26
339 New Leicester Highway, Suite 140 • Asheville. NC 28806 •www.fbrmpo.org Long-Range Transportation Plan •Transportation Improvement Program Highway Planning • Bicycle and Pedestrian Planning • Transit Planning • Air Quality Public Involvement

339 New Leicester Highway, Suite 140 - French Broad River MPOfbrmpo.org/wp-content/uploads/2014/06/2014_06_12_MPO_TCC_Agen… · LRTP Tier MPO Staff Projects in the FBRMPO 2035 LRTP

  • Upload
    dinhnga

  • View
    215

  • Download
    0

Embed Size (px)

Citation preview

339 New Leicester Highway, Suite 140 • Asheville. NC 28806 •www.fbrmpo.org

Long-Range Transportation Plan •Transportation Improvement Program

Highway Planning • Bicycle and Pedestrian Planning • Transit Planning • Air Quality

Public Involvement

339 New Leicester Highway, Suite 140 • Asheville. NC 28806 •www.fbrmpo.org

Long-Range Transportation Plan •Transportation Improvement Program

Highway Planning • Bicycle and Pedestrian Planning • Transit Planning • Air Quality

Public Involvement

339 New Leicester Highway, Suite 140 • Asheville. NC 28806 •www.fbrmpo.org

Long-Range Transportation Plan •Transportation Improvement Program

Highway Planning • Bicycle and Pedestrian Planning • Transit Planning • Air Quality

Public Involvement

339 New Leicester Highway, Suite 140 • Asheville. NC 28806 •www.fbrmpo.org

Long-Range Transportation Plan •Transportation Improvement Program

Highway Planning • Bicycle and Pedestrian Planning • Transit Planning • Air Quality

Public Involvement

339 New Leicester Highway, Suite 140 • Asheville. NC 28806 •www.fbrmpo.org

Long-Range Transportation Plan •Transportation Improvement Program

Highway Planning • Bicycle and Pedestrian Planning • Transit Planning • Air Quality

Public Involvement

339 New Leicester Highway, Suite 140 • Asheville. NC 28806 •www.fbrmpo.org

Long-Range Transportation Plan •Transportation Improvement Program

Highway Planning • Bicycle and Pedestrian Planning • Transit Planning • Air Quality

Public Involvement

Criteria (Category in blue, components in

white) Party Description of Criterion Max Points

% of score

QUALITY GROWTH, SUSTAINABLE DEVELOPMENT, & ECONOMIC PROSPERITY

6.00 13.33%

Project Located Near Existing Jobs

MPO Staff

500' buffer of centerline touches TAZ with significant jobs: 0-149=1point , 150-405=2, 406 +=3 (based on statistical "natural breaks" algorithm)

3 6.67%

Located in High Job Growth Areas

MPO Staff

500' buffer of centerline touches TAZ with significant jobs forecast between 2010 and 2040: 0-149=1 point, 150-405=2, 406 +=3 (based on statistical "natural breaks" algorithm)

3 6.67%

MULTI-MODAL OPTIONS

4.00 8.89%

Bike Ped indicated in LRTP

MPO Staff

Project indicates bike/ped component in the LRTP highway project table, 0 point if not include 1 point if included

1 2.22%

Multimodal Options MPO Staff

Can achieve 1 point each (for a maximum of 3 total possible points) if: project is included in local or regional bike plan (1 point), pedestrian plan (1 point), or is on a transit fixed route or spine of deviated fixed route (1 point)

3 6.67%

CONGESTION MANAGEMENT

5.00 11.11%

In high volume corridor

MPO Staff

Scaled for Regional & Division (not Statewide) Tiers: over 30,000=3 points, 20-30k=2, 10-20k=1, under 10 =0

3 6.67%

Identified as CMP Hotspot/includes access man/ITS

MPO Staff

Projects in a CMP designated "Hot Spot" corridor = 2 points; Projects that are not in a hot spot but implement a congestion management strategy that is not adding a lane (e.g. ITS, access management)

2 4.44%

339 New Leicester Highway, Suite 140 • Asheville. NC 28806 •www.fbrmpo.org

Long-Range Transportation Plan •Transportation Improvement Program

Highway Planning • Bicycle and Pedestrian Planning • Transit Planning • Air Quality

Public Involvement

SAFETY & SECURITY

2.00 4.44%

Lane Width MPO Staff

Project addresses moving a deficient lane width closer to NCDOT current standard width. Any improvement toward the standard will get one point.

