A8 PLUMBING ABBREVIATIONS
A/E ARCHITECT/ENGINEER AD AREA DRAIN AFF ABOVE FINISHED FLOOR AFG
ABOVE FINISHED GRADE AG AIR GAP AP ACCESS PANEL AS AUTOMATIC
SPRINKLER ASD ADJUSTABLE SPEED DRIVES ASD AUTOMATIC SPRINKLER DRAIN
ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION
AND AIR CONDITIONING ENGINEERS ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS ASPE AMERICAN SOCIETY OF PLUMBING ENGINEERS ASR AUTOMATIC
SPRINKLER RISER
BFP REDUCED PRESSURE BACKFLOW PREVENTER BHP BRAKE HORSEPOWER BSP
BLACK STEEL PIPE BTU BRITISH THERMAL UNIT BTUH BRITISH THERMAL UNIT
PER HOUR
C CELSIUS CGA COMPRESSED GAS ASSOCIATION CI CAST IRON CO CLEANOUT
CV CONTROL VALVE
DCW DOMESTIC COLD WATER DN DOWN DOE DEPARTMENT OF ENERGY DS
DOWNSPOUT DWG DRAWING DWV DRAIN WASTE VENT
EL ELEVATION EMCS ENERGY MONOSERRAT AND CENTRAL SYSTEM EPA
ENVIRONMENTAL PROTECTION AGENCY EPACT ENERGY POLICY ACT ESC
ESCUTCHEON EX EXISTING
F FAHRENHEIT FCO FLOOR CLEANOUT FD FLOOR DRAIN FDC FIRE DEPARTMENT
(HOSE) CONNECTION FM FLOW METER FS FLOW SWITCH FU FIXTURE
UNITS
GAL GALLON GCO GRADE CLEANOUT GPD GALLONS PER DAY GPH GALLONS PER
HOUR GPM GALLONS PER MINUTE GVTR GAS VENT THROUGH ROOF
HB HOSE BIBB HD HUB DRAIN HP HORSEPOWER HYD HYDRANT
INV INVERT IPC INTERNATIONAL PLUMBING CODE IRW IRRIGATION
WATER
KW KILOWATT KWHR KILOWATT-HOUR
L/S LITER PER SECOND LAV LAVATORY LBS/HR POUNDS PER HOUR
M METER MAV MANUAL AIR VENT MBH 1,000 BTU MH MANHOLE MOU MEMORANDUM
OF UNDERSTANDING
NC NORMALLY CLOSED NIC NOT IN CONTRACT NO NORMALLY OPEN NOM.
NOMINAL NTS NOT TO SCALE
OC ON CENTER OD OUTSIDE DIAMETER OFD OVERFLOW DRAIN OR OPERATING
ROOM OVFL OVERFLOW DRAIN
PA PASCAL PD PRESSURE DROP OR DIFFERENCE PDI PLUMBING AND DRAINAGE
INSTITUTE PG PRESSURE GAGE PP PLUMBING PUMP PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION PRV PRESSURE REDUCING VALVE PSI
POUNDS PER SQUARE INCH PSIA POUNDS PER SQUARE INCH ATMOSPHERE PSIG
POUNDS PER SQUARE INCH GAUGE PTRV PRESSURE TEMPERATURE RELIEF
VALVE
RD ROOF DRAIN RDL ROOF DRAIN LEADER RL ROOF LEADER RWL RAIN WATER
LEADER
SAN SANITARY SEWER SMACNA SHEET METAL AND AIR CONDITIONING
CONTRACTORS
NATIONAL ASSOCIATION SP SUMP PUMP SPR SPRINKLER LINE SQFT SQUARE
FEET SS STAINLESS STEEL ST STORAGE TANK SW STORM WATER
TCV TEMPERATURE CONTROL VALVE TD TEMPERATURE DIFFERENCE TD TRENCH
DRAIN TDH TOTAL DYNAMIC HEAD TEMP TEMPERATURE TMV THERMOSTATIC
MIXING VALVE T STAT THERMOSTAT TYP TYPICAL
UPC UNIFORM PLUMBING CODE
V VENT VB VACUUM BREAKER VP VACUUM PUMP VS VENT STACK VTR VENT THRU
ROOF
W WASTE WC WATER CLOSET WCO WALL CLEANOUT WG WATER GAGE WH WALL
HYDRANT WL WATER LINE WM WATER METER WPD WATER PRESSURE DROP WS
WASTE STACK
YCO YARD CLEANOUT YH YARD HYDRANT
STORM WATER
DRAIN TILE
A6 PLUMBING PIPING SYMBOLS
UNION
CAPPED OUTLET
PRESSURE GAGE
PIPE UP
PIPE DOWN
PUMP NO.3 IN BUILDING NO.26
EQUIPMENT ABBREVIATION (PUMP)
CHECK VALVE
AUTOMATIC AIR VENT
WATER BALANCE DEVICE
A3 GENERAL NOTES
1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND MAY NOT SHOW EXACT
ROUTING OR ALL REQUIRED OFFSETS, ACCESSORIES OR APPURTENANCES.
CONTRACTOR SHALL PROVIDE AS REQUIRED TO INSTALL A COMPLETE AND
COORDINATED JOB, INCLUDING ANY ADDITIONAL ITEMS REQUIRED TO MEET
ACTUAL FIELD CONDITIONS AND ACTUAL EQUIPMENT SELECTED.
2. THIS IS A GENERAL LIST OF ABBREVIATIONS AND SYMBOLS ON THIS
SHEET. SOME ABBREVIATIONS AND SYMBOLS MAY NOT BE APPLICABLE TO THIS
PROJECT.
3. ALL VALVES SHALL BE READILY ACCESSIBLE FROM A SAFE HEIGHT ON A
SIX FOOT LADDER AND TO BE CLEAR OF ALL OBSTRUCTIONS. OPERATION
SHALL NOT BE ENCUMBERED BY ANY DEVICE OR EQUIPMENT.
