 The destination and installation site are the same.
3 The packing case is in good condition.
4 The cabinet is placed correctly.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 2 Preparing for the Installation
Huawei Technologies Proprietary
2-8
2.4.3 Unpacking the Wooden Case
Caution:
l Do not put the wooden case upside down. Otherwise, the equipment will suffer severe damages.
l Move the packing case into or near the equipment room (if possible) to avoid damage to the cabinet during transportation.
l During unpacking, if the products are soaked and become rusty, stop unpacking and investigate the cause. Feed back the situation to the local Huawei representatives.
Wooden cases are generally used to pack heavy goods like cabinets and batteries. The cabinet package includes wooden panels, steel edges, tongues, and foam plates.
To unpack the wooden case, proceed as follows:
1) Insert one end of the ejector lever into the hole of the tongue on the cover of the wooden case.
2) Turn the ejector lever to straighten the tongue, as shown in Figure 2–1. You can also use a screwdriver or a hammer to handle the tongue.
Ejector lever
Tongue
Wooden panel
Steel edge
Figure 2–1 Straightening the tongue
3) After you straighten all the tongues on the cover, remove the cover as shown in Figure 2–2.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 2 Preparing for the Installation
Huawei Technologies Proprietary
2-9
Figure 2–2 Removing the cover
4) Straighten all the tongues that join the wooden panels around the wooden case and remove the wooden panels, as shown in Figure 2–3.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 2 Preparing for the Installation
Huawei Technologies Proprietary
2-10
Figure 2–3 Removing the wooden panels
& Note:
l Remove the backing blocks out from the rack on the installation site to avoid damages to signal cables and circuit cards.
l When carrying the cabinet, hold on the solid parts of the cabinet, such as the support. Do not use too much force on the parts with poor rigidity, such as cabling rack, cable fixing beams, to avoid any damage to the cabinet or any accident.
2.4.4 Unpacking the Carton
Cartons are usually used to pack cables, boards and terminal devices.
To open a carton, do as follows:
1) Check the types and quantity of boards inside the carton according to labels. 2) Cut the straps with diagonal pliers. 3) Cut the tapes along the seams of the carton cover using a knife. To avoid
damaging the equipment inside, handle it with care. 4) Open the carton and take out the foam plates. 5) Check the labels of the board box, and see whether the board quantity is
consistent with that specified on the label of the carton.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 2 Preparing for the Installation
Huawei Technologies Proprietary
2-11
6) Take out the board box. 7) Check the number and type of boards according to the packing list.
Figure 2–4 shows the carton packed with boards.
Strap
Carton label
Pressure-sensitiveadhesive tape Foam plate
Label on theboard box
ESD bagBoard
Board box
Foam plate
Board box
Figure 2–4 Unpacking procedure for the carton
2.4.5 Cautions for Unpacking Boards
When unpacking boards, observe the following points:
l Take appropriate antistatic measures when you take the boards out. l Note the effect of environment change on boards. When boards are moved from
a cold dry place to a hot damp place, wait for at least 30 min before unpacking. Otherwise, water condensed on the surface may damage the boards.
2.4.6 Accepting the Products
During unpacking, if the products are soaked and have become rusty, stop unpacking and find out the cause. Report the situation to Huawei.
After unpacking, accept the products.
1) Check the products item by item according to the Packing List. 2) If shortage, miscarriage or cargo damage occurs, sign the Unpacking Memo with
the customer. The project supervisor shall fill out the Cargo Inspection Feedback Form, and send it to Huawei within three days.
3) If the products do not match with the Packing List, store those unpacked products in the room.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 2 Preparing for the Installation
Huawei Technologies Proprietary
2-12
4) Take photos of the storage site, the rusty or corroded products, cases and packaging materials. Archive these photos and store the unpacked cases and materials.
5) Sign the Packing List together with the customer.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 3 Installing the Cabinet on the Concrete Floor
Huawei Technologies Proprietary
3-1
Chapter 3 Installing the Cabinet on the Concrete
Floor
3.1 About This Chapter
This chapter describes the process for installing the cabinet on the concrete floor. This chapter includes:
l Checking Before Installation, 3-2 l Marking Reference Lines, 3-2 l Procedure 1
To mark reference lines based on the construction plan drawing, proceed as follows:
1) Measure several points with the measuring tape according to the sizes in the construction plan drawing and the sizes of installation holes of the cabinet.
2) Draw two lines that are parallel to the wall, with a spacing of 460 mm between the two lines.
3) Mark the position for the first expansion bolt. 4) Mark the positions for the other three expansion bolts based on the position for the
first expansion bolt. 5) To install a row of cabinets, refer to the marked hole positions and mark the hole
positions for other cabinets one by one. 6) Measure all the lines and holes again for double check.
II. Procedure 2
To mark reference lines by using the mark-off plate, proceed as follows:
1) Put the marking-off plate on the floor based on the cabinet layout. Put its semi-circle notch towards the front.
2) Mark all the expansion bolt holes, four for each cabinet. l Drilling Holes, 3-5 l Installing Expansion Bolts, 3-6 l Positioning the Cabinet, 3-8 l Levelling the Cabinet, 3-9 l Fastening the Cabinet, 3-10 l Testing Insulation, 3-14 l Outline of the Installed Cabinet, 3-15
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 3 Installing the Cabinet on the Concrete Floor
Huawei Technologies Proprietary
3-2
3.2 Checking Before Installation
3.2.1 Checking the Bottom Space Inside the Cabinet
The MA5600 cabinet does not have feet. It is fixed with expansion bolts. The 8 U high space at the bottom of the cabinet is required for its installation. If the space is not enough, dismantle some modules from the bottom of the cabinet.
3.2.2 Precautions for Installation
Insulate the cabinet from the floor by an insulating plate, and cover the expansion bolt with an insulating tube.
Install the insulating units correctly so that the MA5600 is insulated from the floor before the ground cable is connected.
Warning:
l Before you install the cabinet, check the bearing capability of the installation point. l If the bearing capability does not meet the requirement, reinforce the installation
point.
3.3 Marking Reference Lines
3.3.1 Overview
Mark reference lines according to the construction plan drawing or by using the mark-off template.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 3 Installing the Cabinet on the Concrete Floor
Huawei Technologies Proprietary
3-3
3.3.2 Construction Plan Drawing for a Single Cabinet
Figure 3–1 shows the construction plan drawing for installing a single cabinet.
Unit: mm
800600
800 800
380
600 ¦
¦
¦
460¦50
Back
Right
Front
Left
∅ 16Expansion bolt hole
Figure 3–1 Construction plan drawing for a single cabinet
3.3.3 Construction Plan Drawing for a Row of Cabinets
Figure 3–2 shows the construction plan drawing for installing a row of cabinets.
Unit: mm
800
600
600
800600 600
50¦
380 380380
800
¦
¦
¦
Back
Right
Front
Left
∅ 16Expansion bolt hole
460
Figure 3–2 Construction plan drawing for a row of cabinets
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 3 Installing the Cabinet on the Concrete Floor
Huawei Technologies Proprietary
3-4
Figure 3–3 shows the construction plan drawing for installing back-to-back cabinets.
800
800
600
800
800
600 600 600
600460
460
140
¦
¦
¦
¦∅ 16
Expansion bolt hole
Unit: mm
380 380 380
Front door
Front door
Figure 3–3 Construction plan drawing for back-to-back cabinets
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 3 Installing the Cabinet on the Concrete Floor
Huawei Technologies Proprietary
3-5
3.3.4 Marking-off Plate
Figure 3–4 shows how to install the marking-off plate.
Back
Right
Front
Left
∅
600
380
600
460
16Expansion bolt hole Unit: mm
Figure 3–4 Marking-off plate (for concrete floor installation)
3.3.5 Procedures
I. Procedure 1
To mark reference lines based on the construction plan drawing, proceed as follows:
1) Measure several points with the measuring tape according to the sizes in the construction plan drawing and the sizes of installation holes of the cabinet.
2) Draw two lines that are parallel to the wall, with a spacing of 460 mm between the two lines.
3) Mark the position for the first expansion bolt. 4) Mark the positions for the other three expansion bolts based on the position for the
first expansion bolt. 5) To install a row of cabinets, refer to the marked hole positions and mark the hole
positions for other cabinets one by one. 6) Measure all the lines and holes again for double check.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 3 Installing the Cabinet on the Concrete Floor
Huawei Technologies Proprietary
3-6
II. Procedure 2
To mark reference lines by using the mark-off plate, proceed as follows:
1) Put the marking-off plate on the floor based on the cabinet layout. Put its semi-circle notch towards the front.
2) Mark all the expansion bolt holes, four for each cabinet.
3.4 Drilling Holes
3.4.1 Precautions
When you drill the holes:
l Hold the drill tight and keep the bit vertical to the floor. l Do not shake so as to avoid slanting holes. l Keep the depth of all holes the same. l Chisel a pit to help position the bit if the floor is too hard or slippery.
3.4.2 Procedure
To drill holes, proceed as follows:
1) Select a Φ16 bit. 2) Drill holes with a percussion drill on the marked positions for the expansion bolts,
with the hole depth from 52 mm to 60 mm. 3) Clean the dust inside the holes with a vacuum cleaner. 4) Measure the net depth of the hole. It ranges from 52 mm to 60 mm.
3.5 Installing Expansion Bolts
3.5.1 Composition
Figure 3–5 shows the composition of the expansion bolt.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 3 Installing the Cabinet on the Concrete Floor
Huawei Technologies Proprietary
3-7
Expansion bolt
Expansion tube
Guide trough
Expansion nutGuide rib
Flat washerSpring washer
Figure 3–5 Composition of the expansion bolt
3.5.2 Installation Procedure
To install the expansion bolt, proceed as follows:
1) Clean all holes with a vacuum cleaner. 2) Measure the distance between the holes, rework if the measurements are
incorrect. 3) Remove the expansion tube and nut from the expansion bolt. 4) Align the guide rib on the expansion nut with the guide trough on the expansion
tube and insert the expansion nut into the expansion tube. 5) Insert the expansion tube and nut vertically into the hole. 6) Knock the expansion nut into the floor completely using a rubber hammer.
Figure 3–6 shows how to install the expansion bolt.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 3 Installing the Cabinet on the Concrete Floor
Huawei Technologies Proprietary
3-8
Figure 3–6 Installing the expansion bolt
3.6 Positioning the Cabinet
& Note:
l The front door of the cabinet can be removed to facilitate the following installation. After installation, mount and ground the front door correctly.
l There is an insulating plate between the cabinet and the ground; the expansion bolt has an insulating tube. Install the insulating parts correctly during construction so that the whole equipment is not connected to the ground before the ground cables are installed.
To position the cabinet, proceed as follows:
1) Put the insulating plates on the floor, two for each cabinet. 2) Put the cabinet to the planned position to align the installation holes of the cabinet
with the holes for the expansion bolts, as shown in Figure 3–7.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 3 Installing the Cabinet on the Concrete Floor
Huawei Technologies Proprietary
3-9
Insulating plate
Expansion bolt hole
Cabinet
Floor
Figure 3–7 Positioning the cabinet
3.7 Levelling the Cabinet
& Note:
The filling pad is used to level the cabinet. Insert it between the insulating plate and the floor.
To level the cabinet, proceed as follows:
1) Place a horizontal ruler in two orthogonal directions on the top of the cabinet to check the cabinet level.
2) If the cabinet is not levelled, insert the filling pad under it.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 3 Installing the Cabinet on the Concrete Floor
Huawei Technologies Proprietary
3-10
Figure 3–8 shows how to level the cabinet.
Cabinet
FloorFilling pad
Insulating plate
Figure 3–8 Levelling the cabinet
3.8 Fastening the Cabinet
3.8.1 Overview
The requirements for fastening the cabinet are as follows:
l When a single cabinet is installed, you need to fasten only its bottom. l When a row of cabinets is installed, you need to fasten both their bottom and top.
3.8.2 Fastening the Cabinet Bottom
To fasten the cabinet bottom, proceed as follows:
1) Put the spring washer, flat washer and insulting washer on the M12 x 65 bolt. 2) Insert the bolt through the lower enclosure frame of the cabinet into the expansion
bolt holes. 3) Fasten the bolt diagonally with a torque of 45 N∃m.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 3 Installing the Cabinet on the Concrete Floor
Huawei Technologies Proprietary
3-11
Figure 3–9 shows the fastening of the cabinet bottom.
Filling pad
Flat washer
Insulating washer
Insulating plate
Expansion bolt hole
Cabinet
Floor
Bolt M12 x 65
Spring washer 12
Figure 3–9 Fastening the cabinet bottom
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 3 Installing the Cabinet on the Concrete Floor
Huawei Technologies Proprietary
3-12
3.8.3 Attaching the Cabinet Top
To attach the cabinet top, proceed as follows:
1) Make sure that connecting plates are installed on the top of the cabinets, as shown in Figure 3–10.
Connecting plate
Fixing holes for theconnecting plate
Screw assembliesM6 x 12
Figure 3–10 Connecting plate for attaching two cabinets
2) Dismount the connecting plates from two adjacent cabinets. 3) Mount a connecting plate to these two cabinets to attach them, as shown in
Figure 3–11.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 3 Installing the Cabinet on the Concrete Floor
Huawei Technologies Proprietary
3-13
Figure 3–11 Attaching two cabinets with a connecting plate
When two cabinets are installed back to back, they must also be attached by a connecting plate. The attaching method is the same.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 3 Installing the Cabinet on the Concrete Floor
Huawei Technologies Proprietary
3-14
Figure 3–12 shows the cabinets attached by the connecting plates.
Figure 3–12 Cabinets attached by the connecting plates
3.8.4 Checking the Installation
After the cabinet is fastened, open and close the front doors to check whether the doors work smoothly. If the doors do not work smoothly, check the level of the cabinet. If the cabinet is not leveled, level it again.
3.9 Testing Insulation
3.9.1 Insulation Requirement
The resistance between the cabinet and the ground should be greater than 5 megohms.
3.9.2 Procedure
To test the cabinet insulation, proceed as follows:
1) Set the multimeter to the megohm level to measure the resistance between the expansion bolt M12 x 65 and the cabinet.
2) If the resistance is less than 5 megohms, remove all the components to check whether any insulating part is missing or damaged.
3) Fasten the cabinet and test the insulation again.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 3 Installing the Cabinet on the Concrete Floor
Huawei Technologies Proprietary
3-15
3.10 Outline of the Installed Cabinet
Figure 3–13 shows a single cabinet installed on the concrete floor.
Figure 3–13 A single cabinet installed on the concrete floor
Figure 3–14 shows a row of cabinets installed side by side on the concrete floor.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 3 Installing the Cabinet on the Concrete Floor
Huawei Technologies Proprietary
3-16
Figure 3–14 A row of cabinets installed side by side on the concrete floor
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 4 Installing the Cabinet on the Antistatic Floor
Huawei Technologies Proprietary
4-1
Chapter 4 Installing the Cabinet on the Antistatic
Floor
4.1 About This Chapter
This chapter describes the process to install the cabinet on the antistatic floor.
l Marking Reference Lines, 4-5 l Drilling Holes, 4-8 l Installing Expansion Bolts, 4-9 l Installing Supports, 4-10 l Installing Holder Fasteners, 4-13 l Positioning the Cabinet, 4-13 l Leveling the Cabinet, 4-14 l Fastening the Cabinet, 4-15 l Testing Insulation, 4-19 l Recovering the Floor, 4-20
This chapter also covers:
l S600A Support Series, 4-2 l Recommended Tools, 4-5 l Outline of the Installed Cabinets, 4-21
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 4 Installing the Cabinet on the Antistatic Floor
Huawei Technologies Proprietary
4-2
4.2 S600A Support Series
4.2.1 Application of Supports
To install the cabinet on the antistatic floor, the S600A support series is required.
The supports lift the cabinet and ease the floor tiles arrangement and cable routing.
The S600A support consists of the following parts:
l Support l Slide rail and floor holder l Side floor holder
The cabinet is fixed to expansion bolts through the supports and slide rails.
4.2.2 Support
The S600A support includes four models. Models I–III are height-adjustable and model IV is of fixed height.
Table 4–1 lists the height ranges of these models.
Table 4–1 Height ranges of the S600A supports
Model Suitable for antistatic floor at a height of…
I 210 mm to 255 mm
II 256 mm to 345 mm
III 346 mm to 525 mm
IV 100 mm and above, customized
& Note:
The height of the antistatic floor is the distance between the upper plane of the antistatic floor and the concrete floor.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 4 Installing the Cabinet on the Antistatic Floor
Huawei Technologies Proprietary
4-3
Figure 4–1 shows the outline of the S600A support.
Upper support
Lower support
Height scale
Connection hole for the slide rail
Installation holefor the ground
Figure 4–1 Outline of the S600A support
4.2.3 Slide Rail and Floor Holder
The functions of the slide rail and the floor holder are as follows:
l The slide rail connects the cabinet with the support. l The floor holder upholds the floor around the cabinet.
Each set of the assembly includes the following parts:
l Two floor holders l Two slide rails l Two holder fasteners l Screws l Washers l Large washers l Insulating pads l Insulating tubes
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 4 Installing the Cabinet on the Antistatic Floor
Huawei Technologies Proprietary
4-4
Figure 4–2 shows the outline of the assembly.
Slide rail
Floor holder
Floor holder fastenerInstallation hole forthe side holder
Figure 4–2 Outline of the slide rail and floor holder assembly
Figure 4–3 shows the outline of the slide rail.
Holes for the cabinet
Holes for the support
Figure 4–3 Outline of the slide rail
Each cabinet needs a set of the assembly, delivered with the support.
4.2.4 Side Floor Holder
The side floor holder supports the antistatic floor at two sides of the cabinet.
Each set of the side floor holder includes the following parts:
l Two side floor holders l Four holder fasteners l Some screws
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 4 Installing the Cabinet on the Antistatic Floor
Huawei Technologies Proprietary
4-5
Figure 4–4 shows the outline of the side floor holder.
Side floor holder
Fastener
To connect withthe slide rail
Figure 4–4 Outline of the side floor holder
Each row of cabinets uses a set of the side floor holder delivered with the support, even if there is only one cabinet in the row.
4.3 Recommended Tools
Prepare the following tools for installing the cabinet on the antistatic floor.
l Percussion drill l Multimeter l Hammer l Flathead screwdrivers: M3–M6 l Cross screwdrivers: M3–M6 l Adjustable wrench l Socket wrenches: M6, M8, M12, M14, M17 and M19
4.4 Marking Reference Lines
4.4.1 Overview
You can mark reference lines based on:
l The construction plan drawing l The marking-off template
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 4 Installing the Cabinet on the Antistatic Floor
Huawei Technologies Proprietary
4-6
4.4.2 Construction Plan Drawing for a Single Cabinet
Figure 4–5 shows the construction plan drawing for installing a single cabinet.
800
600
800
354
Wall
46050
Back
Right
Front
800
Unit: mm Expansion bolt hole4N-Ø16
600
≥
≥
≥
≥
Figure 4–5 Construction plan drawing for a single cabinet
4.4.3 Construction Plan Drawing for a Row of Cabinets
Figure 4–6 shows the construction plan drawing for installing a row of cabinets.
