2015-2020 STRATEGIC PLAN 2015-2020 STRATEGIC PLAN AND ANNUAL PERFORMANCE AND ANNUAL PERFORMANCE PLAN PLAN
24 March 2015PORTFOLIO COMMITTEE – PMTE APP AND SPM Govender
2
1. MISSION & VISION
MissionThe pre-eminent accommodation and real-estate management service provider for National Government
VisionTo optimize the State’s immovable asset portfolio through innovative and best practice approaches to ensure competent, proficient and sustainable service delivery by :•Reducing the cost to Government on leased-in accommodation and maximising returns on leased-out accommodation;•partnering the private sector for property financing and delivery options / strategies;•streamlining the value chain business improvement policy approaches and strategic alignments; and•utilising alternative energy solutions and green management technology for enhanced efficiency cost savings.
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
3
2. VALUES
The PMTE’s core values are underpinned by the Batho Pele principles, and are augmented by the following values:
•Integrity: by consistently honouring our commitments, upholding ethical, honest behaviour and transparent communication;
•Professionalism: by treating our stakeholders with respect and reliably delivering against expectations;
•Teamwork: by respecting diversity while sharing a common purpose and working together in cooperation with each other; and
•Innovation: by tirelessly seeking opportunities for service delivery improvement by thinking freely and not bound by old, non-functional, or limiting structures, rules, or practices.
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
4
3. PMTE FOCUS• To improve service delivery in the context of Government’s
priorities and to save costs to the Department and the fiscus by:o Maintaining the value of Government’s assetso Improving access to and quality of Government’s assetso Optimal utilisation of State stock and move away from leasing-ino Utilise State’s vacant properties productively to create a funding
stream for capital maintenance and improvements to extend the life-cycle of existing state properties;
• To reclaim mandate of Public Works o develop small proclaimed and unproclaimed harbourso develop Government precincts in small towns and rural areaso safeguarding the State’s assets from vandalism, theft and
invasiono reclaiming all misappropriated State lando preserve Government assets, structures, building, land parcels
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
5
3. PMTE FOCUS (Cont…)
• Leverage the State’s property portfolio to contribute towards skills development – FM Service Centres (Workshops)
• Leverage the State’s property portfolio to create employment (FM Service Centres, COOPS, Turnkey Solutions procurement);
• Leverage the State’s property portfolio to empower emerging black business (REMS & FM divisions - targeting SMMEs for unutilised state owned properties and/or maintenance/refurbishment projects)
• Ensure water & electricity supply security through sound investment decisions that meets conservation and renewable energy targetso Smart Meter Installations, o Renewable energy (e.g. solar geysers) o Energy audits, monitoring, reporting and verificationo Capacity Building and Training – Energy Efficiency Basicso Retrofitting
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
6
4. PMTE STRATEGIC GOALS & GOAL STATEMENTS
STRATEGIC GOAL GOAL STATEMENT
1. To effectively and efficiently manage the life cycle of immovable assets under the custodianship of Public Works.
Optimise the utilisation and value of the State’s assets that fall under the custodianship of the Minister of Public Works and provide a client-centric professional property and facilities management services to meet user departments’ accommodation requirements and save costs to the State.
2. Good corporate governance to support effectual service delivery
Provide strategic leadership in ensuring effective governance, sound resource management and integrity of the operations of the entity.
3. To promote economic growth through integrated infrastructure development in urban and rural areas.
Improved land administration and integrated planning for small harbour development and building government precincts in cities, small towns and rural areas.
7
4. PMTE STRATEGIC GOALS & GOAL STATEMENTS (Cont…)
STRATEGIC GOAL GOAL STATEMENT4. To create employment
opportunities and develop skills in the provision of construction, property and facilities management services to the State
Lead and coordinate the creation of additional employment opportunities through labour intensive delivery methods (construction, property and facilities management) and skills development programmes for the participation of the unemployed in delivering needed services
5. To leverage the State’s property portfolio to contribute towards Government’s broader transformation, empowerment and economic development goals.
Empower emerging black business and bridge service delivery gaps through meaningful engagements with small business and other relevant stakeholders in the property and construction sector by targeting and engaging SMME’s to provide property and facilities management services for the unutilized and derelict state properties.