4. ALL WATER PIPING SUPPLYING FIXTURES FROM WALLS OR CHASES SHALL
BE PIPED FROM A FULL SIZED HORIZONTAL MANIFOLD, VERTICAL BRANCHES
FROM THE MANIFOLD, INCLUDING AIR CHAMBERS, SHALL BE ONE PIPE SIZE
LARGER THAN THE SIZE INDICATED UNDER "CONNECTIONS" OF THE FIXTURE
SPECIFICATIONS. SEE PLANS FOR SUPPLY PIPE SIZING TO WALLS OR
CHASES.
5. DO NOT SUPPORT PLUMBING PIPING FROM METAL DECK.
6. COORDINATE SCHEDULE FOR HOOK-UPS TO EXISTING SYSTEMS AND
EQUIPMENT REMOVAL OR RELOCATIONS WITH THE OWNER AND PERFORM THIS
WORK AT SUCH TIMES TO ENSURE THAT PERIODS OF SHUTDOWN WILL BE
ACCEPTABLE TO THE OWNER.
7. VERIFY EXACT LOCATION OF CONNECTION POINTS (NEW TO EXISTING) IN
FIELD PRIOR TO CONSTRUCTION.
8. COORDINATE INSTALLATION OF NEW PIPING WITH EXISTING BUILDING
STRUCTURE, DUCTWORK, PIPING, ELECTRICAL CONDUIT, LIGHTING,
ETC.
9. RELOCATE EXISTING PIPING IN EXISTING CEILING SPACES TO
ACCOMMODATE ALL RENOVATIONS AND ADDITIONS.
10. REFER TO ARCHITECTURAL ELEVATION DRAWINGS FOR LOCATION OF WALL
MOUNTED MECHANICAL ITEMS.
11. THIS PLAN IS APPROVED FOR WORK INDICATED PER THE APPLICABLE
DRAWINGS AND SPECIFICATIONS ONLY. ALL OTHER AREAS SHOWN ARE FOR
REFERENCE ONLY AND SHALL NOT BE CONSIDERED OR APPROVED TO BE IN
ACCORDANCE WITH APPLICABLE CODES OR AUTHORITY HAVING
JURISDICTION.
12. NOT ALL PIPING AND PIPE SIZES ARE SHOWN ON THE DRAWINGS FOR
CLARITY. REFER TO STACK DIAGRAMS, WATER RISERS, AND MEDICAL GAS
RISER FOR ADDITIONAL PIPING AND SIZES.
13. ALL EXISTING BUILDING UTILITIES HAVE BEEN DOCUMENTED FROM
AVAILABLE DRAWINGS, RECORDS AND FIELD SURVEY AND THEREFORE, THEIR
LOCATIONS MUST BE CONSIDERED APPROXIMATE ONLY. IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE LOCATION AND SIZE OF
ALL EXISTING UTILITIES BEFORE BEGINNING WORK.
14. THIS IS A GENERAL LIST OF ABBREVIATIONS AND SYMBOLS ON THIS
SHEET. SOME ABBREVIATIONS AND SYMBOLS MAY NOT BE APPLICABLE TO THIS
PROJECT.
15. THE SPACE ABOVE THE CEILING IS LIMITED AND THE INSTALLATION OF
WORK WILL BE TIGHT. DUE TO THIS, IT IS IMPORTANT THAT THE TRADE
CONTRACTOR SHALL COORDINATE THE INSTALLATION OF THEIR WORK WITH THE
CEILING SYSTEM HEIGHT AND CONSTRUCTION, THE STRUCTURAL SYSTEM, THE
LIGHTING FIXTURES, THE SPRINKLER HEADS / MAINS AND THE PLUMBING
PIPES. ROUTE PIPING AS HIGH AS POSSIBLE. MAINTAIN PROPER SERVICE
ACCESS CLEARANCE. ACCURATE SHOP DRAWINGS SHALL BE SUBMITTED FOR
APPROVAL, PRIOR TO FIELD INSTALLATION.
16. DO NOT INSTALL ANY NEW WORK DIRECTLY ABOVE ANY ELECTRICAL
PANELS AND TRANSFORMERS.
17. NO EQUIPMENT OR DEVICE REQUIRING REGULAR ACCESS OR MAINTENANCE
SHALL BE INSTALLED IN AN INACCESSIBLE CEILING CAVITY. LOCATE SUCH
ITEMS ABOVE ACOUSTIC TILE CEILINGS WHEREVER POSSIBLE. IF ANY SUCH
ITEMS ARE REQUIRED TO BE INSTALLED ABOVE DRYWALL CEILINGS, PROVIDE
AN ACCESS PANEL OR PANELS SIZED AND LOCATED TO PROVIDE SUFFICIENT
ACCESS FOR EQUIPMENT SERVICE. SUBMIT LAYOUT OF ALL REQUIRED ACCESS
PANELS FOR ARCHITECTS REVIEW AND APPROVAL PRIOR TO THE ONSET OF
INSTALLATION.
18. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY PARAGRAPH,
SUBMITTALS. CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL
THE LAYOUT DRAWINGS HAVE BEEN APPROVED BY VA.
19. ALL CONTRACTORS / SUB-CONTRACTORS ARE TO REFERENCE / COORDINATE
WITH ALL OTHER DISCIPLINE'S DRAWING SHEETS WITHIN THIS ENTIRE SET
OF DOCUMENTS.
20. ALL PIPE DROPS TO OCCUR WITHIN 6" OF INTERIOR OR EXTERIOR WALL
TO AVOID DISRUPTING PARKING SPACES.
21. ALL PIPING SHALL BE ROUTE TO MAINTAIN A CLEARANCE OF 8'-4" IN
THE DRIVE LANE.