1 2.22%

Shoulder Width MPO Staff

Project addresses moving a deficient shoulder width closer to NCDOT current standard width. Any improvement toward the standard will get one point.

1 2.22%

FREIGHT & GOODS MOVEMENT

2.00 4.44%

Project improves Freight Route

MPO Staff

Project on a "shielded" NC, US, or Interstate route not on official network: 1 point, project on official NCDOT freight network: 2 points

2 4.44%

HEALTH & ENVIRONMENT

3.00 6.67%

Project Provides Increased Accessibility for Low-Income & Minority Communities

MPO Staff

Will use 5 Environmental Justice demographic variables by block group: population 65 plus, minority, low income, zero vehicle households and Low English Proficiency. Project must touch at least one qualifying block group to get points. Since most other criteria do not go to five points, the initial recommendation is to use a 3 point scale for this category: • Social Equity Index of 1 and Multi-modal Criteria of at least 1: Score of 0.5 • Social Equity Index of 2 and Multi-modal Criteria of at least 1: Score of 1 • Social Equity Index of 3 and Multi-modal criteria of at least 1: Score of 1.5 • Social Equity Index of 4 and Multi-modal criteria score of at least 1: Score of 2 • Social Equity Index of 5 and Multi-modal criteria of at least 1: Score of 3

3 6.67%

339 New Leicester Highway, Suite 140 • Asheville. NC 28806 •www.fbrmpo.org

Long-Range Transportation Plan •Transportation Improvement Program

Highway Planning • Bicycle and Pedestrian Planning • Transit Planning • Air Quality

Public Involvement

PROJECT HISTORY 23.00 51.11%

Identified as Top Local Priority (Primary Qualitative Criterion)

Local Representatives

County-level Transportation Advisory Committees will rank order projects and assign points in descending order with top priority getting 18 points until they run out of projects or run out of points. A one-page summary of the ranking methodology will be provided by each County-level TAC.

18 40.00%

Additional Planning or Preliminary Engineering & Design Conducted

Local Staff/MPO Staff

Recommendation was to give a point if any planning work beyond CTP/LRTP had been completed. Examples include Waynesville Main Street Studies, US 70 Corridor Study, Draft EIS for I-2513, et cetera. Local project sponsors will need to provide the documents if they are not readily evident to the MPO staff. Planning document (up to 8% design) is worth one point, full EIS or engineering to begin ROW or better =2 points

2 4.44%

LRTP Tier MPO Staff

Projects in the FBRMPO 2035 LRTP Tier I get three points, Tier II = 2, and Tier III = 1. Projects not in the LRTP get no points.

3 6.67%

339 New Leicester Highway, Suite 140 • Asheville. NC 28806 •www.fbrmpo.org

Long-Range Transportation Plan •Transportation Improvement Program

Highway Planning • Bicycle and Pedestrian Planning • Transit Planning • Air Quality

Public Involvement

SPOTID

TIP Route Description Cost to NCDOT

Running Total of $290 million

Runing total without Connector

SPOT Score

Local Score out of 45 points

Local as 15

Local TAC

H090364-A

U-2801A

US-25-ALT-Sweeten Creek Road

Widen to Multi-Lanes

27,300,000 262,700,000 262,700,000 27.07 36.79 12.26 Buncombe

H129600-B

I-2513B

I-26 Construct Multi-Lane Freeway, Part on New Location

229,000,000 33,700,000 262,700,000 36.71 35 11.67 Buncombe

H090831

US-276 Russ Avenue

Russ Avenue Corridor Improvements and Pedestrian/Bicycle Enhancements

17,753,000 $ 15,947,000

$ 244,947,000

19.35 34.29 11.43 Haywood

H141930

NC-81 Swannanoa River Road

Widen roadway to add capacity.

10,560,000 $ 5,387,000

$ 234,387,000

19.26 34 11.33 Buncombe

H090019-C

I-4400C

I-26 Add Additional Lanes.

32,060,000 -26,673,000 $ 202,327,000

25.86 32 10.67 Henderson

H090452-A

US-25 Merrimon Avenue

Improve intersection 233,000 -26,906,000 $ 202,094,000

55.15 31.93 10.64 Buncombe

H141467

US-70 Tunnel Road

ACCESS MANAGEMENT AND SPOT INTERSECTION IMPROVEMENTS; COORDINATE WITH BIKE PLAN

14,287,000 -41,193,000 $ 187,807,000

22.01 31.86 10.62 Buncombe

H090155-A

R-2588A

NC-191 US 25 in Hendersonville to NC 280 South of Mills River. Widen to Multi-Lanes. Section A: US 25 to SR 1381 (Mountain Road).

