WORK PACKAGE
Project name insert project name
Release Draft/Final
Date:
PRINCE2
Author:
Owner:
Client:
Document Number:
document.doc insert project name Date:
Document History
Document Location
This document is only valid on the day it was printed.The source of the document will be found in the Control section of the xxx stage file.
Revision History
Date of this revision:Date of next revision:
Revision date
Previous revision date
Summary of Changes Changes marked
Approvals This document requires the following approvals.
Signed approval forms are filed in the project files.
Name Signature Title Date of Issue
Version
Distribution This document has been distributed to:
Name Title Date of Issue
Version
Page 1
document.doc insert project name Date:
Date
Team or person authorised
Description
Product Description(s)
Techniques/processes/ procedures to be used
Interfaces to be satisfied by the completed product
Interfaces to be maintained during the work
Configuration management requirements
Stage Plan extract
Joint agreement on effort/cost/time
Page 2
document.doc insert project name Date:
Any constraints to be observed
Independent quality-checking arrangements
Reporting arrangements
Problem handling and escalation
Sign-off requirements
Work return arrangements
How completion is to be advised