Back
Right
Front
Left
800
600
600
800600 600
46050
354 354354
800
Unit: mm
Expansion bolt hole4N-Ø16
Wall
≥
≥
≥ ≥
Figure 4–6 Construction plan drawing for a row of cabinets
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 4 Installing the Cabinet on the Antistatic Floor
Huawei Technologies Proprietary
4-7
Figure 4–7 shows the construction plan drawing for installing back-to-back cabinets.
Expansion bolt hole4N-Ø16
Wall
800
800
600
800
354 354
800
600
600460
460
354
Back
Right
Front
Left
Unit: mm
≥
≥
≥
≥
Figure 4–7 Construction plan drawing for back-to-back cabinets
4.4.4 Marking-off Plate
Figure 4–8 shows the marking-off plate.
600
354
600
460
Back
Right
Front
Left
Unit: mmExpansion bolt hole4N-Ø16
Figure 4–8 Marking-off plate for the antistatic floor installation
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 4 Installing the Cabinet on the Antistatic Floor
Huawei Technologies Proprietary
4-8
4.4.5 Procedures
I. Procedure 1
To mark reference lines according to the construction plan drawing, proceed as follows:
1) Measure several points with the measuring tape according to the sizes in the construction plan drawing and the sizes of installation holes of the cabinet.
2) Draw two lines that are parallel to the wall based on the points, with a spacing of 460 mm between the two lines.
3) Mark the position for the first expansion bolt. 4) Mark the positions for the other three expansion bolts based on the position for the
first expansion bolt. 5) To install a row of cabinets, refer to the marked hole positions and mark the hole
positions for other cabinets one by one. 6) Measure all the lines and holes again for double check.
II. Procedure 2
To mark reference lines by using the marking-off plate, proceed as follows:
1) Put the marking-off plate on the floor based on the cabinet layout. Put its semi-circle notch towards the front.
2) Mark all the expansion bolt holes according to the marking-off plate, four holes for each cabinet.
4.5 Drilling Holes
4.5.1 Precautions
When you drill the holes:
l Hold the drill tight and keep the bit vertical to the floor. l Do not shake so as to avoid slanting holes. l Keep the depth of all holes the same. l Chisel a pit to help position the bit if the floor is too hard or slippery.
4.5.2 Procedure
To drill holes, proceed as follows:
1) Select a Φ16 bit. 2) Drill holes with a percussion drill on the marked positions for the expansion bolts,
with the hole depth from 52 mm to 60 mm. 3) Clean the dust inside the holes with a vacuum cleaner. 4) Measure the net depth of the hole. It ranges from 52 mm to 60 mm.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 4 Installing the Cabinet on the Antistatic Floor
Huawei Technologies Proprietary
4-9
4.6 Installing Expansion Bolts
4.6.1 Composition
Figure 4–9 shows the composition of the expansion bolt.
Expansion bolt
Expansion tube
Guide trough
Expansion nutGuide rib
Flat washerSpring washer
Figure 4–9 Composition of the expansion bolt
4.6.2 Installation Procedure
To install the expansion bolt, proceed as follows:
1) Clean all holes with a vacuum cleaner. 2) Measure the distance between the holes, rework if the measurements are
incorrect.. 3) Remove the expansion tube and nut from the expansion bolt. 4) Align the guide rib on the expansion nut with the guide trough on the expansion
tube and insert the expansion nut into the expansion tube. 5) Insert the expansion tube and nut vertically into the hole. 6) Knock the expansion nut into the floor completely by using a rubber hammer.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 4 Installing the Cabinet on the Antistatic Floor
Huawei Technologies Proprietary
4-10
Figure 4–10 shows how to install the expansion bolt.
Figure 4–10 Installing the expansion bolt
4.7 Installing Supports
4.7.1 Overview
This section describes how to install supports.
The installation of supports involves the following:
l Adjusting the Height of the Support l Assembling the Support l Fastening the Support
4.7.2 Adjusting the Height of the Support
To adjust the height of the support, proceed as follows:
1) Adjust the height of the support to the same as that of the antistatic floor. 2) Fasten the height-locking bolt to 45 N∃m.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 4 Installing the Cabinet on the Antistatic Floor
Huawei Technologies Proprietary
4-11
Figure 4–11 shows the positions of the height-locking bolt.
Height lockingbolt (two sides)
Height lockingbolt (middle)
12
Figure 4–11 Positions of the height-locking bolt
& Note:
When you set the height of the support, first fasten the height-locking bolts in the middle, and then the bolts at the two sides of each support foot.
4.7.3 Assembling the Support
To assemble the support, proceed as follows:
1) Assemble the supports and slide rails together using the M12 x 30 bolt, spring washer and flat washer. See Figure 4–12.
Flat washer 12
Spring washer 12
Bolt M12 x 30
Support
Slide rail
Diagonal A
Diagonal B
Figure 4–12 Assembling the support and slide rail together
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 4 Installing the Cabinet on the Antistatic Floor
Huawei Technologies Proprietary
4-12
2) Adjust the support until the length of the diagonals between the two slide rails become the same, as shown by diagonals A and B in Figure 4–12.
3) Fasten the nuts.
4.7.4 Fastening the Support
To fasten the support to the ground, proceed as follows:
1) Align the installation holes in the support with the expansion bolt holes in the ground.
2) Put the spring washer and large flat washer onto the bolt M12 x 60. 3) Insert the bolt through the installation hole into the holes in the ground. 4) Adjust the support to proper position. 5) Fasten the M12 x 60 bolt with a torque of 45 N∃m.
Figure 4–13 shows how to fix the support to the ground.
Spring washer 12
Flat washer
Bolt M12 x 60
Floor
Support
Slide rail
Figure 4–13 Fixing the support to the ground
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 4 Installing the Cabinet on the Antistatic Floor
Huawei Technologies Proprietary
4-13
4.8 Installing Holder Fasteners
The holder fastener sustains the floor holder, and the holder supports the antistatic floor tile near the cabinet.
Figure 4–14 shows the installation of the holder fastener.
Support
Slide rail
Spring washer 12
Bolt M12 x 30
Flat washer 12
Fastener for thefront holder
Figure 4–14 Installing the holder fastener
4.9 Positioning the Cabinet
To position the cabinet, proceed as follows:
1) Put the insulating plates on the floor, two for each cabinet. 2) Move the cabinet to the planned position to align the installation holes of the
cabinet with the holes for expansion bolts, as shown in Figure 4–15.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 4 Installing the Cabinet on the Antistatic Floor
Huawei Technologies Proprietary
4-14
Insulating plate
Slide rail
Cabinet
Support
Figure 4–15 Positioning the cabinet on the support
4.10 Leveling the Cabinet
& Note:
Insert the filling pad between the insulating plate and the support. If you insert the pad between the cabinet and the insulating plate, the cabinet will not be insulated.
To level the cabinet, proceed as follows:
1) Place a horizontal ruler in two orthogonal directions on the top of the cabinet to check the cabinet level.
2) If the cabinet is not leveled, insert a filling pad under it.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 4 Installing the Cabinet on the Antistatic Floor
Huawei Technologies Proprietary
4-15
Figure 4–16 shows how to level the cabinet.
Cabinet
Support
Filling pad
Insulating plate
Slide rail
Figure 4–16 Leveling the cabinet on the antistatic floor
4.11 Fastening the Cabinet
4.11.1 Overview
The requirements for cabinet fastening are as follows:
l When a single cabinet is installed, you need to fasten only its bottom. l When multiple cabinets are installed in one row, you need to fasten both their
bottom and top.
4.11.2 Fastening the Cabinet Bottom
To fasten the cabinet bottom, proceed as follows:
1) Put the spring washer, flat washer and insulting washer on the M12 x 35 bolt. 2) Insert the bolt through the lower enclosure frame of the cabinet and into the
connecting holes on the slide rail. 3) Fasten the bolt diagonally with a torque of 45 N∃m.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 4 Installing the Cabinet on the Antistatic Floor
Huawei Technologies Proprietary
4-16
Figure 4–17 shows how to fasten the cabinet bottom on the antistatic floor.
Filling pad
Flat washer
Insulating washer
Insulating plate
Slide rail
Bolt M12 x 35
Spring washer 12
Figure 4–17 Fastening the cabinet bottom on the antistatic floor
4.11.3 Fastening the Cabinet Top
To fasten the cabinet top, proceed as follows:
1) Make sure that the connecting plates are attached to the top of the combined cabinets, as shown in Figure 4–18.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 4 Installing the Cabinet on the Antistatic Floor
Huawei Technologies Proprietary
4-17
Connecting plate
Fixing holes for theconnecting plate
Screw assembliesM6 x 12
Figure 4–18 Connecting plate for combining two cabinets
2) Remove the connecting plates from two adjacent cabinets. 3) Mount one connecting plate to these two cabinets to connect them, as shown in
Figure 4–19.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 4 Installing the Cabinet on the Antistatic Floor
Huawei Technologies Proprietary
4-18
Figure 4–19 Combining two cabinets with the connecting plate
When you install two cabinets back to back, you must combine them using the connecting plate. The combining method is the same as above.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 4 Installing the Cabinet on the Antistatic Floor
Huawei Technologies Proprietary
4-19
Figure 4–20 shows the cabinets combined by the connecting plate.
Figure 4–20 Cabinets combined by the connecting plate
4.11.4 Checking the Installation
After the cabinet is fastened, open and close the front doors to check whether the doors work smoothly. If the doors do not work smoothly, check the level of the cabinet. If the cabinet is not leveled, level it again.
4.12 Testing Insulation
4.12.1 Insulation Requirement
The resistance between the cabinet and the ground must be larger than 5 megohms.
4.12.2 Procedure
To test the cabinet insulation, complete the following procedure:
1) Set the multimeter to the megohm level to measure the resistance between the expansion bolt M12 x 65 and the cabinet.
2) If the resistance is less than 5 megohms, remove all the components to check whether any insulating part is missing or damaged.
3) Fasten the cabinet again and test the insulation again.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 4 Installing the Cabinet on the Antistatic Floor
Huawei Technologies Proprietary
4-20
4.13 Recovering the Floor
4.13.1 Overview of Floor Recovery
Recovering the floor involves the following:
l Installing the Floor Holder l Adjusting the Holder l Recovering the Floor
4.13.2 Installing the Floor Holder
Fasten the floor holder to the fastener with M12 x 30 bolt, spring washer and flat washer. Figure 4–21 shows how to install the floor holder.
Slide rail
Front holder fastener
Bolt M12 x 30
Spring washer 12
Flat washer 12
Support
Front holder
Figure 4–21 Installing the floor holder
4.13.3 Adjusting the Holder
Adjust the height of the holder to align the top surface of the holder with the bottom surface of the antistatic floor.
4.13.4 Recovering the Floor
Cut the antistatic floor to proper size and lay the floor around the cabinet.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 4 Installing the Cabinet on the Antistatic Floor
Huawei Technologies Proprietary
4-21
4.14 Outline of the Installed Cabinets
Figure 4–22 shows the outline of a row of cabinets installed on the antistatic floor.
Figure 4–22 A row of cabinets installed on the antistatic floor
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 5 Installing the Dripping-proof Cover
Huawei Technologies Proprietary
5-1
Chapter 5 Installing the Dripping-proof Cover
5.1 About This Chapter
This chapter covers the following:
l Introduction to the Dripping-proof Cover, 5-1 l Installation Procedure, 5-1
5.2 Introduction to the Dripping-proof Cover
The dripping-proof cover protects the cabinet against water from the roof. If the equipment room conditions are not good enough, you must install the dripping-proof cover.
& Note:
Install the cover before connecting the cables.
Figure 5–1 shows the outline of the dripping-proof cover.
Supporting bolt
Small movable bushingLarge movable bushing
Panel nut
Dripping-proof cover
Figure 5–1 Outline of the dripping-proof cover
5.3 Installation Procedure
To install the dripping-proof cover, complete the following procedure:
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 5 Installing the Dripping-proof Cover
Huawei Technologies Proprietary
5-2
1) Remove the two connecting plates on the top of the cabinet, as shown in Figure 5–2.
Connecting plate forcombining cabinets
Figure 5–2 Connecting plate on the cabinet top
2) Fasten the four supporting bolts of the dripping-proof cover to the top of the cabinet, as shown in Figure 5–3.
Supporting bolt
Figure 5–3 Installing the supporting bolts
3) Affix the dripping-proof cover onto the top of the cabinet, as shown in Figure 5–4.
Supporting bolt
Enclosure frameof the cabinet
Figure 5–4 The installed dripping-proof cover
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 6 Installing the Cabling Rack
Huawei Technologies Proprietary
6-1
Chapter 6 Installing the Cabling Rack
6.1 About This Chapter
The cabling rack consists of the cabling trough and cabling ladder. This chapter describes the method and procedure for installing the cabling rack.
This chapter covers:
l Installation Process, 6-2 l Assembling the Cabling Ladder, 6-2 l Installing the Cabling Trough, 6-4 l Turning or Jointing the Cabling Ladder, 6-6 l Mounting the Cabling Rack, 6-9 l Installing the Accessories, 6-14
& Note:
l In the upward cabling mode, install the cabling rack in the equipment room. If no cabling rack is required, skip this chapter.
l Huawei recommends selecting the 400 mm cabling ladder without the cabling trough to facilitate cabling and heat dissipation.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 6 Installing the Cabling Rack
Huawei Technologies Proprietary
6-2
6.2 Installation Process
Figure 6–1 shows the process for installing the cabling rack.
Wall-mounting Ceiling-mounting/Floor-mounting
Assemble the wiring ladder
Start
Fasten the wiring trough
Install the accessories
End
Joint the wiring ladder
Over-cabinetmounting
Yes
NoInstall the wiringtrough?
Figure 6–1 Process of installing the cabling rack
6.3 Assembling the Cabling Ladder
6.3.1 Overview
The cabling ladder comprises the U-steel and horizontal beam. See Figure 6–2 for the outline of the cabling ladder.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 6 Installing the Cabling Rack
Huawei Technologies Proprietary
6-3
U-steelHorizontal beam
Figure 6–2 Outline of the cabling ladder
6.3.2 Precaution
If the cabling ladder is to be used horizontally, face its bolts downward to ease the installation of cabling troughs.
6.3.3 Procedure
To assemble the cabling ladder, proceed as follows:
1) Arrange the U-steels in parallel, with the spacing between two U-steels being the length of the horizontal beam.
2) Fasten a horizontal beam every five holes to the U-steel by using a fastener, as shown in Figure 6–3.
U-steelFastener Horizontal beam
Figure 6–3 Assembling the cabling ladders
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 6 Installing the Cabling Rack
Huawei Technologies Proprietary
6-4
3) Connect several cabling ladders using the U-shaped connecting piece when a very long cabling ladder is required, as shown in Figure 6–4.
Wiring ladder BWiring ladder A U-shaped connecting piece
Fastener
Figure 6–4 Connecting two cabling ladders
& Note:
l If the length of the cabling ladder is not the integral multiple of 2.5 m, cut out the remaining.
l After cutting the ladder, paint the cross section of the cut for rust-protection.
6.4 Installing the Cabling Trough
6.4.1 Overview
This section describes the connection between cabling troughs, and the procedure to install the cabling trough.
According to the width of the cabling ladder, the cabling trough can be installed:
l On a 200 mm or 400 mm cabling ladder l On a 600 mm cabling ladder
If the cabling trough is lengthened, add the trough first and then fasten it.
6.4.2 Connecting the Cabling Troughs
The two ends of a cabling trough are not of the same size. To connect two sections of cabling troughs, insert the smaller end of one cabling trough into the larger end of the other. The insertion depth is 250 mm.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 6 Installing the Cabling Rack
Huawei Technologies Proprietary
6-5
6.4.3 Procedure
To install the cabling trough on a 200 mm or 400 mm cabling ladder, proceed as follows:
1) Select the 200 mm or 400 mm cabling trough. 2) Put the cabling trough onto the cabling ladder. 3) Use fixing clips to fasten the cabling trough to the cabling ladder. Each cabling
trough needs four clips, two on each side of the trough.
Figure 6–5 shows the cabling trough that is connected and fastened to the cabling ladder.
Wiring trough A
Fixing clip Wiring ladder
Wiring trough B
Figure 6–5 Connecting and fastening the cabling trough on a 200 mm or 400 mm cabling ladder
To install the cabling trough on a 600 mm cabling ladder, proceed as follows:
1) Combine a 200 mm cabling trough with a 400 mm cabling trough to fit the 600 mm cabling ladder.
2) Use the special connecting clips to connect the cabling troughs, three for each trough.
3) Fasten the cabling trough to the cabling ladder using the fixing clips. Each cabling trough needs four clips, two on each side of the trough.
Figure 6–6 shows the cabling troughs that are connected and fastened to the cabling ladder.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 6 Installing the Cabling Rack
Huawei Technologies Proprietary
6-6
Wiring ladder (600 mm wide)
Fixing clip
Connecting clip
Wiring ladder (400 mm wide)
Wiring ladder (200 mm wide)
Figure 6–6 Connecting and fastening the cabling trough on a 600 mm cabling ladder
6.5 Turning or Jointing the Cabling Ladder
6.5.1 Overview
In practice, the cabling ladder may be turned, raised or lowered, which involves two operations:
l Turning the cabling ladder l Jointing the cabling ladder
6.5.2 Turning the Cabling Ladder
This section describes the turning of the cabling trough when:
l The cabling rack has no cabling trough l The cabling rack has the cabling trough
I. The Cabling Rack Has No Cabling Trough
Connect two cabling ladders using bracket angles and fasteners, and make sure that the two ladders are on the same surface, as shown in Figure 6–7.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 6 Installing the Cabling Rack
Huawei Technologies Proprietary
6-7
Fastener Bracket Wiring ladder A Wiring ladder B
Figure 6–7 Horizontal turning of the cabling ladders without the cabling trough
II. The Cabling Rack Has The Cabling Trough
& Note:
The cabling ladder of one cabling rack must be of the same height as the cabling trough of the other cabling rack so that cables can turn easily.
Connect two cabling ladders using bracket angles and fasteners, as shown in Figure 6–8.
Wiring ladder A
Wiring trough
BracketFastener
Wiring ladder B
Figure 6–8 Horizontal turning of the cabling ladders with the cabling trough
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 6 Installing the Cabling Rack
Huawei Technologies Proprietary
6-8
6.5.3 Jointing the Cabling Ladder
To joint the cabling ladder, proceed as follows:
1) Select a segment of the cabling ladder as the climbing ladder. 2) Connect the climbing ladder and the cabling ladder using bracket angles and
fasteners.
The jointing between the climbing ladder and the cabling ladder falls into three types: front jointing, side jointing and oblique jointing.
Figure 6–9 shows the front jointing.
Bracket
Fastener
Climbing ladder
Wiring ladder
Figure 6–9 Front jointing of the cabling ladders
Figure 6–10 shows the side jointing.
Wiring ladder Bracket
Fastener
Climbing ladder
Figure 6–10 Side jointing of the cabling ladders
Figure 6–11 shows the oblique jointing.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 6 Installing the Cabling Rack
Huawei Technologies Proprietary
6-9
Bracket
Fastener
Wiring ladder C
Wiring ladder B
Wiring ladder A
Figure 6–11 Oblique jointing of the cabling ladders
6.6 Mounting the Cabling Rack
6.6.1 Overview
The cabling rack can be mounted in three ways:
l Wall mounting l Ceiling mounting or floor mounting l Over-cabinet mounting
& Note:
The cabling rack must be insulated from the floor, ceiling and wall.