35,777,000 -76,970,000 $ 152,030,000

21.57 31.14 10.38 Henderson

339 New Leicester Highway, Suite 140 • Asheville. NC 28806 •www.fbrmpo.org

Long-Range Transportation Plan •Transportation Improvement Program

Highway Planning • Bicycle and Pedestrian Planning • Transit Planning • Air Quality

Public Involvement

H090019-B

I-4400B

I-26 Add Additional Lanes.

39,768,000 -116,738,000

$ 112,262,000

25.64 30.79 10.26 Henderson

H090452-B

US-25 Merrimon Avenue

Improve intersection 930,000 -117,668,000

$ 111,332,000

56.35 30.71 10.24 Buncombe

H090829

US-64 Blythe St. to Daniel Dr. and White Pine Dr. - Widening and Improvements, Laurel Park

7,191,000 -124,859,000

$ 104,141,000

23.45 29.57 9.86 Henderson

H090482

U-4712

US-23-BUS-South Main Street

SR 1164 (Hyatt Creek Road) to US 276. Widen to Multi-Lanes. Feasibility Study Underway

44,685,000 -169,544,000

$ 59,456,000

17.06 29.36 9.79 Haywood

H090019-A

I-4400A

I-26 Add Additional Lanes.

39,768,000 -209,312,000

$ 19,688,000

23.38 28.36 9.45 Henderson

H111158

NC-213 New Route

Construct Two-Lane Roadway on New Location

8,722,000 -218,034,000

$ 10,966,000

18.57 28 9.33 Madison

H111311

I-4409

I-40 Convert Grade Separation to interchange. Widen SR 2500 (Blue Ridge Road) to Three Lanes from US 70 to South of I-40 and Upgrade Roadway South of I-40 to SR 2713

5,800,000 -223,834,000

$ 5,166,000

21.26 27.57 9.19 Buncombe

H090155-B

R-2588B

NC-191 US 25 in Hendersonville to NC 280 South of Mills River. Widen to Multi-Lanes. Section B: SR 1381 (Mountain Road) to NC 280.

50,202,000 -274,036,000

-$45,036,000 21.98 27.43 9.14 Henderson

H111104

US-19 Modernize Roadway 8,664,000 -282,700,000

-$53,700,000 9.43 27 9.00 Haywood

339 New Leicester Highway, Suite 140 • Asheville. NC 28806 •www.fbrmpo.org

Long-Range Transportation Plan •Transportation Improvement Program

Highway Planning • Bicycle and Pedestrian Planning • Transit Planning • Air Quality

Public Involvement

H090274-A

R-4406A

US-19 , US-23

NC 215 in Canton to Multi-Lanes near NC 151. Widen to Multi-Lanes. (Coordinate with B-3656). Section A - NC 215 in Canton to SR 1836.

29,511,000 -312,211,000

-$83,211,000 11.43 26.93 8.98 Haywood

SPOTID TIP Route From / Cross Street

To Cost to NCDOT

Running Tally of

D13’s 200000000

Running Tally of

D14’s 220000000

SPOT Out of 50

Local Score out of 25

Local TAC

H090515 U-5019

- Wilma Dykeman Riverway

Amboy Road 2.2 Miles North on Riverside Drive

73,991,000 126,009,000 13.53 18.61 Buncombe

H090830 - New Route - Balfour Parkway

NC 191 (Brevard Road)

US 64 156,200,000 63,800,000 20.16 17.50 Henderson

H090491 U-4739

SR-3556 Amboy Road/Meadow Road

I-240 US 25 (Biltmore Avenue)

46,559,000 79,450,000 18.46 17.01 Buncombe

H140296 SR-1477 Riverside Drive

NC 251/SR 1781 Broadway

I-40/SR 1231 Hill Street

7,754,000 71,696,000 14.24 16.34 Buncombe

H141279 US-276 Jonathan Creek Road

US 19 I-40 11,960,000 51,840,000 7.28 15.62 Haywood

H111106 SR-1127 Kanuga Road

US 25 Business (Church Street)

SR 1123 (Little River Road)