STORM WATER
SANITARY SEWER
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
CANNON DESIGN PROJECT NO. 03640.50
© CannonDesign 2016 All rights reserved. No part of this document
may be reproduced or utilized in any form, without prior written
authorization by the Cannon Corporation
MARCH 10, 2017
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and
Facilities Management
o n e e ig h th in c h = o n e fo o t 1 6
8 4
0
B
A
C
D
E
F
th re e in c h e s = o n e fo o t
6 "
6 "
o n e a n d o n e h a lf in c h e s = o n e fo o t
o n e in c h = o n e fo o t
2 0
0 2
th re e q u a rt e rs in c h = o n e fo o t
o n e h a lf in c h = o n e fo o t
4 0
th re e e ig h th s in c h = o n e fo o t
4 0
0 4
8
o n e q u a rt e r in c h = o n e fo o t
VA FORM 08-6231
F
E
D
C
B
A
Department of Veterans Affairs
VA PARKING GARAGE Eriksson Engineering Assoc. 145 Commerce Drive
Suite A Graylake, IL 60030 T: 847.223.4804 www.eea-ltd.com
Hinman
One Bush Street Suite 510 San Francisco, CA 94104 T: 415.875.7709
www.hce.com
ECS Midwest, LLC 1575 Barclay Boulevard Buffalo Grove, IL 60089 T:
847.777.0344 www.ecslimited.com
LEGENDS, SYMBOLS & ABBREVIATIONS
P0001 JJS RJL
8" ST I.E. 60.00' FOR CONTINUATION REFER TO CIVIL PLAN
S T
S T
W
W
W
W
W
4" DT I.E. 58.00' FOR CONTINUATION REFER TO CIVIL PLAN
4 " D
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
CANNON DESIGN PROJECT NO. 03640.50
© CannonDesign 2016 All rights reserved. No part of this document
may be reproduced or utilized in any form, without prior written
authorization by the Cannon Corporation
MARCH 10, 2017
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and
Facilities Management
o n e e ig h th in c h = o n e fo o t 1 6
8 4
0
B
A
C
D
E
F
th re e in c h e s = o n e fo o t
6 "
6 "
o n e a n d o n e h a lf in c h e s = o n e fo o t
o n e in c h = o n e fo o t
2 0
0 2
th re e q u a rt e rs in c h = o n e fo o t
o n e h a lf in c h = o n e fo o t
4 0
th re e e ig h th s in c h = o n e fo o t
4 0
0 4
8
o n e q u a rt e r in c h = o n e fo o t
VA FORM 08-6231
F
E
D
C
B
A
Department of Veterans Affairs
VA PARKING GARAGE Eriksson Engineering Assoc. 145 Commerce Drive
Suite A Graylake, IL 60030 T: 847.223.4804 www.eea-ltd.com
Hinman
One Bush Street Suite 510 San Francisco, CA 94104 T: 415.875.7709
www.hce.com
ECS Midwest, LLC 1575 Barclay Boulevard Buffalo Grove, IL 60089 T:
847.777.0344 www.ecslimited.com
UNDERFLOOR PLUMBING PLAN
P0100 JJS RJL
1/16" = 1'-0" F2
UNDERFLOOR PLUMBING PLAN
6" ST I.E. 75.25' FOR CONTINUATION REFER TO CIVIL PLAN
6" ST UP
4" W DN
4" DT DN
COORDINATE FINAL TRENCH DRAIN LOCATION AND SPACING WITH PRECASTER
(TYP.)
FD-AA 4" W UP
(2) 2" V UP
HOLD VERTICAL PIPING CLOSE TO MIDDLE WALL AND/OR PERIMETER COLUMNS
AND PROVIDE PIPE GUARDS PER D4/P0601.
FINAL LOCATION OF DRAINS TO BE COORDINATED TO AVOID PENETRATING
PRECAST TEE WEBS.
1.
2.
T: 314.241.6250 F: 314.241.2570
CANNON DESIGN PROJECT NO. 03640.50
© CannonDesign 2016 All rights reserved. No part of this document
may be reproduced or utilized in any form, without prior written
authorization by the Cannon Corporation
MARCH 10, 2017
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and
Facilities Management
o n e e ig h th in c h = o n e fo o t 1 6
8 4
0
B
A
C
D
E
F
th re e in c h e s = o n e fo o t
6 "
6 "
o n e a n d o n e h a lf in c h e s = o n e fo o t
o n e in c h = o n e fo o t
2 0
0 2
th re e q u a rt e rs in c h = o n e fo o t
o n e h a lf in c h = o n e fo o t
4 0
th re e e ig h th s in c h = o n e fo o t
4 0
0 4
8
o n e q u a rt e r in c h = o n e fo o t
VA FORM 08-6231
F
E
D
C
B
A
Department of Veterans Affairs
VA PARKING GARAGE Eriksson Engineering Assoc. 145 Commerce Drive
Suite A Graylake, IL 60030 T: 847.223.4804 www.eea-ltd.com
Hinman
One Bush Street Suite 510 San Francisco, CA 94104 T: 415.875.7709
www.hce.com
ECS Midwest, LLC 1575 Barclay Boulevard Buffalo Grove, IL 60089 T:
847.777.0344 www.ecslimited.com
LOWER LEVEL C - PLUMBING PLAN
P0101 JJS RJL
1/16" = 1'-0" F2
71
636-125
M
L
K
J
H
G
F
E
D
C
B
A
1.522.53
4
4.5
5
5.5
6
1
(2) BFP-1
2" DOMESTIC CW I.E. 85.25' FOR CONTINUATION REFER TO CIVIL
PLAN
4" FD-D
STAIR 01
6" ST I.E. 78.25' FOR CONTINUATION REFER TO CIVIL PLAN
6" ST I.E. 78.25' FOR CONTINUATION REFER TO CIVIL PLAN
8" ST UP & DN
4" FD-Y
RACK COLD WATER AND SANITARY PIPING WITHIN 2'-0" OF INTERIOR WALL.
COORDINATE WITH OTHER DISCIPLINES PRIOR TO INSTALLATION.
RACK COLD WATER AND SANITARY PIPING WITHIN 2'-0" OF INTERIOR WALL.