8
5. ALIGNMENT OF STRATEGIC GOALS WITH BROADER POLICY PRIORITIES
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
MTSF PRIORITY OVER-ARCHING
STRATEGIC THEMESNATIONAL OUTCOME STRATEGIC GOAL
PRO-GRAMM
E
Improving Service Delivery
12 : An efficient and effective development-oriented Public Service
1: to optimise the utilisation and value of the State’s assets that fall under the custodianship of the Minister of Public Works and provide client-centric professional property and facilities management services to meet user-departments’ accommodation requirements
2, 4, 5, 6
2. Good corporate governance to support effectual service delivery
1
6: An efficient, competitive and responsive infrastructure network
3: To promote economic growth through integrated planning and delivery of infrastructure projects through small harbour development and building government precincts in cities small towns and rural areas.
2, 3, 4, 5, 6
7: Vibrant, equitable, sustainable rural communities contributing towards food security for all.
9
5. ALIGNMENT OF STRATEGIC GOALS WITH BROADER POLICY PRIORITIES
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
MTSF PRIORITY OVER-ARCHING
STRATEGIC THEMESNATIONAL OUTCOME STRATEGIC GOAL
PRO-GRAM
ME
Radical Economic transformation
4: Decent employment through inclusive economic growth
4: The creation of employment opportunities and the development of skills in the provision of construction, property and facilities management services to the State
3, 4, 6
5: A skilled and capable workforce to support an inclusive growth path14: a better South Africa contributing to a batter Africa and a better world
5: To contribute towards Government’s broader transformation empowerment and economic development goals through meaningful engagements with small business and relevant stakeholders in the property and construction sector
3,4,6
10
6. EXTERNAL ENVIRONMENT
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
1. The expected performance of the South African economy and the need to expedite economic growth through the implementation of the NDP.
2. An overall view of the South African Property Sector and the implications for the PMTE.
3. The Construction sector, the challenges in infrastructure development and the PMTE’s role in addressing these issues.
4. Trends in the formal and informal employment sector.
5. Current electrical and water supply challenges in South Africa and possible water and energy saving initiatives.
6. Trends in the political environment and emerging drivers of politics for the next five years.
11
7. BUDGET ALLOCATION SUMMARY PER PROGRAMME
Programmes
Adjusted appropriati
on
Medium-term expenditure estimate
2014/15 2015/16 2016/17 2017/18
(R’000) (R’000) (R’000) (R’000)
Administration 9 150 1 009 137 1 058 668 1 108 073
Real Estate Investment Management
- 107 021 112 007 126 080
Construction Project Services 35 583 465 962 485 693 523 864
Real Estate Management Services 5 121 173 5 720 352 6 152 426 6 633 046
Real Estate Information and Registry Services
720 000 1 662 469 1 664 749 1 670 325
Facilities Management Services - 2 803 656 2 812 980 2 919 291
Total 8 596 42111 768
59712 286
52312 980
679
12
8. BUDGET ALLOCATION SUMMARY PER ECONOMIC CLASSIFICATION
Economic classification
Adjusted appropriation
Medium-term expenditure estimate
2014/15 2015/16 2016/17 2017/18
(R’000) (R’000) (R’000) (R’000)
Current payments 6 577 362 8 724 577 9 112 479 9 664 874
Compensation of employees - 1 288 773 1 369 234 1 474 350
Goods and services 6 541 656 7 398 875 7 705 008 8 150 877
Damages and losses 20 000 20 000 20 000 20 000 Interest, dividends and rent on land
15 716 16 929 18 237 19 647
Transfers and subsidies 960 162 1 056 178 1 161 796 1 277 976
Provinces and municipalities 960 162 1 056 178 1 161 796 1 277 976
Payments for capital assets 3 495 864 4 932 916 5 415 670 5 770 304Buildings and other fixed structures
