An Architect Engineer s response to An Architect Engineer s response to Fukushima Dr. Alexander Wolski, Ljubljana, 2012-11-16

An Architect Engineers Response to Fukushima

Embed Size (px)

DESCRIPTION

Presentation given during REMOO conference 2012

Citation preview

Page 1: An Architect Engineers Response to Fukushima

An Architect Engineer’s response toAn Architect Engineer s response to Fukushima

Dr. Alexander Wolski, Ljubljana, 2012-11-16

Page 2: An Architect Engineers Response to Fukushima

Industry LeaderREMOO, 2012

Ljubljanay

2 19-Sep-13

Page 3: An Architect Engineers Response to Fukushima

WorleyParsons’ History of GrowthREMOO, 2012

Ljubljanay y

WorleyParsons in 2004 $ 0 5 BWorleyParsons in 2004 – $ 0.5 BToday – $ 7.4 B

18931960 1980 1990 2000 2002 2004 2006 2008 2010 2011

143 Legacy Companies

3 1011R2926

Page 4: An Architect Engineers Response to Fukushima

Global ReachREMOO, 2012

Ljubljana

Global Reach

A combination of extensive global resources, world recognized technicalA combination of extensive global resources, world recognized technical expertise and deep local knowledge

40,800 personnel |163 offices | 41 countries

Page 5: An Architect Engineers Response to Fukushima

We Operate inREMOO, 2012

Ljubljanap

PowerAdvanced Coal

Minerals, Metals & ChemicalsBase Minerals

Infrastructure & Environment

HydrocarbonsArctic Advanced Coal

Coal Gas Turbine Based PlantsNuclear

CoalChemicalsFerrous MetalsAlumina

Resource InfrastructureUrban InfrastructurePorts & Marine T i l

Gas ProcessingHeavy Oil & Oil SandsINTECSEALNG Nuclear

Renewable EnergyTransmission Networks

AluminaAluminiumIron OreGas Cleaning

TerminalsWater & WastewaterTransportEnvironment

Onshore Production & Enhanced Oil RecoveryPipeline SystemsOffshore TopsidesPetrochemicalsRefiningSulphur TechnologyUnconventional Oil & Gas

WorleyParsons is a recognized leader in successful project delivery with distinguished technical experience, project management and control system, know-how and resource, which enables the group to provide the customers with a wide range of decisions tailored to suit the project requirements on each stage.

Page 6: An Architect Engineers Response to Fukushima

Power Customer Sector100Years of Power Experience Power Customer Sector192,000 MWGenerating Capacity Worldwide

1,800+ highly qualified engineering personnelWork from 4 company power hubs in

g p y

p y pUSA, Europe, Singapore and Australia Services provided for: • Nuclear• Nuclear • Coal-Fired Plants • Gas Turbine/Combined Cycle • Integrated Gasification Combined

Cycle (IGCC) • Renewable – Solar, Wind, Biomass • Air Quality Control • Transmission networks • Operations & Maintenance

740Power Generating Units

Operations & Maintenance18Nuclear Units Engineer of Record

Page 7: An Architect Engineers Response to Fukushima

Engineer of Record – Consultant Basic Design

Nuclear Plant Units Power MWe Client Role

1 Belene NPP 2 Units x 1000 MWe 2 000 Natsionalna Elektricheska Kompania (NEK) Architect Engineer1 Belene NPP 2 Units x 1000 MWe 2 000 Natsionalna Elektricheska Kompania (NEK) Architect Engineer

2 Crystal River NPP Unit 3 855 Florida Power Corporation A/E of Record

3 Erie NPP (cancelled) 2 Units x 1260 MWe 2 520 Central Area Power Coordinating Group A/E of Record

4 Ko-Ri 2 NPP Unit 2 600 Westinghouse Electric Corporation (Owner Korea Electric Company) A/E of RecordElectric Company)

5 Kozloduy NPP 2 Units x 1000 MWe 2 000 Kozloduy Nuclear Power Plant Consultant Basic Design & Execution

6 Krsko NPP, Slovenia Unit 1 630 Nuklearna Elektrarna Krsko A/E of Record

7 Limerick NPP 2 Units x 1100 MWe 2 200 Exelon (formerly Philadelphia Electric Company PECO) Consulting ServicesPECO) g

8 Mihama 1&2 NPP, Japan 1x340 + 1x525 865 Westinghouse Electric Corporation (Owner Kansai Electric Power Company) A/E of Record

