5
WORK PACKAGE Project name insert project name Release Draft/Final Date: PRINCE2 Author: Owner: Client: Document Number:

Prince 2: project managment Document:Work package

Embed Size (px)

Citation preview

Page 1: Prince 2: project managment Document:Work package

WORK PACKAGE

Project name insert project name

Release Draft/Final

Date:

PRINCE2

Author:

Owner:

Client:

Document Number:

Page 2: Prince 2: project managment Document:Work package

document.doc insert project name Date:

Document History

Document Location

This document is only valid on the day it was printed.The source of the document will be found in the Control section of the xxx stage file.

Revision History

Date of this revision:Date of next revision:

Revision date

Previous revision date

Summary of Changes Changes marked

Approvals This document requires the following approvals.

Signed approval forms are filed in the project files.

Name Signature Title Date of Issue

Version

Distribution This document has been distributed to:

Name Title Date of Issue

Version

Page 1

Page 3: Prince 2: project managment Document:Work package

document.doc insert project name Date:

Date

Team or person authorised

Description

Product Description(s)

Techniques/processes/ procedures to be used

Interfaces to be satisfied by the completed product

Interfaces to be maintained during the work

Configuration management requirements

Stage Plan extract

Joint agreement on effort/cost/time

Page 2

Page 4: Prince 2: project managment Document:Work package

document.doc insert project name Date:

Any constraints to be observed

Independent quality-checking arrangements

Reporting arrangements

Problem handling and escalation

Sign-off requirements

Work return arrangements

How completion is to be advised

Page 3