37
SWAC/CRC Locust information officer workshop 2013 RNE, Cairo (Egypt) Keith Cressman, FAO

CRC/SWAC DLIO workshop 2013

Embed Size (px)

DESCRIPTION

Desert Locust Information Officers from ten countries (Egypt, Eritrea, Ethiopia, India, Iran, Oman, Pakistan, Saudi Arabia, Sudan, Yemen) and the Desert Locust Control Organization for Eastern Africa (DLCO-EA) participated in the 6th annual workshop held at the UN Food and Agricultural Organization (FAO) Regional Office in Cairo, Egypt. The workshop is an informal forum where participants exchange problems and solutions regarding tools they use for Desert Locust monitoring and early warning such as eLocust2 (handheld data logger and satellite transmitter), remote sensing imagery, and RAMSESv3 GIS for data management and analysis. FAO provides a report card on how countries have been doing in terms of quality and timely reporting as part of the early warning system. The workshop contributes to maintaining an effective and updated system. This year's workshop focussed on training in the new open source version of RAMSESv4 as well as a demonstration of the new revolutionary version of eLocust3. The workshop was organized by the FAO Commission for Controlling the Desert Locust in the Central Region (CRC) and conducted by the FAO Senior Locust Forecasting Officer who was assisted by three resource persons.

Citation preview

Page 1: CRC/SWAC DLIO workshop 2013

SWAC/CRCLocust information officer workshop 2013RNE, Cairo (Egypt)

Keith Cressman, FAO

Page 2: CRC/SWAC DLIO workshop 2013

workshop programme

21 3

eLocust3

RAMSESv4 install/uninstallRAMSESv4 use

reporting2012 followup

Page 3: CRC/SWAC DLIO workshop 2013

DESERT LOCUST REPORTINGAPRIL 2012 - MARCH 2013

Page 4: CRC/SWAC DLIO workshop 2013

2

2.2

2.4

2.6

2.8

3

Quality

DJI IRNOMN YEM ETH

SOM SUDEGY PAK

SAU

IND

ERI

APRIL 2012 - MARCH 2013

Page 5: CRC/SWAC DLIO workshop 2013

2

2.2

2.4

2.6

2.8

3

Timeliness

DJI ETH IRN OMN SAU YEM SUDEGY

IND SOM PAKERI

APRIL 2012 - MARCH 2013

Page 6: CRC/SWAC DLIO workshop 2013

0

10

20

30

40

50

60

Number of reports

IND

SUD

EGY

OMN

YEM SAU PAK ERIETH SOM

IRN

DJI

APRIL 2012 - MARCH 2013

Page 7: CRC/SWAC DLIO workshop 2013

0 500 1000 1500 2000 2500 3000 3500

IND

SUD

SAU

EGY

PAK

YEM

OMN

IRN

ERI

ETH

RAMSES DATA 2012-13

Page 8: CRC/SWAC DLIO workshop 2013

-0.5

-0.25

0

0.25

0.5

0.75

1

OMN ERIEGY SUD IND

SAU

+

COMPARED TO 2011

QUALITY

SOM

YEM PAK ETH DJI IRN -

Page 9: CRC/SWAC DLIO workshop 2013

0

0.1

0.2

0.3

0.4

0.5

0.6 SOM

ETH

ERI

SUDPAK

+

COMPARED TO 2011

TIMELINESS

Page 10: CRC/SWAC DLIO workshop 2013

EGY ERI ETH IND IRN PAK SAU SOM SUD

report every 3 daysduring outbreaks X X X

control totals differ X X

ramses data not sent X X

monthly bulletin late X X

duplicate reporting X

ramses data + map show swarms but not in text X

no data summary (sau: during outbreak) X X

insufficient summary & analysis (fortnightly bull) X

pdf is a scan only X

map is word doc not a pdf X

no reports received sepmar

May-Sep,mar

May,Jan-Mar

mayjul

Page 11: CRC/SWAC DLIO workshop 2013

dear all, Please find herewith attached DL situation report during the above sujecte4d period and RAMSES output data for the sameperiod>