9 Mochovce 3&4 NPP 2 Units x 440 Mwe 880 Slovenske Elektrarne Consultant Basic Design & Feasibility

W ti h El t i C ti (O K i10 Ohi 1&2 NPP, Japan 2 Units x 1100 MWe 2 200 Westinghouse Electric Corporation (Owner Kansai Electric Power Company) A/E of Record

11 Peach Bottom 2&3 NPP 2 Units x 800 MWe 1 600 Exelon (formerly Philadelphia Electric Company PECO) Re-start A/E

12 Perry 1&2 NPP (U2 cancelled) 1 Unit x 1200 MWe 1 200 The Cleveland Electric Illuminating Company A/E of Record

13 R.E.Ginna NPP 1 Unit x 490 MWe 490 Westinghouse Electric Corporation A/E of Record

14 Susquehanna NPP 2 Units x 1100 MWe 2 200 Pennsylvannia Power & Light Company Consulting, Continuing Services A/E

15 Three Mile Island I 1 Unit x 870 Mwe 870 General Public Utilities (Nuclear) A/E of Record

16 Vi il C S 1 U it 900 M 900 S th C li El t i & G C A/E f R d16 Virgil C. Summer 1 Unit x 900 Mwe 900 South Carolina Electric & Gas Company A/E of Record

Total: 25 22 010

Page 8: An Architect Engineers Response to Fukushima

WorleyParsonsN l C t f E ll

REMOO, 2012Ljubljana

Nuclear Centers of Excellence

► EU Hub ► Canada Hub ► USA Hub• Approximately 560 employees

and staff augmentation support• Site selection and site hazards• Feasibility Studies, Licensing

• Approximately 100 employees and staff augmentation support

• Engineering and Design

• Approximately 450 employees and staff augmentation support

• Proven excellence in nuclear y , gand preconstruction services

• New build/Refurbishment Owner’s Engineer, design support

Support to Canadian nuclear program and main Canadian utilities

PM role and design• Vast US NRC regulations

application experience• New plant services

• Safety Assessment and Verification Analyses including stress tests

• Major nuclear PM experience accumulated last 10 years

(deployment, planning, COLA and ESP)

• Existing plant services• Decommissioning

8

accumulated last 10 years• Main centre for IAEA and EU

regulations application experience

• Post-Fukushima evaluations and modernizations

Page 9: An Architect Engineers Response to Fukushima

WorleyParsons Nuclear ServicesREMOO, 2012

Ljubljana

What We DoWe guide and support our clients through all 55+g pp gphases of a nuclear power plant lifecycle:• Pre-project phase – Czech, South Africa, Egypt,

Bulgaria, Russia, Saudi Arabia, USA, Slovenia

Years of Industry Experience

g• Project decision-making – Jordan, Egypt, Bulgaria,

Armenia, Slovakia, Russia • Construction – USA, Japan, Korea, Slovenia

18 Nuclear UnitsEngineer of Record, p , ,

• Operation:− Power-uprates, plant upgrades and modernization –

Canada, USA, Mexico, Slovenia, Sweden, Bulgaria,

g

30,000+MW Nuclear Projects, , , , , g ,

Russia and FSU countries (Lithuania, Ukraine, Armenia)

− Post-Fukushima Experience – Bulgaria, Turkey, Russia USA

MW Nuclear Projects

Russia, USA− License renewal – USA, Canada− SF and RAW management - USA, UK

D i i i USA

9

• Decommissioning – USA

Page 10: An Architect Engineers Response to Fukushima

Post FukushimaTh A id t

REMOO, 2012Ljubljana

The AccidentCause of the DamageHuge Tsunami

46 MeterGrid Line

① Loss of Off site Power① Loss of Off-site Power due to the Earthquake

ReactorBuilding

TurbineBuilding

Building

Tsunami (estimated 14m)About20M

About40M

GE Hitachi Nuclear Energy

Elevation: about 10m

② Diesel Generator Inoperable due to the Tsunami

Diesel Generator5.4 ~5.7m

Breakwater

Seawater Pump

due to the TsunamiSeawater level

Page 11: An Architect Engineers Response to Fukushima

European Stress TestsC i ti t th E C i i

REMOO, 2012Ljubljana

Report to EC – Main Findings

Communication to the European Commission

(1) IAEA / WENRA to issue guidance on assessment of natural hazards and margin assessmentg