COORDINATE WITH OTHER DISCIPLINES PRIOR TO INSTALLATION.
ELECTRICAL ENTRY ROOM
B04
2" PD DN 4" W I.E. 77.50' FOR CONTINUATION REFER TO CIVIL
PLAN
4" FCO
4" FCO
4" FCO
8" ST UP
4" W UP
DOMESTIC WATER LINE SHALL PENETRATE CONCRETE WALL BELOW GRADE AT
LEVEL B. RUN PIPING TIGHT AGAINST BOTTOM OF STRUCTURE ABOVE, TO
WATER ENTRY ROOM. HEAT TRACING SHALL BE PROVIDED ON PIPING UNTIL IT
REACHES BACKFLOW PREVENTER.
W W
2" PD DN
2" V DN & 3" V UP
4" YCO
2" V DN
ROUTE UP BETWEEN TEE FLANGES.
ROUTE UP BETWEEN TEE FLANGES.
ROUTE UP BETWEEN TEE FLANGES.
ROUTE UP BETWEEN TEE FLANGES.
HOLD VERTICAL PIPING CLOSE TO MIDDLE WALL AND/OR PERIMETER COLUMNS
AND PROVIDE PIPE GUARDS PER D4/P0601.
FINAL LOCATION OF DRAINS TO BE COORDINATED TO AVOID PENETRATING
PRECAST TEE WEBS.
1.
2.
T: 314.241.6250 F: 314.241.2570
CANNON DESIGN PROJECT NO. 03640.50
© CannonDesign 2016 All rights reserved. No part of this document
may be reproduced or utilized in any form, without prior written
authorization by the Cannon Corporation
MARCH 10, 2017
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and
Facilities Management
o n e e ig h th in c h = o n e fo o t 1 6
8 4
0
B
A
C
D
E
F
th re e in c h e s = o n e fo o t
6 "
6 "
o n e a n d o n e h a lf in c h e s = o n e fo o t
o n e in c h = o n e fo o t
2 0
0 2
th re e q u a rt e rs in c h = o n e fo o t
o n e h a lf in c h = o n e fo o t
4 0
th re e e ig h th s in c h = o n e fo o t
4 0
0 4
8
o n e q u a rt e r in c h = o n e fo o t
VA FORM 08-6231
F
E
D
C
B
A
Department of Veterans Affairs
VA PARKING GARAGE Eriksson Engineering Assoc. 145 Commerce Drive
Suite A Graylake, IL 60030 T: 847.223.4804 www.eea-ltd.com
Hinman
One Bush Street Suite 510 San Francisco, CA 94104 T: 415.875.7709
www.hce.com
ECS Midwest, LLC 1575 Barclay Boulevard Buffalo Grove, IL 60089 T:
847.777.0344 www.ecslimited.com
LOWER LEVEL B - PLUMBING PLAN
P0102 JJS RJL
1/16" = 1'-0" F2
72
636-125
M
L
K
J
H
G
F
E
D
C
B
A
1.522.53
4
4.5
5
5.5
6
1
6" ST DN
6" FCO
RACK STORM PIPING WITHIN 2'-0" OF INTERIOR WALL. COORDINATE WITH
OTHER DISCIPLINES PRIOR TO INSTALLATION.
RACK STORM PIPING WITHIN 2'-0" OF INTERIOR WALL. COORDINATE WITH
OTHER DISCIPLINES PRIOR TO INSTALLATION.
2" V UP. KEEP TIGHT TO CORNER.
4" ST UP
ST
4" ST UP
3" V DN
TURN VENT DOWN
10'-3"
10'-0"
15'-0"
15'-0"
10'-3"
ROOF AREA #: 11 ROOF FLAT AREA: 6,900 S.F. ROOF WALL AREA: 1,100
S.F. ROOF TOTAL AREA: 7,450 S.F.
ROOF AREA #: 12 ROOF FLAT AREA: 6,900 S.F. ROOF WALL AREA: 1,100
S.F. ROOF TOTAL AREA: 7,450 S.F.
HOLD VERTICAL PIPING CLOSE TO MIDDLE WALL AND/OR PERIMETER COLUMNS
AND PROVIDE PIPE GUARDS PER D4/P0601.
FINAL LOCATION OF DRAINS TO BE COORDINATED TO AVOID PENETRATING
PRECAST TEE WEBS.
1.
2.
T: 314.241.6250 F: 314.241.2570
CANNON DESIGN PROJECT NO. 03640.50
© CannonDesign 2016 All rights reserved. No part of this document
may be reproduced or utilized in any form, without prior written
authorization by the Cannon Corporation
MARCH 10, 2017
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and
Facilities Management
o n e e ig h th in c h = o n e fo o t 1 6
8 4
0
B
A
C
D
E
F
th re e in c h e s = o n e fo o t
6 "
6 "
o n e a n d o n e h a lf in c h e s = o n e fo o t
o n e in c h = o n e fo o t
2 0
0 2
th re e q u a rt e rs in c h = o n e fo o t
o n e h a lf in c h = o n e fo o t
4 0
th re e e ig h th s in c h = o n e fo o t
4 0
0 4
8
o n e q u a rt e r in c h = o n e fo o t
VA FORM 08-6231
F
E
D
C
B
A
Department of Veterans Affairs
VA PARKING GARAGE Eriksson Engineering Assoc. 145 Commerce Drive
Suite A Graylake, IL 60030 T: 847.223.4804 www.eea-ltd.com
Hinman
One Bush Street Suite 510 San Francisco, CA 94104 T: 415.875.7709
www.hce.com
ECS Midwest, LLC 1575 Barclay Boulevard Buffalo Grove, IL 60089 T:
847.777.0344 www.ecslimited.com
LOWER LEVEL A - PLUMBING PLAN
P0103 JJS RJL
1/16" = 1'-0" F2
73
636-125
M
L
K
J
H
G
F
E
D
C
B
A
1.522.53
4
4.5
5
5.5
6.5
6
1
2" CW DN
2" CW DN
AREA SHOWN FOR CLARIFICATION PURPOSES. SEE SHEET P0103 FOR DRAIN
LOCATIONS.