Kind regards

-- Information and Forecasting UnitLocust Control Section (LCS), PPDP. O Box 14Khartoum North, SudanDirect Tel: (+249) 85 337437

201304090414.xls (157 KB) DL situation…l.pdf (39 KB)

Desert Locust <[email protected]>To: FAO DLIS <[email protected]>, Keith DLIS <[email protected]>, “Mamoon AlAlawi” <[email protected]>, Lidia Naguib <[email protected]>, “Saudi locust centre” <[email protected]>, Abdullatif Abdulsalam <[email protected]>, "Khalifah, Essam (FAORNE)" <[email protected]>, Khidir Gibril Musa <[email protected]>, "Eltoum M.Abbas PCA" <[email protected]>, [email protected], Nassor Al-Harthy <[email protected]>, "Kamal Suliman (Kamal Suliman [[email protected]])" <[email protected]>, Locust Egypt <[email protected]> , “Adel Shaibani” <[email protected]>, “Fuad” <[email protected]>, Nassor Seif Al Harthy [email protected]>, “Oman” <[email protected]>, “Ethiopia Kassahun” <[email protected]>, Hiruy Asghedom <[email protected]>, Mehari tesfayohannes <[email protected]>, "Jones, Zoie (TCEO)" <[email protected]>, "Agobia, Charles (FAOSD)" <[email protected]>Cc: “CRC-Locust” <[email protected]>, Eritrea DLIO <[email protected]>, Ethiopia DL <[email protected]>, “Ethiopia Kassahun” <[email protected]>, "Felege 2 ([email protected])" <[email protected]>, Neldjibaye Rassei <[email protected]>, “Ybelayneh” <[email protected]>DL situation during 9th - 14th April 2013

20 April 2013 15:24

2 Attachments, 195 KB

85 ha

Report TotalRAMSES Total

6 days

8 daysRAMSES data: 9-12 April

3problems

1

2

3

Page 12: CRC/SWAC DLIO workshop 2013

subscription data data vs. subEGY 192.00 58.63 3ERI 112.00 7.92 14ETH 80.00 0.00 80OMN 64.00 4.51 14SAU 160.00 23.43 7SOM 32.00 0.00 32SUD 240.00 132.88 2YEM 48.00 0.88 54IND 256.00 66.88 4IRN 144.00 15.40 9PAK 400.00 22.11 18

eLocust2

Page 13: CRC/SWAC DLIO workshop 2013

Locust information officer workshop 2012follow up

1. eLocust2: if only 1 stage present, do NOT use dominant2. every survey + control team must use eLocust23. check export files before sending to DLIS4. DLIOs must know habitat and join survey teams

Page 14: CRC/SWAC DLIO workshop 2013

RAMSESv4intro • tour • exercises

Page 15: CRC/SWAC DLIO workshop 2013

RAMSESv4 team

Page 16: CRC/SWAC DLIO workshop 2013

learning RAMSESv4

Intro Tour Exercises

•architecture•java•sys reqs

•menus•vector•raster

•layer menu•view menu•plug-ins•file menu•windows

Page 17: CRC/SWAC DLIO workshop 2013

openjump

+Postgis / PostgreSQL

spatial databaseGIS

Page 18: CRC/SWAC DLIO workshop 2013

what is java ?a programming languagerequired to run custom applicationsfast, secure, reliableplatform independentfree

Page 19: CRC/SWAC DLIO workshop 2013

how does java workan applicationuninstall from the Control Panel

Page 20: CRC/SWAC DLIO workshop 2013

How to determine the Operating Systemand RAM size on your PC

1. go to the desktop on your PC

2. right-click with the mouse on My Computer

3. select Properties

4. you will see the information

1

2 3

4

Page 21: CRC/SWAC DLIO workshop 2013

external hard disk drive

WD SES Device Driver

installation_sequence installuninstall

data Raster_Data

Static

Dynamiciri

modis

composite

drying

evi

greening

ndvi

docs

updates

blue_marble

crop_production_value

landsat

natural_earth

srtm

topo_30

tpc

2008-12

Page 22: CRC/SWAC DLIO workshop 2013

openjump

+Postgis / PostgreSQL

spatial databaseGIS

Page 23: CRC/SWAC DLIO workshop 2013

what is java ?a programming languagerequired to run custom applicationsfast, secure, reliableplatform independentfree

