IP Track Delivery Update The Railway Correspondence and

Travel Society

4 September 2014

Steve Featherstone

/

Our Key Themes for CP5

Safety and Performance go hand in hand

Continuous Improvement

Digitising the Railway

/ 3

Initiative Safety benefit Performance benefit

FTAP Trains move when railway is

operational 15 mins (TRS)

ZKL(RC) Removes need to access track

when placing protection 2 mins / line block

Runway lights &

10:1 comms app

Visual confirmation of adjacent

line block 5 mins / line block

Lasers on tampers Removes need to access

adjacent line to measure

5-10 mins faster start for

tampers

CCTV on MFS Removes risk of working at

height and in dust

15 mins

(Awaiting isolation)

Lean tool storage & well planned,

lean, organised teams

More competent and strength

in depth 30 - 60 mins +

Magnetic drain plugs Prevents catastrophic failure of

hydraulics 4 shifts per annum

Proximity switches Better quality track at handback More reliable and faster repair

time

Safety and Performance go hand in hand – High Output

/

Safety and Performance go hand in hand

Total - Rolling FWI vs %age of forecast volume delivered

0.000

0.020

0.040

0.060

0.080

0.100

0.120

0.140

P1

13/14

P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13

13/14

P1

14/15

P2 P3

0%

20%

40%

60%

80%

100%

120%

140%

Rolling FWI %age volume achieved Linear (%age volume achieved) Linear (Rolling FWI)

/ 5 5

Continuous Improvement - behaviour change

We need to:

Unlearn past behaviour

Copy great ideas / best practices

“Copy with pride”

Share successes and learning's.

“Share with pride”

Do things differently.

/ 6 6

Structured Continuous Improvement at Network Rail

Many different models:

- Total Quality Management

- Six Sigma

- Lean

- Kaizen

- Process Improvement

- Process re engineering

- 4 ation model:

Eradication

Simplification

Rationalisation

Automation

But all encompass….

/ 7 7

Continuous Improvement - Concept of Marginal Gains

"The whole principle came from the idea that if you broke down everything you could

think of that goes into riding a bike, and then improved it by 1%, you will get a

significant increase when you put them all together"

Sir Dave Brailsford, CBE

At the 2004 Olympic Games Great Britain won two cycling gold medals, their best

performance since 1908.

Won multiple world championships in road, track, BMX and Mountain bike racing

Great Britain lead the cycling medal table at the 2008 and 2012 Olympic Games, winning 8

golds at both, while British cyclists won 59 World Championships from 2003-2013

As Sky Team principal he oversaw both Bradley Wiggins' and Chris Froome's victories in

the 2012 and 2013 Tour de France

Won the BBC Sports Personality of the Year Coach Award on 14 December 2008 & 2012.

/ 8

Digitising the Railway

ETCS

Traffic Management

BIM / 4D modelling

RILA

ORBIS

/

Our 10 Point Plan

/

10 Point Plan

10. Improve

Access

9. Improve

Scope &

Specification

Unit cost

4.Get eng

trains to

site on time

2. Improve

plant

reliability

1. Improve

safety

8. Significant

technology

innovation

7. Re-tender

contracts 6. Re-org

into specialist

teams

5. Improve

competence

& multi-

skilling

3. Improve

planning

& lock

downs

Network

Ops

Network

Ops

IP

Track Network

Ops IP Track IP Track

IP

Track

Network

Ops

IP

Track

IP

Track

/

1. Safety – Adjacent Line Open Working, Ballast Dust and Fatigue are key issues

/

2. Improved Plant Reliability

/

2. Improved Plant Reliability

/

3. Improved Planning and Lock Downs

Haulage

Work method Specification

Access

/

4. Get Engineering Trains to and From Site on Time

PAP ETPM MAA from April 2012 to June 2014

30%

40%

50%

60%

70%

80%

90%

1

2012 2013 2014 2015

Anglia Kent

LNE LNW

East Mids Scotland

Sussex Wales

Wessex Western

National National target

/

5. Competencies & Multiskilling

/

6. Organise Track Delivery into specialists units

Previous organisation New specialist organisation

activities

Previous organisation New specialist organisation

S&C

PL conventional

PL High Output

7. Tender new contracts - S&C Procurement Outcome

NEW LANDSCAPE

NORTH - EM, LNE, LNW

(N), Scotland & Wales (N)

AMEY SERSA

SOUTH - Anglia, Kent,

LNW (S), Sussex,

Wales (S), Wessex &

Western

COLAS URS

PREVIOUS POSITION

Anglia, Kent, Sussex &

Wessex

BALFOUR BEATTY

EM, LNE, LNW (N)

& Scotland

BABCOCK

LNW (S), Wales &

Western

AmeyCOLAS

7. Tender new contracts - Plain Line Procurement Outcome

PREVIOUS POSITION

1

1 1

2

3

4 5

5 7

6 6

Anglia, Kent, Sussex &

Wessex

BALFOUR BEATTY

EM, LNE, LNW (N)

& Scotland

BABCOCK

LNW (S), Wales &

Western

AmeyCOLAS

1

11

2

3

45

57

66

LNW (S),

Scotland,

Wales, Wessex

and Western

BABCOCK

EM, LNE & LNW

(N)

CARILLION

Anglia, Sussex &

Kent

COLAS

NEW LANDSCAPE

7. Tender new contracts - High Output In-Sourcing

High Output Video

/

8. Significant Technology Innovation

S&C ballast treatment Modular slab track

RILA Micro-piling

/

8. Significant Technology Innovation

App development Remote TCOD

Flexible Train Arrival Point Use of Unimogs

/

9. Improved Scope and specification

£ £ £ £

£ £ £ £ £ £

£ £ £ £ £ £ £ £

campaigns

short

worksites

< 8 hrs blockades

Access

Sco

pe

£ £ £ £

£ £ £ £ £ £

£ £ £ £ £ £

campaigns

short

worksites

< 8 hrs blockades

Access

Sc

op

e

Current position Future position with Plain Line

Efficient Delivery Techniques (EDT)

/

Plain Line Video

/

10hrs access per night

Adjacent line open working

Signallers stop trains on request

when all lines blocked is required

Opening at 50 mph rather than 80mph

700 yards per night on jointed track

1,000 yards per night on CWR

Every production record smashed

10. Improved Access

High Output work in Wessex

- what good really looks like:

/

10 Point Plan

10. Improve

Access

9. Improve

Scope &

Specification

Unit cost

4.Get eng

trains to

site on time

2. Improve

plant

reliability

1. Improve

safety

8. Significant

technology

innovation

7. Re-tender

contracts 6. Re-org

into specialist

teams

5. Improve

competence

& multi-

skilling

3. Improve

planning

& lock

downs

Network

Ops

Network

Ops

IP

Track Network

Ops IP Track IP Track

IP

Track

Network

Ops

IP

Track

IP

Track

/

S&C Video

/

IP Track Delivery Update The Railway Correspondence and

Travel Society

4 September 2014

Steve Featherstone

Recommended