16
Patent Pending Keep it watertight with Welded steel anchor Wood/Steel anchor Concrete anchor Sealable scaffold attachment system for exterior plaster Enhance Safety and Eliminate Water Intrusion at Scaffold Ties Toll Free (877) 490-8884

Bumperite Sales Brochure

  • Upload
    strama3

  • View
    477

  • Download
    0

Embed Size (px)

DESCRIPTION

Bumperite Waterguards Sealed Scaffold Ties are 35 times stronger than traditional scaffold wire ties, plus they are sealable in just one component. Using Bumperite Waterguards reduces labor costs and is safer and more reliable.

Citation preview

Page 1: Bumperite Sales Brochure

Patent Pending

Keep it watertight with

Welded steel anchor Wood/Steel anchorConcrete anchor

Sealable scaffold attachment system for exterior plaster

Enhance Safety and EliminateWater Intrusion at Scaffold Ties

Toll Free (877) 490-8884

Page 2: Bumperite Sales Brochure

THE PROBLEMWater intrusion at conventional push pull wire ties.

THE SOLUTIONTHE SOLUTIONSealable scaffold attachments.Sealable scaffold attachments.

Bumperite Waterguards enhance Safety and eliminate Liabilitydue to leaks caused by conventional scaffold wire ties assemblies.

Patent Pending

Page 3: Bumperite Sales Brochure

• SAFETYOSHA compliantEngineered and tested structural attachment for scaffolding (4500) lbs. Report # L-06-3265 Ideal for tarped or enclosed scaffolds in high wind conditions.

• REDUCED LABOR COSTEliminate costly end laps and their cuts to building papers verses conventional scaffold wire ties.Removable bumper allows easy access to difficult work areas.*Promotes the continuous installation of building materials.

• RELIABILITYWater tested to ASTM E331-00 at Smith-Emery laboratories, Inc. Los Angeles, CA. Report # L-

06-3059

*See installation instructions.

Patent Pending

Page 4: Bumperite Sales Brochure

Welded Steel AnchorINSTALLATION PROCEDURE

• Determine spacing requirement to insure safe scaffold erection.*

• Measure distance between slab edge bent plate and outer face of stud framing.

• Cut the anchor strut to length as to flush out with face of stud framing.

• Align the anchor strut with the bent plate and stud framing (true, square, and plumb) per detail.

• Weld anchor strut to building bent plate per welding detail shown.

• The use of a certified welder and E7018 rod or equal is recommended.

*Spacing requirements for application should be determined by a competent scaffold erector or structural engineer per building and safety codes prior to installation. The temporary disconnection and reconnection of this product at erected scaffold should only be preformed one connection at any given time and only after it is determined safe to do so. The final determination of safety is the sole responsibility of the end user and should be determined by a competent and qualified person. Follow all OSHA, Federal, State, and Local requirements to ensure scaffold safety.

To ensure safety, use only components manufactured by Bumperite Waterguards, LLC. at scaffold attachment.

Patent Pending

1/8”

Page 5: Bumperite Sales Brochure
Page 6: Bumperite Sales Brochure

WOOD INSTALLATION PROCEDURE

• Determine spacing requirement to insure safe scaffold erection.*

• Review screw matrix provided to determine screw size and quantity required for safe installation.

• Install Bumperite anchor plate where suitable framing and or backing occurs to ensure sufficient strength required to carry intended scaffold load.

• Apply compatible sealant between Bumperite anchor plate & building papers to ensure seal at screws.

• Ensure complete screw embedment at pre-drilled holes in anchor plate.

*Spacing requirements for application should be determined by a competent scaffold erector or structural engineer per building and safety codes prior to installation. The temporary disconnection and reconnection of this product at erected scaffold should only be preformed one connection at any given time and only after it is determined safe to do so. The final determination of safety is the sole responsibility of the end user and should be determined by a competent and qualified person. Follow all OSHA, Federal, State, and Local requirements to ensure scaffold safety.

To ensure safety, use only components manufactured by Bumperite Waterguards, LLC. at scaffold attachment.

Patent Pending

Page 7: Bumperite Sales Brochure
Page 8: Bumperite Sales Brochure

STEEL FRAMED INSTALLATION PROCEDURE

• Determine spacing requirement to insure safe scaffold erection.*

• Review backing plate requirements.

• Install Bumperite anchor plate over 12 gage backing plate per diagram to ensure sufficient strength required to carry intended scaffold load.

• Apply compatible sealant between Bumperite anchor plate & building papers to ensure seal at screws.

• Ensure complete screw embedment at pre-drilled holes in anchor plate.