3 495 864 4 902 223 5 378 256 5 731 995
Machinery and equipment - 30 693 37 414 38 309Software and other intangible assets
- - - -
Total 11 033 388 14 713 671 15 689 945 16 713 154
13
PART BPROGRAMME STRUCTURE
13
14
5. PROGRAMME STRUCTURE
PROGRAMME SUB-PROGRAMME1. Administration A Management Leadership
B Operations Support Management (COO)
C Financial and Accounting Management
D Supply Chain Management
2. Real Estate Investment
Management
A User Demand Management
B Planning and Precinct Development Services
C
Property Performance Management
Investment Analysis
2. Construction Project
Management
A Construction Project PlanningB Construction Project Management
2. Real Estate Management A Management of Freehold Property
Land Administration & Management
B Surplus Freehold (Revenue) Management
Leasehold Management
2. Real Estate Information &
Registry Services
A Asset Registry Services
Conveyancing
2. Facilities Management A Scheduled Maintenance SHERQ Management
B Unscheduled Maintenance Management
PURPOSE: Provide leadership, strategic management, governance and administrative support to the PMTE
PROGRAMME 1: ADMINISTRATION
16
PROGRAMME 1: ADMINISTRATIONStrategic Objectives and Strategic Plan Targets
17
PROGRAMME 1: ADMINISTRATIONPerformance indicators and annual targets for 2015/16 -2017/18
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
18
PROGRAMME 1: ADMINISTRATIONPerformance indicators and annual targets for 2015/16 -2017/18
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
Performance Indicator Medium-Term Targets2015/16 2016/17 2017/18
1.2.B OPERATIONS SUPPORT MANAGEMENT4 Percentage of time the network is available
for business use 92% 94% 96%
5 Percentage of ICT infrastructure available for business use
92% 94% 96%
6 Percentage of ICT SLA commitments achieved (Business Applications)
60% 70% 80%
7 Percentage of legal opinions and contracts formulated within 5 working days of request
60% 70% 80%
8 Percentage reduction in vacancy rate 25% Reduction in vacancy Rate
25% Reduction in vacancy Rate
25% Reduction in vacancy Rate
9 Percentage of Staff developed on specialised skills
50% 60% 70%
19
PROGRAMME 1: ADMINISTRATIONPerformance indicators and annual targets for 2015/16 -2017/18
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
Performance Indicator Medium-Term Targets2015/16 2016/17 2017/18
1.2.C FINANCIAL AND ACCOUNTING MANAGEMENT10 Percentage of invoices paid
within 30 days of receipt80% 90% 100%
11 Percentage reduction in the debtors balance (1.8billion as at 1st April 2014)
20% of 1.8billion 20% of 1.8billion 20% of 1.8billion
12 Percentage recovery in the debtors current year balance
90% 92% 94%
13 Estimate of National Expenditure (ENE) supporting documents (database and narrative) submitted within regulated timeframes to National Treasury
ENE supporting documents (database and narrative) submitted within regulated timeframes to National Treasury
ENE supporting documents ( database and narrative) submitted within regulated timeframes to National Treasury
ENE supporting documents (database and narrative) submitted within regulated timeframes to National Treasury
20
PROGRAMME 1: ADMINISTRATIONPerformance indicators and annual targets for 2015/16 -2017/18
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
Performance Indicator Medium-Term Targets2015/16 2016/17 2017/18
1.2.D SUPPLY CHAIN MANAGEMENT14 Percentage of bids awarded within
56 working days of tender closure 50% 60% 70%
15 110.% (market related price + 10% preferential premium) achieved in purchasing goods, services or works
140% 130% 110%
16 Average variation on all contracts executed
10% 7.5% 5%
PROGRAMME 2: REAL ESTATE INVESTMENT MANAGEMENT
PURPOSE: To achieve an efficient and competitive Real Estate Portfolio for the State through effective planning, analysis and informed investments.
