13
© Copyright 2015, First Solar, Inc.

© Copyright 2015, First Solar, Inc. · Imperial Energy Center West, CA 150 SDG&E Tenaska Taylor, GA 147 (2) Southern Co Butler, GA 103 Georgia Power Southern Co Shams Ma’an, Jordan

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: © Copyright 2015, First Solar, Inc. · Imperial Energy Center West, CA 150 SDG&E Tenaska Taylor, GA 147 (2) Southern Co Butler, GA 103 Georgia Power Southern Co Shams Ma’an, Jordan

© Copyright 2015, First Solar, Inc.

Page 2: © Copyright 2015, First Solar, Inc. · Imperial Energy Center West, CA 150 SDG&E Tenaska Taylor, GA 147 (2) Southern Co Butler, GA 103 Georgia Power Southern Co Shams Ma’an, Jordan

2

© C

op

yrig

ht

20

15

, Fi

rst

Sola

r, I

nc.

Forward-Looking Statements

During the course of this presentation the Company will make projections and other statements that

are forward-looking statements within the meaning of the federal securities laws. The forward-looking

statements in this presentation are based on current information and expectations, are subject to

uncertainties and changes in circumstances, and do not constitute guarantees of future performance.

Those statements involve a number of factors that could cause actual results to differ materially from

those statements, including the risks as described in the Company’s most recent Annual Report on

Form 10-K, Quarterly Report on Form 10-Q, and other filings with the Securities and Exchange

Commission. Please review the information regarding forward-looking statements contained in the

press release issued today. First Solar assumes no obligation to update any forward-looking

information contained in this presentation or with respect to the announcements described herein.

Page 3: © Copyright 2015, First Solar, Inc. · Imperial Energy Center West, CA 150 SDG&E Tenaska Taylor, GA 147 (2) Southern Co Butler, GA 103 Georgia Power Southern Co Shams Ma’an, Jordan

3

© C

op

yrig

ht

20

15

, Fi

rst

Sola

r, I

nc.

Agenda

• Business & Operations Outlook

• 2016 Financials Outlook & Guidance

• Q&A

Page 4: © Copyright 2015, First Solar, Inc. · Imperial Energy Center West, CA 150 SDG&E Tenaska Taylor, GA 147 (2) Southern Co Butler, GA 103 Georgia Power Southern Co Shams Ma’an, Jordan

4

© C

op

yrig

ht

20

15

, Fi

rst

Sola

r, I

nc.

2016 Strategic Priorities

• Maximize module production output to meet strong demand

• Systems project execution with >2GWac reaching COD in 2016

• Maintain cost and technology leadership

• Convert growing international opportunities into bookings

• Maintain strong U.S. market share position

• Achieve book to bill ratio of at least one-to-one

• Increase ending cash position to over $2.6 billion

• Achieve earnings per share guidance mid-point of $4.25

• Utilize financial strength to take advantage of opportunities that arise

Page 5: © Copyright 2015, First Solar, Inc. · Imperial Energy Center West, CA 150 SDG&E Tenaska Taylor, GA 147 (2) Southern Co Butler, GA 103 Georgia Power Southern Co Shams Ma’an, Jordan

5

© C

op

yrig

ht

20

15

, Fi

rst

Sola

r, I

nc.

1.61.8

2.5

3.0

13.2%

14.0%

15.5%

16.2%

8.0%

9.0%

10.0%

11.0%

12.0%

13.0%

14.0%

15.0%

16.0%

17.0%

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

2013 2014 2015 2016

GW

DC

Module Production Average Fleet Conversion Efficiency

2016 Module Production & Efficiency

Page 6: © Copyright 2015, First Solar, Inc. · Imperial Energy Center West, CA 150 SDG&E Tenaska Taylor, GA 147 (2) Southern Co Butler, GA 103 Georgia Power Southern Co Shams Ma’an, Jordan

6

© C

op

yrig

ht

20

15

, Fi

rst

Sola

r, I

nc.

Project/Location MW AC PPA Owner Project Owner

Stateline, CA 300 SCE Southern Co

Silver State South, NV 250 SCE NextEra

McCoy, CA 250 SCE NextEra

Astoria, CA 175 (1) Recurrent

Imperial Energy Center West, CA 150 SDG&E Tenaska

Taylor, GA 147 (2) Southern Co

Butler, GA 103 Georgia Power Southern Co

Shams Ma’an, Jordan 53 NEPCO (1)