6.6.2 Wall Mounting
Take the following precautions for wall mounting.
l Add insulating plates and washers to insulate the cabling ladder from the wall. l When you fasten the triangular supports onto the wall, use a larger flat washer 8
(GB96-85) instead of the one on the expansion bolt. l The spacing between two triangular supports must be an integer multiple of 50
mm. Otherwise, the cabling ladder will not be able to connect with the triangular support.
l The recommended spacing between two triangular supports is 1250 mm, that is, each segment of the cabling ladder is supported by two triangular supports.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 6 Installing the Cabling Rack
Huawei Technologies Proprietary
6-10
I. Procedure
To mount the cabling ladder to the wall, proceed as follows:
1) Mount the cabling ladder to the wall with the bracket angles, insulating plate, insulating pad, fastener and expansion bolt, as shown in Figure 6–12.
(1)
(1) Expansion bolt (2) Insulating plate (3) Insulating washer (4) Large flat washer
(5) Spring washer (6) Nut (7) Wiring ladder (8) Bracket
(2) (3) (4) (5) (6)
(7)(8)
Figure 6–12 Mounting the cabling ladder to the wall
2) Put two insulating plates between the vertical beam of each triangular support and the wall.
3) Add one insulating washer between the vertical beam and each of the nuts that fasten the beam.
4) Mount the triangular support onto the wall with expansion bolts, as shown in Figure 6–13.
5) Put the cabling ladder on the triangular support. 6) Align holes in the U-steel of the ladder with holes in the horizontal beam of the
triangular support, and fasten them with fasteners, as shown in Figure 6–13.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 6 Installing the Cabling Rack
Huawei Technologies Proprietary
6-11
Horizontal beam
Wiring ladder
Insulating plate
Expansion boltOblique beam
Vertical beam
Figure 6–13 Installing the triangular support
6.6.3 Ceiling Mounting or Floor Mounting
Mounting the ceiling means suspending the cabling rack using U-steel bars hanging from the ceiling. Mounting the floor means upholding the cabling rack using U-steel bars fastened on the floor.
To mount the cabling rack to the ceiling or floor, proceed as follows:
1) Select U-steel bars with suitable length according to the height of the cabling rack and equipment room. When the required U-steel bar is longer than 2.5 m, connect two U-steel bars together in the same way as that of connecting the cabling ladder. Use the U-shaped fasteners and paint the cut area.
& Note:
l The spacing between two U-steel bars must be an integer multiple of 50 mm. Huawei recommends a spacing of 1250 mm, that is, each segment of the cabling ladder is supported by two U-steel bars.
l For ceiling or floor mounting, install the U-steel bar onto the outer side of the cabling ladder to ease the cabling trough installation.
l Insulate the U-steel bar from the roof or floor, and ensure that the insulating plate and pad are added.
2) Connect the U-steels to the ceiling (or floor) with the bracket angles, fasteners and expansion bolts. The connecting method is the same as the wall mounting.
3) Connect the cabling ladder to U-steel bars with the bracket angles, fasteners and expansion bolts.
Figure 6–14 shows the ceiling mounting and floor mounting.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 6 Installing the Cabling Rack
Huawei Technologies Proprietary
6-12
U-steel
Bracket
Insulating washer
Insulatingplate
Wiring trough
Wiring ladder
Expansion boltM8x80
Figure 6–14 Mounting the cabling rack to the ceiling and the floor
6.6.4 Over-cabinet Mounting
When the cabling rack runs over the cabinet, use the over-cabinet mounting mode. You can use the cabinet-top support to hold the cabling rack, or use the cabling ladder.
& Note:
To improve heat dissipation, do not use the cabling trough in the over-cabinet mounting mode.
I. Using the Support
Proceed as follows:
1) Prepare the cabinet-top support. It must be welded with steel and must be able to hold the cabling racks.
2) Install the cabinet-top support with two expansion bolts, as shown in Figure 6–15.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 6 Installing the Cabling Rack
Huawei Technologies Proprietary
6-13
Cabinet
SupportFlat washer 8
Spring washer 8
Bolt M8 x 20
Figure 6–15 Installing the support on the cabinet
3) Fasten the cabling ladder with the support through expansion bolt holes, as shown in Figure 6–16.
Flange bolt M8
Flange nutM8 x 20
Cabinet
SupportWiring ladder
Figure 6–16 Installing the cabling ladder to the cabinet-top support
II. Using the Cabling Ladder
When there is no support on the top of the cabinet, use the cabling ladders over the cabinet. Refer to Figure 6–10 and Figure 6–11 for the connection of the cabling ladders.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 6 Installing the Cabling Rack
Huawei Technologies Proprietary
6-14
6.7 Installing the Accessories
6.7.1 Overview
This section describes how to install accessories, including:
l Cable manager l End cover, baffle ring and trough rim
6.7.2 Installing the Cable Manager
Cable managers are often installed on the cabling ladder over the cabinet. The quantity and installation positions of cable managers depend on the actual situation.
& Note:
To align the cable manager with the cabling rack: l Fasten the cable manager to the cabling ladder through the upper holes in the cable
manager, if the cabling trough is available. l Fasten the cable manager to the ladder through the lower holes in the cable
manager, if the cabling trough is not available.
Figure 6–17 shows the installation of the cable manager when there is no cabling trough.
Cabling rack
Pectinate bracket
Upper hole Lower hole
Figure 6–17 Installing the cable manager when no cabling trough is used
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 6 Installing the Cabling Rack
Huawei Technologies Proprietary
6-15
6.7.3 Installing the Baffle Ring, End Cover and Trough Rim
I. Installing the Baffle Ring
The baffle ring is installed on both sides of the cabling trough to increase the height of the trough and hold cables inside the trough. Each segment of the cabling trough uses four baffle rings, evenly installed on both sides.
Figure 6–18 shows the installation of the baffle ring.
Wiring trough
Wiring ladder Baffle ring
Figure 6–18 Installing the baffle ring
II. Installing the End Cover and Trough Rim
The end cover and the trough rim can prevent cables from being damaged.
The installation requirements for the end cover and the trough rim are as follows:
l The end cover is used at the end of the cabling ladders. Install end covers for all cabling ladders if possible.
l The trough rim covers the bottom edge of the cabling trough. All the exposed bottom edges at the end of the cabling trough must be covered by the trough rim.
Figure 6–19 shows the installation of the end cover and the trough rim.
Trough rim
End cover
Wiring trough
Figure 6–19 Installing the end cover and the trough rim
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 7 Installing the Frame and Board
Huawei Technologies Proprietary
7-1
Chapter 7 Installing the Frame and Board
7.1 About This Chapter
This chapter describes:
l Installing the Frame, 7-2 l Inserting and Removing the Board, 7-4
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 7 Installing the Frame and Board
Huawei Technologies Proprietary
7-2
7.2 Installing the Frame
7.2.1 Introduction to the Frame
The holes in the mounting bracket on both sides of the frame are used to fasten the bolts, as shown in Figure 7–1.
Hole
Mount bracket
Figure 7–1 Frame structure
7.2.2 Procedure
To install the frame, complete the following procedure:
1) Install the slide rail, as shown in Figure 7–2. If the slide rail has been installed, proceed to the next step.
Figure 7–2 Installing the slide rail
2) Install captive nuts to the mounting rails of the cabinet according to the position of the holes in the frame bracket.
3) Put the frame on the slide rails in the cabinet, as shown in Figure 7–3.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 7 Installing the Frame and Board
Huawei Technologies Proprietary
7-3
4) Gently push the frame into the cabinet and make the brackets on the frame touch the mounting rails of the cabinet.
Cabinet
Panel screw
Figure 7–3 Installing the frame
5) Align all frames. The eight holes in the frame brackets must be aligned with the captive nuts in the mounting rail of the cabinet. Insert eight M6x12 panel screws to fix the frame, as shown in Figure 7–3.
& Note:
When you fasten the bolts, fasten all the bolts diagonally and evenly.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 7 Installing the Frame and Board
Huawei Technologies Proprietary
7-4
7.3 Inserting and Removing the Board
7.3.1 Preparation
Boards are sensitive to ESD. Before handling the boards, make the necessary preparations and observe the cautions below.
I. Checking Equipment Grounding
Check whether the equipment is securely grounded according to the requirements.
II. Fastening the ESD Wrist Strap
l Always wear an ESD wrist strap during the operation. l Tighten the wrist strap around your wrist, and attach the other end of the wrist
strap to the grounding point of the equipment, as shown in Figure 7–4.
Figure 7–4 Wearing an ESD wrist strap correctly
l Check the validity and functionality of the wrist strap. Its resistance must range from 0.75 megaohms to 10 megaohms. If the validity period (usually two years) of the wrist strap expires or the resistance value does not fulfill the requirement, use a new ESD wrist strap.
l Avoid contact with the boards and your clothing as it generates static electricity beyond the protection scope of the wrist strap.
III. Replacing Board Software or Chip
l Wear antistatic gloves and place the board on an antistatic pad while replacing board software or chip.
l Use antistatic tweezers or extraction tools to replace chips. l Do not touch the chips, circuits, or pins with bare hands.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 7 Installing the Frame and Board
Huawei Technologies Proprietary
7-5
IV. Handling the Board
l Keep the boards and other ESD sensitive parts to be installed in antistatic bags. l Place removed boards and components on an antistatic pad or other antistatic
materials. l Do not use non-antistatic materials such as white foams, common plastic bags, or
paper bags to pack the boards or let them touch the boards.
V. Protecting Board Port
l Wear an ESD wrist strap while operating the ports of the boards because they are also ESD-sensitive.
l Discharge the static electricity of cables and protective sleeves before connecting them to the ports.
VI. Reserving Package Materials
Reserve some materials for board package (such as antistatic boxes and bags) in the room for future use.
7.3.2 Precautions
Observe the following when you insert a board:
l While inserting a board into a slot, push it in slowly. l To install a board, place the board properly on the guide rails, so that it can be
contacted with the backplane properly.
7.3.3 Procedure for Inserting the Board
To insert the board, complete the following procedure:
1) If there is a filler panel on the slot, remove the filler panel. 2) Make sure that there is no loose or damaged component on the board. 3) Set the jumpers and DIP switches on the board. 4) Hold the ejector levers outwards horizontally, as shown in Figure 7–5.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 7 Installing the Frame and Board
Huawei Technologies Proprietary
7-6
Figure 7–5 Installing the board
5) Insert the board smoothly along the slot guide rail until the locating pin on the front panel touches the pin locating hole on the frame.
6) Press the ejector levers inwards till the inner sides of the ejector levers contact the fore end of the frame.
7) Fix the screws with the screwdriver.
7.3.4 Procedure for Removing the Board
To remove the board, complete the following procedure:
1) Loosen the screws on the ejector levers. 2) Hold the ejector levers with both hands. 3) Turn the ejector levers outward to separate the locating pin of the board from the
backplane. 4) Pull out the board slowly. 5) Push the ejector levers inwards to fix them. 6) Install a filler panel to the slot.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 8 Installing the Power Supply System
Huawei Technologies Proprietary
8-1
Chapter 8 Installing the Power Supply System
8.1 About This Chapter
This chapter describes the components of the power supply system and their installation procedures, including:
l Installation Components, 8-2 l Introduction to Power and Ground Cables, 8-2 l Making Power Cables on Site, 8-3 l Installing the Lightning Arrester, 8-3 l Installing the GEPS4845 Power Module, 8-5 l Installing Batteries, 8-10 l Installing the Signal Transfer Box, 8-13 l Installing the DC Power Distribution Unit, 8-14 l Installing the Environment Monitor Unit, 8-17 l MDF Grounding Requirements, 8-18
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 8 Installing the Power Supply System
Huawei Technologies Proprietary
8-2
8.2 Installation Components
The MA5600 cabinet can be powered by 220 VAC, 110 VAC, –48 VDC or –60 VDC.
l For 220 VAC or 110 VAC power supply, the GEPS4845 (220 V or 110 V) power module and the SPD28SZ or SPD32SZ lightning arrester are used.
l For –48 VDC or –60 VDC power supply, the DC PDU is used.
Table 8–1 lists the components to be installed.
Table 8–1 List of MA5600 power supply components
Power supply Components
SPD28SZ or SPD32SZ lightning arrester
Signal transfer box (optional)
Power module AC
Battery
PDU DC
EMU (optional)
For power and ground cables involved in the installation of components, see sections "8.3 Introduction to Power and Ground Cables" and "8.4 Making Power Cables on Site".
8.3 Introduction to Power and Ground Cables
Table 8–2 lists the colors and types of power and ground cables.
Table 8–2 Color and types of power and ground cables
Power supply and cable Type Color
N White AC
L Black
NEG (–48 V/–60 VDC) Blue DC
RTN (BGND) Black
Ground cable PE (PGND) Yellow and green
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 8 Installing the Power Supply System
Huawei Technologies Proprietary
8-3
8.4 Making Power Cables on Site
To make power cables on site, complete the following procedure:
1) Cut a cable with proper length. 2) Strip the cable sheath and put on the heat shrink tube. 3) Crimp the OT terminal to the cable with crimp pliers. 4) Heat the heat shrink tube to make it adhere to the cable.
8.5 Installing the Lightning Arrester
8.5.1 Overview
This section describes how to install the lightning arrester, which includes:
l Recommended Tools l Preconditions l Installation Procedure
8.5.2 Recommended Tools
Prepare the following tools for installing the lightning arrester:
l Two expansion bolts not larger than M6 (for fixing the lightning arrester) l Multimeter
Prepare the following clamping tools:
l Flathead screwdrivers: M3–M6 l Cross screwdrivers: M3–M6 l Adjustable wrench l Socket wrenches: M6, M8, M12, M14, M17 and M19 l Double offset ring spanners: M6, M8, M12, M14, M17 and M19 l Rubber hammer
8.5.3 Preconditions
Before installation, the following conditions should be met:
l Make the copper cables ready for connecting the lightning arrester. l Ensure that the cross-sectional area of the phase lines (L) and neutral lines (N)
through the lightning arrester is not smaller than 4 mm2. l Ensure that the cross-sectional area of the protection ground cable is not smaller
than 25 mm2.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 8 Installing the Power Supply System
Huawei Technologies Proprietary
8-4
8.5.4 Installation Procedure
& Note:
Ensure that no abnormal voltage exists on the neutral line before installation. All grounding points of the cabinet must be connected to the grounding copper bar of the lightning arrester, which shall connect to the ground finally.
To install the lightning arrester, complete the following procedure:
1) Mount the lightning arrester with expansion bolts through the fixing holes to a proper position on the wall. Keep the lightning arrester 5–10 m away from the cabinet.
2) Open the front panel of the lightning arrester, and connect the grounding bar with the grounding point of the cabinet, as shown by "1” in Figure 8–1.
3) Connect the grounding bar of the lightning arrester with the grounding terminal block in the equipment room, as shown by 2 in Figure 8–1.
NOUT LOUT NIN LIN
Grounding bar
Lightning arrester
Mains supply
AC-L AC-N
Grounding terminal blockof the equipment room
Neutral line output N
Power module
Cabinet PGND 5-10 m
PGND
1 2
3 4
Live line output L
Neutral line input N
Live line input L
Figure 8–1 Connection diagram of the SPD28SZ
4) Connect LOUT and NOUT of the lightning arrester to AC-L and AC-N of the power module respectively by using power cables, as shown by "3” in Figure 8–1.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 8 Installing the Power Supply System
Huawei Technologies Proprietary
8-5
5) Connect LIN and NIN of the lightning arrester to the live input L, neutral line input N of the mains supply respectively by using power cables, as shown by 4 in Figure 8–1.
6) Ensure that all connections are compliant with the connection diagram at the panel of the lightning arrester.
7) Ensure that the grounding resistance of the lightning arrester is less than 10 ohms.
8.6 Installing the GEPS4845 Power Module
8.6.1 Overview
The power cables of the GEPS4845 power module include: AC input cable, DC output cable and battery input cable.
The procedure for installing and connecting the GEPS4845 is as follows:
1) Install the GEPS4845. 2) Connect the AC input cable. 3) Connect the DC output cable. 4) Connect the battery input cable.
8.6.2 Introduction to GEPS4845 Power Module
The GEPS4845 power module is front accessible. Power and signal cables are connected to wiring terminals at the front of the GEPS4845.
Figure 8–2 shows the outline of the GEPS4845.
Power supply unit Monitoring unit Rectifier unit
Figure 8–2 Outline of the GEPS4845
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 8 Installing the Power Supply System
Huawei Technologies Proprietary
8-6
The outline and installation of the GEPS4845 (220 VAC) are the same as those of the GEPS4845 (110 VAC). Both of them are called "GEPS4845 power module" in this manual.
The GEPS4845 power module has already been installed at the factory. You only need to connect the power cables on site.
See GEPS4815-3A-2.55kW-1A Power Module User Manual for more details.
8.6.3 Installation Procedure
To install the GEPS4845, complete the following procedure:
1) Put the GEPS4845 on the slide rail in the cabinet, and then push the GEPS4845 into the cabinet gently until its mount bracket is in contact with the mount rail of the cabinet.
2) Adjust the GEPS4845 to the middle of the cabinet. Align four holes in the mount bracket of the GEPS4845 with the captive nuts on the mount rail of the cabinet.
3) Tighten four M6 x 12 screws to secure the GEPS4845. 4) Fasten all the bolts diagonally and evenly.
8.6.4 Connecting the AC Input Cable
I. Precautions
Observe the following while connecting the AC input cable:
l Switch off the AC input. l Attach warning labels on the switches that cannot be closed during wiring. l Insulate the AC terminals and all other unnecessary bare parts. l The cross sectional area of the protection ground cable from the lightning arrester
to the grounding terminal block of the equipment room must not be smaller than 25 mm2. The cable should be of the suitable length.
l The cross-sectional area of the protection ground cable from the lightning arrester to the GEPS4845 should not be smaller than 25 mm2, and the cable should not be longer than 10 m.
l The grounding resistance of the grounding terminal block in the equipment room should not be smaller than 10 ohms.
II. Procedure
To connect the AC input cable, complete the following procedure:
1) Take off the cover of the module. 2) Take out the baffle above "AC-L" and "AC-N" terminals along the arrow direction.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 8 Installing the Power Supply System
Huawei Technologies Proprietary
8-7
3) Connect the blue live line from the lighting arrester to the "AC-L" terminal, and the black neutral line to the "AC-N" terminal. See Figure 8–3.
Figure 8–3 Connecting terminals of the GEPS4845
4) Connect one end of the yellow-green PGND cable to on the GEPS4845, and secure the fixing screw. Connect the other end to the grounding bar of the lightning arrester and secure it.
5) Lead out one protection ground cable from the grounding bar of the lightning arrester and connect it to the grounding terminal block of the equipment room.
6) To ensure the reliable grounding of the cabinet, connect the GEPS4845 to the nearest cabinet. Connect the grounding point of the cabinet to the external PGND busbar by using the yellow-green cable with a cross-sectional area more than 6 mm2.
7) Replace the baffle above "AC-L" and "AC-N" terminals.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 8 Installing the Power Supply System
Huawei Technologies Proprietary
8-8
8.6.5 Connecting the DC Output Cable
I. Connection Description
Table 8–3 describes the DC output terminals.