(2) PWR primary circuit depressurization to protect containment integrity (3) Installation of containment filtered venting systems (4) Passive hydrogen mitigation under SA conditions(5) Seismic Monitoring Systems to be installed(6) Measures to cope with SBO as ultimate limiting case (mobile and fixed SBO-(6) Measures to cope with SBO as ultimate limiting case (mobile and fixed SBO

PS, secure storage for mobile equipment(7) UHS not identified as key problem, but alternative UHS to be strengthened(8) M lti it id t t i i i l d i ( t ff d i t t b i d)(8) Multi-unit accident not in original design (staff and equipment to be increased)(9) Instrumentation and Communication means shall withstand severe accident(10) Enhancement of SAM tools (procedures, training, equipment, communication)( ) (p , g, q p , )

Page 12: An Architect Engineers Response to Fukushima

US NRCN T T k F

NTTF Recommendations (12 7 2011)

Near Term Task Force

NTTF Recommendations (12.7.2011)Regulatory Framework • Establishment of a logical, systematic and coherent

regulatory framework for adequate protection

E i P t ti Re e al ation of seismic and flooding design baseEnsuring Protection • Re-evaluation of seismic and flooding design base• Enhancement in prevention and mitigation of seismically

induced fires and floods

E h i Miti ti St th i SBO bilit i b d d i tEnhancing Mitigation • Strengthening SBO capability in beyond-design events• Hardened vents for MARK 1/2 containments• Identify improvements for H2 control and mitigation

Additi f di h d d SFP i t t ti• Addition of diverse hardened SFP instrumentation• SFP make-up capability• On-Site Emergency Preparedness (EOP, SAMG, EDMG)

Emergency Preparedness

• Specifically addressing SBO and multi-unit events in all emergency plans

Improve NRC • Stronger regulatory oversight focusing attention on Improve NRC Programs

g g y g gdefense-in-depth requirements

Page 13: An Architect Engineers Response to Fukushima

US NRCI l t ti

NNTF Recommendations - Prioritization

Implementation

NNTF Recommendations PrioritizationTier 1 To be implemented without unnecessary delay, required skills and

resources are available:Seismic and flooding hazard re evaluation• Seismic and flooding hazard re-evaluation

• Seismic and flooding walk-downs• Hardened vents for MARK 1 & 2• SFP Instrumentation

Tier 2 To be implemented once further technical assessments have been performed and critical skills and resources have been ensured availablep

Tier 3 • Implementation highly dependent on results of tier 1 and 2 implementation

• Coherent integration of EOP SAMG EDMGCoherent integration of EOP, SAMG, EDMG

Rule- making for Tier 1 implementation underway (today 3 recommendations to be i l t d b f 2017)implemented before 2017)

Page 14: An Architect Engineers Response to Fukushima

Post-Fukushima experienceREMOO, 2012

Ljubljana

Performing “Stress tests” for Kozloduy NPP:

p

• Full stress test analysis of Units 3 & 4

• Development of stress test report for Units 5 & 6

• Participation in the international stress test report review missionsp p

Performing “Design Stress Tests” of Generation III reactor designs:• Bulgaria – A92 (including participation in IAEA mission)

• Russia AES 2006• Russia – AES 2006

• Turkey – AES 2006

Development of Hardened vents for BWR containments• In response to one of the high-priority recommendations of the NRC

Active involvement in “Post-Fukushima” work of international expert missions and work groups:• IAEA expert workshops and missions

• ASME Task Force on Response to the Fukushima events

• ASME Code Case Sub- Committee

• Support the Boiling Water Reactor Owner’s Group

Page 15: An Architect Engineers Response to Fukushima

Stress Test ReportsW l P A l i d R lt

REMOO, 2012Ljubljana

Reviewed and analyzed all EU Progress and Final Stress Tests reports + id tifi d l t d th d l t i l di IAEA id

WorleyParsons Analysis and Results

identified related methodology reports, including IAEA guidance• Developed an activity & task-level work breakdown structure (WBS) for performing

stress testsE t t d ll id tifi d b t i t ( h th l d f d d• Extracted all identified robustness improvements (whether already performed, under implementation, planned or proposed) and developed categorized Improvements Database

