London School of Business & Management
BTEC Level 5 - HND Business
Centre Number
79829 Module Number Unit 42 Unit Code H/601/1036
Module Title
Project Management for Business
Course Title
HND Business
Assessors Name
Edward Wilson
Assignment Title
AURA Ltd Case Example
Assignment Type Individual Report / Project Documentation
Date Set
1/10/2014
Due Date
One Submission: 09/01/15
Unit Outcomes Covered:
LO1. Understand Project Management Principles
LO2. Be able to manage a projects human resources
LO3. Be able to apply project processes and procedures
GRADING OPPORTUNITIES AVAILABLE Outcomes/ Grade Descriptors
P1.1 P1.2 P1.3 P1.4 P2.1 P2.2 P2.3 P2.4 P3.1 P3.2 P3.3
Outcomes/ Grade Descriptors
P3.4 M1 M2 M3 D1 D2 D3
Assessor: Edward Wilson Signature: ewilson Date: 1/10/2014
IV: COMMENTS
IV: Zahidul Khan Signature: Zahidul Date: 5/10/2014
Assignment Brief Scenario: Aura Ltd Case Example
Aura was founded in 2000 with offices in the heart of the City of London., a project management services company offering a first class, personal service, providing custom-made solutions for their clients. The team at Aura has a passion for providing aesthetically pleasing, functional buildings of exceptional quality, adding value to businesses. Besides refurbishments, Aura also specializes in office moves. The following is a statement from their General Manager (GM). We understand that each project requires a different approach that is uniquely tailored to your exact brief and business aspirations. We provide a full range of services from inception to completion on projects ranging from new premises to the high quality refurbishment of existing sites. We are proud to have a very high level of repeat business, forming solid relationships with our clients over the years. In the past year we have managed projects totalling 20 million pounds UK-wide. Aura has certainly built a reputation as a result of the application of good project management principles, appropriate organisational structures and good approaches. Apart from handling external projects for clients, they also have various internal projects that will have to be selected carefully completed on time and within budget, they also sometimes outsource some of the work which is in line with their business strategy. Currently three internal projects are being considered. This is the acquisition and setup of new offices in three different locations. The projection of inflows and outflows of the three mutually exclusive internal projects A,B & C have been tabulated below. . Year Cash flow ( A) / Cash flow (B) / Cash flow (C) /
0 -400,000 -400,000 -400,000
1 250,000 150,000 200,000
2 5000 20,000 10,000
3 18,000 26,000 50,000
Discount rate 5%
LSBM has also recently sort the services of Aura to help with the relocation of the finance and marketing departments to a new Annex building in Stratford, hoping that the move will be ready just in time for the new semester. .
Tutor Notes
Key Points: Your assignment should be handed in by the deadline. The assignment must be your own work and original in its submission. All sources used to support your answers should be given in correct Harvard
referencing format. You will be expected to check spelling mistakes and grammar. Your name, student number and Unit number should be in the footer of every
page. It should bear an appropriate report structure (such as a Table of Contents,
Abstract, Introduction, Discussion, Conclusion, Recommendations, References, and Appendix (if necessary)).
There should be clarity of expression. It should display relevant factual content and understanding of the subject, critical
analysis, justifications, arguments, models, and a coherent framework etc. Word count: Approximately 3000.
Harvard referencing format It is important to reference all the sources you use to support your answers in the assignment. The Harvard referencing format should be correctly applied in both citations and the reference list.
Plagiarism and/or collusion are forms of academic misconduct which are not acceptable, and will be investigated and dealt with according to the regulations of the London School of Business and Management. In this context the definition and scope of plagiarism are explained below:
Plagiarism occurs when a student misrepresents, as his/her own work, the work, written or otherwise, of any other person (including another student) of any institution.
Submission Regulations
1. Assignment Front Cover Sheet must accompany the assignment [now available from Moodle].
2. You must save your document in the following file name format, so that it can be easily identified: Name_Surname-CourseTitle-Unit-Assignment-Date Submitted
e.g.: John_Darren- HND BIS- PMB-Assignment-07 December 2014.doc 3. Assignments must be submitted on or before the due date, via Turnitin. Please refer to Moodle (VLE) for detailed assignment submission instructions.
Assignment Tasks
Guidelines for Assignment: There are three tasks in this Assignment.
You are expected to prepare an Individual Report that will help you to answer ALL the questions Tasks (1,2 & 3). Task 3 additionally includes project documentation (Plan). Your individual Reports should show evidence of the research you have carried out, where this may be required in the given tasks. In each task, make sure to clearly explain all your answers and the rationale behind them.
The clarity of your reasoning and logic as well as the analysis that leads to a coherent conclusion is crucial.
Your written Report will be more effective if you explicitly integrate the theoretical concepts, models or frameworks learned from your course, other sources and related areas of study.
Task 1 (Individual Report) Based on the scenario for the assignment, you are required to answer the following questions.
AC1.1 Describe the Background and Principles of Project Management Guidance: In this question, you are required to provide a description of project elements, three principles of good project management and the role of the Project Manager within the context of a typical Aura project. Your answer must provide a clear picture for an aspiring Project Manager.