Table 8–3 Description of the DC output terminals
Terminal Description MCB
1-, 1+ Cathode and anode terminals of load 1 voltage LOAD1 10A
2-, 2+ Cathode and anode terminals of load 2 voltage LOAD2 20A
3-, 3+ Cathode and anode terminals of load 3 voltage LOAD3 20A
4-, 4+ Cathode and anode terminals of load 4 voltage LOAD4 50A
B-, B+ Cathode and anode terminals of the emergency light device N/A
Remarks:
l Connecting terminals with the same labels are electrically parallel, and you can select them as required.
l Terminal B is parallel to the cathode terminal B1B2 of the battery voltage, and is not controlled by the MCB.
II. Procedure
To connect the DC output cable, complete the following procedure:
1) Ensure that the load MCBs of the power supply unit are switched off. 2) Connect the load "+" to the "LOAD(+)" terminal. 3) Connect the load "-" to the "LOAD(-)" terminal.
Figure 8–4 shows the DC output terminals.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 8 Installing the Power Supply System
Huawei Technologies Proprietary
8-9
Figure 8–4 DC output terminals
8.6.6 Connecting the Battery Input Cable
I. Precautions
Observe the following while connecting the battery input cable:
l It is normal for sparks to occur while connecting negative lead to terminal BATT (-). l To avoid short-circuits, strict insulation measures are required in adding load when
the line is live.
II. Procedure
To connect the battery input cable, complete the following procedure:
1) Prepare positive and negative connecting leads, including making terminals and marking positive and negative.
2) Ensure that all battery MCBs involved are off. 3) Bundle the cathode and anode connecting cables. 4) Connect one end of the anode connecting cable to the BATT (+) terminal. 5) Connect one end of the cathode connecting cable to terminal BATT (-), as shown
in Figure 8–4. 6) Connect the other end of the anode connecting cable to the anode of the battery. 7) Connect the other end of the cathode connecting cable to the cathode of the
battery.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 8 Installing the Power Supply System
Huawei Technologies Proprietary
8-10
8.7 Installing Batteries
8.7.1 Overview
This section describes how to install batteries, which includes:
l Precautions l Preconditions for Installation l Installation Procedure l Checking the Battery Installation
8.7.2 Precautions
Observe the following while installing batteries:
l Strictly follow the installation procedure to install the batteries. Any short circuit may hurt the personnel and damage the equipment.
l Leave a distance of at least 10 mm between two batteries for heat dissipation. l Connect the power distribution cables to the batteries correctly. Otherwise, the
batteries cannot be managed, or the charging current will be too high. l Connect the polarities of the batteries correctly. There should not be any
short-circuit between the batteries.
& Note:
l If the batteries have not been recharged for more than three months, there will be an irrecoverable loss of battery capacity. This will severely affect the service life of the batteries.
l If the open circuit voltage is below the specified lower limit (12.12 V for 12 V batteries, 2.02 V for 2 V batteries) due to self discharge of the battery, only professionals are entitled to handle the situation.
8.7.3 Preconditions for Installation
Prepare the following before installing the batteries:
l Measure the open circuit voltage of the batteries. You must charge the batteries, if the open circuit voltage is lower than the specified lower limit (12.48 V for 12 V battery, and 2.08 V for 2 V battery) due to self discharge, or if the batteries are not installed three months after arrival.
l —The charging mode is the forced equalized charging.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 8 Installing the Power Supply System
Huawei Technologies Proprietary
8-11
l —The charging voltage is 14.3–14.5 V/PCS (for 12 V battery), or 2.35–2.45 V/PCS (for 2 V battery).
l —The charging time is 20–24 hours, but does not exceed 24 hours. l Switch off the primary power module. l Based on the specific environment, put the battery shelf in a proper position for
easy operation and maintenance.
8.7.4 Installation Procedure
To install the batteries, complete the following procedure:
1) Put the batteries on the battery shelf.
A battery shelf has two partitions, and each partition can hold four batteries. When only one group of batteries is required, install them in the lower shelf.
Figure 8–5 shows the outline of the battery shelf.
Unit: mm
Figure 8–5 Outline of the battery shelf
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 8 Installing the Power Supply System
Huawei Technologies Proprietary
8-12
Figure 8–6 shows the batteries installed in the shelf.
Battery
Figure 8–6 Batteries installed in the battery shelf
2) Connect the positive and the negative leads of each group of batteries.
Figure 8–7 shows the connection of one group of batteries.
11 22 33 45
- + - + - + - +
To B1 ofthe power module
To B1+ ofthe power module
Figure 8–7 Connection of one group of batteries
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 8 Installing the Power Supply System
Huawei Technologies Proprietary
8-13
Figure 8–8 shows the connection of two groups of batteries.
11 22 33
44 55 66
7
8
9
10
- + - + - + - +
- + - + - + - +
9
10
8
7(1)
(2)
(3)
(4)
(1) To B1 of the power module (2) To B2 of the GEPS4845 power module (3) To B2+ of the power module (4) To B1+ of the GEPS4845 power module
Figure 8–8 Connection of the two groups of batteries
3) Connect the anode and cathode of the first group of batteries to "B1+" and "B1" of the GEPS4845 power module respectively.
4) Connect the anode and cathode of the second group of batteries to "B2+" and "B2" of the GEPS4845 power module respectively.
5) Bundle all connecting cables.
8.7.5 Checking the Battery Installation
After battery installation, check whether the batteries work normally.
Check the battery installation after the system power-on check is passed.
8.8 Installing the Signal Transfer Box
8.8.1 Overview
This section describes the cable connection of the signal transfer box, which includes:
l Connecting to the GEPS4845 Monitor Unit l Connecting to Various Sensors
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 8 Installing the Power Supply System
Huawei Technologies Proprietary
8-14
8.8.2 Connecting to the GEPS4845 Monitor Unit
Connect the smaller end of the cable to the DB-37 port on the front panel, and the other end to "J1" port of the signal transfer box. See Figure 8–9.
ALM RUN
COM
MS
PSM-B5
Communicationport DB-37
Figure 8–9 Front panel of the GEPS4845 monitor unit
8.8.3 Connecting to Various Sensors
See GEPS4815-3A-2.55kW-1A Power System User Manual (220 V power supply) and GEPS4815-3A-2.55kW-1B Power System User Manual (110 V power supply).
8.9 Installing the DC Power Distribution Unit
8.9.1 Overview
This section describes how to install the PDU, which includes:
l DC Power Supply Layout l Installation Procedure l Connecting the –48 VDC Input Cable l Connecting the DC Load Output Cable
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 8 Installing the Power Supply System
Huawei Technologies Proprietary
8-15
8.9.2 DC Power Supply Layout
When the cabinet uses –48 VDC, no power module is required. –48 VDC comes directly to the PDU at the top of the cabinet.
BGND
PGND
Grounding terminal blockof the equipment room
DC powerdistribution cabinet
Cabinet
-48V/-60 V
BGND
PDU
-48V/-60 V
Figure 8–10 Connection diagram of the external power and ground cables for the DC-powered cabinet
8.9.3 Installation Procedure
To install the PDU, complete the following procedure:
1) Install captive nuts on the mount rail of the cabinet according to the PDU position. 2) Put the PDU on the slide rail in the cabinet, and then push the PDU into the cabinet
gently until its mount bracket is in contact with the mount rail of the cabinet. 3) Adjust the PDU to the middle of the cabinet. Align four holes in the mount bracket
of the PDU with the captive nuts on the mount rail of the cabinet. 4) Tighten four fasteners M6x12 to secure the PDU. 5) Install the protection cover of the PDU.
Caution:
When fastening screws, screw them lightly, and then tighten them diagonally.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 8 Installing the Power Supply System
Huawei Technologies Proprietary
8-16
8.9.4 Connecting the –48 VDC Input Cable
Caution:
l Switch off the DC input current during the connection. l Attach warning labels on the switches that cannot be used during wiring. l Insulate the DC terminals and all other unnecessary bare parts.
To connect the DC input cable, complete the following procedure:
1) Connect the PGND cable (yellow and green) in the equipment room to the "PGND" terminal on the PDU.
2) Connect two –48 VDC power cables (blue) in the equipment room to "NEG1(-)" and "NEG2(-) " on the PDU.
3) Connect two BGND cables (black) in the equipment room to "RTN1(+)" and "RTN2(+)" on the PDU.
Caution:
If the equipment room has only one –48 V input, be sure to connect the wiring terminals "NEG(-)" and "NEG(2)".
8.9.5 Connecting the DC Load Output Cable
I. Description on Load Switches
Table 8–4 describes the load connecting terminals and control switches.
Table 8–4 Load connecting terminals and control switches
Terminal Description Control switch
1-, 1+ Cathode and anode terminals of load 1 SW1
2-, 2+ Cathode and anode terminals of load 2 SW2
3-, 3+ Cathode and anode terminals of load 3 SW3
ESC(-), ESC+ Cathode and anode terminals of the EMU N/A
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 8 Installing the Power Supply System
Huawei Technologies Proprietary
8-17
II. Connection Procedure
To connect the load output cable, complete the following procedure (taking load 1 as an example):
1) Confirm whether the input power supply of the DC PDU is switched off. 2) Connect the load "-" to the "1-" terminal of the DC PDU. 3) Connect the load "+" to the "1+" terminal of the DC PDU.
8.10 Installing the Environment Monitor Unit
To install the EMU, complete the following procedure:
1) Confirm the installation position of the EMU, and install captive nuts on the mount rail of the cabinet.
2) Put the EMU on the slide rail in the cabinet, and then push the EMU into the cabinet gently until its mount bracket is in contact with the mount rail of the cabinet.
3) Adjust the EMU to the middle of the cabinet. Align four holes in the mount bracket of the EMU with the captive nuts on the mount rail of the cabinet.
4) Insert the screws diagonally.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 8 Installing the Power Supply System
Huawei Technologies Proprietary
8-18
8.11 MDF Grounding Requirements
The MA5600 cabinet does not have a built-in distribution frame. Hence the equipment room should have an external MDF. The following requirements must be met:
l The shielded layer of the subscriber cable must connect with the lightning protection ground at the MDF.
l The MDF needs one separate ground cable connecting with the protection ground terminal in the equipment room.
l The ground cables of adjacent MDFs must be interconnected. l The protective unit on the MDF must be routinely checked to ensure protection
from over-voltage and over-current. l The cross-sectional area of the ground cable for the external MDF in remote office
must be 16 mm2 at least. l The cross-sectional area of the ground cable for the external MDF of the central
office must be 50 mm2 at least. l The cross-sectional area of the protection ground cable for the external DDF must
be 6 mm2 at least.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 9 Connecting and Routing Cables
Huawei Technologies Proprietary
9-1
Chapter 9 Connecting and Routing Cables
9.1 About this Chapter
This chapter describes the cable routing rules and the connection of MA5600 cables, which includes:
l Cable Routing Rules, 9-2 l Cables Routing in the Cabinet, 9-5 l Connecting and Routing SCU Cables, 9-6 l Connecting and Routing ADSL-SPL Cables, 9-8 l Connecting SHEA Cables, 9-12 l Connecting and Routing ISU Cables, 9-13 l Connecting and Routing EIU Cables, 9-14 l Connecting and Routing AIUG Cables, 9-14 l Connecting and Routing Optical Fibers, 9-15
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 9 Connecting and Routing Cables
Huawei Technologies Proprietary
9-2
9.2 Cable Routing Rules
9.2.1 Installing the Lug
Connect the power cables, ground cables, and various signal cables firmly at both the ends and fasten the transfer connectors.
If there are two or more cable lugs to be installed on one stud:
l Bend the upper one 45° or 90° downwards. l Bend the lugs sideways and put the larger lug under the smaller one.
Figure 9–1 shows the installation of the lugs.
Do not parallel the lugs
Do not put the smallerlug under the larger one
Overlap the lugs indifferent directions
°Bend one lug 45 or 90°
Figure 9–1 Installing the lugs
9.2.2 Curving Cables
Observe the following when curving the cables:
l To prevent damage to the cable cores, do not bend the cables excessively, especially the digital trunk cable and the optical patchcord.
l The curvature radius must be greater than 4 cm in general. l The curvature radius of the cable at the turning points is twice greater than its
diameter. The curvature radius near the outlet of the components is four to six times greater than the cable diameter.
l The curvature radius of the optical fiber is 20 times greater than its diameter.
9.2.3 Bundling Cables
Observe the following when bundling cables:
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 9 Connecting and Routing Cables
Huawei Technologies Proprietary
9-3
l Ensure that the highest cable tie for each frame is the one after the turning of the cable bundle from the frame.
l Bundle the cables evenly with equal spacing between the ties. l Do not bundle the cables too tightly, especially for the optical patchcord. l Arrange all cable ties in the same direction without any sharp edges at the ends. l Coil the redundant optical fibers and cables. l Put the protection cap on the optical patchcord that is not used for the moment. l Ensure that the cable connectors made on site are standard, firm and reliable. l Arrange the bundled cables orderly and close to each other. l Soak the twine with wax before you use the twine to bundle the cables.
Do not bundlecables at the turning
Figure 9–2 Bundling cables correctly at the turning
9.2.4 Arranging Cables
Observe the following when arranging cables:
l Place the cables in order. l Do not stretch the cables. l Bundle the cables with moderate strength. l Route the cables of different types separately. l Ensure that the cables comply with the planned scale, path, sectional area and
position. l Consider future maintenance and expansion.
9.2.5 Routing Cables
Observe the following when routing cables:
l For overhead cabling, all cables must go through the cabling rack over the cabinet.
l For overhead cabling, if the cabling ladder is used, cables go downward through the cabling ladder, as shown in Figure 9–3.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 9 Connecting and Routing Cables
Huawei Technologies Proprietary
9-4
Figure 9–3 Cable routing through the cabling ladder
l For overhead cabling, if the cabling trough is used, cables go downward at the side of the cabling trough, as shown in Figure 9–4.
Figure 9–4 Cable routing at the side of the cabling trough
l If the cabling rack is less than 0.8 m away from the cable outlet on the cabinet, lead the cables directly to the outlet. If the spacing is more than 0.8 m, you need a climbing ladder to hold the cables.
l For underfloor cabling, all cables go through the floor interlayer or the cabling trough.
l For underfloor cabling, when cables are piled up under the antistatic floor, the height of cable bundles does not exceed three fourth of the net height under the raised floor.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 9 Connecting and Routing Cables
Huawei Technologies Proprietary
9-5
9.3 Cables Routing in the Cabinet
Observe these rules when routing cables in the cabinet.
l Adopt overhead cabling or underfloor cabling as required. Bundle the cables along both sides of the cabinet, and route these cables from outlets in the top or bottom of the cabinet.
l Route the cables down to the cable manager, and then divide and route them to the cable loop at both sides of the cabinet. Then, bundle them.
l Route the cables from the left half frame to the left side of the cabinet, and the cables from the right half frame to the right side.
Observe these rules when routing different types of cables.
l Arrange four cables in one row when you route the cables in the cabling trough. l When there are multiple service frames, route the cables from the upper service
frame along the inner side of the cabling trough. l Route subscriber cables at the inner side of the cabinet, and optical fibers and
network cables at the outer side. l Route power cables to the back of the cabinet to supply power for the SPL frame.
& Note:
l Remove power cables inside the cabinet before routing other cables. Reconnect the power cables and bundle them after all cables are well arranged.
l To ease cable routing, install the frame from the bottom upwards for overhead cabling; and install the frame from the top downwards for underfloor cabling.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 9 Connecting and Routing Cables
Huawei Technologies Proprietary
9-6
9.4 Connecting and Routing SCU Cables
9.4.1 Relative Cables
The SCU board uses the following cables:
l Cable for local maintenance serial port l Cable for maintenance network port l Cable for FE/GE electrical port l Cable for FE/GE optical port
9.4.2 Cable for Local Maintenance Serial Port
The serial port cable is led out from the front panel of the board. It is used for debugging or remote maintenance.
One end of the cable is an 8-PIN RJ-45 connector, connected to the SCU board. The other end is a DB-9 or DB-25 female connector, connected to the PC.
9.4.3 Cable for Maintenance Network Port
There are two types of network cables: straight through cable and crossover cable.
When you connect a terminal and a network device, use the straight through cable. When you connect two terminals for direct communication, use the crossover cable.
9.4.4 Cable for FE/GE Electrical Port
When equipped with electrical port subboards, the MA5600 SCU board offers FE/GE electrical ports for connecting to the upstream device or the local server.
The FE/GE electrical port adopts the straight through cable and crossover cable. To use both of them, you can use the software to enable auto adaptation of network cable.
The straight through cable has the same structure as the crossover cable. They use RJ-45 connectors and the 8-core and UTP-5 twisted pairs (UTP stands for unshielded twisted pair).
In the cabinet, the network cables of electrical ports are led out from the front panel of the board. Route the network cables through the cable bracket under the service frame to two sides of the cabinet and bundle them. Bundle the network cable separately from the power cables.
9.4.5 Optical Fiber for FE/GE Optical Port
Refer to section 9.10 "Connecting and Routing Optical Fibers".
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 9 Connecting and Routing Cables
Huawei Technologies Proprietary
9-7
9.4.6 Connected Cables
Figure 9–5 shows the SCU cables routed from above.
Figure 9–5 Routing SCU cables
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 9 Connecting and Routing Cables
Huawei Technologies Proprietary
9-8
9.5 Connecting and Routing ADSL-SPL Cables
9.5.1 Relative Cables
In the MA5600, the ADSL board cooperates with the SPL board to access ADSL2+ services. Table 9–1 lists the ADSL-SPL cables.
Table 9–1 ADSL-SPL cables
Cable Quantity Connection description
ADSL-SPL 2 Connects the xDSL ports of the ADSL board and the SPL board.
SPL subscriber cable 4
l Connects the LINE port of the SPL board to the MDF.
l Connects the PSTN port of the SPL board to the MDF at the central office.
9.5.2 Connection Process
The connection process is as follows:
l Connecting the ADSL-SPL cable. l Connecting the SPL cable. l Jumpering the subscriber line at the CO MDF.
Figure 9–6 shows the cable connection of the ADSL board and the SPL board.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 9 Connecting and Routing Cables
Huawei Technologies Proprietary
9-9
SPL subscriber cable
PO
TSP
OTS
LIN
ELI
NE
xDSL
xDS
L
PO
TSP
OTS
LIN
ELI
NE
xDSL
xDS
L
POTS
PO
TSLI
NE
LIN
ExD
SL
xDSL
PO
TSP
OTS
LIN
ELI
NE
xDSL
xDS
L
Slots 0-6 of the lefthalf frame
xDS
LxD
SL
xDS
LxD
SL
xDS
LxD
SL
xDS
LxD
SL
ADSL-SPLconnecting cable
Slots 9-15 of theright half frame
Figure 9–6 Cable connection of the ADSL board and the SPL board
9.5.3 Precautions
Observe the following when connecting cables:
l When inserting the connector of the ADSL cable, insert it horizontally and steadily, do not swag.
l Do not fasten the screws, which are used to secure the connector too tightly. l Before connecting the ADSL-SPL cable, ensure that the ADSL board and the
SPL board in the frame are aligned with each other.