10,146,000 41,694,000 13.30 15.39 Henderson

H090894 SR-1545 Old Airport Road

US 25 Mills Gap Road

2,166,000 39,528,000 16.16 15.34 Henderson

H140701 US-23-BUS-North Main, - Walnut St

US 276 Russ Avenue

2,550,000 36,978,000 9.81 15.28 Haywood

H142140 SR-2002 Riceville Road

US 70 (Tunnel Road)

SR 2285 (Clear Vista Lane)

1,875,000 69,821,000 16.09 14.84 Buncombe

H111093 SR-1783 Highland Lake Road

NC 225 US 176 2,622,000 34,356,000 11.88 14.40 Henderson

H090835 - New Route - Black Mountain Southeast Connector

NC 9 US 70 Business (Slate Street), SR 2522 (Mccoy

6,564,000 63,257,000 9.40 14.34 Buncombe

339 New Leicester Highway, Suite 140 • Asheville. NC 28806 •www.fbrmpo.org

Long-Range Transportation Plan •Transportation Improvement Program

Highway Planning • Bicycle and Pedestrian Planning • Transit Planning • Air Quality

Public Involvement

Cove Road)

H111001 SR-1170 White Street

SR 1171 (Willow Road)

US 176 (Spartanburg Highway)

7,201,000 27,155,000 12.97 14.34 Henderson

H111000 SR-1173 Plott Creek Road

SR 1175 (Will Hyatt Road)

Richland Creek Bridge East of Sulphur Springs Road

4,501,000 22,654,000 6.94 14.01 Haywood

H090799 SR-1631 New Route - Frontage Road

SR 1631 (Frontage Road)

NC 213 1,980,000 61,277,000 6.28 13.89 Madison

H090834 - Dellwood Drive/Miller Road

US 276 (Russ Avenue)

Miller Road 18,405,000 4,249,000 14.09 13.79 Haywood

H142129 SR-3116 Mills Gap Road

US 25 (Hendersonville Road)

SR 3157 (Weston Road)

3,025,000 42,872,000 15.38 13.68 Buncombe

H090801 SR-1354 Bruce Road

SR 1609 (South Main Street)

SR 1353 (Riddle Hill Road),

342,000 42,530,000 0.39 13.39 Madison

H090870 SR-3449 Beaverdam Road

US 25 (Merrimon Avenue)

Webb Cove Road

5,814,000 36,716,000 10.58 13.07 Buncombe

H090876 SR-1592 Beaverdam Road

NC 215 (Champion Drive)

Cherry Street

798,000 3,451,000 6.21 13.01 Haywood

H142044 SR-2435 Old US 70

US 70 US 70 W. State St.

7,574,000 29,142,000 12.30 12.08 Buncombe

H090897 SR-1352 Butler Bridge Road

SR 1345 (Jeffries Road)

Hollobrooke Parkway

684,000 2,767,000 0.00 11.86 Henderson

H140280 SR-1172 Hebron Road

Lake Avenue SR 1164 State Street

592,000 2,175,000 3.38 11.68 Henderson

H142095 SR-3032 New Haw Creek Road

US 70 (Tunnel Road)

SR 2289 (Huntington Chase Drive)

3,896,000 25,246,000 10.33 11.58 Buncombe

H111003 - State Street SR 1172 (Hebron Road)

SR 1127 (Kanuga Road)

5,966,000 -3,791,000 6.69 11.24 Henderson

H090364-A

U-2801A

US-25-ALT-Sweeten Creek Road

US 25 (Hendersonville Road)

SR 3081 (Rock Hill Road)

27,300,000 -2,054,000 22.68 11.11 Buncombe

339 New Leicester Highway, Suite 140 • Asheville. NC 28806 •www.fbrmpo.org

Long-Range Transportation Plan •Transportation Improvement Program

Highway Planning • Bicycle and Pedestrian Planning • Transit Planning • Air Quality

Public Involvement

SPOT ID TIP Route From / Cross Street To Description

H090452-B US-25 Merrimon Avenue

Edgewood Rd Improve intersection

H090452-A US-25 Merrimon Avenue

W. T. Weaver Blvd. Improve intersection

H140972

NC-107 East Main Street, US-23-BUS-West Main Street, US-23-BUS-Asheville Highway

SR 1449 (Cope Creek Road)

SR 1783 (Council Circle)

Widen roadway to include bicycle lanes, standard lane widths, raised median; upgrade traffic signals for two-phase coordinated operation, proved bulb-outs for U-turns.