22
PROGRAMME 2: REAL ESTATE INVESTMENT SERVICESStrategic Objectives and Strategic Plan Targets
23
PROGRAMME 2: REAL ESTATE INVESTMENT SERVICESPerformance indicators and annual targets for 2015/16 -2017/18
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
Performance Indicator Medium-Term Targets2015/16 2016/17 2017/18
2.2.A. USER DEMAND MANAGEMENT1 Number of completed User Asset
Management Plans (UAMP’s) for user departments
42 UAMPs for 2017/18
42 UAMPs for 2018/19
42 UAMPs for 2019/20
2 Number of Service Level Agreements developed in line with new Service Delivery Standards (SDS) Percentage of Service Level Agreements managed in line with new Service Delivery Standards (SDS)
51 SLA’s developed
100% managed
100% managed
3 Percentage of user departments Framework Agreements concluded for the use of freehold properties
80 - 100% 80 - 100% 80 - 100%
24
PROGRAMME 2: REAL ESTATE INVESTMENT SERVICESPerformance indicators and annual targets for 2015/16 -2017/18
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
Performance Indicator Medium-Term Targets2015/16 2016/17 2017/18
2.2.B PLANNING AND PRECINCT (SPATIAL) DEVELOPMENT SERVICES4 Number of Precinct development
proposals produced for Head Offices in Tshwane
2 2 3
5 Number of Precinct development proposals produced for metros and district municipalities
2 2 2
6 Number of Precinct development proposals produced for local/rural municipalities
2 4 4
25
PROGRAMME 2: REAL ESTATE INVESTMENT SERVICESPerformance indicators and annual targets for 2015/16 -2017/18
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
Performance Indicator Medium-Term Targets2015/16 2016/17 2017/18
2.2.C INVESTMENT MANAGEMENTINVESTMENT ANALYSIS
7 Percentage increase in the value of the immovable asset portfolio
2% 2% 2%
8 Percentage of preliminary investment decisions approved within 3 months from date of request
75% 80% 85%
9 Percentage of investment solutions for construction approved within 24 months from date of request
75% 80% 85%
10 Percentage of investment solutions for refurbishments approved within 6 months from date of request
75% 80% 85%
11 Percentage of investment solution for leasehold and surplus freehold approved within 1 month from date of request
75% 80% 85%
12 Number of initiatives for social and economic development approved within 12 months
2 2 2
26
PROGRAMME 2: REAL ESTATE INVESTMENT SERVICESPerformance indicators and annual targets for 2015/16 -2017/18
STRATEGIC PLAN - PMTE
Performance Indicator Medium-Term Targets
2015/16 2016/17 2017/18
13 Percentage of Disposal Certificates of Approval issued within 6 Months from date of request
80% 90 % 100%
14 Number of vacant free hold properties approved for re development by BBBEE developers
80 - 100 80 - 100 80 - 100
15 Percentage of investment decisions approved to support Operation Phakisa (mari/aquaculture projects) within 3 months from date of request**
60-80% 90% 100%
16 Percentage of investment decisions approved on proclaimed fishing harbours infrastructure within 9 months from date of request **
60-80% 90% 100%
PROPERTY PERFORMANCE MANAGEMENT ( RESEARCH)17 Report on the performance of identified buildings against
the mean for the year in the 9 listed performance areas3 reports 4 reports 4 reports
18 Number of freehold and leasehold buildings measured against industry standards
Report on performance
Report on performance
Report on performance
PURPOSE: To provide effective and efficient delivery of accommodation needs for DPW and User Departments through construction
PROGRAMME 3:CONSTRUCTION PROJECT MANAGEMENT
28
PROGRAMME 3: CONSTRUCTION PROJECT MANAGEMENTStrategic Objectives and Strategic Plan Targets
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
29
PROGRAMME 3: CONSTRUCTION PROJECT MANAGEMENTPerformance indicators and annual targets for 2015/16 -2017/18
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
Performance Indicator Medium-Term Targets2015/16 2016/17 2017/18
3.2.A. CONSTRUCTION PROJECT PLANNING1. Number of work opportunities created
through construction projects (EPWP )15000 15000 15000
3.2.B. CONSTRUCTION PROJECT MANAGEMENT