9.5.4 Connecting the ADSL-SPL Cable
Connect the ADSL-SPL cable as follows:
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 9 Connecting and Routing Cables
Huawei Technologies Proprietary
9-10
1) Select one ADSL-SPL cable. Connect one end of the cable to the xDSL1 port of the ADSL board, and the other end to the xDSL1 port of the SPL board. See Figure 9–7.
2) Select another ADSL-SPL cable. Connect one end of the cable to the xDSL0 port of the ADSL board, and the other end to the xDSL0 port of the SPL board.
ADSL-SPL cable
ADEF
RUN
ALM
SPLF
xDS
L1xD
SL1
DB-64 connector
DB-64 connector
Figure 9–7 Connecting the ADSL-SPL cable
9.5.5 Connecting the SPL Cable
Connect the SPL cable as follows:
1) Select one SPL cable. 2) Connect the DB-64 connector of the cable to the PSTN0 port of the SPL board,
as shown by Å in Figure 9–8. 3) Route the connected SPL cables through the cabling space to the left or right
side of the cabinet.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 9 Connecting and Routing Cables
Huawei Technologies Proprietary
9-11
4) Connect PSTN1, LINE0 and LINE1 ports of the SPL board in the same way, as shown by Ç, É and Ñ in Figure 9–8.
PS
TN0
1
2
3
4
DB-64 connector
HUAW EI
SPLF
Figure 9–8 Connecting the SPL cable
9.5.6 Jumpering the Subscriber Cable at the MDF
The procedure is as follows:
1) Select an idle port in the ADSL board, and cut off the connection between the MDF at the central office (CO) and the MDF at the subscriber end.
2) Connect the PSTN port on the SPL board to the MDF at the CO with a connecting cable.
3) Connect the LINE port on the SPL board to the MDF at the subscriber end with a connecting cable.
4) Record the frame number, slot number and port number of the port to which the connecting cable is connected.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 9 Connecting and Routing Cables
Huawei Technologies Proprietary
9-12
Figure 9–9 shows the jumpering of the subscriber cable at the MDF.
Splitter
ADEF Data andvoice
MDF at thesubscriber end
MDF at the centraloffice end
Data
Analogvoice
Dotted line is the physical line before the MDFs are connectedSolid line is the physical line after the MDFs are connected
XDSL
SPLF
LIN
EP
STN
XDSL
PSTN
IP
Figure 9–9 Jumpering the subscriber cable at the MDF
9.6 Connecting SHEA Cables
9.6.1 Relative Cables
The SHEA board resides in slots 0–6 and 9–15 in the MA5600 frame. It uses the SPL subscriber cable.
9.6.2 Connection Procedure
The procedure is as follows:
1) Select one SPL subscriber cable. 2) Connect the DB-64 connector of the cable to the SHDSL port of the SHEA board,
as shown in Figure 9–10. 3) Route the connected SPL subscriber cables through the cabling space to the left
or right side of the cabinet.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 9 Connecting and Routing Cables
Huawei Technologies Proprietary
9-13
SHEA
RUN
ALM
DB-64 connector
SH
DS
L
HUAW EI
Figure 9–10 Connecting the SHEA cable
9.7 Connecting and Routing ISU Cables
9.7.1 Relative Cables
The ISU board uses the following cables:
l Cable for local maintenance serial port l Cable for maintenance network port l Cable for FE/GE electrical port l Cable for FE/GE optical port
9.7.2 Connection Procedure
The ISU cables are connected in the same method as the SCU cables. Refer to section "9.4 Connecting and Routing SCU Cables" for the method.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 9 Connecting and Routing Cables
Huawei Technologies Proprietary
9-14
9.8 Connecting and Routing EIU Cables
9.8.1 Relative Cables
The EIU board uses optical fibers.
9.8.2 Connection Procedure
Refer to section "9.10 Connecting and Routing Optical Fibers".
9.9 Connecting and Routing AIUG Cables
9.9.1 Relative Cables
The AIUG board uses the following cables:
l E8IT cable l 155M trunk cable l Optical fiber
9.9.2 Connecting the E8IT Cable
To connect the E8IT cable, proceed as follows:
1) Select one E8IT cable. 2) Connect the DB-50 connector of the cable to the E8IT subboard port of the AIUG
board. 3) Route the connected E8IT cable through the cabling space to the left or right side
of the cabinet.
9.9.3 Connecting the 155M Trunk Cable
To connect the 155M trunk cable, proceed as follows:
1) Select two to four 155M trunk cables. 2) Connect the SMB connector of the cable to the E3 subcard port of the AIUG
board. 3) Route the connected 155M trunk cable through the cabling space to the left or
right side of the cabinet.
& Note:
Each E3 port connects with two 155M trunk cables, one for receiving and the other for transmitting.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 9 Connecting and Routing Cables
Huawei Technologies Proprietary
9-15
9.9.4 Connecting the Optical Fibers
Refer to section "9.10 Connecting and Routing Optical Fibers".
9.10 Connecting and Routing Optical Fibers
9.10.1 Precautions
Observe the following points when connecting the optical fibers.
l In the cabinet, the routing direction of the optical fibers is upon the board position.
l After the optical fibers come out of the front panel of the board, route them through two sides of the cabinet and through the cable bracket under the frame, Bundle them.
l Label the optical fibers, and coil abundant optical fibers. l Bundle optical fibers moderately with the fiber bundling strip. l Do not bend optical fibers excessively. The bending radius must not be less than
40 mm. l When optical fibers are laid outside the cabinet, cover them with protection tubes
(corrugated pipe), and fix the tubes inside the cabinet. l Cut the corrugated pipe smoothly with diagonal pliers. Cover the edge of cutting
section with a tape to avoid scratching the optical fibers. l Protect the optical fibers with caps when they are not in use.
9.10.2 Connection and Routing Illustration
Figure 9–11 illustrates the connection and routing of optical fibers. Connect optical fibers to the ODF after they come out of the cabinet.
Figure 9–11 Connection and routing of the optical fibers
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 10 Powering on the System
Huawei Technologies Proprietary
10-1
Chapter 10 Powering on the System
10.1 About This Chapter
This chapter describes the various aspects of checking the installation and power on the system. It includes:
l Checking Before Power-on, 10-2 l Power-on Debugging for Lightning Arrester, 10-4 l Powering on the Frame, 10-5 l Powering on the Board and Fan, 10-5 l Powering on the Battery, 10-6
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 10 Powering on the System
Huawei Technologies Proprietary
10-2
10.2 Checking Before Power-on
Check the cabinet, cables, connectors, sockets, labels and on-site environment.
10.2.1 Cabinet
Table 10-1 lists the checklist for the cabinet.
Table 10-1 Checklist for the cabinet
Item Description Record
Cabinet
l The cabinet is kept in a stable and orderly manner.
l The distance between the rows of the cabinets is consistent.
l All modules in the cabinet are aligned. l Vertical deviation of the cabinet does not
exceed 3 mm. l Hand-touch marks left on the cabinet during
installation are cleaned up. The dust inside and outside the cabinets are also cleaned.
Panel
l The panels on four sides of the cabinet are installed and aligned in a straight line with the deviation not exceeding 5 mm.
l Two adjacent cabinets are put together. Cabinets in the same column are in the same plane instead of an uneven array.
Screw l All screws are fastened securely. l Each screw has flat and spring washers. l No washer is installed upside-down.
Part
l No part on the cabinet is off or damaged. l No connection cable is damaged or broken. l All nameplates are correct, clear and
complete.
Cable outlet The cable outlets at the top and bottom of a cabinet are covered to prevent small creatures (such as rodent) from entering it.
10.2.2 Cable Distribution
Table 10-2 lists the checklist for cable distribution.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 10 Powering on the System
Huawei Technologies Proprietary
10-3
Table 10-2 Checklist for cable distribution
Item Description Record
Power and ground cables
l The cables include all the power cables and ground cables that are led out from the power module to the PDU, and then to the busbar, and to the power sockets of boards.
l All the power and ground cables are firmly connected with correct polarities and in reliable contact.
Intra-module cable connection
l All cables are correctly connected, and there is no loose contact for the plugs.
l All cables are bundled properly and the spacing between cable ties is appropriate.
l No overlapping or sharp head is found in the cable ties.
Cables and optical fibers
l Cables are not tensed at bends (turning points), and the curvature radius is 4 cm at least.
l The cabling route is correct and cables are bundled at even spacing.
l The cables are straight and smooth without crossover inside the cabinets. Cables outside the cabinets are bundled for the corresponding cabinet.
l The cables in the trough or along the wiring ladder are tidily arranged. All cables are bound properly without any damage on the skin.
l Proper redundancy is provided for cables and the binding straps are cut flush, without sharp tips exposed outside or overlapped bundling.
10.2.3 Plugs and Sockets
Table 10-3 lists the checklist for plugs and sockets.
Table 10-3 Checklist for plugs and sockets
Item Description Record
Plug l The lockers of cable plugs are firmly buckled and coaxial cable plugs are tightly fastened.
Socket l All sockets are checked to see whether any
pins are missing or short circuit exists due to bent pins.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 10 Powering on the System
Huawei Technologies Proprietary
10-4
10.2.4 Label
All labels must be neatly arranged, clean, legible and correctly positioned. See “Appendix C Cable Labels” to learn how to write, stick and use labels.
10.2.5 Site Environment
Table 10-4 lists the checklist for the site environment.
Table 10-4 Checklist for the site environment
Item Description Record
Cabinet
l There is no additional cable tie ends, cable ends and other sundries in the cabinets.
l The front door, back door and side panels of the cabinet are clean without stain or hand-touch marks.
Wiring trough
l No construction remnants, such as cable tie ends, cable ends and desiccant bags, are found in cabling troughs or under the raised floor beneath and around the cabinets.
l All parts are tidy and clean.
Equipment room
l Useless things removed from the the room. l Necessary articles to be kept in the room are
tidily arranged. l The work bench is clean and tidy, and the
raised floor is smooth and clean.
10.3 Power-on Debugging for Lightning Arrester
To power on the lightning arrester, proceed as follows:
1) Turn on the AC input and the MCB in the lightning arrester. 2) Check whether the lightning arrester works normally.
When the green LED turns on, the lightning arrester is working normally. When the red LED turns on, the lightning arrester is faulty.
3) Turn off the AC input.
Caution:
After you turn off the MCB in the lightning arrester, the lightning arrester stops functioning, and the power supply is turned off. Therefore, do not turn off the MCB in the lightning arrester during its normal running.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 10 Powering on the System
Huawei Technologies Proprietary
10-5
10.4 Powering on the Frame
To power on the frame, proceed as follows:
1) Turn off the main switch of 220 V/110 VAC or –48 V/–60 VDC in the equipment room.
2) Turn off all AC power sockets and power switches connected with the MA5600 and terminals.
3) Disconnect all boards. 4) Use a multimeter to check whether any short circuit exists among the phase line
(live line), earth line and neutral line of each power socket.
I. Debugging for AC Power Supply
When the AC power supply is used, proceed as follows:
1) Turn on the AC switch. 2) Use the multimeter to check whether the voltage at the Uninterrupted Power
Supply (UPS) input end is normal. 3) If normal, turn on the UPS and measure its output voltage. 4) Turn on the power switch for the MA5600 and measure the output voltage from the
power switch. Now, the input indicator VIN of the rectifier unit must be lit. Refer to Appendix A "Equipment Parameters" for the standard voltage parameters.
II. Debugging for DC Power Supply
When the –48 V/–60 VDC is used, proceed with the debugging as follows:
1) Use the multimeter to check whether short circuit exists between –48 V/–60 V, GND and PGND.
2) If there is no short circuit, turn on the main switch of the –48 V/–60 VDC power supply.
3) Use the multimeter to check whether the voltage between –48 V/–60 V and GND, the voltage between –48 V/–60 V and PGND on the PDU are normal. The normal voltage ranges from –38.4 V to –72 V. Refer to Appendix A "Equipment Parameters" for the standard voltage parameters.
10.5 Powering on the Board and Fan
If the frame power-on debugging finds no abnormality, proceed with power-on debugging for the board and fan.
The procedure is as follows.
1) If the –48 V/–60 VDC input is normal, turn on the power supply switch for the cabinet.
2) The fans in the fan tray and the chassis start rotating. If they do not rotate, take out the fan tray and check.
3) Turn off the power supply and install boards correctly into the frame.
Installation Manual SmartAX MA5600 Multi-service Access Module Chapter 10 Powering on the System
Huawei Technologies Proprietary
10-6
4) Turn on the power supply and indicators on the boards are lit and the RUN indicator on each card begins blinking.
For the LED description, refer to SmartAX MA5600 Multi-service Access Module Hardware Description Manual.
10.6 Powering on the Battery
After the board and fan pass the power-on debugging, power on and check the battery.
The procedure is as follows:
1) Check if the battery has been connected with the power module. 2) Turn on the AC input, and check if the board indicators are normal. 3) Turn off the AC input and check the status of the board indicators. 4) If the board indicators are normal, it means that the battery can be switched over
normally. If the indicators are off, the battery has no normal power supply, check the battery and install it again.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix A Equipment Parameters
Huawei Technologies Proprietary
A-1
Appendix A Equipment Parameters
A.1 About this Appendix
This appendix covers:
l Dimensions and Weight, A-1 l Power Consumption, A-2
A.2 Dimensions and Weight
Table A–1 lists the dimensions and weight of the MA5600 cabinet.
Table A–1 Dimensions and weight of the MA5600 cabinet
Cabinet type H66-18 H66-22
Weight (no load) 81 kg 95 kg
Weight (with frames) 190 kg 230 kg
Dimensions (W x D x H)
600 mm x 600 mm x 1800 mm
600 mm x 600 mm x 2200 mm
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix A Equipment Parameters
Huawei Technologies Proprietary
A-2
A.3 Power Parameters
A.3.1 AC Input Parameters
Table A–2 lists the AC input parameters of the MA5600.
Table A–2 AC input parameters of the MA5600
Item Value
Rated voltage 110 V/127 V or 220 V/230 V/240 V
Voltage range 88 V–143 V (110 V/127 V) or 150 V–280 V (220 V/230 V/240 V)
Frequency range 47 Hz–63 Hz
A.3.2 DC Input Parameters
Table A–3 lists the DC input parameters of the MA5600.
Table A–3 DC input parameters of the MA5600
Item Value
Rated voltage –48 V or –60 V
Voltage range –38.4 V to –57.6 V (–48 V) or –38.4 V to –72 V (–60 V)
A.4 Power Consumption
A.4.1 Power Consumption of the Boards
Table A–4 lists the power consumption of the boards.
Table A–4 Power consumption of the boards
Board Power consumption (W)
SCU 50.0
ISUA 37.0
ISUE 35.0
ADEF 93.9
ADBF 95.5
SHEA 45.0
AIUG 34.2
EIUB 3.0
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix A Equipment Parameters
Huawei Technologies Proprietary
A-3
Board Power consumption (W)
SPLF 0
SPLH 0
SPLL 0
A.4.2 Power Consumption of the Fan Tray
The power consumption of the fan tray (with six fans) is 90.6 W.
A.4.3 Power Consumption of the Frame
& Note:
The MA5600 supports various types of boards with different power consumptions. So, the power consumptions of the frames are different if these frames are configured differently. In the following example, a frame is fully configured with ADL boards (14 subscriber boards plus one main control board plus fan tray).
When a frame is fully configured with the ADBF boards, the power consumption of the frame is 1477.6 W.
When a frame is fully configured with the ADEF boards, the power consumption of the frame is 1455.2 W.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix B Cabinet Connection Diagrams
Huawei Technologies Proprietary
B-1
Appendix B Cabinet Connection Diagrams
B.1 About This Appendix
This appendix describes the connection diagrams of the following cabinets:
l AC-powered H66-18/22 cabinet with the SPL frame, see "Cabinet Connection Diagram I", B-2.
l DC-powered H66-18 cabinet with the SPL frame, see "Cabinet Connection Diagram II", B-5.
l DC-powered H66-22 cabinet with the SPL frame, see "B.4 Cabinet Connection Diagram III", B-7.
l DC-powered H66-18 cabinet without the SPL frame, see "B.5 Cabinet Connection Diagram IV", B-9.
l DC-powered H66-22 cabinet without the SPL frame, see "B.6 Cabinet Connection Diagram V", B-11.
l Cabinet grounding diagram, see "B.7 Cabinet Grounding Diagram", B-13.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix B Cabinet Connection Diagrams
Huawei Technologies Proprietary
B-2
B.2 Cabinet Connection Diagram I
Figure B–1 shows the connection diagram of the AC-powered H66-18/22 cabinet with the SPL frame.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix B Cabinet Connection Diagrams
Huawei Technologies Proprietary
B-3
COM
MS
Figure B–1 Connection diagram of the AC-powered H66-18/22 cabinet with the SPL frame
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix B Cabinet Connection Diagrams
Huawei Technologies Proprietary
B-4
Figure B–2 shows the grounding diagram of the AC-powered H66-18/22 cabinet with the SPL frame.
Rear door13
Side cover
Bottom cover
Front door
12
11
14
15
Side cover
12
11 15 14
Figure B–2 Grounding diagram of the AC-powered H66-18/22 cabinet with the SPL frame
Table B–1 describes the connection diagram of the AC-powered H66-18/22 cabinet with the SPL frame.
Table B–1 Connection description of the AC-powered H66-18/22 cabinet with the SPL frame
No. Name Quantity Remarks
1 –48 V feeder cable 1 Cable No.: 1
2 –48 V feeder cable of the frame 1 Cable No.: 3
3 PGND cable 5 Cable No.: 11–15
4 Environment monitoring cable 1 Cable No.: 6
5 –48 V power cable of the modem 1 Cable No.: 40
6 Communication cable of the backup port 1 Cable No.: 41
7 Signal-transfer cable of the modem 1 Cable No.: 42
8 Phone-transfer cable of the modem 1 Cable No.: 43
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix B Cabinet Connection Diagrams
Huawei Technologies Proprietary
B-5
B.3 Cabinet Connection Diagram II
Figure B–3 shows the connection diagram of the DC-powered H66-18 cabinet with the SPL frame.
Figure B–3 Connection diagram of the DC-powered H66-18 cabinet with the SPL frame
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix B Cabinet Connection Diagrams
Huawei Technologies Proprietary
B-6
Figure B–4 shows the grounding diagram of the DC-powered H66-18 cabinet with the SPL frame.
Rear door13
Side cover
Bottom cover
Front door
12
11 15
Side cover
14
Figure B–4 Grounding diagram of the DC-powered H66-18 cabinet with the SPL frame
Table B–2 describes the connection diagram of the DC-powered H66-18 cabinet with the SPL frame.
Table B–2 Connection description of the DC-powered H66-18 cabinet with the SPL frame
No. Name Quantity Remarks
1 –48 V feeder cable 1 Cable No.: 1
2 PGND feeder cable 5 Cable No.: 11–15
3 –48 V power cable of the modem 1 Cable No.: 40
4 Communication cable of the backup port 1 Cable No.: 41
5 Signal-transfer cable of the modem 1 Cable No.: 42
6 Phone-transfer cable of the modem 1 Cable No.: 43
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix B Cabinet Connection Diagrams
Huawei Technologies Proprietary
B-7
B.4 Cabinet Connection Diagram III
Figure B–5 describes the connection diagram of the DC-powered H66-22 cabinet with the SPL frame.
