DESCRIPTION

Redi Max and QPL-27 Products' Field Test Review

Citation preview

NPE 0801-1 CeraTech Redi MAX and QPL-27 Products to Review -- Pavemend SLQ, Pavemend TR, Pavemend 15.0, and DOTLine

Field Tests are located after Mile Post 44 on

State Route 404 (I-16) –First is Redi-Max Slab Replacement at the entrance of the GDOT Rest Area, then

going passed the slab are the 2 field test installs – DOTLine was tested in one spall by the road edge, and the Pavemend products were tested together at the

same seam toward the middle of the road in the outside lane.The Field Tests were Installed on February 27, 2008

These Field Tests were Reviewed on June 12, 2009 (Photos attached)

Present: GDOT – Brennan A. Roney

6/12/09 Review 1NPE 0801-1 CeraTech "RediMAX"

6/12/09 Review 2NPE 0801-1 CeraTech "RediMAX"

6/12/09 Review 3NPE 0801-1 CeraTech "RediMAX"

6/12/09 Review 4NPE 0801-1 CeraTech "RediMAX"

6/12/09 Review NPE 0801-1 CeraTech "RediMAX" 5

6/12/09 Review 6NPE 0801-1 CeraTech "RediMAX"

6/12/09 Review 7NPE 0801-1 CeraTech "RediMAX"

6/12/09 Review 8NPE 0801-1 CeraTech "RediMAX"

6/12/09 Review 9NPE 0801-1 CeraTech "RediMAX"

12

-#1:-- Location of Field Test Redi-Max Slab on I-16

#2:-- Location of Field Test of the Pavemend SLQ, TR, 15.0, and the DOTLine product

6/12/09 Review 10NPE 0801-1 CeraTech "RediMAX"

#2:-- Location of Field Test of the Pavemend SLQ, TR, 15.0, and the DOTLine product

Pavemend 15.0 covered with TR Pavemend SLQ covered with TR

DOTLine Product

6/12/09 Review 11NPE 0801-1 CeraTech "RediMAX"

6/12/09 Review 12NPE 0801-1 CeraTech "RediMAX"

6/12/09 Review 13NPE 0801-1 CeraTech "RediMAX"

6/12/09 Review 14NPE 0801-1 CeraTech "RediMAX"

6/12/09 Review 15NPE 0801-1 CeraTech "RediMAX"

6/12/09 Review 16NPE 0801-1 CeraTech "RediMAX"