121002 Malmo Shard Presentation

  • View
    220

  • Download
    0

Embed Size (px)

Text of 121002 Malmo Shard Presentation

  • 7/27/2019 121002 Malmo Shard Presentation

    1/119

    The Shard: structural engineerin

    Stlbyggnadsdagen 2012

  • 7/27/2019 121002 Malmo Shard Presentation

    2/119

  • 7/27/2019 121002 Malmo Shard Presentation

    3/119

    Height:

    Storeys:

    Client:

    Architect:

    Structural engineer:

    Services engineer:

    Project manager:

    Cost consultant:

    Main contractor:

    Piling:

    Steel:

    Concrete:

    72

    Sellar Prop

    on behalf of LB

    Renzo Piano Building WorkAdamson Assoc

    WSP G

    Turner + Town

    Davis Lan

    Stent Founda

    Severfield

    Byrne Bro

  • 7/27/2019 121002 Malmo Shard Presentation

    4/119dom Tower 541m Eiffel Tower 324m Shard at London Bridge 306m One Canada Square

  • 7/27/2019 121002 Malmo Shard Presentation

    5/119

    ross internal area: 127,000 m

    2

    et internal area: 85,000 m2

    Residential: 5,800 m2

    Hotel: 17,800 m2

    Offices: 55,200 m2

    Retail 5,600 m2

    olume of concrete: 54,000 m3

    eight of steel: 11,000 tons

    ifts: 44

    rea of faade: 56,000 m2

    opulation 8,000

    ar parking spaces: 48

    1,367,000 sq915,000 sq

    62,000 sq

    192,000 sq594,000 sq

    61,000 sq

    22 Olympic swimming poo

    8 football pitch

    Burnham-on-Crou

  • 7/27/2019 121002 Malmo Shard Presentation

    6/119

  • 7/27/2019 121002 Malmo Shard Presentation

    7/119

  • 7/27/2019 121002 Malmo Shard Presentation

    8/119

  • 7/27/2019 121002 Malmo Shard Presentation

    9/119

  • 7/27/2019 121002 Malmo Shard Presentation

    10/119

  • 7/27/2019 121002 Malmo Shard Presentation

    11/119

    Spire

    Viewing Gallery

    Apartments

    Hotel

    Restaurants

    Offices

    Offices

  • 7/27/2019 121002 Malmo Shard Presentation

    12/119

    Offices

    L07 2,900 m

    L28 1,350m2

    Restaurants

  • 7/27/2019 121002 Malmo Shard Presentation

    13/119

    Restaurants

    L31 1,200m2

    Hotel

  • 7/27/2019 121002 Malmo Shard Presentation

    14/119

    Hotel

    L37 1,000m2

    L50 670m2

    Apartments

  • 7/27/2019 121002 Malmo Shard Presentation

    15/119

    Apartments

    L53 600m2

    L65 270m2

  • 7/27/2019 121002 Malmo Shard Presentation

    16/119

    C of G

    rectilinear tower

    C of G

    Shard

  • 7/27/2019 121002 Malmo Shard Presentation

    17/119

    shard 1

    shard 18

    mini backpack(to L20)

    backpack (to L

    main core

    backpack core

    winter garden

    wing wall

  • 7/27/2019 121002 Malmo Shard Presentation

    18/119

  • 7/27/2019 121002 Malmo Shard Presentation

    19/119

  • 7/27/2019 121002 Malmo Shard Presentation

    20/119

  • 7/27/2019 121002 Malmo Shard Presentation

    21/119

  • 7/27/2019 121002 Malmo Shard Presentation

    22/119

    Top of raft slab River terrace grav-9m

  • 7/27/2019 121002 Malmo Shard Presentation

    23/119

    Main bearing

    piles

    1500-1800 dia

    Secant pile wall

    male pile

    1000 dia

    ecant pile wall

    female pile960 dia

    Top of raft slab

    -13.4m

    Thanet sand

    Chalk

    Lambeth group

    London clay

    River terrace grav

    -59m/-65m

    -45m/-51m

    -30m/-35m

    -9m

    TOE LEVEL

  • 7/27/2019 121002 Malmo Shard Presentation

    24/119

  • 7/27/2019 121002 Malmo Shard Presentation

    25/119

  • 7/27/2019 121002 Malmo Shard Presentation

    26/119

  • 7/27/2019 121002 Malmo Shard Presentation

    27/119

  • 7/27/2019 121002 Malmo Shard Presentation

    28/119

    15 total stat

    ~ 900 monitoring ta

  • 7/27/2019 121002 Malmo Shard Presentation

    29/119

    p down 1: secant piled wall

  • 7/27/2019 121002 Malmo Shard Presentation

    30/119

    p down 2: bearing piles and plunge columns

  • 7/27/2019 121002 Malmo Shard Presentation

    31/119

    p down 3: L00 slab; excavation to B2

  • 7/27/2019 121002 Malmo Shard Presentation

    32/119

    p down 4: core slipform set up at B2

  • 7/27/2019 121002 Malmo Shard Presentation

    33/119

    p down 5: core slipform started; excavation to B3

  • 7/27/2019 121002 Malmo Shard Presentation

    34/119

    p down 6: first hold point L00 and B2 slabs connected

    Faade

  • 7/27/2019 121002 Malmo Shard Presentation

    35/119

    p down 7: second hold point full depth excavation

  • 7/27/2019 121002 Malmo Shard Presentation

    36/119

    p down 8: B3 slab cast; core walls completed

  • 7/27/2019 121002 Malmo Shard Presentation

    37/119

  • 7/27/2019 121002 Malmo Shard Presentation

    38/119

  • 7/27/2019 121002 Malmo Shard Presentation

    39/119

    14.