Figure B–5 Connection diagram of the DC-powered H66-22 cabinet with the SPL frame
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix B Cabinet Connection Diagrams
Huawei Technologies Proprietary
B-8
Figure B–6 shows the grounding diagram of the DC-powered H66-22 cabinet with the SPL frame.
Rear door13
Side cover
Bottom cover
Front door
12
11 15
Side cover
14
Figure B–6 Grounding diagram of the DC-powered H66-22 cabinet with the SPL frame
Table B–3 describes the connection diagram of the DC-powered H66-22 cabinet with the SPL frame.
Table B–3 Connection description of the DC-powered H66-22 cabinet with the SPL frame
No. Name Quantity Remarks
1 –48 V feeder cable of the upper frame 1 Cable No.: 1
2 –48 V feeder cable of the middle frame 1 Cable No.: 3
3 PGND feeder cable 5 Cable No.: 11–15
4 –48 V power cable of the modem 1 Cable No.: 40
5 Communication cable of the backup port 1 Cable No.: 41
6 Signal-transfer cable of the modem 1 Cable No.: 42
7 Phone-transfer cable of the modem 1 Cable No.: 43
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix B Cabinet Connection Diagrams
Huawei Technologies Proprietary
B-9
B.5 Cabinet Connection Diagram IV
Figure B–7 describes the connection diagram of the DC-powered H66-18 cabinet without the SPL frame.
Figure B–7 Connection diagram of the DC-powered H66-18 cabinet without the SPL frame
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix B Cabinet Connection Diagrams
Huawei Technologies Proprietary
B-10
Figure B–8 shows the grounding diagram of the DC-powered H66-18 cabinet without the SPL frame.
Rear door13
Side cover
Bottom cover
Front door
12
11 15
Side cover
14
Figure B–8 Grounding diagram of the DC-powered H66-18 cabinet without the SPL frame
Table B–4 describes the connection diagram of the DC-powered H66-18 cabinet without the SPL frame.
Table B–4 Connection description of the DC-powered H66-18 cabinet without the SPL frame
No. Name Quantity Remarks
1 –48 V feeder cable 1 Cable No.: 1
2 –48 V feeder cable 1 Cable No.: 3
3 PGND feeder cable 5 Cable No.: 11–15
4 –48 V power cable of the modem 1 Cable No.: 40
5 Communication cable of the backup port 1 Cable No.: 41
6 Signal-transfer cable of the modem 1 Cable No.: 42
7 Phone-transfer cable of the modem 1 Cable No.: 43
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix B Cabinet Connection Diagrams
Huawei Technologies Proprietary
B-11
B.6 Cabinet Connection Diagram V
Figure B–9 shows the connection diagram of the DC-powered H66-22 cabinet without the SPL frame.
Figure B–9 Connection diagram of the DC-powered H66-22 cabinet without the SPL frame
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix B Cabinet Connection Diagrams
Huawei Technologies Proprietary
B-12
Figure B–10 shows the grounding diagram of the DC-powered H66-22 cabinet without the SPL frame.
Rear door13
Side cover
Bottom cover
Front door
12
11 15
Side cover
14
Figure B–10 Grounding diagram of the DC-powered H66-22 cabinet without the SPL frame
Table B–5 describes the connection diagram of the DC-powered H66-22 cabinet without the SPL frame.
Table B–5 Connection description of the DC-powered H66-22 cabinet without the SPL frame
No. Name Quantity Remarks
1 –48 V feeder cable 1 Cable No.: 1
2 –48 V feeder cable 1 Cable No.: 3
3 –48 V feeder cable 1 Cable No.: 18
4 PGND feeder cable 5 Cable No.: 11–15
5 –48 V power cable of the modem 1 Cable No.: 40
6 Communication cable of the backup port 1 Cable No.: 41
7 Signal-transfer cable of the modem 1 Cable No.: 42
8 Phone-transfer cable of the modem 1 Cable No.: 43
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix B Cabinet Connection Diagrams
Huawei Technologies Proprietary
B-13
B.7 Cabinet Grounding Diagram
Rear door13
Side cover
Bottom cover
Front door
12
11 15
Side cover
14
Figure B–11 Grounding diagram of the cabinet
Table B–6 Description of the cabinet grounding
No. Name Quantity Remarks
1 PGND feeder cable 5 Cable No.: 11–15
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix C Cable Labels
Huawei Technologies Proprietary
C-1
Appendix C Cable Labels
C.1 About This Chapter
The appendix covers:
l Introduction to Labels, C.2 l Labels for External Alarm Cables, C-10 l Labels for Network Cables, C-11 l Labels for Optical Fibers, C-13 l Labels for Trunk Cables, C-16 l Labels for Subscriber Cables, C-19 l Labels for Power Cables, C-20
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix C Cable Labels
Huawei Technologies Proprietary
C-2
C.2 Introduction to Labels
Labels are affixed on cables to identify the physical positions of cables on different devices. Cable labels can ease cable connection and maintenance.
& Note:
If the customer wants to keep the labels of all devices in the equipment room consistent, the customer requirements may be applied. This must be, however, stated in the self-check report.
C.2.1 Material Features
The material features of labels are as follows:
l Material: Polyester (PET), with Underwriters Laboratories (UL) and Canadian Standards Association (CSA) certificates
l Color: chalk white l Thickness: 0.09 mm l Applicable temperature: –29°C to +149°C l Compatible with laser printing or handwriting with oil markers
C.2.2 Types and Outline
I. Label Types
There are two types of cable labels: label for the power cable and label for the signal cable.
The power cable includes AC power cable and DC power cable.
The signal cable includes:
l External cable of the alarm box l Network cable l Optical fiber l Trunk cable l Subscriber cable
II. Label for the Signal Cable
The label for the signal cable is L-shaped with a fixed size. Figure C–1 shows the label for the signal cable.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix C Cable Labels
Huawei Technologies Proprietary
C-3
TO:
84.07.5
7.0
5.5
5.5
11.0
11.0
37.0
7.57.0
5.55.5
1.5
0.6
1.0
2.0
Dividing line
Dotted line
10.0
Dividing line
Dotted line
Unit: mm
Figure C–1 Label for signal cables
The dividing lines on the label help you to specify more clearly the position of a cable. For example, there is one dividing line between the cabinet number and the shelf number and another between the shelf number and the slot number. The dividing line size is 1.5 mm x 0.6 mm, and its color is PANTONE 656c (light blue).
The dotted line helps you to fold the label while affixing it to the cable. Its size is 1.0 mm x 2.0 mm.
There is a mark "TO:" (upside down in the figure) at the lower right corner of the label. The mark identifies the opposite end of the cable on which the label is affixed.
III. Label for the Power Cable
The label for the power cable is attached to the identification plate on the cable ties. The identification plate is circled by a nib of 0.2 mm x 0.6 mm (symmetric on both sides), as shown in Figure C–2. Affix the label at the concave.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix C Cable Labels
Huawei Technologies Proprietary
C-4
1.5
0.611.0
26.2
12.2
0.6
10
11TO:
25
R1.0
Cable tie
Label paper
Dividing line on the label
Unit: mm
Figure C–2 Label for the power cable
C.2.3 Printing Labels
I. Printer
You can print the contents using a laser printer or write the contents with an oil marker. But, printing is recommended.
II. Template for the Printing
You can get the template through the following two ways:
l Download the template from the technical support website: http://support.huawei.com. The path is as follows: Documentation > Engineering Service > Engineering Quality > Quality Standard and Template.
l Get the template from the local Huawei representative.
When you use the template, you can modify the contents directly. Note the following requirements:
l The center, direction and fonts settings of the characters on the label cannot be changed.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix C Cable Labels
Huawei Technologies Proprietary
C-5
l When there are too many contents to be filled in, zoom out the characters, but make sure the printouts are clear and legible.
III. Cells Merging on the Template
To merge the cells, first recover the table structure. If gridlines are displayed, go to Step 3.
1) Select Edit > Select All. 2) Select Format > Borders and Shading > Borders. 3) Select Box. 4) Click OK. 5) Drag the mouse to select the cells to be merged. 6) Select Table > Merge Cells.
If two merged cells are still not enough to accommodate the letters, use more lines.
IV. Setting the Printer
To print the labels, use the laser printer. Before you print, set up the page and try printing on an ordinary blank paper. Ensure that both sides of the paper are blank.
After the labels are printed on the ordinary blank paper, proceed as follows:
1) Place the paper on the label paper. 2) Check whether the page setup conforms to the requirements. 3) Make sure that the printer properties, such as Paper Size and Direction, are set
correctly.
If the printout conforms to the requirements, print it to the label paper. Otherwise, adjust the page setup and try printing again, until the correct printout is produced.
To adjust the page setup, proceed as follows:
4) Select File > Page Setup. 5) Select Layout, set Header and Footer as 0. 6) Click the Margins tab page. 7) Select Left for Gutter Position. 8) Adjust the values of Top, Bottom, Left, and Right. 9) If the warning as shown in Figure C–3 appears before printing, click Ignore to
continue printing.
Figure C–3 Warning before printing
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix C Cable Labels
Huawei Technologies Proprietary
C-6
Save the present page setup for future use. This page setup is necessary only when you use the template for the first time.
V. Requirements on Feeding the Printer
Different from the ordinary paper, the label paper is composed of two pages. No matter what model of the printer you use, feed in the labels one after another by hand. Never use the auto-feed mode to avoid jamming the labels. Different models of printers may have different feeding positions, feed in the labels to the correct position.
VI. Requirements on the Printed Label
The printed labels must meet the following requirements:
l All the printouts must be on the label, and nothing shall be printed on the base page of the label.
l Contents in the cells must be centered. In the case of a single-line printout, the dividing lines and the mark "TO" must not be covered by the printed characters.
l When the cells are merged and the printouts are filled in multiple lines, do not cover the mark "TO".
C.2.4 Writing Labels
I. Writing Tool
Use the black oil marker delivered together with the products to write the labels.
In special cases, you can use the black biro, although not recommended. When writing with a biro, do not to leave any oil on the label. The oil may contaminate the label and blur the words.
& Note:
The delivered marker has two nibs. Use the smaller nib to write the labels.
II. Font, Size and Direction
The handwriting must resemble the standard typeface (Times New Roman) as much as possible for easy recognition and looking good. Table C–1 shows the standard typeface.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix C Cable Labels
Huawei Technologies Proprietary
C-7
Table C–1 Standard typeface for handwriting
0 1 2 3 4 5 6 7 8
9 A B C D E F G H
I J K L M N O P Q
R S T U V W X Y Z
Write the characters in proper size.
Figure C–4 shows the writing direction.
1 06
TO:
A01 2 A
106 A012A
Figure C–4 Writing direction of the label
C.2.5 Affixing Labels
After printing or writing the label, remove it from the base page, and then affix it to the signal cable or the identification plate of the power cable.
I. Affixing the Label to the Signal Cable
The label is affixed 2 cm from the connector on the signal cable. In special cases, for example, to avoid cable turning or affecting other cables, other positions are allowed to affix the labels.
When the cable is placed vertically, the label faces right. When the cable is placed horizontally, the label faces downward. See Figure C–5.
TO:1 06A01 2 A
TO:
106
A01
2A
Figure C–5 Sticking the label onto a proper position on the signal cable
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix C Cable Labels
Huawei Technologies Proprietary
C-8
See Figure C–6 for the method to stick the label onto the signal cable.
Stick side
TO:1 06A01 2 A
Figure C–6 Sticking the label onto the signal cable
II. Affixing the Label to the Power Cable
Remove the label from the base page and affix it onto the concave on one side of the identification plate. The cable tie is fastened 2 cm from the connectors, and other positions are allowed in special circumstances.
Cable ties shall be fastened on both ends of a cable. After bundling, the finished identification plate will be on top of the cable in horizontal cabling, or on the right side of the cable in vertical cabling. Make sure that the label is facing outward, as shown in Figure C–7.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix C Cable Labels
Huawei Technologies Proprietary
C-9
TO:
Cable
TO:
Cable
B03 -48V2 B03 -48V2
1-The identification plate is on topof the cable in horizontal cabling
2-The identification plate is at the rightside of the cable in vertical cabling
Figure C–7 Appearance of the affixed label on the power cable
C.2.6 Information Carried on Labels
I. For the Signal Cable
The two sides of the label affixed on the signal cable indicate the location of the ports connected to both ends of the cable, as shown in Figure C–8.
TO:
3Area 1
2
Area
Area
Figure C–8 Text parts on the label for signal cables
The information is given as follows:
l Area 1 contains the location information about local end of the cable. l Area 2 (with the mark "TO:") contains the location information about the opposite
end of the cable. l Area 3 is folded up inside the label.
Seen from the cable leading-out end, the label is at the right side of the cable. The side with "TO:" that is facing outside indicates the opposite end; and the other side indicates the local end. Therefore, the information in Area 1 at one end is the same as the information in Area 2 at the peer end of the cable.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix C Cable Labels
Huawei Technologies Proprietary
C-10
II. For the Power Cable
The label for the power cable is only affixed on one side of the identification plates. The label has information (the part after the mark "TO:") about the location of the device on the peer end of the cable.
C.2.7 Cautions for Using Labels
Note the following items when using labels:
l When you print, write or affix labels, keep the labels clean. l Since the label paper is made out of waterproof material, never use ink-jet printers
and ink pens to print or write on them. l Affix the labels neatly. l Bundle cable ties in the same height, and put all identification plates towards the
same direction. l The positions of "up", "down", "right" and "left" in this section are viewed from the
operator.
C.3 Labels for External Alarm Cables
I. Overview
The external alarm cables are connected to the first cabinet of each row. Labels pasted on the first cabinet indicate the equipment that uses the access terminal. Labels are required on the equipment side only if there are special requirements. In this case, only Area 2 of the label shall be filled in.
II. Meaning of the Label
Table C–2 shows the information on the label for the external alarm cable.
Table C–2 Information on the label for the external alarm cable
Content Meaning Example
MN
MN: Cabinet number M: Cabinet row, numbered from A to Z N: Cabinet column, numbered from 01 to 99
A01 is the cabinet in row A and column 01.
& Note:
Generally, the above numbering method is enough to identify the position of a specific cabinet. If two cabinets are installed back to back, the cabinet front must be specified, so the numbering method MNO is used. Here, "O" means the direction of the cabinet, which can be "A" or "B". On the cable labels described in the following sections, this numbering method is also used.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix C Cable Labels
Huawei Technologies Proprietary
C-11
The label on the alarm cable carries simple information, and only part of the text area needs to be filled in. Huawei recommends keeping the whole length of the label instead of cutting out the blank area.
III. Example of the Label
Figure C–9 shows a label on the alarm cable. "A01" indicates that the alarm cable is connected from the first cabinet to the cabinet in row A, column 01.
TO:A01
Figure C–9 Example of the label on the alarm cable
C.4 Labels for Network Cables
I. Application
The labels for network cables are affixed on the network cables for the cards, the network cables connecting HUB to server, and the network cables connecting agent to Value Added Service (VAS) device.
II. Meaning of the Label
Table C–3 shows the information on the label for the network cable.
Table C–3 Information on two sides of the label for the network cable
Content Meaning Example
MN: Cabinet number A01 indicates the first cabinet in row A.
B: Shelf number, expressed in two numerals. The shelves are numbered from bottom to top.
01 indicates the lowest shelf.
C: Slot number, expressed in two numerals. The slots are numbered from left to right, from top to bottom.
01 indicates slot 1 of the shelf.
MN-B-C-D
D: Network port number, expressed in two numerals. The ports are numbered from top to bottom, from left to right.
01 indicates the first network port.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix C Cable Labels
Huawei Technologies Proprietary
C-12
Content Meaning Example
MN: Cabinet number B02 indicates the second cabinet in row B.
MN-Z
Z: Position of the terminal device. For the router connected to the cabinet, the cabinet number, shelf number and network port number of the router must be specified. For the NMS workstation, specific location of the NMS workstation must be given.
B02-03-12
In VAS products, the information provided on the labels is different, subject to different devices, which are connected by the cables in the network.
l Labels for the network cable that connects the HUB and the server
The label on the HUB end indicates the number of the shelf and cabinet where the HUB is located, and the serial number of the HUB.
The label on the server end indicates the number of the shelf and cabinet where the server locates. If it is a stand-alone server, specific position of the server is provided.
l Labels for the network cable that connects the HUB and the agent
The label on the agent end contains the serial number of the Ethernet port. The definitions of the cabinet number and shelf number are the same as those described in Table C–3 above.
If it is a stand-alone HUB, without any cabinet or shelf, the label will contain specific location information that identifies the HUB.
The serial number on the HUB, the network port number of the agent and the location of stand-alone server will be specified according to actual connection.
III. Example of the Label
Figure C–10 shows the label for the network cable.
A01
TO:
03 10 05
B020312
Figure C–10 Example of the label for the network cable
"A01-03-10-05" indicates that the local end of the network cable connects Ethernet port 05, slot 10, shelf 03 of the cabinet in row A, column 01.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix C Cable Labels
Huawei Technologies Proprietary
C-13
"B02-03-12" indicates that the peer end of the network cable connects Ethernet port 12, shelf 03 of the cabinet in row B, column 02.
C.5 Labels for Optical Fibers
The label for the optical fiber is affixed on the optical fibers that connect the optical ports on the cards in a shelf, or on the box-type devices.
There are two types of labels for optical fibers.
l One is for the optical fiber, which connects the optical ports on two cabinets. l The other is for the optical fiber, which connects the cabinet and the ODF.
C.5.1 Labels for the Fibers Connecting Two Cabinets
I. Meaning of the Label
Table C–4 shows the information on the label for the optical fiber connecting two cabinets.
Table C–4 Information on two sides of the label for the optical fiber connecting two cabinets
Content Meaning Example
MN: Cabinet number A01 indicates the first cabinet in row A.
B: Shelf number, expressed in two numerals. The shelves are numbered from bottom to top.
01 indicates the lowest shelf.
C: Slot number, expressed in two numerals. The slots are numbered from left to right, from top to bottom.
01 indicates slot 1 of the shelf.
D: Optical port number, expressed in two numerals. The ports are numbered from top to bottom, from left to right.
05 indicates the fifth network port.
MN-B-C-D-R/T
R: Optical receiving interface T: Optical transmitting interface
NA
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix C Cable Labels
Huawei Technologies Proprietary
C-14
Content Meaning Example
MN: Cabinet number
B: Shelf number
C: Slot number
D: Optical port number
The meaning is the same as above. When the local cabinet and the opposite cabinet are not in the same equipment room, MN can be the name of the equipment room. MN-B-C-D-R/T
R: Optical receiving interface T: Optical transmitting interface
NA
II. Example of the Label
Figure C–11 shows the label on the optical fiber between two cabinets.
A01 R
TO:
01 05 05
G01T 010101
Figure C–11 Example of the label on the optical fiber between two cabinets
"A01-01-05-05-R" indicates that the local end of the optical fiber is connected with the optical receiving interface 05 on slot 05, shelf 01 in the cabinet in row A, column 01.
"G01-01-01-01-T" indicates that the opposite end of the optical fiber is connected with optical transmitting interface 01 on slot 01, shelf 01 in the cabinet in row G, column 01.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix C Cable Labels
Huawei Technologies Proprietary
C-15
C.5.2 Labels for the Fiber Connecting the Cabinet and the ODF
I. Meaning of the Label
Table C–5 shows the information on the label for the optical fiber connecting the cabinet and the ODF.