Page 16: An Architect Engineers Response to Fukushima

Stress Test MethodologyD t il d I t ti M l

REMOO, 2012Ljubljana

► Requirements? ENSREG “Stress T t R t St t ”

a Detailed Instruction Manual

Test Report Structure” ► Why? Every utility considered

relevant different aspects and h d h i d hmethods; no harmonized approach

► Basis? Activities performed by each participating Utility to answer the p p g yspecific requirement

► What? Activity & task-level work breakdown structure (WBS) SPECIFY( )

► Purpose? Basis / guideline for future stress tests & safety assessments based on EU best-

DESCRIBE

CONSIDER

DETERMINE

practise, using set of clearly identified activities

ASSESS

ESTIMATE

INVESTIGATE

EVALUATE

Page 17: An Architect Engineers Response to Fukushima

Improvements DatabaseG i C t i ti d C R f i

REMOO, 2012Ljubljana

Grouping, Categorization and Cross-Referencing

SEISMIC

►> 1500 d t i t GeneralFLOODINGGeneralFlooding protection engineering features/structures, e.g. dykesEXTREME WEATHER CONDITIONSELECTRICAL SYSTEMS

►> 1500 raw data improvements►Condensed to 209 across 72 plants

Almaraz ■■

Asco ■■

Emergency diesel generator (EDG) (Primary)Mobile diesel generator (MDG)…BatteriesHEAT REMOVAL SYSTEMSGeneral

Belene ■■

Borssele ■

Safety injection systems…Spent fuel poolMobile pumpsACCIDENT MANAGEMENTGeneral

PWR / VVER ■BWR �

GeneralStaffingProcedures (Development & updating)…Hydrogen analysis and mitigationEx-vessel coolingOTHER / GENERAL

Vandellos II ■

Zaporizhzhya ■■■■■■

PHWR ♦UNGG / AGR / Magnox ○

RBMK ‡

OTHER / GENERAL…

RBMK ‡

Page 18: An Architect Engineers Response to Fukushima

Improvements Database Interface - Overview

REMOO, 2012Ljubljana

Interface - Overview

Page 19: An Architect Engineers Response to Fukushima

Improvements DatabaseA I t Sit

REMOO, 2012Ljubljana

Average Improvements per Site

Page 20: An Architect Engineers Response to Fukushima

Improvements Database/Matrix Results

REMOO, 2012Ljubljana

Improvements Database/Matrix Results

COUNT BY CATEGORY

SEISMIC (GENERAL)

HEAT REMOVAL

OTHER

EXTREME WEATHER CONDITIONS

FLOODING

ELECTRICAL POWER

EXTREME WEATHER CONDITIONS

0 500 1000 1500 2000 2500

ACCIDENT MANAGEMENT

Page 21: An Architect Engineers Response to Fukushima

Improvements DatabaseImprovements by Category and Reactor Type

REMOO, 2012Ljubljana

Improvements by Category and Reactor Type

Page 22: An Architect Engineers Response to Fukushima

Improvements DatabaseTop 30 Improvements

REMOO, 2012Ljubljana

Top 30 Improvements

Page 23: An Architect Engineers Response to Fukushima

Improvements DatabaseTop 10 Improvements

REMOO, 2012Ljubljana

Improvement BWR GCR PWR VVER Others1 Seismic survivability of relevant SSCs 99 99 11 33 11

Top 10 Improvements

1 Seismic survivability of relevant SSCs 99 99 11 33 11

2Seismic Margin Assessment (SMA) / Seismic -PSA 24 44 33 14 11

SSC used for flooding protection (dykes,

3mountable flood walls, building seals, air inlets, doors, flood valves, check valves, mobile pumps, etc.)

13 88 66 11 31

4Diesel and lube oil supplies (volume, versatility,

40 17 22 29 774pp ( , y,

diversity, etc.) 40 17 22 29 77

5 SAMGs 11 53 99 11 26

6Add more EDGs (preferably separated / independent) 60 14 44 43 15independent)

7Filtered containment venting (pressure relief), possibly seismically qualified 44 24 29 22 27

8Access to site and specific areas, transport and l i ti t ft i f t t d 22 33 34 49 168 logistics management after infrastructure damage due to external events (incl. weather)

22 33 34 49 16

9EFW bunkered system protected against floods and earthquakes 111 23 5 78 19

10 Flooding survivability of relevant SSCs 10 5 23 46 73

Page 24: An Architect Engineers Response to Fukushima

24Fukushima EventI t th “N l R i ”Impact on the “Nuclear Renaissance”

Page 25: An Architect Engineers Response to Fukushima