Page 24: CRC/SWAC DLIO workshop 2013

Participant Country OS Language RAM Partner Country

Felege DLCO-EA W7 E 4 Orion Eritrea

Osama Egypt W7 E 4 Yara Egypt

Hiwot Ethiopia XP E 2 Tedros Eritrea

Zebdewos Ethiopia XP E 3.5 Hussien Sudan

Pramod India XP E 2 Charma India

Chalaki Iran W7 E 6 Eshatti Sudan

Khalid Oman XP E 3 Pramod India

Nassor Oman W7 E 4 Marwan KSA

Shabaz Pakistan W7 E 6 Khan / Charma Pak/India

Abdellatif KSA W7 E 4 Saeed KSA

Hussien Sudan W7 E 2

Eryani Yemen XP A 3 Saeed Yemen

Essam CRC XP E 3.5 Khaled Egypt

Page 25: CRC/SWAC DLIO workshop 2013

vector raster

Page 26: CRC/SWAC DLIO workshop 2013

installJavaJava Advanced Imaging (JAI)OpenJumpPostgis/PostgreSQLRAMSES

uninstall

Java (manual)Java Advanced Imaging (JAI)OpenJumpPostgis/PostgreSQLRAMSESUser

Page 27: CRC/SWAC DLIO workshop 2013

XP issuesPROBLEMafter successful install, it does not start

SOLUTIONchange memory 1512->1000:1. go to c:\Program Files\RAMSES-4.0.0\bin\oj_windows.bat 2. make backup copy first - copy/paste3. Find 1512 and change to 10004. Save

alt-control-delete: task manager

background processes use RAM -end some of these

Page 28: CRC/SWAC DLIO workshop 2013

W7 issues

PROBLEMUninstall error after starting: Uninstaller did not find install.bat

SOLUTIONDo manual uninstall, orCopy installation_sequence folder from HDD to desktop

PROBLEMcannot uninstall JavaSOLUTIONdownload and apply Uninstall Java Patchhttp://support.microsoft.com/mats/Program_Install_and_Uninstall

Page 29: CRC/SWAC DLIO workshop 2013

1. upgrade to Windows 7

2. minimum 4GB RAM (6GB is better)

recommendations

Page 30: CRC/SWAC DLIO workshop 2013

1. temporarily disable anti-virus programs

2. close all windows and apps

3. XP with 2+ GB RAM

4. W7 as Admin (right-click - Run as… and set in Properties)

5. copy installation_sequence folder to desktop and uninstall from there

RAMSESv4 tipsinstall / uninstall

Page 31: CRC/SWAC DLIO workshop 2013

1. zoom in first, then add hi-resolution backgrounds (Landsat, TPC)2. don't update Java63. Greenness maps - to make gray background transparent:

(a) right-click on layer(b) Change Raster Image Properties(c) tick - Do you want a color to be set to be transparent(d) RGB tab(e) resize window(f) RGB=100/110/110 

4. if get error during query, restart RAMSESv45. Greenness map (and some other dynamic images) selection – only FROM date6. monthly rainfall anomaly (difference from norm) vs. aggregate (month total)7. use eLocust3Importer plug-in to enter, update and correct data manually

RAMSESv4 tipsusage

Page 32: CRC/SWAC DLIO workshop 2013

1st time useinstallindex data

Normal usestart-upLayers Menu - Locust data

Page 33: CRC/SWAC DLIO workshop 2013

FILE VIEW

WINDOW

PLUG-IN

LAYERS

Page 34: CRC/SWAC DLIO workshop 2013
Page 35: CRC/SWAC DLIO workshop 2013

Vector layer

Raster layer

right mouse click

Page 36: CRC/SWAC DLIO workshop 2013

HDD docsSTMinstall - Windows 7install - XPuninstall