2 Number of projects completed within agreed construction period
62 projects of 103
27 projects of 41 10 projects of 14
3 Number of projects completed within approved budget
77 projects of 103
21 projects of 26 4 projects of 5
4 Number of projects in the current WCS project list cleared
271 projects of 542
108 projects of 271
16 projects of 163
5 Percentage of construction contracts allocated towards BBBEE
35% 40% 45%
30
PROGRAMME 3: CONSTRUCTION PROJECT MANAGEMENTPerformance indicators and annual targets for 2015/16 -2017/18
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
Performance Indicator Medium-Term Targets2015/16 2016/17 2017/18
3.2.C SPECIAL PROJECTS6 Number of schools completed
within planned construction period774 144
7 Number of Work Opportunities Created*
3870 720
PROGRAMME 4: REAL ESTATE MANAGEMENT SERVICES
PURPOSE: To timeously provide and manage suitable accommodation in support of Client needs to meet their service delivery objectives
32
PROGRAMME 4: REAL ESTATE MANAGEMENT SERVICESStrategic Objectives and Strategic Plan Targets
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
33
PROGRAMME 4: REAL ESTATE MANAGEMENT SERVICESPerformance indicators and annual targets for 2015/16 -2017/18
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
Performance indicator
Medium-Term Targets2015/16 2016/17 2017/18
4.2.A MANAGEMENT OF FREEHOLD PROPERTY & LAND ADMINISTRATION AND MANAGEMENT1 Percentage occupancy rate increased for
partially occupied property5% 10% 15%
2 Number of vacant land (Land Parcels) let out towards economic development initiatives
100 200 300
4.2.B SURPLUS FREEHOLD (REVENUE) MANAGEMENT & LEASEHOLD MANAGEMENT3 Number of surplus freehold office type
properties let out for revenue generation100 100 100
4 Number of surplus freehold residential properties let out for revenue generation
500 500 500
5 Number of lease agreements reviewed according to the rental rate per square metre and escalations
500 1000 1500
34
PROGRAMME 4: REAL ESTATE MANAGEMENT SERVICESPerformance indicators and annual targets for 2015/16 -2017/18
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
Performance indicator
Medium-Term Targets2015/16 2016/17 2017/18
6 Percentage of leases renewed before expiry date
75% 80% 90%
7 Percentage of leased accommodation (lease in) provided within agreed time period
50% 55% 60%
8 Percentage of surplus freehold property allocated towards BBBEE
10% of 3000 12% of 3000 15% of 3000
PROGRAMME 5: PROGRAMME 5: REAL ESTATE INFORMATION & REGISTRY SERVICES
PURPOSE: To develop and manage a complete, accurate and compliant Immovable Asset Register
36
PROGRAMME 5: REAL ESTATE INFORMATION & REGISTRY SERVICESStrategic Objectives and Strategic Plan Targets
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
37
PROGRAMME 5: REAL ESTATE INFORMATION & REGISTRY SERVICESPerformance indicators and annual targets for 2015/16 -2017/18
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
Performance Indicator Medium-Term Targets2015/16 2016/17 2017/18
1 Percentage of identified Real Estate Assets verified
100% identified Real Estate Assets verified
Real Estate Asset Register maintained
Real Estate Asset Register maintained
2 Percentage of Real Estate Assets (annually identified after December) verified
100% of Real Estate Assets annually identified after December
100% of Real Estate Assets annually identified after December
100% of Real Estate Assets annually identified after December
3 Number of Provincial Real Estate Asset Register incorporated into the single repository
1 Provincial Real Estate Asset Register incorporated into the single repository
1 Provincial Real Estate Asset Register incorporated into the single repository
1 Provincial Real Estate Asset Register incorporated into the single repository
38
PROGRAMME 5: REAL ESTATE INFORMATION & REGISTRY SERVICESPerformance indicators and annual targets for 2015/16 -2017/18
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
Performance Indicator Medium-Term Targets2015/16 2016/17 2017/18
4 Number of Metropolitan Municipalities Real Estate Register incorporated into the single repository