In Development with PPA Awarded, but Not Sold

Moapa, NV 250 LADWP Not Sold

California Flats, CA3 130 Apple Not Sold

East Pecos, TX 119 Austin Energy Not Sold

Switch Station, NV4 179 Nevada Power Not Sold

Cuyama, CA 40 PG&E Not Sold

Kingbird, CA 40 (5) Not Sold

2016 Systems Project CODs – Over 2GWac

(1) Contracted but not specified(2) PPA contracted partners include Cobb Electric Membership Corp, Flint Electric Membership Corp, and Sawnee Electric Membership Corp (3) California Flats total size is 280MWac. Apple 130MWac & PG&E 150MWac. Remaining project COD is 2018(4) Previously named Playa Solar in 10-Q filings. 100MWac PPA signed in June 2015. Additional 79MWac PPA signed in November 2015(5) Southern California Public Power Authority (SCPPA) 20MWac and City of Pasadena 20 MWac

Page 7: © Copyright 2015, First Solar, Inc. · Imperial Energy Center West, CA 150 SDG&E Tenaska Taylor, GA 147 (2) Southern Co Butler, GA 103 Georgia Power Southern Co Shams Ma’an, Jordan

7

© C

op

yrig

ht

20

15

, Fi

rst

Sola

r, I

nc.

2016 Bookings & Contracted Volume

Bookings OpportunitiesAs of Oct 29, 2015

Mid-to-Late-Stage

Early-Stage

17.4 GW DC

2016 Module Supply

Contracted vs Non-Contracted

>75% of supply contracted

Contracted

Non-Contracted

Contracted includes systems projects, contracted 3rd-party module-only and module plus sales. Systems projects include (a) contracted/sold (b) with PPA but not yet sold

Page 8: © Copyright 2015, First Solar, Inc. · Imperial Energy Center West, CA 150 SDG&E Tenaska Taylor, GA 147 (2) Southern Co Butler, GA 103 Georgia Power Southern Co Shams Ma’an, Jordan

© Copyright 2015, First Solar, Inc.

Page 9: © Copyright 2015, First Solar, Inc. · Imperial Energy Center West, CA 150 SDG&E Tenaska Taylor, GA 147 (2) Southern Co Butler, GA 103 Georgia Power Southern Co Shams Ma’an, Jordan

9

© C

op

yrig

ht

20

15

, Fi

rst

Sola

r, I

nc.

Guidance Assumptions as of December 9, 2015

Assumptions

Production ~3 GWdc • Running plants at average of ~96% utilization

Module Efficiency16.3%>17%

• 2016 full year fleet average• Lead line efficiency exit

Volume (Shipped)2.4 GWdc

0.5 to 0.6 GWdc

• Systems segment shipments• Module only shipments

Net Sales / Operating Profit

40% in H1 201660% in H2 2016

• Expected distribution of net sales & operating profit

Page 10: © Copyright 2015, First Solar, Inc. · Imperial Energy Center West, CA 150 SDG&E Tenaska Taylor, GA 147 (2) Southern Co Butler, GA 103 Georgia Power Southern Co Shams Ma’an, Jordan

10

© C

op

yrig

ht

20

15

, Fi

rst

Sola

r, I

nc.

Operating Expenses (including plant start-up)

(1) 2011 operating expenses exclude $40.3 million of power loss compensation payments made to certain customers(2) 2015 & 2016 based on guidance mid-point

0%

5%

10%

15%

20%

25%

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

2011 2012 2013 2014 2015 2016

In $

M

Net Sales Opex Opex % of Net Sales

(1) (2) (2)

Page 11: © Copyright 2015, First Solar, Inc. · Imperial Energy Center West, CA 150 SDG&E Tenaska Taylor, GA 147 (2) Southern Co Butler, GA 103 Georgia Power Southern Co Shams Ma’an, Jordan

11

© C

op

yrig

ht

20

15

, Fi

rst

Sola

r, I

nc.

2016 Guidance Low High

Net Sales $3.9B $4.1B

Gross Margin (%) 16% 18%

Operating Expenses $380M $400M

Operating Income $260M $330M

Effective Tax rate 16% 18%

Earnings Per Share1 $4.00 $4.50

Net Cash Balance2 $2.0B $2.3B

Operating Cash Flow3 $500M $700M

Capital Expenditures $300M $400M

Shipments 2.9GW 3.0GW

2016 Guidance as of December 9, 2015

1 – Includes a gain of approximately $200 million from the expected sale of an equity method investment and share of 8point3 earnings2 – Cash and marketable securities less expected debt at the end of 20163 – Does not include approximately $450 million from the expected sale of an equity method investment treated as an investing cash flow

Page 12: © Copyright 2015, First Solar, Inc. · Imperial Energy Center West, CA 150 SDG&E Tenaska Taylor, GA 147 (2) Southern Co Butler, GA 103 Georgia Power Southern Co Shams Ma’an, Jordan

© Copyright 2015, First Solar, Inc.

Page 13: © Copyright 2015, First Solar, Inc. · Imperial Energy Center West, CA 150 SDG&E Tenaska Taylor, GA 147 (2) Southern Co Butler, GA 103 Georgia Power Southern Co Shams Ma’an, Jordan