H129600-B I-2513B I-26 North of SR 3548 (Haywood Road)

US 19/23/70 Construct Multi-Lane Freeway, Part on New Location

H141130 I-40 Jamestown Road Upgrade Interchange 100 at I-40 and Jamestown Road (SR 1142)

H090042 I-5009 I-40 US 64 (Burkemont Road)

interchange Improvements.

339 New Leicester Highway, Suite 140 • Asheville. NC 28806 •www.fbrmpo.org

Long-Range Transportation Plan •Transportation Improvement Program

Highway Planning • Bicycle and Pedestrian Planning • Transit Planning • Air Quality

Public Involvement

SPOT ID TIP Route From / Cross Street To Description

H090452-B US-25 Merrimon Avenue

Edgewood Rd Improve intersection

H090452-A US-25 Merrimon Avenue

W. T. Weaver Blvd. Improve intersection

H140972

NC-107 East Main Street, US-23-BUS-West Main Street, US-23-BUS-Asheville Highway

SR 1449 (Cope Creek Road)

SR 1783 (Council Circle)

Widen roadway to include bicycle lanes, standard lane widths, raised median; upgrade traffic signals for two-phase coordinated operation, proved bulb-outs for U-turns.

H141130 I-40 Jamestown Road Upgrade Interchange 100 at I-40 and Jamestown Road (SR 1142)

H090042 I-5009 I-40 US 64 (Burkemont Road)

interchange Improvements.

H111006 R-5600 NC-107 US 23 Business NC 116

Upgrade to Boulevard Facility with Median, Improve intersections, Construct Access Management Improvements

H090364-A U-2801A US-25-ALT-Sweeten Creek Road

US 25 (Hendersonville Road)

SR 3081 (Rock Hill Road)

Widen to Multi-Lanes

H090298-B R-4745B - New Route - NC 107 Connector

West of Cope Creek

US 23/74 East of Sylva

Construct Multi-Lanes on New Location.

H090298-A R-4745A - New Route - NC 107 Connector

NC 107 East of Sylva

West of Cope Creek

Construct Multi-Lanes on New Location.

339 New Leicester Highway, Suite 140 • Asheville. NC 28806 •www.fbrmpo.org

Long-Range Transportation Plan •Transportation Improvement Program

Highway Planning • Bicycle and Pedestrian Planning • Transit Planning • Air Quality

Public Involvement

H090019-C I-4400C I-26 US 25 Business NC 280 Add Additional Lanes.

H090019-B I-4400B I-26 US 64 US 25 Business Add Additional Lanes.

H090829 US-64 SR 1180 (Blythe Street)

SR 1173 (White Pine Drive), SR 1186 (Daniel Drive)

Blythe St. to Daniel Dr. and White Pine Dr. - Widening and Improvements, Laurel Park

SPOT ID

TIP Route From / Cross Street

To Description Cost to

NCDOT

$ 200,000

,000

SPOT

Score

(Out of 50)

MPO 18@25

Combined Score

First County

H090491

U-4739

SR-3556 Amboy Road/Meadow Road

I-240 US 25 (Biltmore Avenue)

I-240 to US 25 (Biltmore Avenue). Widen to Multi- Lanes with New Bridge Over the French Broad River.

$ 46,559,

000

$ 153,441

,000

18.46 25 43.46 Buncombe

339 New Leicester Highway, Suite 140 • Asheville. NC 28806 •www.fbrmpo.org

Long-Range Transportation Plan •Transportation Improvement Program

Highway Planning • Bicycle and Pedestrian Planning • Transit Planning • Air Quality

Public Involvement

H142140

SR-2002 Riceville Road

US 70 (Tunnel Road)

SR 2285 (Clear Vista Lane)

Upgrade to NCDOT standards and add turn lanes and signals where needed to improve safety.

$ 1,875,0

00

$ 151,566

,000

16.09 25 41.09 Buncombe

H142129

SR-3116 Mills Gap Road

US 25 (Hendersonville Road)

SR 3157 (Weston Road)

Upgrade existing roadway to NCDOT standards and add turn lanes and signals where needed to increase safety.