1 Metropolitan Municipalities Real Estate Register incorporated into the single repository
5 Percentage of Conveyancing within 180 days
80% 85% 90%
6 Audit of all state coastal reserves under the custodianship of Public Works*
State coastal reserves (GIS) mapped
30% of state coastal reserves surveyed
35% of state coastal reserves surveyed
30% of state coastal reserves registered
PROGRAMME 6: PROGRAMME 6: FACILITIES MANAGEMENT SERVICES
PURPOSE: To ensure that immoveable assets used by government departments and the public, are optimally utilised and maintained
40
PROGRAMME 6: FACILITIES MANAGEMENT SERVICESStrategic Objectives and Strategic Plan Targets
41
PROGRAMME 6: FACILITIES MANAGEMENT SERVICESPerformance indicators and annual targets for 2015/16 -2017/18
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
Performance Indicator Medium-Term Targets2015/16 2016/17 2017/18
6.1.A & B SCHEDULED MAINTENANCE & SHERQ MANAGEMENT / UNSCHEDULED MAINTENANCE1 Number of identified buildings
with Facilities Management Contracts
300 300 300
2 Reduction in kilowatt-hour (Kwh) usage achieved on energy consumption
220,000,000 250,000,000 350,000,000
3 Reduction in kilolitre -(kl) usage achieved on water consumption*
3,905,528 4,296,080 4,725,688
4 Percentage efficiency (turnaround time) for unscheduled maintenance on freehold property within 5 days
65% 75% 85%
42
PROGRAMME 6: FACILITIES MANAGEMENT SERVICESPerformance indicators and annual targets for 2015/16 -2017/18
STRATEGIC & ANNUAL PERFORMANCE PLAN - PMTE
Performance Indicator Medium-Term Targets2015/16 2016/17 2017/18
6.2.B UNSCHEDULED MAINTENANCE MANAGEMENT5 Number of job opportunities
created through maintenance programmes (DPW’s EPWP Targets)
5000 5000 5000
6 Number of Building Management Systems installed
2 3 3
7 Percentage of Facilities Management contracts allocated towards BBBEE
65% 65% 65%
PART C: PART C: LINKS TO LONG-TERM LINKS TO LONG-TERM INFRASTRUCTURE PLANINFRASTRUCTURE PLAN
44
1. NEW, REPLACEMENT, UPGRADE AND ADDITIONS
STRATEGIC PLAN - PMTE
No of projects
Programme Outcome Main appropriation
Adjusted Appropriation
Revised Estimate
Medium Term Estimates
2011/12 2012/13 2013/14 2014/15 2014/15 2014/15 2015/16 2016/17 2017/18
77 Departmental285 294 000
228 106 000
255 513 000
207 100 000
-
207 100 000
111 194 000
168 808 000
182 613 300
165 Accessibility 11 386 000
4 992 000
7 098 000 11 369 000
-
11 369 000
9 005 000 9 482 265 9 956 378
31 Dolomite Risk Management
32 167 000
32 355 000
24 717 000
73 000 000
-
73 000 000
141 000 000
148 473 000
155 896 650
114 Land Ports of Entry
274 626 000
233 892 000
191 684 000
142 000 000
-
142 000 000
261 137 000
261 159 000
276 663 950
32 Inner City Regeneration
42 059 000
94 838 000
36 199 000
6 900 000 -
6 900 000
101 000 000
106 353 000
111 670 650
46 Prestige 365 876 000
118 820 000
57 626 000
70 000 000
-
70 000 000
150 000 000
139 540 000
146 517 000
TOTAL 1 011 408 000
713 003 000
572 837 000
510 369 000
510 369 000
773 336 000
833 815 265
883 317 928
45
DPW INFRASTRUCTURE BUDGET: SIGNIFICANT PROJECTSProject Details Project
costR`000
1. Pretoria, Salvokop, contribution to bulk services 62 490
Development of Government precinct
2. Maseru (Lesotho), Border post, Land port of entry: Lesotho Free State border road infrastructure project plan, phase 1,2 and 3
100 000
Construction of access road and upgrading and redevelopment of boarder post
3. Pretoria central, HG de Wit building, refurbishment of existing building
38 250
Refurbishment of building to serve as student accommodation
4. Skilpadhek Border Post, Land Port Of Entry: redevelopment project, construction of main border post (civil works, operational buildings, bus and light vehicle inspection)
33 844
Redevelopment of border post
46
DPW INFRASTRUCTURE BUDGET: SIGNIFICANT PROJECTSProject Details Project cost
R`000
5. Port Elizabeth, Eben Donges building, alterations and refurbishment including air conditioning and mechanical installation
18 983
Alteration and refurbishment of existing building including air-conditioning