  • 7/27/2019 121002 Malmo Shard Presentation

    40/119

    14.

  • 7/27/2019 121002 Malmo Shard Presentation

    41/119

    14.

  • 7/27/2019 121002 Malmo Shard Presentation

    42/119

  • 7/27/2019 121002 Malmo Shard Presentation

    43/119

  • 7/27/2019 121002 Malmo Shard Presentation

    44/119

  • 7/27/2019 121002 Malmo Shard Presentation

    45/119

  • 7/27/2019 121002 Malmo Shard Presentation

    46/119

  • 7/27/2019 121002 Malmo Shard Presentation

    47/119

  • 7/27/2019 121002 Malmo Shard Presentation

    48/119

  • 7/27/2019 121002 Malmo Shard Presentation

    49/119

  • 7/27/2019 121002 Malmo Shard Presentation

    50/119

  • 7/27/2019 121002 Malmo Shard Presentation

    51/119

  • 7/27/2019 121002 Malmo Shard Presentation

    52/119

  • 7/27/2019 121002 Malmo Shard Presentation

    53/119

  • 7/27/2019 121002 Malmo Shard Presentation

    54/119

  • 7/27/2019 121002 Malmo Shard Presentation

    55/119

  • 7/27/2019 121002 Malmo Shard Presentation

    56/119

  • 7/27/2019 121002 Malmo Shard Presentation

    57/119

  • 7/27/2019 121002 Malmo Shard Presentation

    58/119

  • 7/27/2019 121002 Malmo Shard Presentation

    59/119

  • 7/27/2019 121002 Malmo Shard Presentation

    60/119

  • 7/27/2019 121002 Malmo Shard Presentation

    61/119

  • 7/27/2019 121002 Malmo Shard Presentation

    62/119

  • 7/27/2019 121002 Malmo Shard Presentation

    63/119

  • 7/27/2019 121002 Malmo Shard Presentation

    64/119

  • 7/27/2019 121002 Malmo Shard Presentation

    65/119

  • 7/27/2019 121002 Malmo Shard Presentation

    66/119

    L09

  • 7/27/2019 121002 Malmo Shard Presentation

    67/119

    L23

  • 7/27/2019 121002 Malmo Shard Presentation

    68/119

  • 7/27/2019 121002 Malmo Shard Presentation

    69/119

  • 7/27/2019 121002 Malmo Shard Presentation

    70/119

  • 7/27/2019 121002 Malmo Shard Presentation

    71/119

  • 7/27/2019 121002 Malmo Shard Presentation

    72/119

  • 7/27/2019 121002 Malmo Shard Presentation

    73/119

  • 7/27/2019 121002 Malmo Shard Presentation

    74/119

  • 7/27/2019 121002 Malmo Shard Presentation

    75/119

    L45

  • 7/27/2019 121002 Malmo Shard Presentation

    76/119

  • 7/27/2019 121002 Malmo Shard Presentation

    77/119

  • 7/27/2019 121002 Malmo Shard Presentation

    78/119

    63

  • 7/27/2019 121002 Malmo Shard Presentation

    79/119

  • 7/27/2019 121002 Malmo Shard Presentation

    80/119

    Efficient use of materials

  • 7/27/2019 121002 Malmo Shard Presentation

    81/119

    GGBS in concrete (70% in B3 slab saved700 tons of cement)

    Public transport hub

    Mixed use building

    Combined heat, cooling and power

    Faade and automatic blinds

    BREEAM brown roof

  • 7/27/2019 121002 Malmo Shard Presentation

    82/119

  • 7/27/2019 121002 Malmo Shard Presentation

    83/119

  • 7/27/2019 121002 Malmo Shard Presentation

    84/119

  • 7/27/2019 121002 Malmo Shard Presentation

    85/119

  • 7/27/2019 121002 Malmo Shard Presentation

    86/119

  • 7/27/2019 121002 Malmo Shard Presentation

    87/119

  • 7/27/2019 121002 Malmo Shard Presentation

    88/119

  • 7/27/2019 121002 Malmo Shard Presentation

    89/119

  • 7/27/2019 121002 Malmo Shard Presentation

    90/119

  • 7/27/2019 121002 Malmo Shard Presentation

    91/119

  • 7/27/2019 121002 Malmo Shard Presentation

    92/119

  • 7/27/2019 121002 Malmo Shard Presentation

    93/119

  • 7/27/2019 121002 Malmo Shard Presentation

    94/119

    Spire

    Vi i G ll

  • 7/27/2019 121002 Malmo Shard Presentation

    95/119

    Viewing Gallery

    Apartments

    Hotel

    Restaurants

    Offices

    Backpack

  • 7/27/2019 121002 Malmo Shard Presentation

    96/119

  • 7/27/2019 121002 Malmo Shard Presentation

    97/119

  • 7/27/2019 121002 Malmo Shard Presentation

    98/119

  • 7/27/2019 121002 Malmo Shard Presentation

    99/119

  • 7/27/2019 121002 Malmo