$ 3,025,0

00

$ 148,541

,000

15.38 25 40.38 Buncombe

H140296

SR-1477 Riverside Drive

NC 251/SR 1781 Broadway

I-40/SR 1231 Hill Street

widen to 2-4 lanes w/ median or 3 lane with parallel parking; This is the section of the on-street Wilma Dykeman Riverway north of the River Arts District in Asheville

$ 7,754,0

00

$ 140,787

,000

14.24 25 39.24 Buncombe

H090515

U-5019

- Wilma Dykeman Riverway

Amboy Road

2.2 Miles North on Riverside Drive

US 70 to Broadway (SR 1781), Widen to 2 Or 4 Lanes with Median Or 3-Lane Section with Parallel Parking, 9.0 Miles.

$ 73,991,

000

$ 66,796,

000

13.53 25 38.53 Buncombe

339 New Leicester Highway, Suite 140 • Asheville. NC 28806 •www.fbrmpo.org

Long-Range Transportation Plan •Transportation Improvement Program

Highway Planning • Bicycle and Pedestrian Planning • Transit Planning • Air Quality

Public Involvement

H090870

SR-3449 Beaverdam Road

US 25 (Merrimon Avenue)

Webb Cove Road

Beaverdam Road Upgrade and Pedestrian

$ 5,814,0

00

$ 60,982,

000

10.58 25 35.58 Buncombe

H090835

- New Route - Black Mountain Southeast Connector

NC 9 US 70 Business (Slate Street), SR 2522 (Mccoy Cove Road)

Black Mountain Southeast Connector - New Route

$ 6,564,0

00

$ 54,418,

000

9.40 25 34.40 Buncombe

H090799

SR-1631 New Route - Frontage Road

SR 1631 (Frontage Road)

NC 213 I-26/Hwy 213 interchange - Connect Frontage Road to Highway 213 Or I-26 Exit.

$ 1,980,0

00

$ 52,438,

000

6.28 25 31.28 Madison

H090832

I-240 US 25 (Merrimon Avenue)

I-240/Merrimon Avenue - interchange Redesign.

$ 31,404,

000

$ 21,034,

000

26.23 26.23 Buncombe

H140327

US-25 McDowell Street

SR 3214 Biltmore Ave

US 25 Southside Ave

Access Management, spot intersection, and other operational improvements.

$ 30,674,

000

$ (9,640,0

00)

25.51 25.51 Buncombe

H090801

SR-1354 Bruce Road

SR 1609 (South Main Street)

SR 1353 (Riddle Hill Road),

Upgrade and Widen near Main Street in Mars Hill - Project Ends at Mars Hill Elementary School Driveway, Approximately 2500 Ft from

$ 342,00

0

$ (9,982,0

00)

0.39 25 25.39 Madison

339 New Leicester Highway, Suite 140 • Asheville. NC 28806 •www.fbrmpo.org

Long-Range Transportation Plan •Transportation Improvement Program

Highway Planning • Bicycle and Pedestrian Planning • Transit Planning • Air Quality

Public Involvement

Start of Project

H090486-B

U-4715B

Asheville Signal System

Asheville Signal System - Citywide Signal Improvements.

$ 12,100,

000

$ (22,082,

000)

24.13 24.13 Buncombe

H141130

I-40 Jamestown Road

Upgrade Interchange 100 at I-40 and Jamestown Road (SR 1142)

$ 2,175,0

00

$ (24,257,

000)

23.91 23.91 Burke

H090364-A

U-2801A

US-25-ALT-Sweeten Creek Road

US 25 (Hendersonville Road)

SR 3081 (Rock Hill Road)

Widen to Multi-Lanes

$ 27,300,

000

$ (51,557,

000)

22.68 22.68 Buncombe

H090042

I-5009

I-40 US 64 (Burkemont Road)

interchange Improvements.

$ 1,160,0

00

21.28 21.28 Burke

H129600-A

I-2513A

I-26 North of I-26/I-40 Split

North of SR 3548 (Haywood Road)

Add Additional Lanes.