AREA SHOWN FOR CLARIFICATION PURPOSES. SEE SHEET P0103 FOR DRAIN
LOCATIONS.
3" V UP TO 3" VTR. KEEP TIGHT TO CORNER.
RD-2
RD-2
4" FCO
HUB DRAIN SHALL COLLECT DOWNSPOUT DISCHARGE WITH AIR GAP.
COORDINATE WITH DOWNSPOUT LOCATION BEFORE INSTALLATION.
HUB DRAIN SHALL COLLECT DOWNSPOUT DISCHARGE WITH AIR GAP.
COORDINATE WITH DOWNSPOUT LOCATION BEFORE INSTALLATION.
3" RD-1
7 '-6
"
ROOF AREA #: 1 ROOF FLAT AREA: 950 S.F. ROOF WALL AREA: 250 S.F.
ROOF TOTAL AREA: 1,075 S.F.
ROOF AREA #: 5 ROOF FLAT AREA: 1,800 S.F. ROOF WALL AREA: 130 S.F.
ROOF TOTAL AREA: 1,865 S.F.
ROOF AREA #: 4 ROOF FLAT AREA: 3,380 S.F. ROOF WALL AREA: 745 S.F.
ROOF TOTAL AREA: 3,753 S.F.
ROOF AREA #: 2 ROOF FLAT AREA: 900 S.F. ROOF WALL AREA: 125 S.F.
ROOF TOTAL AREA: 1,075 S.F.
ROOF AREA #: 6 ROOF FLAT AREA: 1,020 S.F. ROOF WALL AREA: 160 S.F.
ROOF TOTAL AREA: 1,100 S.F.
ROOF AREA #: 7 ROOF FLAT AREA: 1,800 S.F. ROOF WALL AREA: 130 S.F.
ROOF TOTAL AREA: 1,865 S.F.
ROOF AREA #: 8 ROOF FLAT AREA: 3,475 S.F. ROOF WALL AREA: 660 S.F.
ROOF TOTAL AREA: 3,805 S.F.
ROOF AREA #: 9 ROOF FLAT AREA: 1,550 S.F. ROOF WALL AREA: 200 S.F.
ROOF TOTAL AREA: 1,650 S.F.
ROOF AREA #: 10 ROOF FLAT AREA: 1,550 S.F. ROOF WALL AREA: 200 S.F.
ROOF TOTAL AREA: 1,650 S.F.
ROOF AREA #: 3 ROOF FLAT AREA: 900 S.F. ROOF WALL AREA: 200 S.F.
ROOF TOTAL AREA: 1,075 S.F.
B
A
2.53
3" VTR
HOLD VERTICAL PIPING CLOSE TO MIDDLE WALL AND/OR PERIMETER COLUMNS
AND PROVIDE PIPE GUARDS PER D4/P0601.
FINAL LOCATION OF DRAINS TO BE COORDINATED TO AVOID PENETRATING
PRECAST TEE WEBS.
1.
2.
T: 314.241.6250 F: 314.241.2570
CANNON DESIGN PROJECT NO. 03640.50
© CannonDesign 2016 All rights reserved. No part of this document
may be reproduced or utilized in any form, without prior written
authorization by the Cannon Corporation
MARCH 10, 2017
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and
Facilities Management
o n e e ig h th in c h = o n e fo o t 1 6
8 4
0
B
A
C
D
E
F
th re e in c h e s = o n e fo o t
6 "
6 "
o n e a n d o n e h a lf in c h e s = o n e fo o t
o n e in c h = o n e fo o t
2 0
0 2
th re e q u a rt e rs in c h = o n e fo o t
o n e h a lf in c h = o n e fo o t
4 0
th re e e ig h th s in c h = o n e fo o t
4 0
0 4
8
o n e q u a rt e r in c h = o n e fo o t
VA FORM 08-6231
F
E
D
C
B
A
Department of Veterans Affairs
VA PARKING GARAGE Eriksson Engineering Assoc. 145 Commerce Drive
Suite A Graylake, IL 60030 T: 847.223.4804 www.eea-ltd.com
Hinman
One Bush Street Suite 510 San Francisco, CA 94104 T: 415.875.7709
www.hce.com
ECS Midwest, LLC 1575 Barclay Boulevard Buffalo Grove, IL 60089 T:
847.777.0344 www.ecslimited.com
LEVEL ONE - PLUMBING PLAN
NTS
1/4" [6mm] STEEL PLATE WATER STOP &
ANCHOR COLLAR
FLOOR DRAIN TERMINATE OVER
STAND PIPE
WALL & FLOOR. SECURE BACKFLOW PREVENTER TO UNSTRUT SUPPORTS AS
REQUIRED TO
NOTE: P.C. SHALL FURNISH & INSTALL
BALL VALVE W/ HOUSE DRAIN
2"
2"
(TYP)
CW
M
GATE VALVE(TYP)
CHECK VALVE
P.C. TO BOLT BASE OF BASIN TO SLAB (TYP)
FLOAT
VENT
TRAP
3'-0" DIA. 6'-0" DEEP PRECAST REINFORCED CONCRETE BASIN BY
P.C.
4" WASTE INLET
CONCRETE PAD BY STRUCTURAL CONTR.
STRUCTURAL SLAB BY STRUCTURAL CONTR.
3'-0" DIA. 6'-0" DEEP, 4" THICK PRECAST REINFORCED CONCRETE BASIN
BY P.C.
ANCHOR BOLTS CAST INTO SLAB BY STRUCTURAL CONTR. (TYP.)
4"
SLEEVE CLEANOUT AT GRADE
BUILDING WALL
(2) #4 EACH WAY (EPOXY COATED) BY GENERAL CONTRACTOR. PLACE TIGHT
TO SIDES OF DRAIN
28" SQUARE BY 3" DEEP CAST-IN-PLACE CONCRETE WITH INTEGRAL CAST-IN
DRAIN. DRAIN BY PLUMBING CONTRACTOR.