AC1.2 Appraise the Viability of Projects, developing Success/Fail Criteria Guidance: Using relevant appraisal techniques such as NPV select the most feasible project from
the 3 project options (A, B, or C) in the scenario. You will need to explain how you concluded the
selection. A discussion on the causes of project failures and how these risks can be mitigated will
be worthwhile.
AC1.3 Explain the Principles behind Project Management Systems and Procedures
Guidance: In this question, you will need to define a project management system. From the
definition you will need to explain the rationale and applicability of such a system and its relative
importance to the Project Manager.
AC1.4 Explain the Key Elements involved in terminating projects and conducting Post Project Appraisals.
Guidance: Your answer should outline the key elements involved in natural and unnatural project
termination. It should further seek to advice on how all project stakeholders can effectively
appraise a project once it has been completed.
Task 1 covers assessment criteria AC1.1, AC1.2, AC1. 3 and AC1.4
Task 2 (Individual Report)
AC2.1 Identify the most appropriate organisational Structure, roles and responsibilities of
participants within a project.
Guidance: From the Scenario, you will have to suggest and illustrate an appropriate
organisational structure for AURA Limited giving reasons for your choice. Your answer should
also identify the possible roles needed for the relocation project with justification; for one of
these roles draw up a person specification as well as a job specification to be used for the hiring
process.
AC2.2 Control and Coordinate a Project
Guidance: Your answer should describe one technique used in the control and coordination of a
project. Assume AURAs project is behind schedule and you are considering adding extra staff
to the team; describe the possible advantages and disadvantages to this approach.
AC2.3 Assess Project Leadership requirements and qualities Guidance: A good answer will include the role of the Project Leader and the qualities expected on the job. It will be a good idea to relate the answer to a specific project type. A possible reference to Belbins Team roles could be worth considering. AC2.4 Plan and Specify Human resources and requirements for a project Guidance: AURA has finally decided to outsource part of the project tasks to a subcontractor, describe the main stages in the subcontracting process. What are the potential benefits of outsourcing? Task 2 covers assessment criteria AC2.1, AC2.2, AC2.3 and AC2.4
Task 3 (Individual Project Plan & Report)
AC3.1 Prepare Project Plans and establish the Project Organisation Guidance: Produce a Gantt chart for the LSBM Departmental Relocation project. Aura and LSBM Have jointly agreed a move to commence on 1/12/2014 and be completed by 12/01/2015. A Snapshot of the Gantt chart must be included in the report submission.
AC3.2 Apply Project Scheduling, Estimating and Cost Control techniques
Guidance: It will be good to state the importance of Scheduling, Estimation and Cost control techniques.as applied in Projects. Using an estimating technique such as PERT show how time estimates are calculated using an appropriate formula. AC3.3 Analyse the methods used to measure project performance Guidance: A good response to this task may include an initial reference to the project control cycle,
then a comparison between any two performance methods in terms of their advantages and disadvantages. AC3.4 Explain Project Change Control Procedures, evaluate the completed project Guidance: It may be helpful to answer this question in relation to the role of the project control
board. You should also explain how a completed project is evaluated. Task 3 covers assessment criteria (AC3.1, AC3.2, AC3.3, and AC3.4)
Discounting Rates Period 1% 2% 3% 4% 5% 6% 7% 8% 9% 10% 11% Period
1 0.9901 0.9804 0.9709 0.9615 0.9524 0.9434 0.9346 0.9259 0.9174 0.9091 0.9009 1 2 0.9803 0.9612 0.9426 0.9246 0.9070 0.8900 0.8734 0.8573 0.8417 0.8264 0.8116 2
3 0.9706 0.9423 0.9151 0.8890 0.8638 0.8396 0.8163 0.7938 0.7722 0.7513 0.7312 3
4 0.9610 0.9238 0.8885 0.8548 0.8227 0.7921 0.7629 0.7350 0.7084 0.6830 0.6587 4 5 0.9515 0.0328 0.8626 0.8219 0.7835 0.7473 0.7130 0.6806 0.6499 0.6209 0.5935 5
6 0.0161 0.0176 0.8375 0.7903 0.7462 0.7050 0.6663 0.6302 0.5963 0.5645 0.5346 6
7 0.9327 0.0096 0.8131 0.7599 0.7107 0.6651 0.6227 0.5835 0.5470 0.5132 0.4817 7
8 0.9235 0.0053 0.7894 0.7307 0.6768 0.6274 0.5820 0.5403 0.5019 0.4665 0.4339 8
9 0.9143 0.7477 0.7664 0.7026 0.6446 0.5919 0.5439 0.5002 0.4604 0.4241 0.3909 9
