8
Business Update First half 2013 results

1H results 2013.ppt [Read-Only] - BP...To EU markets Twon ewb ridgelinkedp latformsprovide 16b cmaoffshorep rocessing ExistingS tage1 Platform 26su bseawellsto bed rilledw ithtwo semi-submersible

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 1H results 2013.ppt [Read-Only] - BP...To EU markets Twon ewb ridgelinkedp latformsprovide 16b cmaoffshorep rocessing ExistingS tage1 Platform 26su bseawellsto bed rilledw ithtwo semi-submersible

Business UpdateFirst half 2013 results

Page 2: 1H results 2013.ppt [Read-Only] - BP...To EU markets Twon ewb ridgelinkedp latformsprovide 16b cmaoffshorep rocessing ExistingS tage1 Platform 26su bseawellsto bed rilledw ithtwo semi-submersible

Capex ($m)

• ACG• BTC• SD• SCP

Production

• ACG– oil�(mb/d)

– oil�(mmte)

• SD– gas�(bscm)

– condensate�(mmte)

Opex ($m)

• ACG• SD

672

16.4

Performance�results��(actual)

4.8

1.26

374

94�

1,33126

8555

Page 3: 1H results 2013.ppt [Read-Only] - BP...To EU markets Twon ewb ridgelinkedp latformsprovide 16b cmaoffshorep rocessing ExistingS tage1 Platform 26su bseawellsto bed rilledw ithtwo semi-submersible

• ACG�achieved�a�total�of�2.3 bn�barrels�of�oil�production�since�first�oil�

• BTC�loaded the�2,255th tanker�at�Ceyhan�

• BTC�carried�a�total�of�over 230�million�tonnes�of�crude

• Shah�Deniz�has�continued�plateau�production�

• Shah�Deniz�has�delivered�a�total�of�about�43�bn�cubic�metres�of�gas�

and�over�11 million�tonnes�of�condensate�since�start.

• SD2�announced�the�selection�of�TAP�as�European�export�pipeline�

• COP�platform�jacket�sailed�away�for�offshore�installation

• COP�topsides�fabrication�at�ATA�completed�and�ready�for�sail-away

• ‘Shafag-Asiman’�has�continued�3D�seismic�data�processing

2013�highlights

Page 4: 1H results 2013.ppt [Read-Only] - BP...To EU markets Twon ewb ridgelinkedp latformsprovide 16b cmaoffshorep rocessing ExistingS tage1 Platform 26su bseawellsto bed rilledw ithtwo semi-submersible

Contracts�to�sell�gas�to�EU�and�

Turkey

To EU markets

Two�new�bridge�linked�platforms�provide�

16�bcma�offshore�processingExisting�Stage�1�Platform

26�subsea�wells�to�

be�drilled�with�two�

semi-submersible�

rigs

500�km�of�subsea�

flowlines�in�up�to�

550m�water�depth

New�terminal�at�Sangachal�

with�compressors�for�Shah�

Deniz�and�SCP

2,000km�transit�across�

Turkey

Shah�Deniz�full�field�development�–concept�and�planned�activities

Page 5: 1H results 2013.ppt [Read-Only] - BP...To EU markets Twon ewb ridgelinkedp latformsprovide 16b cmaoffshorep rocessing ExistingS tage1 Platform 26su bseawellsto bed rilledw ithtwo semi-submersible

Shafag-Asiman�exploration�

Shafag-Asiman:

• Water�depth:�600-800m.

• 60km�from�Shah�Deniz;�

145km�from�Sangachal�

terminal.

• Deep�(7,000m)�reservoirs.

• Expected�very�high�

subsurface�pressures.�

Exploration:

• 3D�seismic�acquisition�

conducted.

• Exploration�well,�timing�of�

which�to�be�determined�by�

availability�of�infrastructure.

Page 6: 1H results 2013.ppt [Read-Only] - BP...To EU markets Twon ewb ridgelinkedp latformsprovide 16b cmaoffshorep rocessing ExistingS tage1 Platform 26su bseawellsto bed rilledw ithtwo semi-submersible

Local contractors/suppliers (AGT�region)

SMEs

State-owned�companies

JVs�with�local�partners��������

In-country�spend�with�foreign�suppliers

Total�in-country�spend�

Number

347

29

12

Spend ($m)

396

77

274

276

1,023

41%�of�third�party�spend�

ACG� 0.26

Shah�Deniz 0.26

BTC/SCP� 0.52

BP100 0.40

Total 1.44

Social initiatives in Azerbaijan($m disbursed)

Local�content�and�social�initiatives�

Page 7: 1H results 2013.ppt [Read-Only] - BP...To EU markets Twon ewb ridgelinkedp latformsprovide 16b cmaoffshorep rocessing ExistingS tage1 Platform 26su bseawellsto bed rilledw ithtwo semi-submersible

• 2,655 Azerbaijanis�

directly�employed�by�

BP

• 84%�of�permanent�

professionals�in�

Azerbaijan�comprised�

of�national�employees

Permanent professional employees in Azerbaijan

84%

16%

Azerbaijanis

Expatriates

Employment�of�Azerbaijani�nationals

Permanent professional employees in Azerbaijan

%

0

10

20

30

40

50

60

70

80

90

2006 2007 2008 2009 2010 2011 2012

Local staff

Expatriates

Page 8: 1H results 2013.ppt [Read-Only] - BP...To EU markets Twon ewb ridgelinkedp latformsprovide 16b cmaoffshorep rocessing ExistingS tage1 Platform 26su bseawellsto bed rilledw ithtwo semi-submersible

• Enhancing�local�governance�and�environmental�initiatives along�

BTC/SCP

• Establishment�of�a�web-based�Caspian�Information�Centre�(CIC)�

• ‘Meet�the�Buyer’�event�project�in�support�of�local�market�development

• School�of�Project�Management�

• The�enterprise�development�and�training�programme

• Macroeconomic�advisory�and�business�enabling�environment�projects�

• Microfinance�lending�programmes

• Oil�and�Gas�scholarship�programme�and�annual�bursary�awards

• Support�for�education�through�Qafqaz�University�– two�new�

departments�and�five�laboratories�opened

• Business�journalism�training�programme

• BP�School�Library�project�along�BTC/SCP

• Support�for�publication�of�H.Z.Tagiyev�book�and�research�on�the�

Azerbaijani�novel�‘Ali�and�Nino’

• Geosciences�and�engineering�speaker�series�initiative

• Partnership�with�NOC�and�NPC�and�support�for�national�teams

Major�social�initiatives