6. Cape Town, Parliamentary complex, 120 Plein Street, 100 Plein Street and Marks buildings: replace 14 lifts
15 555
Replacement of lifts 14 lifts
7. Cape Town, Parliamentary complex, National Assembly, NCOP and old Assembly buildings: replace 19 lifts
13 182
Replacement of 19 lifts
8. Malmesbury, medium a prison, upgrade of existing hot water systems and water reticulation
13 110
Upgrading of existing services for water systems
47
DPW INFRASTRUCTURE BUDGET: SIGNIFICANT PROJECTS
STRATEGIC PLAN - PMTE
Project Details Project costR`000
9. Golela border post, redevelopment project: construction of residential accommodation, repair, maintenance and upgrading of buildings and infrastructure; electrical installations and mechanical equipment
16 887
Redevelopment of Land Port Of Entry, including new buildings and repairs, maintenance and upgrading of existing buildings
10. Boesmansnek, Ongeluksnek and Ramatselison's Land Ports Of Entry, repair, maintenance and upgrading of buildings and infrastructure; electrical installations and mechanical equipment
7 247
Upgrading of Land Port Of Entry, including repairs, maintenance and upgrading of existing buildings
11. Zastron, Makhaleng, Telle and Sepapushek Land Ports Of Entry, maintenance and servicing of building, civil, mechanical and electrical installations
62 490
Repairs, maintenance and upgrading of existing buildings
48
DPW INFRASTRUCTURE BUDGET: SIGNIFICANT PROJECTS
• 48
Project Details Project cost
R`000
9. Golela border post, redevelopment project: construction of residential accommodation, repair, maintenance and upgrading of buildings and infrastructure; electrical installations and mechanical equipment
16 887
Redevelopment of Land Port Of Entry, including new buildings and repairs, maintenance and upgrading of existing buildings
10. Boesmansnek, Ongeluksnek and Ramatselison's Land Ports Of Entry, repair, maintenance and upgrading of buildings and infrastructure; electrical installations and mechanical equipment
7 247
Upgrading of Land Port Of Entry, including repairs, maintenance and upgrading of existing buildings
11. Zastron, Makhaleng, Telle and Sepapushek Land Ports Of Entry, maintenance and servicing of building, civil, mechanical and electrical installations
62 490
Repairs, maintenance and upgrading of existing buildings
49
DPW INFRASTRUCTURE BUDGET: SIGNIFICANT PROJECTS
• 49
Project Details Project cost
R`000
12. Paarl, Drakenstein prison, 30 boiler houses, replacement and upgrading of electrical and mechanical installations
6 572
Repairs and maintenance of existing electrical and mechanical services, including boilers
13. Pretoria, Bryntirion, heritage - construction of outer boundary fence
6 392
Construction of perimeter fence
14. Vioolsdrift and Alexander bay Land Ports Of Entry, maintenance and servicing of buildings, civil, mechanical and electrical infrastructure
5 662
Upgrading of Land Ports Of Entry, including new buildings and repairs, maintenance and upgrading of existing buildings
50
DPW INFRASTRUCTURE BUDGET: SIGNIFICANT PROJECTS
Project Details Project costR`000
15. Cape Town, Rondebosch, Groote Schuur Estate, heritage, upgrade of Koeikamp, irrigation dam, replacement of potable water reticulation and relining of sewer pipes
4 940
Upgrade of exiting irrigation system
16. Mahamba, Bothashoop and Emahlathini Land Ports Of Entry, maintenance and upgrading of buildings, civil infrastructure, electrical installations and mechanical equipment.
4 911
Upgrading of Land Port Of Entry, including new buildings and repairs, maintenance and upgrading of existing buildings
17. Bloemfontein, Central Government building, construction of office block
4 888
Development of new offices for DPW.
51
2. MAINTENANCE AND REPAIRS (PMTE)
The maintenance and repair of existing state accommodation as funded by the PMTE through accommodation charges received from user departments
52
PMTE INFRASTRUCTURE BUDGET : PLANNED MAINTENANCE (CURRENT) : SIGNIFICANT PROJECTS
Project Details Project costR`000
1. Durban central: complete R&R to station complex, all single quarters, as well as other surrounding buildings within the complex; excluding Natalia Court.
