22
1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use, reproduction or alteration of the information contained in this presentation, by the addressee or by any other recipient, without the prior written consent of ENBALA Power Networks Inc. is strictly prohibited. DSWG February 24, 2012 Smart Grid Solutions That Pay You

1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,

Embed Size (px)

Citation preview

Page 1: 1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,

1

Confidential

The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other

distribution, use, reproduction or alteration of the information contained in this presentation, by the addressee or by any

other recipient, without the prior written consent of ENBALA Power Networks Inc. is strictly prohibited.

DSWG February 24, 2012

Smart Grid Solutions That Pay You

Page 2: 1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,

2

Confidential

Regulation Service – Demand Side Participation

Regulation Service in essentially provided by Generation in ERCOTLoads have passed the testing and are registered to participate Market reports indicate the Demand Side resources are not very active in the market

Page 3: 1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,

3

Confidential

Demand Side Regulation – North American Markets

Market Rules Permit Load

Participation

Active Loads

Permit Aggregation

Sub-Metering

ERCOT Y Y N N

PJM Y Y Limited Soon

MISO Y 1 – ALCOA Limited N

NYISO Y N No N

ISO-NE Y N Limited Y

CAISO Y/N N Limited N

IESO Y N N N

SPP not included as there currently isn’t a marketfor Regulation

Page 4: 1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,

4

Confidential

Load Management Universe Market maturity for demand-side assets to participate

Page 5: 1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,

5

Confidential

New DR products must be bi-directional

Regulation represents required balance in the gridAs likely to require the use of more power as curtailment

Page 6: 1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,

6

Confidential

Requires intelligent capture of inherent

flexibility in processes

Requires the ability to define constraints

such that operational priorities rank first

Cannot Impact the Customer

Requirements are more frequent and

have shorter notice

Page 7: 1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,

7

Confidential

Why Limited Load in Regulation Market?A load does a process or task. Participation in the Electricity Wholesale Market should not impact the process or taskTraditional DR has limited curtailment events and therefore limited impact on the loadRegulation requires the load to respond to 4 second control signalsRegulation as likely to require the load increase consumption as often as curtail consumptionVery few loads have the flexibility to respond in the short timeframe and bi-directionally Increased communication requirementsRules limit aggregation to create a network or fleet response

Page 8: 1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,

8

Confidential

A Network Approach

Generally a single Demand Resource can not respond to the a 4 second signalA group of Demand Resources acting as an intelligent integrated network can provide robust, reliable and efficient Regulation Service

Page 9: 1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,

9

Confidential

ENBALA Power Network

Page 10: 1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,

10

Confidential

What is ENBALA’s Grid Balance Program

• It provides moment by moment balance for the grid.• It works within Load defined operational parameters• It is an energy and capacity neutral program• It monetizes the flexibility inherent in Load processes• It requires an intelligently managed network of assets• It is complementary to demand response and other energy

management programs• It is NOT demand response• It is NOT an energy curtailment program• It is NOT intrusive to Load operation

Page 11: 1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,

11

Confidential

Benefits of Demand Side Regulation

Utilizes installed resources Frees generation to provide other services Increases the efficiency of the generation portfolioReduces cost Provides an additional revenue stream for the hostEnhances Regulation competition

Page 12: 1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,

12

Confidential

Market RequirementsMultiple QSE’s

– Allowing multiple technology providers to work with a load– Ensure compatibility– Crucial for much wider spread adoption

Sub-metering– To gain access to the specific characteristics of specific loads

Aggregation and Portfolio – Across sub zones– Lower aggregation requirements– Performance measurement at Portfolio not Resource level

Regulation offers without Energy offers ... Not an issue but needs to be considered when developing rules for Demand participation in the Nodal Market

Page 13: 1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,

13

Confidential

Next Steps

DSWG endorsement to investigate and implement rules that would enable a Network to effectively participate in the ERCOT market

Page 14: 1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,

14

Confidential

Thank You

Rob CoulbeckVP Regulatory Affairs

[email protected]

www.enbala.com

Page 15: 1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,

15

Confidential

ISO Signal

Page 16: 1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,

16

Confidential

Resource ResponseEPN Client Pool

beginning to respond to ISO

signal.

EPN Client Pool beginning to

respond to ISO signal.

Page 17: 1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,

17

Confidential

Resource Response

Page 18: 1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,

18

Confidential

Resource ResponseMore

participants from the Client

Pool are responding to

requests.

More participants

from the Client Pool are

responding to requests.

Page 19: 1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,

19

Confidential

Resource ResponseThe green line

is EPNs aggregated

response from the Client Pool.

The green line is EPNs

aggregated response from the Client Pool.

Page 20: 1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,

20

Confidential

Resource Response8 binary assets

(on/off) responding to

the EPN.

8 binary assets (on/off)

responding to the EPN.

Page 21: 1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,

21

Confidential

Resource ResponseThe 9th participating

load is a VFD – providing a continuous

response (ranging between 1000 kW –

1750 kW)

The 9th participating load is a VFD –

providing a continuous

response (ranging between 1000 kW –

1750 kW)

Page 22: 1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,

22

Confidential

Resource Response

The aggregate response of each resource in the

network is compiled to form a unified

regulation response.

The aggregate response of each resource in the

network is compiled to form a unified

regulation response.