$ 112,100,000

20.07 20.07 Buncombe

H141872

I-40 US 25 (Hendersonville Road)

Upgrade interchange - EB ramp

$ 540,00

0

19.82 19.82 Buncombe

H141876

I-40 US 25A (Sweeten Creek Road)

Upgrade interchange - EB ramp

$ 15,660,

000

19.46 19.46 Buncombe

339 New Leicester Highway, Suite 140 • Asheville. NC 28806 •www.fbrmpo.org

Long-Range Transportation Plan •Transportation Improvement Program

Highway Planning • Bicycle and Pedestrian Planning • Transit Planning • Air Quality

Public Involvement

SPOT ID

TIP Route From / Cross Street

To Description Cost

to NCDOT

$ 220,000

,000

SPOT Score (Out

of 50)

MPO 18@25

Combined

First County

H090830

- New Route - Balfour Parkway

NC 191 (Brevard Road)

US 64

Balfour Parkway - Construct New 4-Lane Expressway, Hendersonville

$ 156,200

,000

$ 63,800,

000

20.16 25 45.16 Henderson

H090894

SR-1545 Old Airport Road

US 25 Mills Gap Road

Widening and Improvements

$ 2,166,0

00

$ 61,634,

000

16.16 25 41.16 Henderson

H090834

- Dellwood Drive/Miller Road

US 276 (Russ Avenue)

Miller Road

Dellwood Road - Widening, Part on New Location

$ 18,405,

000

$ 43,229,

000

14.09 25 39.09 Haywood

H111106

SR-1127 Kanuga Road

US 25 Business (Church Street)

SR 1123 (Little River Road)

Improve Geometrics and Widen As Appropriate

$ 10,146,

000

$ 33,083,

000

13.30 25 38.30 Henderson

H111001

SR-1170 White Street

SR 1171 (Willow Road)

US 176 (Spartanburg Highway)

White Street Realignment & Extension; Construct 3-Lane Connector; intersection Realignment, and Improvements at NC 225/US 176, .5Mi

$ 7,201,0

00

$ 25,882,

000

12.97 25 37.97 Henderson

339 New Leicester Highway, Suite 140 • Asheville. NC 28806 •www.fbrmpo.org

Long-Range Transportation Plan •Transportation Improvement Program

Highway Planning • Bicycle and Pedestrian Planning • Transit Planning • Air Quality

Public Involvement

H111093

SR-1783 Highland Lake Road

NC 225 US 176

Construct 24' Paved Roadway with 4' Paved Shoulders and 6' Grass Shoulders

$ 2,622,0

00

$ 23,260,

000

11.88 25 36.88 Henderson

H140701

US-23-BUS-North Main, - Walnut St

US 276 Russ Avenue

Upgrade Roadway and spot intersection improvements; Realign Walnut St/N. Main intersection (the northern one) per N. Main St Corridor Study

$ 2,550,0

00

$ 20,710,

000

9.81 25 34.81 Haywood

H141279

US-276 Jonathan Creek Road

US 19 I-40

Install paved shoulders on the median and outside shoulders with rumble strips. Construct or upgrade left turn lanes at various crossovers.

$ 11,960,

000

$ 8,750,0

00

7.28 25 32.28 Haywood

H111000

SR-1173 Plott Creek Road

SR 1175 (Will Hyatt Road)

Richland Creek Bridge East of Sulphur Springs Road

Upgrade Roadway to Improve Safety, Reduce Congestion and Provide Pedestrian Facilities.

$ 4,501,0

00

$ 4,249,0

00

6.94 25 31.94 Haywood

339 New Leicester Highway, Suite 140 • Asheville. NC 28806 •www.fbrmpo.org

Long-Range Transportation Plan •Transportation Improvement Program

Highway Planning • Bicycle and Pedestrian Planning • Transit Planning • Air Quality

Public Involvement

H140972

NC-107 East Main Street, US-23-BUS-West Main Street, US-23-BUS-Asheville Highway

SR 1449 (Cope Creek Road)

SR 1783 (Council Circle)

Widen roadway to include bicycle lanes, standard lane widths, raised median; upgrade traffic signals for two-phase coordinated operation, proved bulb-outs for U-turns.

$ 11,951,

000

$ (7,702,0

00)

25.25 25.25 Jackson

H111006

R-5600

NC-107 US 23 Business

NC 116

Upgrade to Boulevard Facility with Median, Improve intersections, Construct Access Management Improvements

$ 21,278,

000

$ (28,980,

000)

22.39 22.39 Jackson

H090019-C

I-4400C

I-26 US 25 Business

NC 280 Add Additional Lanes.

$ 32,060,

000

$ (61,040,

000)

20.18 20.18 Henderson

H090019-B

I-4400B

I-26 US 64 US 25 Business

Add Additional Lanes.