67 659 752
Complete repairs and renovations to existing station complex
2. Pietermaritzburg old and new prison : maintenance for bulk electrical and mechanical installations
30 336 987
Repairs and maintenance of electrical and mechanical service
3. Heritage - facilities management contract for Prestige facilities 40 570 323
Facilities management contract
53
PMTE INFRASTRUCTURE BUDGET : PLANNED MAINTENANCE (CURRENT) : SIGNIFICANT PROJECTS
Project Details Project cost
R`000
4. Rehabilitation project - refurbishment/upgrade of 14 Sai Military Base in Umtata
23 160 635
Refurbishment and upgrade of Military base
5. Cape Town: official office accommodation: provide integrated facilities management services (for a 5 year period)
22 611 200
Facilities management contract
6. Cato Manor: complete R&R to station complex as well as buildings accommodating special task teams and the CID’s
22 384 888
Repairs and renovation to existing police station
54
PMTE INFRASTRUCTURE BUDGET : PLANNED MAINTENANCE (CURRENT) : SIGNIFICANT PROJECTS
Project Details Project cost
R`0007. Elliotdale, Libode and Umtata: repair maintenance and operations of water sewerage services 19 430 206Repairs, maintenance of Water Sewerage system
55
3. REHABILITATION, RENOVATIONS AND REFURBISHMENT (PMTE)
55
Major renovations and refurbishment of state accommodation funded by PMTE through accommodation charges received from user departments and augmentation received from National Treasury
56
PMTE INFRASTRUCTURE BUDGET : PLANNED MAINTENANCE (CAPITAL) : SIGNIFICANT PROJECTSProject Details Project cost
R`000
1. Agrivaal building site: new office accommodation for Government Department
243 362 843
New office accommodation for Government Departments
2. Innes Chambers: repair, renovations and refurbishment 54 597 045
Repairs, renovation and refurbishment of facility
3. Rehabilitation of 85 Anderson Street, Johannesburg, for DPW
24 979 332
Rehabilitation of office accommodation
4. Heritage - Prestige portfolio: 2 - interim facilities management contract
24 417 232
Interim facilities management contract
57
PMTE INFRASTRUCTURE BUDGET : PLANNED MAINTENANCE (CAPITAL) : SIGNIFICANT PROJECTSProject Details Project cost
R`000
5. Rehabilitation of 99 Shepstone Road, Durban Point area 21 941 299
Rehabilitation of existing building
6. Refurbishment of residences of sessional officials in the three Parliamentary Villages.
19 508 111
Refurbishment of residences for Parliamentary Villages
7. Rehabilitation of old DPW workshops on Prince Edward Street
18 431 378
Rehabilitation exist workshop building
8. Heritage - refurbishment of NCOP building, including HVAC, electrical and electronic installations
17 245 288
Refurbishment of existing NCOP building
58
PMTE INFRASTRUCTURE BUDGET : PLANNED MAINTENANCE (CAPITAL) : SIGNIFICANT PROJECTSProject Details Project
costR`000
9. Cape Town: official residential accommodation: provide integrated facilities management services. (for a 5 year period)
16 718 400
Facilities management contract
10. Heritage - rehabilitation of SANDF: John Ross Highway 16 145 761
Rehabilitation of existing house
11. Durban various Government buildings: repair, modernization and maintenance of passenger and goods lifts
15 392 487
Upgrading of existing lift
12. Rehabilitation of 9 Golf Road 14 568 572
Rehabilitation of existing building
59
PMTE INFRASTRUCTURE BUDGET : PLANNED MAINTENANCE (CAPITAL) : SIGNIFICANT PROJECTSProject Details Project
costR`000
13. Replace existing security fence with new concrete security wall
14 174 820
Upgrading of security fence
14. Complete repair and renovations of complex 13 808 449Repairs and renovation of complex
15. Rehabilitation of 8 Mill Street building for SAPS 13 641 677Rehabilitation of existing building16. Rehabilitation of Old Bulwer Prison on the corner of Dartnell and Jackson Street
13 440 555
Rehabilitation od existing Prison
17. Service contract for maintenance of security systems at various units
12 921 301
Service contract for Security system services
60
PMTE INFRASTRUCTURE BUDGET : PLANNED MAINTENANCE (CAPITAL) : SIGNIFICANT PROJECTS
Project Details Project costR`000
18. Heritage - Tuynhuys: proposed new furniture and ancillary store, business hub, paraplegic platform stair lift and security installations
12 863 206
Refurbishment of existing buildings
61
• National Department of Public Works (NDPW)
• Head Office: Public WorksCGO BuildingCnr Bosman and MadibaPretoria CentralPrivate Bag X65Pretoria0001
• Website: http://www.publicworks.gov.za