Patent Pending

*Spacing requirements for application should be determined by a competent scaffold erector or structural engineer per building and safety codes prior to installation. The temporary disconnection and reconnection of this product at erected scaffold should only be preformed one connection at any given time and only after it is determined safe to do so. The final determination of safety is the sole responsibility of the end user and should be determined by a competent and qualified person. Follow all OSHA, Federal, State , and Local requirements to ensure scaffold safety.

To ensure safety, use only components manufactured by Bumperite Waterguards, LLC. at scaffold attachment.

Page 9: Bumperite Sales Brochure

4500 lbs.

Page 10: Bumperite Sales Brochure

CONCRETE INSTALLATION PROCEDURE

• Determine Bumperite spacing requirement and concrete psi values for suitable safe scaffold erection.*

• Install Bumperite anchor plate at concrete slab edge with a minimum of two SIMPSON TITEN HD concrete anchors screws (THD37400H)

• Install SIMPSON anchors per manufactures installation guidelines.

• Ensure complete anchor screw

embedment for maximum strength.

Patent Pending

*Spacing requirements for application should be determined by a competent scaffold erector or structural engineer per building and safety codes prior to installation. The temporary disconnection and reconnection of this product at erected scaffold should only be preformed one connection at any given time and only after it is determined safe to do so. The final determination of safety is the sole responsibility of the end user and should be determined by a competent and qualified person. Follow all OSHA, Federal, State , and Local requirements to ensure scaffold safety.

To ensure safety, use only components manufactured by Bumperite Waterguards, LLC. at scaffold attachment.

Page 11: Bumperite Sales Brochure

Bumperite Attachment to Concrete DeckBumperite Attachment to Concrete Deck

Illustrations and load Capacity provided by FICCADENTI & WAGGONER, Consulting Structural Engineers, Inc

Page 12: Bumperite Sales Brochure

BUMPERITE QUICK-TABOptional feature

• The specially designed Quick-tab is a scaffold erectors dream.

• Fast and easy installation with no hassle.

• A temporary attachment to building slab edge during scaffold erection prior to exterior wall framing and welded attachment of Bumperite Waterguard.

• Using a 1-1/2” x 8” x 14 gage ASTM A653 grade 50 galvanized strap attached to a 1.666 O.D. x 0.098 wall thickness structural steel pipe ASTM A53 Grade A with two Hilti #10 hex head self tapping screws attached to concrete slab with two Hilti X-AL-H 0.177 diameter shank pins with 1-1/2” embedment per Hilti installation guidelines.

• Available upon request.

• WARNING: The Quick-tab attachment is not to be used at tarped or enclosed scaffolds.

Patent Pending

*Spacing requirements for application should be determined by a competent scaffold erector or structural engineer per building and safety codes prior to installation. The temporary disconnection and reconnection of this product at erected scaffold should only be preformed one connection at any given time and only after it is determined safe to do so. The final determination of safety is the sole responsibility of the end user and should be determined by a competent and qualified person. Follow all OSHA, Federal, State , and Local requirements to ensure scaffold safety.

To ensure safety, use only components manufactured by Bumperite Waterguards, LLC. at scaffold attachment.

Page 13: Bumperite Sales Brochure
Page 14: Bumperite Sales Brochure

Manufacturer recommends the use of Densglass Gold exterior sheathing, butyl sealant, Tyvek Straight Flash, minimum UU-B-790a grade D, building paper, and

three coat cement plaster per testing report L-06-3059 from Smith-Emery Laboratories, Inc. using test method ASTM E331-00

WARRANTY: Bumperite Waterguards, LLC. liability expressed or implied is limited to the selling price of any defected goods. User shall determine thesuitability of this product for the intended use by doing f ield test before using, and assumes all risk and liabilities in connection therew ith.

RECOMMENDED METHOD OF SEAL AT CONNECTION

Patent Pending

Page 15: Bumperite Sales Brochure

Patent PendingStep by Step

Page 16: Bumperite Sales Brochure

BUMPERITE - VS - WIRE TIES

Testing at Smith-Emery Laboratories suggest that the Bumperite Waterguard peak tension load is +/-35 TIMES STRONGER than conventional double strand #12

black annealed wire tie assemblies.

OSHA 1926.451(c)(1) states, Capacity- - Scaffolds and scaffold components must support

at least 4 times the maximum intended load.

Sealable & strength Difficult to seal & weaker

Patent Pending

For More Information Please Contact Us [email protected]

Bumperite Waterguards, LLC.

Toll free (877) 490-8884