Table C–5 Information on two sides of the label for the optical fiber connecting the cabinet and the ODF
Content Meaning Example
MN: Cabinet number A01 indicates the first cabinet in row A.
B: Shelf number, expressed in two numerals. The shelves are numbered from bottom to top.
01 indicates the lowest shelf.
C: Slot number, expressed in two numerals. The slots are numbered from left to right, from top to bottom.
01 indicates slot 1 of the shelf.
D: Optical port number, expressed in two numerals. The ports are numbered from top to bottom, from left to right.
05 indicates the fifth network port.
MN-B-C-D-R/T
R: Optical receiving port T: Optical transmitting port
NA
MN: ODF number. M: ODF row, numbered from A to Z. N: ODF column, numbered from 01 to 99.
G01 indicates the first ODF in row G.
B: Row number of the terminal
C: Column number of the terminal
Range: 01–99, such as 01–01. ODF-MN-B-C-R/T
R: Optical receiving interface T: Optical transmitting interface
NA
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix C Cable Labels
Huawei Technologies Proprietary
C-16
II. Example of the Label
Figure C–12 shows the label on the optical fiber from the cabinet to the ODF.
ODF R
TO:
G01 01 01
A01R 010505
Figure C–12 Example of the label on the optical fiber from the cabinet to the ODF
"ODF-G01-01-01-R" indicates that the local end of the optical fiber is connected with the optical receiving terminal in row 01, column 01 of the ODF in row G, column 01.
"A01-01-05-05-R" indicates that the opposite end of the optical fiber is connected with optical receiving interface 05 on slot 05, shelf 01 in the cabinet in row A, column 01.
C.6 Labels for Trunk Cables
There are two types of labels for the trunk cable. One type is used for the trunk cable connecting two cabinets. The other type is used for connecting the cabinet and the DDF.
The trunk cables include 75-ohm E1 cable, 120-ohm E1 cable, 120 ohm–75 ohm trunk cable, clock cable, 34 Mbit/s cable, 45 Mbit/s cable, 140 Mbit/s cable and 155 Mbit/s cable.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix C Cable Labels
Huawei Technologies Proprietary
C-17
C.6.1 Labels for the Trunk Cable Connecting Two Cabinets
I. Meaning of the Label
Table C–6 shows the information on the label for the trunk cable connecting two cabinets.
Table C–6 Information on two sides of the labels for the trunk cable connecting two cabinets
Content Meaning Example
MN: Cabinet number A01 indicates the first cabinet in row A.
B: Shelf number, expressed in two numerals. The shelves are numbered from bottom to top.
01 indicates the lowest shelf.
C: Slot number, expressed in two numerals. The slots are numbered from left to right, from top to bottom.
01 indicates slot 1 of the shelf.
D: Cable number, expressed in two numerals. The cables are numbered from top to bottom, from left to right.
05 indicates the fifth network port.
MN-B-C-D-R/T
R: Optical receiving port T: Optical transmitting port
NA
MN-B-C-D-R/T Same as the other side of the label. Same as the other side of the label.
II. Example of the Label
Figure C–13 shows the label on the trunk cable that connects two cabinets.
G01 T
TO:
01 05 12
D02R 010110
Figure C–13 Example of the label on the trunk cable that connects two cabinets
"G01-01-05-12-T" indicates that the local end of the trunk cable is connected with the transmitting terminal of trunk cable 12 on slot 05, shelf 01 in the cabinet in row G, column 01.
"D02-01-01-10-R" indicates that the opposite end of the trunk cable is connected with the receiving terminal of trunk cable 10 on slot 01, shelf 01 in cabinet in row D, column 02.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix C Cable Labels
Huawei Technologies Proprietary
C-18
C.6.2 Labels for the Trunk Cable Connecting the Cabinet and the DDF
I. Meaning of the Label
Table C–7 shows the information on both sides of the labels for the trunk cable that connects the cabinet and the DDF.
Table C–7 Information on labels for the trunk cable that connects the cabinet and the DDF
Content Meaning Example
MN: Cabinet number A01 indicates the first cabinet in row A.
B: Shelf number, expressed in two numerals. The shelves are numbered from bottom to top.
01 indicates the lowest shelf.
C: Slot number, expressed in two numerals. The slots are numbered from left to right, from top to bottom.
01 indicates slot 1 of the shelf.
D: Cable number, expressed in two numerals. The cables are numbered from top to bottom, from left to right.
05 indicates the fifth network port.
MN-B-C-D-R/T
R: Optical receiving port T: Optical transmitting port
NA
MN: DDF number M: DDF row, numbered from A to Z N: DDF column, numbered from 01 to 99
G01 indicates the first DDF in row G.
B: Row number of the terminal
C: Column number of the terminal Range: 01–99, such as 01–01.
DDF-MN-B-C-D/R/T D: Direction A or B
A means the DDF terminal connects to the optical device B means the DDF terminal connects to the switching device R: Optical receiving port T: Optical transmitting port
NA
II. Example of the Label
Figure C–14 shows the label on the trunk cable connecting the cabinet and the DDF.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix C Cable Labels
Huawei Technologies Proprietary
C-19
A01 R
TO:
03 01 01
DDFAR G010101
Figure C–14 Example of the label on the trunk cable connecting the cabinet and the DDF
"A01-03-01-01-R" indicates that the local end of the trunk cable is connected with the receiving terminal of trunk cable 01 in slot 01, shelf 03 of the cabinet in row A, column 01.
"DDF-G01-01-01-AR" indicates that the opposite end of the trunk cable is connected with the receiving terminal of direction A (connected to the optical network equipment) in row 01, column 01 of the DDF in row G and column 01.
C.7 Labels for Subscriber Cables
The labels are affixed on both ends of the subscriber cable to identify the position of the cables on the cabinet side and the MDF side.
I. Meaning of the Label
Table C–8 shows the information on the labels for the subscriber cable.
Table C–8 Information on the labels for the subscriber cable
Content Meaning Example
MN: Cabinet number A01 indicates the first cabinet in row A.
B: Shelf number, expressed in two numerals. The shelves are numbered from bottom to top.
01 indicates the lowest shelf.
C: Slot number, expressed in two numerals. The slots are numbered from left to right, from top to bottom.
01 indicates slot 1 of the shelf.
MN-B-C-D
D: Cable number, expressed in two numerals. The cables are numbered from top to bottom, from left to right.
01 indicates the first network port.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix C Cable Labels
Huawei Technologies Proprietary
C-20
Content Meaning Example
MN: MDF number M: MDF row, numbered from A to Z N: MDF column, numbered from 01 to 99
G01 indicates the first MDF in row G.
B: Row number of the terminal
MDF-MN-B-C
C: Column number of the terminal Range: 01–99, such as 01–01.
II. Example of the Label
Figure C–15 shows the label on the subscriber cable.
A01
TO:
03 01 01
MDFG010101
Figure C–15 Example of the label for the subscriber cable
"A01-03-01-01" indicates that local end of the subscriber cable is connected with Terminal 01 on slot 01, shelf 03 of the cabinet in row A, column 01.
"MDF-G01-01-01" indicates that the opposite end of the label is connected with the terminal in row 01, column 01 of the MDF in row G, column 01.
C.8 Labels for Power Cables
C.8.1 Labels for DC Power Cables
The labels are affixed on the DC cables that provide power for the cabinets, including –48 V, PGND and BGND cables. The labels for DC power cables are affixed to one side of the identification plate on the cable tie.
I. Meaning of the Label
Table C–9 shows the information on the labels for the DC power cable.
Table C–9 Information on the labels for the DC power cable
Content Meaning
MN(BC)-–48 V1
MN(BC)-–48 V2
MN(BC)-BGND
MN(BC): BC is written right below MN. On the loaded cabinet side, only MN is used to identify the cabinet. On the power distribution device side, MN identifies the
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix C Cable Labels
Huawei Technologies Proprietary
C-21
Content Meaning
MN(BC)-PGND
row and column numbers of the power distribution device like the control cabinet and power distribution box; BC identifies the row and column numbers of the –48 V connecter. If there is no row number or column number, or the connecter can be identified without them, BC can be omitted. BGND and PGND do not need the row or column number.
The label only indicates the location of the opposite equipment, control cabinet or distribution box. Information about the local end is unnecessary. Table C–9 lists the information about two inputs of –48 V power supply on the label. The information for other DC voltages (such as 24 V, 60 V) is given in similar methods.
II. Example of the Label
Make sure that labels are affixed in the correct direction.
After the cable ties are bundled onto the cable, the identification plates with the labels shall face upward.
The text on the labels in the same cabinet shall be in the same direction, as shown in Figure C–16.
TO: A01 -48V2 B08
TO: B03 -48V2
(1) (2)
Figure C–16 Example of the labels on the DC power cable
In Figure C–16, (1) indicates the label on the loaded cabinet side. It indicates the position of the cable on the power distribution cabinet side. (2) indicates the label on the power distribution cabinet side. It indicates the position of the cable on the loaded cabinet side.
On the loaded cabinet side, the label marked with "A01/B08-–48 V2" indicates that the cable is for –48 V2 DC supply. It comes from the eighth connecter on row B of –48 V bus bar in the power distribution cabinet in row A, and column 01.
On the power distribution cabinet side, the label marked with "B03-–48 V2" indicates that the cable is for –48 V2 DC supply. It comes from the loaded cabinet in row B, column 03.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix C Cable Labels
Huawei Technologies Proprietary
C-22
In the power distribution cabinet (or the first power cabinet of a row in the transmission equipment room), every terminal block on the –48 V connector bar has a numeric identification. For example, in the above label of "A01/B08-–48 V2", "08" (or sometimes "8") is the numeric identification of the terminal block.
PGND and BGND are two copper bars, on which the terminals are directly connected. Hence the connection of any of the terminals does not affect the power distribution. Only the row and column numbers of the power distribution cabinet are needed, instead of specific serial number of the terminals on the copper bar. For example, if the label on the loaded cabinet side is "A01-BGND", it means that the power cable is a BGND cable that connects the BGND copper bar in the power distribution cabinet in row A, column 01. Information on the labels for PGND cables shall be given in the similar way.
C.8.2 Labels for AC Power Cables
The labels are affixed on the AC cables that provide power for the cabinets, including –48 V, PGND and BGND cables. Labels are pasted on both ends of the cable too. The AC cables have the insulation sheath, so, you only need to write "AC" and the cabinet number on each label.
The labels for AC power cables are affixed to one side of the identification plate on the cable tie.
I. Meaning of the Label
Table C–10 shows the information on the labels for the AC power cable.
Table C–10 Information on the labels for the AC power cable
Content Meaning
MN-AC
MN: Cabinet number or the power socket position. Power socket: Mark the positions clearly to avoid confusion with other sockets. If the sockets have multiple rows and columns, identify their positions as the cabinet.
II. Example of the Label
The label only indicates the location of the opposite equipment or socket. Information about the local end is unnecessary.
Ensure that labels are affixed in the correction direction. After the cable ties are bundled onto the cable, the identification plates with the labels face up.
The text on the labels in the same cabinet shall be in the same direction, as shown in Figure C–17.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix C Cable Labels
Huawei Technologies Proprietary
C-23
TO: A01 AC
TO: B01 AC
(1) (2)
Figure C–17 Example of the labels on the AC power cable
In Figure C–17, (1) indicates the label on the loaded cabinet side. It indicates the position of the cable on the power distribution cabinet side. (2) indicates the label on the power distribution cabinet side. It indicates the position of the cable on the loaded cabinet side.
On the loaded cabinet side, the label marked with "A01-AC" indicates that the cable is from the power socket in row A and column 01.
On the power distribution cabinet side, the label marked with "B01-AC" indicates that the cable is from the loaded cabinet in row B and column 01.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix D Environment Requirements
Huawei Technologies Proprietary
D-1
Appendix D Environment Requirements
D.1 About This Appendix
This appendix covers:
l Environment Requirements for Equipment Room, D-2 l Requirements for Power Supply, D-10
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix D Environment Requirements
Huawei Technologies Proprietary
D-2
D.2 Environment Requirements for Equipment Room
D.2.1 Site Selection of Equipment Room
The telecom equipment should run in a favorable environment. Its equipment room should be located at a place free from high temperature, dust, toxic gases, explosive materials or instable voltage, and away from great vibrations, strong noise or power transformer stations. During project designing, consider the following factors: hydrographic, geological, seismic, power supply and transportation. Select a site in line with the engineering and environmental requirements for the telecom equipment.
The construction, structure, heating and ventilation, power supply, lighting and fire fighting of the equipment room should be designed by specialized construction designers. The equipment room shall be designed in accordance with the following requirements:
l Environment requirements for access equipment running l Requirements on industrial, environment protection, fire fighting, and civil air
defense l Current standards or regulations of the local country or region l Requirements of special technical process for building construction design.
The specific requirements for site selection of equipment room are as follows:
l Keep the site far from pollution sources.
For heavy pollution sources such as the smeltery and coal mine, keep a distance of 5 km. For medium pollution sources such as the chemical, rubber and galvanization industrials, keep a distance of 3.7 km. For light pollution sources such as packinghouse and tanyard, keep a distance of 2 km. If these pollution sources cannot be avoided, keep the equipment room in the perennial upwind direction of the pollution sources. In addition, adopt the high-quality equipment room or protection product.
l Keep the air vent of the equipment room away from the exhaust of city waste pipes, big cesspools and sewage treatment tanks. Keep the equipment room in the positive pressure state lest the corrosive gases enter the equipment room and erode components and circuit boards.
l Keep the equipment room away from the industrial and heating boilers. l It is best to locate the equipment room in or above the second floor. If this cannot
be satisfied, the ground for equipment installation in the equipment room shall be at least 600 mm above the maximum flood level in the local record.
l Keep the equipment room away from livestock farms. If this requirement cannot be satisfied, it should be located in the perennial upwind direction of the livestock farms.
l Keep the equipment room 3.7 km away from the seaside or salt lake. If this requirement cannot be satisfied, the equipment room should be airtight with
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix D Environment Requirements
Huawei Technologies Proprietary
D-3
cooling facilities. In addition, the alkalized soil cannot be used as the construction material. Otherwise, the equipment applicable in atrocious environment must be adopted.
l The old livestock room or the fertilizer warehouse cannot be used as the equipment room.
l The equipment room should be solid enough to withstand wind and downpour. l Keep the equipment room away from the road or sand field with dusts flying
around. If this requirement cannot be satisfied, the windows and doors of the equipment room should be away from the pollution sources.
D.2.2 Layout of Equipment Room
To ease the future maintenance and management, place the telecom equipment into different rooms. Figure D–1 shows the plane layout of the equipment room.
Main communicationequipment room
Transmissionroom
Power distributionroom
Substation room
Control room Generator room
Battery room
Power cable
Communication cable and optical cable
Main communicationequipment room
Transmissionroom
Power distributionroom
Substation room
Control room Generator room
Battery room
Power cable
Communication cable and optical cable
Figure D–1 Layout of the equipment room
The general layout principles of the equipment room are as follows.
l It shall meet the requirements for cabling and maintenance of communication cables and power cables.
l It shall make the cabling distance as short as possible, which facilitates cable maintenance, reduces the potential communication faults and raises working efficiency.
D.2.3 Construction Requirements for Equipment Room
Table D–1 lists the construction requirements for the equipment room.
Table D–1 Construction requirements for the equipment room
Item Requirements
Area The equipment room can accommodate the equipment with the largest capacity.
Net height The minimum height of the equipment room refers to the net height below the beam or the ventilation pipe. The recommended minimum height of the equipment room is three meters or higher.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix D Environment Requirements
Huawei Technologies Proprietary
D-4
Item Requirements
Floor
The floor in the equipment room is semi-conductive and dustproof. The raised floor is recommended. Pave the raised floor tightly and solidly. The horizontal tolerance of each square meter is less than 2 mm. If no raised floor is applicable, use the static electricity conductive floor material, with the volume resistivity of 1.0 x 107 ohm–1.0 x 1010 ohm. Ground the static electricity conductive floor material or raise floor so that the static electricity can be conducted. You can connect them with the grounding unit through the current limiting resistor and connection line. The resistance of the current limiting resistor is 1 MΩ.
Load-bearing capacity It is larger than 450 kg/m2.
Door and window
The door of the equipment room is two meters high and one meter wide. One door is enough. Install the door and windows with dustproof plastic tape for seal. Install the windows with double-layer glass and seal them strictly.
Wall surface processing
Adhere wallpaper to the surface of the wall or apply the flat paint to the wall, except the pulverized paint.
Grooves
Use grooves to arrange cables. The inner face of the groove must be smooth. The reserved length and width of the groove, and the number, position and dimensions of the holes must comply with the requirements of the arrangement of the optical transmission equipment.
Water pipe Pass the service pipes, drainpipes and storm sewers through the equipment room. Do not set the fire hydrant in the equipment room, but in the corridor or near the staircase.
Internal partition wall
Separate the area where the equipment is installed from the equipment room door. The partition wall can hold back some dusts.
Installation position of the air conditioner
Install the air conditioner in the suitable place so that its air is not directed to the equipment.
Other requirements Avoid the proliferation of fungi mildew, and prohibit rodents.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix D Environment Requirements
Huawei Technologies Proprietary
D-5
Figure D–2 shows internal partition wall inside the equipment room.
Equipment
Air conditioner
Internal partition wall
Equipment
Air conditioner
Internal partition wall
Figure D–2 Internal partition wall inside the equipment room
D.2.4 Requirements for Temperature and Humidity
To maintain a favorable working environment for the equipment, keep the proper temperature and humidity in the equipment room. Table D–2 gives the specific requirements.
Table D–2 Requirements for temperature and humidity
Equipment Temperature Relative humidity
MA5600 –5°C to + 45°C 20%–90%
Note: Before measuring the temperature and humidity, remove the protection boards in front of and at the back of the cabinet (if any). The measurement point shall be 1.5 m above the ground and 0.6 m in front of the cabinet.
To meet the above requirements, take the following measures in the equipment room.
l Use the perennial temperature-control device no matter what the local climate is. l Mop the ground on a timed basis or use a humidifier to keep the proper humidity
in the equipment room in the dry area. l Use the dehumidifier in the place where the humidity is high.
D.2.5 Requirements for Neatness
The equipment room is free from explosive, conducting, permeability magnetic and corrosive dust. Table D–3 lists the requirements for dust concentration in the equipment room.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix D Environment Requirements
Huawei Technologies Proprietary
D-6
Table D–3 Requirements for dust particles in the equipment room
Mechanical active material Unit Concentration
Suspending dust mg/m³ ≤0.40
Precipitable dust mg/m²·h ≤15.00
Sand mg/m³ ≤300.00
To meet the above requirements, take the following measures in the equipment room.
l Apply dustproof materials for ground, wall and ceiling construction. l Equip screens for the door and windows facing outside. The outer windows
should be dust-proof. l Clean the equipment room periodically, and clean the air filter quarterly. l Wear the shoe covers and ESD-preventive clothes before entering the
equipment room.
D.2.6 Requirements for Corrosive Gases
Besides the dust, the equipment room should be free from corrosive gases, such as SO2, H2S, NH3. Table D–4 lists the requirements for the corrosive gas concentration.