$ 39,768,

000

$ (100,808,000)

20.05 20.05 Henderson

H090829

US-64 SR 1180 (Blythe Street)

SR 1173 (White Pine Drive), SR 1186 (Daniel Drive)

Blythe St. to Daniel Dr. and White Pine Dr. - Widening and Improvements, Laurel Park

$ 7,191,0

00

$ (107,999,000)

19.80 19.80 Henderson

339 New Leicester Highway, Suite 140 • Asheville. NC 28806 •www.fbrmpo.org

Long-Range Transportation Plan •Transportation Improvement Program

Highway Planning • Bicycle and Pedestrian Planning • Transit Planning • Air Quality

Public Involvement

H090019-A

I-4400A

I-26 US 25 US 64 Add Additional Lanes.

$ 39,768,

000

$ (147,767,000)

18.44 18.44 Henderson

H140274

US-64 Brevard Road

SR 1312 South Rugby Road

SR 1186 Daniel Drive

Add TWLTL; possible multi-lanes

$ 15,126,

000 18.42 18.42 Henderson

1. Prioritize the maintenance of existing facilities 2. Plan for and construct a regional public transportation system. 3. Integrate quality of life into planning, project design, and decision-making. 4. Promote regional connectivity and character. 5. Emphasize project delivery, project design, and impact analysis. 6. Consider and involve and all users of the transportation system at a regional, municipal,

and neighborhood level. 7. Develop methods for managing congestion on existing corridors. 8. Increase safety and security for all modes of transportation. 9. Promote livable communities that feature access to affordable housing, more

transportation options, and lower transportation costs while protecting the environment.

RESOLUTION

French Broad River Metropolitan Planning Organization

RESOLUTION TO AMEND THE NEW FREEDOM GRANT FUNDING

WHEREAS, French Broad River Metropolitan Planning Organization has held a competitive call for FTA 5316

(JARC) and FTA 5317 (New Freedom) projects in March of 2012; and

WHEREAS, French Broad River Metropolitan Planning Organization JARC New Freedom Selection Committee

reviewed the applications and recommended full funding of all four applications; and

WHEREAS, FBRMPO Board (TAC) has approved the funding of four applicants for FTA 5316 (JARC) and FTA 5317

(New Freedom) at its April 12, 2012 meeting and further updated the funding amounts during its September 27,

2012 meeting; and

WHEREAS, one of the previously approved New Freedom grant applicants, Customer Inspired Services, is no

longer in business and $23,000 in New Freedom funds remain unutilized; and

WHEREAS, the City of Hendersonville was the only other approved New Freedom grant applicant during the

2012 call for projects and would be able to utilize the extra $23,000 in New Freedom funding to expand the

scope of its original grant application;

NOW THEREFORE BE IT RESOLVED BY THE FRENCH BROAD RIVER METROPOLITAN PLANNING ORGANIZATION

to amend the FTA 5317 (New Freedom) application to increase the City of Hendersonville FTA 5317 New

Freedom funding amount by $23,000, with the amended funding amount listed in the table below:

ADOPTED: June 26, 2014

______________________________________________

Jan Davis, Chair

French Broad River Metropolitan Planning Organization

_________________________________________

Attest:

RESOLUTION

French Broad River Metropolitan Planning Organization

RESOLUTION TO ADOPT AMENDMENTS TO THE 2012-2020 METROPOLITAN TRANSPORTATION

IMPROVEMENT PROGRAM (TIP)

WHEREAS, the French Broad River MPO Board (Transportation Advisory Committee) has adopted the

2012-2020 Transportation Improvement Program on October 27, 2011

WHEREAS, the FBRMPO Board (Transportation Advisory Committee) has reviewed the proposed

amendments and modifications that are listed below and finds them satisfactory for addition to the TIP;

and

WHEREAS, these TIP amendments have been advertised from June 4th

through June 25th for public

comment and have been discussed during the MPO TCC and MPO Board meetings on June 12thth

and

June 26, 2014, with an opportunity for public comment;

WHEREAS, these changes are in agreement with the FBRMPO LRTP and keep the TIP in agreement

with the STIP;

NOW THEREFORE, BE IT RESOLVED that the Board of the French Broad River Metropolitan

Planning Organization hereby adopts the following amendments and modifications to the 2012-2020

Transportation Improvement Program:

ADOPTED: This the 22nd day of May, 2014.

Jan Davis, Board Chair

French Broad River Metropolitan Planning Organization

County of Buncombe :

: ss

State of North Carolina :

Subscribed to before me on this the _____ day of _______, 2014.

Notary Public: ___________________________________________