TIE REBAR AT CROSSINGS
PRE-TOPPED DOUBLE TEE
3/8" X 3/8" GAP FORMED ALL AROUND DRAIN. FILL WITH SEALANT
1'-0" 24" SQUARE 1'-0"
3"
1/2"
WALL OR COLUMN
Q U
A N
T IT
Y O
F P
IP E
V A
R IE
S E
E P
L A
N S
F O
R Q
U A
N T
IT Y
STRAP ANCHOR PLATE 1/4" X 3" X 2" (GALV) (4) REQUIRED - WELD TO
STEEL PLATE. PROVIDE 1/8" NEOPRENE PAD BETWEEN ANCHOR &
COLUMN
10"
5"
2. PAINT ALL STEEL PIPE GUARDS WHITE.
CATCH BASIN (SIDE OUTLET)
VERIFY SECTION SIZE WITH MANUFACTURER DATA
LOAD CLASS D DRAIN AND GRATE
STORM PIPING FROM STAIRWELL ROOF
4'' PIPED TO STORM
T: 314.241.6250 F: 314.241.2570
CANNON DESIGN PROJECT NO. 03640.50
© CannonDesign 2016 All rights reserved. No part of this document
may be reproduced or utilized in any form, without prior written
authorization by the Cannon Corporation
MARCH 10, 2017
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and
Facilities Management
o n e e ig h th in c h = o n e fo o t 1 6
8 4
0
B
A
C
D
E
F
th re e in c h e s = o n e fo o t
6 "
6 "
o n e a n d o n e h a lf in c h e s = o n e fo o t
o n e in c h = o n e fo o t
2 0
0 2
th re e q u a rt e rs in c h = o n e fo o t
o n e h a lf in c h = o n e fo o t
4 0
th re e e ig h th s in c h = o n e fo o t
4 0
0 4
8
o n e q u a rt e r in c h = o n e fo o t
VA FORM 08-6231
F
E
D
C
B
A
Department of Veterans Affairs
VA PARKING GARAGE Eriksson Engineering Assoc. 145 Commerce Drive
Suite A Graylake, IL 60030 T: 847.223.4804 www.eea-ltd.com
Hinman
One Bush Street Suite 510 San Francisco, CA 94104 T: 415.875.7709
www.hce.com
ECS Midwest, LLC 1575 Barclay Boulevard Buffalo Grove, IL 60089 T:
847.777.0344 www.ecslimited.com
PLUMBING DETAILS
NTS D8
D4 PIPE GUARD DETAIL
A9 ABBREVIATIONS
PRESSURE SWITCH
RISER INDICATOR / DETAIL NO. TOP INDICATES TYPE OF RISER / DETAIL
NO. BOTTOM INDICATES RISER NUMBER / DWG NO.
RISER INDICATOR - TOP INDICATES TYPE OF RISER, BOTTOM INDICATES
RISER NUMBER (ARROW INDICATES DIRECTIONAL VIEW OF ISOMETRIC
RISERS)
CHECK VALVE (SHOWN W/FLOW)
FIRE PROTECTION PIPING (FP)
EX. FP
CLEAN AGENT PIPING (CA)CA
AC AIR COMPRESSOR AFF ABOVE FINISHED FLOOR AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION AP ACCESS PANEL ARCH ARCHITECTURE
ASSY ASSEMBLY ATM ATMOSPHERE AUTO AUTOMATIC AUX AUXILIARY
BOB BOTTOM OF BEAM BOP BOTTOM OF PIPE
CA COMPRESSED AIR OR CLEAN AGENT CALCS CALCULATIONS CAP CAPACITY CC
CEILING COLUMN CCD CHICAGO CITY DATUM CLG CEILING cm CENTIMETER CO2
CARBON DIOXIDE COL COLUMN CONC CONCRETE CONN. CONNECTION CONT.
CONTINUED CSP COMBINED STANDPIPE/SPRINKLER SYSTEM CV CHECK
VALVE
DCV DOUBLE CHECK VALVE DDCV DOUBLE DETECTOR CHECK VALVE DIA
DIAMETER DIM DIMENSION DN DOWN DR DRAIN DPV DRY PIPE VALVE DV DRAIN
VALVE DWG DRAWING
EA EACH ELEV. ELEVATION ELEC ELECTRICAL EQUIP EQUIPMENT EX EXISTING
EXIST EXISTING EXP EXPANSION
F FAHRENHEIT FA FIRE ALARM FACP FIRE ALARM CONTROL PANEL FBO
FURNISHED BY OTHERS FD1,2,3... FLOOR DRAIN FDC FIRE DEPARTMENT
CONNECTION FDV FIRE DEPARTMENT VALVE FEC FIRE EXTINGUISHER CABINET
FIN FINISHED FH FIRE HOSE FHC FIRE HOSE CABINET FHR FIRE HOSE RACK
FLR FLOOR FP FIRE PROTECTION FPC FIRE PUMP CONTROLLER FPM FEET PER
MINUTE FPS FEET PER SECOND FPTC FIRE PUMP TEST CONNECTION FS FLOW
SWITCH FT FEET
GC GENERAL CONTRACTOR GPM GALLONS PER MINUTE
IN INCHES ITC INSPECTORS TEST CONNECTION
MD MAIN DRAIN
N&C NIPPLE AND CAP NA NOT APPLICABLE N.C. NORMALLY CLOSED NIC
NOT IN CONTRACT NO. NUMBER N.O. NORMALLY OPEN NS NOT SPRINKLERED
NTS NOT TO SCALE
OSW OPEN SITE WASTE OS&Y OUTSIDE SCREW AND YOKE
P PUMP PG PRESSURE GAUGE PIV POST INDICATOR VALVE PKG PACKAGE POC
POINT OF CONNECTION PRESS PRESSURE PRV PRESSURE REDUCING VALVE PSI
POUNDS PER SQUARE INCH PSIG POUNDS PER SQUARE INCH GAUGE
QTY QUANTITY
RN RISER NIPPLE RPM REVOLUTIONS PER MINUTE
SCV SECTIONAL CONTROL VALVE W/ TAMPER SWITCH SP STANDPIPE SPKR
SPRINKLER SUB-CONTR. SUB CONTRACTOR SYS SYSTEM
TB THRUST BLOCK TEMP TEMPERATURE TH THERMOMETER TS TAMPER SWITCH
TYP TYPICAL
UG UNDERGROUND UNO UNLESS OTHERWISE NOTED
VEL VELOCITY VERT VERTICAL VIF VERIFY IN FIELD
W/ WITH W/O WITHOUT WIP WALL INDICATOR POST
POST INDICATOR VALVE
HEAT DETECTOR
KEYED NOTE TAG
NEW EQUIPMENT TAGXX
F101
1 SECTION INDICATOR TOP INDICATES SECTION NUMBER BOTTOM INDICATES
DRAWING NUMBER
VLC
VLP
VLS
VPS
VRD
U
D
T
FDV
FHC
FDC
CLEAN AGENT PIPING (CA) DEMO
1. FIRE PROTECTION CONTRACTOR SHALL COORDINATE LOCATION OF ALL
PIPING WITH STRUCTURAL ELEMENTS, MECHANICAL, PLUMBING, ELECTRICAL
EQUIPMENT AND CEILING CONFIGURATION INDICATED ON DRAWINGS.