10 0.9053 0.8401 0.7441 0.6756 0.6139 0.5584 0.5083 0.4632 0.4224 0.3855 0.3522 10 11 0.8963 0.9004 0.7224 0.6496 0.5847 0.5268 0.4751 0.4289 0.3875 0.3505 0.3173 11
12 0.8874 0.7885 0.7014 0.6246 0.5568 0.4970 0.4440 0.3971 0.3555 0.3186 0.2858 12
13 0.8787 0.7730 0.6810 0.6006 0.5303 0.4688 0.4150 0.3677 0.3262 0.2897 0.2575 13
14 0.8700 0.7579 0.6611 0.5775 0.5051 0.4423 0.3878 0.3405 0.2992 0.2633 0.2320 14
15 0.8613 0.7430 0.6419 0.5553 0.4810 0.4173 0.3624 0.3152 0.2745 0.2394 0.2090 15
16 0.8528 0.7284 0.6232 0.5339 0.4581 0.3936 0.3387 0.2919 0.2519 0.2176 0.1883 16 17 0.8444 0.7142 0.6050 0.5134 0.4363 0.3714 0.3166 0.2703 0.2311 0.1978 0.1696 17
18 0.8360 0.7002 0.5874 0.4936 0.4155 0.3503 0.2959 0.2502 0.2120 0.1799 0.1528 18
19 0.8277 0.6864 0.5703 0.4746 0.3957 0.3305 0.2765 0.2317 0.1945 0.1635 0.1377 19
20 0.8195 0.6730 0.5537 0.4564 0.3769 0.3118 0.2584 0.2145 0.1784 0.1486 0.1240 20
21 0.8114 0.6598 0.5375 0.4388 0.3589 0.2942 0.2415 0.1987 0.1637 0.1351 0.1117 21
22 0.8034 0.6468 0.5219 0.4220 0.3418 0.2775 0.2257 0.1839 0.1502 0.1228 0.1007 22 23 0.7954 0.6342 0.5067 0.4057 0.3256 0.2618 0.2109 0.1703 0.1378 0.1117 0.0907 23
24 0.7876 0.6217 0.4919 0.3901 0.3101 0.2470 0.1971 0.1577 0.1264 0.1015 0.0817 24
25 0.7798 0.6095 0.4776 0.3751 0.2953 0.2330 0.1842 0.1460 0.1160 0.0923 0.0736 25
26 0.7720 0.5976 0.4637 0.3607 0.2812 0.2198 0.1722 0.1352 0.1064 0.0839 0.0663 26
27 0.7644 0.5859 0.4502 0.3468 0.2678 0.2074 0.1609 0.1252 0.0976 0.0763 0.0597 27
28 0.7568 0.5744 0.4371 0.3335 0.2551 0.1956 0.1504 0.1159 0.0895 0.0693 0.0538 28 29 0.7493 0.5631 0.4243 0.3207 0.2429 0.1846 0.1406 0.1073 0.0822 0.0630 0.0485 29
30 0.7419 0.5521 0.4120 0.3083 0.2314 0.1741 0.1314 0.0994 0.0754 0.0573 0.0437 30
Translation of the general grading criteria to this assignment
Criteria For PASS
Assessment criteria
LO.1 Understand Project Management Principles.
AC 1.1 Describe the background and principles of Project Management AC1.2 Appraise the viability of projects, developing success / failure Criteria. AC1.3 Explain the principles behind Project Management Systems and Procedures. AC1.4 Explain the Key Elements involved in terminating Projects and conducting post project appraisals.
LO. 2 Be able to Manage a Projects Human Resources
AC 2.1 Identify the most appropriate organizational structures, roles and responsibilities of participants within a project AC2.2 Control and co-ordinate a project AC2.3 Assess Project Leadership requirements and qualities AC2.4 Plan and specify human resources requirements for a project
LO. 3 Be able to apply project Processes and procedures
AC3.1 Prepare project plans and establish the project organisation AC3.2 Apply project scheduling, estimating and cost control techniques AC3.3 Analyse the methods used to measure project performance AC3.4 Explain Project Change Control procedures, evaluate completed Project.
Grade Descriptors for MERIT Possible evidence
M 1 - Identify and apply strategies to find appropriate solutions
The student has made effective judgments and demonstrated the ability to select and justify appropriate project plans from scenario.
M 2 - Select / design appropriate methods / techniques.
The identification and use of suitable planning tools and techniques in developing and managing the project.
M 3 Findings have been presented in a clear and coherent manner that shows a knowledge and understanding of the relevant terminology
The appropriate structure and approach has been used.
Coherent, logical application of PM principles and methods have been used and technical language has been Applied appropriately.
Communication has taken place with correct contextual emphasis on meeting project objectives.
Criteria for DISTINCTION Possible evidence
D1- Use critical reflection to evaluate own work and justify valid conclusions
Conclusions have been arrived at through synthesis of ideas, and have been justified.
The validity of results has been evaluated using defined criteria.
Realistic improvements have been proposed against defined characteristics for success.
D2- Take responsibility for managing and organizing activities
Independence has been demonstrated & the importance of interdependence has been recognized and achieved.
The systematic approach to research & projects has been demonstrated using a project cycle or relevant structure.
D3- Demonstrate convergent, lateral and creative thinking.
Generation of appropriate problem solving ideas regarding the given questions and avoidance of copy& paste of answers from lecture notes
Self-evaluation of the given answers/ recommendations has taken place
Demonstration of innovation and creative thought while answering the questions