Table D–4 Requirements for corrosive gas concentration
Chemical active material Unit Concentration
SO2 mg/m³ ≤0.30
H2S mg/m³ ≤0.03
NH3 mg/m³ ≤1.00
Cl2 mg/m³ ≤0.10
To meet the above requirements, take the following measures in the equipment room.
l Avoid constructing the equipment room near the place where the corrosive gas concentration is high, such as a chemical plant.
l Make sure the air intake vent of the equipment room is in the perennial upwind direction of the pollution source.
l Take protective measures on the sewer covers to prevent corrosive gas from entering the equipment room.
l Install the batteries into the room different from the communications equipment. l Ask the professional institute to monitor the corrosive gas conditions.
D.2.7 Requirements for Electromagnetic Environment
Table D–5 lists the requirements for electromagnetic environment.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix D Environment Requirements
Huawei Technologies Proprietary
D-7
Table D–5 Requirements for electromagnetic environment
Electromagnetic phenomenon Parameter
Frequency (Hz) 50–20000 Low frequency magnetic field
Ampl. A/m (rms) 10–0.025
Frequency (MHz) 0.009–1000 Amplitude modulation RF electric field
Ampl. V/m (rms) 3
Frequency (GHz) 1–20 Pulse modulation RF electric field
Ampl. (V/m (peak)) 3
Take the following measures to restrain interference signals:
l Keep the equipment room away from the transformer, high-tension transmission lines, and heavy current equipment.
l Keep the equipment room 200 m or more away from the high-power broadcasting transmitter.
l If there is mobile communication transmitter installed in the communication building, its interference degree must comply with the relevant standards and regulations. If necessary, take measures to screen and isolate the interference.
l Do not use portable wireless devices in the equipment room.
D.2.8 Requirements for ESD Prevention
l The absolute value of electrostatic voltage is less than 2000 V. l To meet the requirement, take the following measures in the equipment room. l Train operators to the knowledge of ESC prevention. l Raise the humidity to 40% or above to reduce the influence of static electricity. l Use the antistatic floor in the equipment room. When entering the equipment
room, wear ESD-preventive shoes, work clothes, and wrist strap.
D.2.9 Requirements for Lightning Proof Grounding
Table D–6 lists the requirements for lightning proof grounding.
Table D–6 Requirements for lightning proof grounding
Item Requirements
Capital construction
Use the reinforced concrete structure for the construction of the equipment room. Install the lightning proof device in the equipment room. The lightning proof grounding shares the same grounding body with the protection grounding of the equipment room.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix D Environment Requirements
Huawei Technologies Proprietary
D-8
Item Requirements
AC power requirements
Use a special power transformer for the telecom offices. Use the metal jacket or steel tube to cover the power cables before burying them under the ground. Ground both ends of the metal jacket or steel tube nearby and properly. Bury the cable under the ground. The length underground should be no less than 15 m. Use a TN-S power supply system for the telecom offices. The socket that supplies power for box-type products should be a uniphase triplex socket. Make sure that the contact holes of PE cables (protection ground cable) in the socket can provide reliable protection grounding for power-demanding equipment and maintenance terminal equipment. Install a gapless zinc oxide arrester to each of the three phase lines at the low tension side of the AC power transformer. Ground nearby and correctly the enclosure of the transformer, the neutral lines at the low tension side, and the metal steel tubes of the power cables that connect with the enclosure of the transformer.
Power cables leading in the communications site need to be equipped with lightning protection box.
Do not lead the AC/DC power cables in/out the communications site in aerial mode. After the low-voltage power cables is led into the equipment room, install the lightning protection box for the power cables in the AC voltage stabilizer and the AC power distribution panel (unit). Ground the arrester nearby and correctly. For the equipment room built in the city, install the power supply arrester with the nominal discharging current not less than 20 kA. For the equipment room built in the suburbs subject to lightning strike, install the power supply arrester with the nominal discharging current larger than 60 kA. For the equipment room in the mountain areas easily subject to lightning strike, or in the separate high-rise buildings in the city, install the power supply arrester with the nominal discharging current larger than 100 kA. The grounding cable of the lightning protection box shall be one meter long at most.
Grounding of DC power distribution
Connect the DC working ground (positive pole of the –48 VDC power supply or the negative pole of the 24 VDC power supply) with the indoor collective grounding cable nearby. The total grounding cable shall meet the maximum load of the equipment. The power equipment must have the DC working grounding cable, which can connect the power equipment to the collective grounding cable.
Equipotential connection
Ground all devices and auxiliary devices in the equipment room properly. Connect all protection grounding cables to the collective protection grounding bar. Join all protection grounding cables in one equipment room to one protection grounding bar. Share the grounding network for the working ground and protection ground. Ground the cabling racks, suspended iron supports, frames or enclosures, metal ventilation pipe, metal windows and doors correctly.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix D Environment Requirements
Huawei Technologies Proprietary
D-9
Item Requirements
General requirements for grounding
Never connect the neutral line of the AC power cable with the protection ground of any telecom equipment in the equipment room. Grounding cables should meet the maximum payload requirement of the equipment. Never install the fuse or switch on the grounding cable. No oxidation corrosion should occur in the general grounding bar. Otherwise, grounding bar cannot connect well with grounding cables, which will result in increase of contact resistance on the grounding path. Make sure reliable connection between the grounding cables and the grounding bar in the equipment room. Make all grounding cables as short as possible, and arrange them as direct as possible.
Grounding resistance
The grounding resistance of the grounding system is recommended to be less than 10 ohms, and the equipment grounding should be in accordance with national and local electrical codes as well. Keep the upper end of the grounding body at least 0.7 meters over the ground. In cold areas, bury the grounding body below the frozen ground. Measure the grounding resistance periodically to ensure the effective grounding.
Subscriber cables and cable distribution frame
The external subscriber cable must be led into the site under the ground. The metal jacket of the cable should be grounded in the distribution frame. The cable distribution frame must be equipped with a security unit. The security unit used for the distribution frame should comply with relevant telecommunication standards. Perform spot test for the security unit periodically (per 2 years) according to relevant standards and replace the disabled or degraded security units in time.
Routing of signal cables
Do not arrange the signal cables overhead in the equipment room. All signal cables must be led into the site under the ground. Use the cables with metal jackets or put them into the metal pipe if they run out of or into the equipment room. The metal jackets of all cables led into the equipment room should be grounded in the distribution frame or connected to the protection grounding bar in the equipment room. After signal cables are led into the equipment, relevant signal lightning protection boxes should be installed for the corresponding ports on the equipment. Keep the grounding cable of the lightning protection box as short as possible. Ground the idle lines inside the cable in the equipment room.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix D Environment Requirements
Huawei Technologies Proprietary
D-10
Item Requirements
Collective grounding cable
Use the grounding ring or grounding bar for the collective grounding cable. Do not use aluminum cables as grounding cables. Take measures to prevent electrification corrosion when connecting different metal parts together. Use the copper busbar as the collective grounding cable with the cross-sectional area not less than 120 mm2, or use the galvanized flat steel that has the same resistance. Insulate the collective grounding cable from the reinforcing steel bars of the building.
Grounding lead-in
Keep the grounding lead-in up to 30 meters long. Use the galvanized flat steel with cross-sectional area of 40 mm x 4 mm or 50 mm x 5 mm.
D.3 Requirements for Power Supply
D.3.1 Requirements for AC Power Supply
The AC power supply system consists of mains, Uninterrupted Power Supply (UPS) and electric generator set. It supplies power in an integrated mode. The low-voltage power supply system uses three-phase five-wire mode or mono-phase three-wire mode. Table D–7 lists the requirements for the nominal voltage and frequency of the low-voltage AC.
Table D–7 AC voltage and frequency
Item Nominal voltage Rated frequency
Single phase three wire 220VAC; 230VAC 50/60 Hz
Three phase five wire 380VAC; 400VAC 50/60 Hz
Voltage fluctuation allowed: For static electric network, fluctuation allowed: ±10%; valid value fluctuation: ±15%; time: less than 500ms. For dynamic electric network, fluctuation allowed: ±10%; time: less than 2ms.
The UPS/mains switchover time shall be no more than 10ms. Otherwise, it may cause equipment restart or reset.
In determining the AC capacity in the equipment room, you need to take into account the working current and fault current. Independent equipment must have an independent AC distribution protection device. The protection switch configuration must be greater than that of the electricity device.
In designing the DC power supply system, you need take into account the maximum payload in dynamic and static conditions. Besides, you have to reserve the margin. The cabling in the power distribution panel must be figured out based on the
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix D Environment Requirements
Huawei Technologies Proprietary
D-11
maximum capacity of the supplied power supply payload. In this way, you can decide the type and size of the conducting wire.
The generator set shall have the following functions:
l Automatic power on and off l Automatic recruitment l Remote communication l Remote control l Remote measurement l Standard interface and communication protocols
The following lists the specific requirements for the AC and DC power cables:
l The AC neutral for communications must use the conducting wire that has the same cross section as the phase cable.
l Select the DC power feeder according to the long-term payload. If the cross section exceeds 95 mm2, use the hard bus cable. If there is a great difference between the recent and long-term payload, make the cabling by stages.
l The conducting wire is fire-resistant. Route the conducting wire according to the local regulations, and set the low-voltage power distribution room according to the local regulations, too.
D.3.2 Recommendations for AC Power Supply
Use the voltage-regulator in the following situations:
l When the communication equipment is powered directly by the mains, the power supply voltage exceeds the rated voltage by –10% to +5%, or the voltage range allowed for the communications equipment.
l When the communications equipment is not powered directly by the mains, the mains voltage exceeds the rated voltage by –15% to +10%, or the AC input voltage range allowed for the DC power equipment.
l Use a DC power supply system that meets the standards and a power system that has network access license.
l Enhance the reliability of the power supply system by improving the reliability of the AC power supply system and decreasing the capacity of storage battery reasonably. If it is difficult to upgrade the reliability of the DC power supply system in small-size offices, increase the storage battery capacity properly.
l Strengthen the control over storage battery temperature and ventilation in the storage battery compartment, where ventilation holes should be available to decrease the possibility of explosion resulting from the gas released by the storage battery.
l To ensure the normality of power supply, use the UPS or inverter. l Configure the generator set for the office to ensure the normal communication in
case of mains failure. The capacity of the generator set is greater than or equal to 1.5–2 times of the continuous power supply equipment.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix D Environment Requirements
Huawei Technologies Proprietary
D-12
l Connect two sets of storage batteries in parallel. There usually is only one set of UPS battery, and a set of backup UPS battery should be configured. If the inverter or UPS is used, select the active inverter that can provide the maximum power. A standby inverter should be configured.
l When DC-to-AC converter and UPS are used. The main converter shall be selected based on the maximum power, and a standby converter shall be configured.
D.3.3 Requirements for DC Power Supply
The DC power supply of the office should use full floating charging mode. In the stage of AC power supply, the rectifier performs floating charging with the 24-section VRLA battery group in parallel connection to supply power for the communication equipment. In the case of AC power cut-off, the storage battery will supply power. After the recovery of AC power supply, adopt this mode for power supply: on-load, constant voltage and current-limiting.
Place the power equipment near the telecom equipment to make the DC feeder as short as possible. To reduce the power consumption and installation cost, the loop voltage drop from the battery port to the equipment port should be smaller than 3.2 V.
Configure a centralized power room or battery room for the office with medium traffic, or adopt the distributed power supply mode.
Use the integrated power supply for the office with small traffic. Note to prevent the corrosive gas released by the battery from eroding the circuit board.
Table D–8 lists the specifications for the DC power supply.
Table D–8 Specifications for the DC power supply
Item Index
Permitted range of the –48 V/–60 V input voltage –38.4 V to –72 V
DC power capacity to support the surge current
Greater than 1.5 times of the rated current at least
Regulated voltage precision
If the AC input voltage is in the range of 85%–110% of the rated value, and the load current is in the range of 5%–100% of the rated value, the output voltage of the rectifier is an integer in the range of –46.0 V to –56.4 V, with the regulated voltage precision ≤ 1%.
Overshoot amplitude of switch on/off
No more than ±5% of the integral value of the DC output voltage
Peak-to-peak noise voltage ≤200 mV
Dynamic response The recovery time is smaller than 200 ms. The overshoot is in the range of the integral value of the DC output voltage ±5%.
Installation Manual SmartAX MA5600 Multi-service Access Module Appendix D Environment Requirements
Huawei Technologies Proprietary
D-13
D.3.4 Recommendations for DC Power Supply
l Adopt the dispersed power supply mode. Use multiple DC power supply systems and set power equipment in multiple positions.
l Adopt the standard DC power supply system, and set the output voltage of the communications equipment to fall within the required range.
l Improve the reliability of the AC power supply system, and reduce the storage batteries. For the small offices, add more storage batteries if it is difficult to enhance the reliability of the AC power supply system.
l The total capacity of the high-frequency switch rectifier must satisfy the power of the communication loading and battery charging.
l Configure the backup rectifier modules. If there are no more than 10 active modules, configure one backup module. If there are more than 10 active modules, configure one backup module for every 10 active modules.
l Install the storage batteries in two or more groups. The capacity is determined by the duration when the storage batteries supply power to the load. For most offices, the batteries should be able to supply power for one hour at least. The time for the storage battery set to supply power for load independently should comply with the following specifications and also be determined in consideration of the duration allowed for power cut-off.
– The backup time for type 1 battery that supplies power for mains is 0.5–1 hour. – The backup time for type 2 battery that supplies power for mains is 1–2 hours. – The backup time for type 3 battery that supplies power for mains is 2–3 hours. – The backup time for type 4 battery that supplies power for mains has two cases. When the battery that is connected to a power through one load channel, 1) For the battery which encounters power cut-off day and night, which has no guarantee of power supply and which could not meet the requirements of type 3 mains, its backup time is 8–10 hours. The backup time for the battery in case of long-time power cut-off or no mains supply is 20–24 hours.
l For unattended offices, the following factors should be considered for the storage battery:
– Certain amount of time for preparation after any failure report is learned. – The normal time for driving from the maintenance site to the office. – The time for troubleshooting. – For those offices that are on top of mountains or in suburban areas, generally no technical personnel will be sent for inspection.
Installation Manual SmartAX MA5600 Multi-service Access Module Index
Huawei Technologies Proprietary
i-1
Index
A AC power cable labels, C-22
accepting the products, 2-11
affixing labels, C-7
assembling
support, 4-11
assembling the cabling ladder, 6-2
attaching the cabinet top, 3-10
B baffle ring, 6-15
battery
installation cautions, 8-9
installation check, 8-13
installation preconditions, 8-10
installation procedure, 8-10
battery shelf, 8-11
boards in service frame, 1-6
boards in SPL frame, 1-7
C cabinet
fastening, 3-9
levelling, 3-8
positioning, 4-13
positioning, 3-8
cabinet dimensions and weight, A-1
cable arrangement requirements, 9-3
cable bundling requirements, 9-2
cable manager, 6-14
cable routing requirements, 9-3
cable turning requirements, 9-2
cabling ladder
installing, 6-3
jointing, 6-8
outline, 6-3
turning, 6-6
cabling rack
ceiling mounting, 6-11
floor mounting, 6-11
over-cabinet mounting, 6-12
wall mounting, 6-10
cabling rack installation process, 6-2
cabling trough
connecting, 6-4
installing, 6-5
cautions for unpacking boards, 2-11
checking before unpacking, 2-7
checking front door, 4-19
checking installation conditions, 2-4
checking the cabinet bottom space, 3-2
checking the installation, 3-13
checkup
cabinet installation, 10-2
cable distribution, 10-2
plugs and sockets, 10-3
connecting plate, 3-11
connection diagram I, B-2
connection diagram II, B-5
connection diagram III, B-7
connection diagram IV, B-9, B-11
construction plan drawing
a row of cabinets, 3-3, 4-6
back-to-back cabinets, 3-4, 4-7
single cabinet, 3-3, 4-6
construction remnant, 10-4
D DC power cable labels, C-20
DC power supply layout, 8-15
drilling holes, 3-6, 4-8
E EMU
Installation Manual SmartAX MA5600 Multi-service Access Module Index
Huawei Technologies Proprietary
i-2
installing, 8-17
end cover and trough rim, 6-15
ESD wrist strap, 7-4
expansion bolt, 3-6, 4-9
composition, 3-6, 4-9
installation, 3-7, 4-9
external alarm cable labels, C-10
F fastening
support, 4-12
fastening the cabinet, 3-9
fastening the cabinet bottom, 3-9, 4-15
fastening the cabinet top, 4-16
floor holder, 4-3
adjust, 4-20
installing, 4-20
frame
installing, 7-2
structure, 7-2
G GEPS4845
connecting AC input cable, 8-6
connecting battery input cable, 8-9
connecting DC output cable, 8-8
installing, 8-6
H H66 cabinet
description, 1-2
outline, 1-3
wire bushing, 9-5
I install the frame, 7-2
installing
holder fasteners, 4-13
lightning arrester, 8-4
supports, 4-10
installing batteries, 8-10
installing expansion bolts, 3-7, 4-9
installing the board, 7-5
installing the cable lug, 9-2
installing the cabling trough, 6-4
installing the EMU, 8-17
installing the GEPS4845, 8-6
installing the slide rail, 7-2
L label outline, C-2
label type, C-2
leveling the cabinet, 4-14
levelling the cabinet, 3-8
lightning arrester
installing, 8-4
tool, 8-3
lightning arrester power-on debugging, 10-4
M MA5600 cabinet layout, 1-7
MA5600 power supply components, 8-2
making power cables on site, 8-3
marking reference lines
construction plan drawing e, 4-8
mark-off template, 4-8
procedures, 4-8
marking reference lines procedure, 3-5
marking-off plate, 3-4, 4-7
material features of the label, C-2
MDF grounding requirements, 8-18
N network cable labels, C-11
O optical fiber labels, C-13
outline of installed cabinet, 4-21
overhead cabling, 9-5
overlapped bundling, 10-3
P PDU
connecting DC input cable, 8-16
Installation Manual SmartAX MA5600 Multi-service Access Module Index
Huawei Technologies Proprietary
i-3
connecting DC load output cable, 8-17
installing, 8-15
positioning cabinet, 4-13
positioning the cabinet, 3-8
power and ground cables, 8-2
power consumption
boards, A-2
fan tray, A-3
frame, A-3
powering on the battery, 10-6
powering on the board and fan, 10-6
powering on the frame, 10-5
preparing tools and meters, 2-2
printing labels, C-4
R recovering floor, 4-20
removing the board, 7-6
S S600A support series, 4-2
SCU cable
crossover cable, 9-6
FE/GE electrical port cable, 9-6
straight through cable, 9-6
service frame
description, 1-3
layout, 1-4
outline, 1-4
side floor holder, 4-4
signal transfer box, 8-14
slide rail, 4-3
SPL frame
description, 1-5
layout, 1-5
outline, 1-6
subscriber cable labels, C-19
support
adjusting height, 4-10
assembling, 4-11
fastening, 4-12
height, 4-2
installing, 4-10
T test insulation, 3-13, 4-19
tool
install cabinet on antistatic floor, 4-5
install lightning arrester, 8-3
trunk cable labels, C-16
U underfloor cabling, 9-5
unpacking the carton, 2-10
unpacking the wooden case, 2-8
W writing labels, C-6
i.