2. ALL PIPING, FITTINGS AND JOINTS IN SPRINKLER AND STANDPIPE
SYSTEMS SHALL CONFORM TO NFPA 13 & 14, NON-METALLIC PIPE AND
FITTINGS ARE UNACCEPTABLE.
3. ALL VALVES WILL BE READILY ACCESSIBLE FROM A SAFE HEIGHT ON A
SIX FOOT LADDER AND TO BE CLEAR OF ALL OBSTRUCTIONS AND THEIR
OPERATION SHALL NOT BE ENCUMBERED BY ANY DEVICE OR EQUIPMENT.
4. INSTALL ALL OVERHEAD HANGERS AND SUPPORTS PRIOR TO SPRAY
FIREPROOFING OR DRYWALL CEILING.
5. DO NOT SUPPORT SPRINKLER PIPING FROM METAL DECK.
6. PROTECT ELEVATOR MACHINE ROOMS AND ELEVATOR SHAFTS.
7. SPRINKLER PIPING IS TO BE BRACED AND RESTRAINED (BRANCH LINES)
IN ACCORDANCE WITH NFPA 13 FOR SEISMIC REQUIREMENTS.
8. THIS IS A GENERAL LIST OF ABBREVIATIONS AND SYMBOLS ON THIS
SHEET. SOME ABBREVIATIONS AND SYMBOLS MAY NOT BE APPLICABLE TO THIS
PROJECT.
9. THE SPACE ABOVE THE CEILING IS LIMITED AND THE INSTALLATION OF
WORK WILL BE TIGHT. DUE TO THIS, IT IS IMPORTANT THAT THE TRADE
CONTRACTOR SHALL COORDINATE THE INSTALLATION OF THEIR WORK WITH THE
CEILING SYSTEM HEIGHT AND CONSTRUCTION THE STRUCTURAL SYSTEM, THE
LIGHTING FIXTURES, THE SPRINKLER HEADS/MAINS AND THE PLUMBING
PIPES. ROUTE PIPING AS HIGH AS POSSIBLE. MAINTAIN PROPER SERVICE
ACCESS CLEARANCES. ACCURATE SHOP DRAWINGS SHALL BE SUBMITTED FOR
APPROVAL PRIOR TO FIELD INSTALLATION.
10. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND MAY NOT SHOW
EXACT ROUTING OR ALL REQUIRED OFFSETS, ACCESSORIES OR
APPURTENANCES. CONTRACTOR SHALL PROVIDE AS REQUIRED TO INSTALL A
COMPLETE AND COORDINATED JOB, INCLUDING ANY ADDITIONAL ITEMS
REQUIRED TO MEET ACTUAL FIELD CONDITIONS AND EQUIPMENT
SELECTED.
11. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY PARAGRAPH,
SUBMITTALS. CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL
THE LAYOUT DRAWINGS HAVE BEEN APPROVED BY VA.
12. ALL CONTRACTORS / SUB-CONTRACTORS ARE TO REFERENCE / COORDINATE
WITH ALL OTHER DISCIPLINE'S DRAWING SHEETS WITHIN THIS ENTIRE SET
OF DOCUMENTS.
13. ALL PIPING SHALL BE ROUTED TO MAINTAIN A CLEARANCE OF 8' - 4"
IN THE DRIVE LANE.
FIRE DEPARTMENT CONNECTION (FDC)
TO CHECK VALVE
SIAMESE HOSE CONNECTION
T: 314.241.6250 F: 314.241.2570
CANNON DESIGN PROJECT NO. 03640.50
© CannonDesign 2016 All rights reserved. No part of this document
may be reproduced or utilized in any form, without prior written
authorization by the Cannon Corporation
MARCH 10, 2017
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and
Facilities Management
o n e e ig h th in c h = o n e fo o t 1 6
8 4
0
B
A
C
D
E
F
th re e in c h e s = o n e fo o t
6 "
6 "
o n e a n d o n e h a lf in c h e s = o n e fo o t
o n e in c h = o n e fo o t
2 0
0 2
th re e q u a rt e rs in c h = o n e fo o t
o n e h a lf in c h = o n e fo o t
4 0
th re e e ig h th s in c h = o n e fo o t
4 0
0 4
8
o n e q u a rt e r in c h = o n e fo o t
VA FORM 08-6231
F
E
D
C
B
A
Department of Veterans Affairs
VA PARKING GARAGE Eriksson Engineering Assoc. 145 Commerce Drive
Suite A Graylake, IL 60030 T: 847.223.4804 www.eea-ltd.com
Hinman
One Bush Street Suite 510 San Francisco, CA 94104 T: 415.875.7709
www.hce.com
ECS Midwest, LLC 1575 Barclay Boulevard Buffalo Grove, IL 60089 T:
847.777.0344 www.ecslimited.com
LEGENDS, SYMBOLS & ABBREVIATIONS
F0001 JJS RJL
76
636-125
UP
M
L
K
J
H
G
F
E
D
C
B
A
1.522.53
4
4.5
5
5.5
6
1
4" DRAIN VALVE AT BASE OF STANDPIPE
STANDPIPE AND FHV SHALL BE INSTALLED OUTSIDE OF CIRCULATION PATH.
SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
CANNON DESIGN PROJECT NO. 03640.50
© CannonDesign 2016 All rights reserved. No part of this document
may be reproduced or utilized in any form, without prior written
authorization by the Cannon Corporation
MARCH 10, 2017
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and
Facilities Management
o n e e ig h th in c h = o n e fo o t 1 6
8 4
0
B
A
C
D
E
F
th re e in c h e s = o n e fo o t
6 "
6 "
o n e a n d o n e h a lf in c h e s = o n e fo o t
o n e in c h = o n e fo o t
2 0
0 2
th re e q u a rt e rs in c h = o n e fo o t
o n e h a lf in c h = o n e fo o t
4 0
th re e e ig h th s in c h = o n e fo o t
4 0
0 4
8
o n e q u a rt e r in c h = o n e fo o t
VA FORM 08-6231
F
E
D
C
B
A
Department of Veterans Affairs
VA PARKING GARAGE Eriksson Engineering Assoc. 145 Commerce Drive
Suite A Graylake, IL 60030 T: 847.223.4804 www.eea-ltd.com
Hinman
One Bush Street Suite 510 San Francisco, CA 94104 T: 415.875.7709
www.hce.com
ECS Midwest, LLC 1575 Barclay Boulevard Buffalo Grove, IL 60089 T:
847.777.0344 www.ecslimited.com
LOWER LEVEL C - FIRE PROTECTION PLAN
F0101 JJS RJL
1/16" = 1'-0" F2
77
636-125
M
L
K
J
H
G
F
E
D
C
B
A
1.522.53
4
4.5
5
5.5
6
1
2-1/2" FHV
STAIR 02
4" DRAIN VALVE AT BASE OF STANDPIPE
STANDPIPE AND FHV SHALL BE INSTALLED OUTSIDE OF CIRCULATION PATH.
SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
STANDPIPE AND FHV SHALL BE INSTALLED OUTSIDE OF CIRCULATION PATH.
SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
CANNON DESIGN PROJECT NO. 03640.50
© CannonDesign 2016 All rights reserved. No part of this document
may be reproduced or utilized in any form, without prior written
authorization by the Cannon Corporation
MARCH 10, 2017
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and
Facilities Management
o n e e ig h th in c h = o n e fo o t 1 6
8 4
0
B
A
C
D
E
F
th re e in c h e s = o n e fo o t
6 "
6 "
o n e a n d o n e h a lf in c h e s = o n e fo o t
o n e in c h = o n e fo o t
2 0
0 2
th re e q u a rt e rs in c h = o n e fo o t
o n e h a lf in c h = o n e fo o t
4 0
th re e e ig h th s in c h = o n e fo o t
4 0
0 4
8
o n e q u a rt e r in c h = o n e fo o t
VA FORM 08-6231
F
E
D
C
B
A
Department of Veterans Affairs
VA PARKING GARAGE Eriksson Engineering Assoc. 145 Commerce Drive
Suite A Graylake, IL 60030 T: 847.223.4804 www.eea-ltd.com
Hinman
One Bush Street Suite 510 San Francisco, CA 94104 T: 415.875.7709
www.hce.com
ECS Midwest, LLC 1575 Barclay Boulevard Buffalo Grove, IL 60089 T:
847.777.0344 www.ecslimited.com
LOWER LEVEL B - FIRE PROTECTION PLAN
F0102 JJS RJL
1/16" = 1'-0" F2
78
636-125
M
L
K
J
H
G
F
E
D
C
B
A
1.522.53
4
4.5
5
5.5
6
1
4" FP UP TO FDC
RACK FIRE PROTECTION PIPING WITHIN 2'-0" OF INTERIOR WALL.
COORDINATE WITH OTHER DISCIPLINES PRIOR TO INSTALLATION.
RACK FIRE PROTECTION PIPING WITHIN 2'-0" OF INTERIOR WALL.
COORDINATE WITH OTHER DISCIPLINES PRIOR TO INSTALLATION.
HOLD TIGHT TO UNDERSIDE OF LEVEL 1 SLAB
HOLD TIGHT TO WALL AND UNDERSIDE OF TEES
ROUTE UP BETWEEN TEE FLANGES.
ROUTE UP BETWEEN TEE FLANGES.
STANDPIPE AND FHV SHALL BE INSTALLED OUTSIDE OF CIRCULATION PATH.
SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
STANDPIPE AND FHV SHALL BE INSTALLED OUTSIDE OF CIRCULATION PATH.
SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
CANNON DESIGN PROJECT NO. 03640.50
© CannonDesign 2016 All rights reserved. No part of this document
may be reproduced or utilized in any form, without prior written
authorization by the Cannon Corporation
MARCH 10, 2017
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and
Facilities Management
o n e e ig h th in c h = o n e fo o t 1 6
8 4
0
B
A
C
D
E
F
th re e in c h e s = o n e fo o t
6 "
6 "
o n e a n d o n e h a lf in c h e s = o n e fo o t
o n e in c h = o n e fo o t
2 0
0 2
th re e q u a rt e rs in c h = o n e fo o t
o n e h a lf in c h = o n e fo o t
4 0
th re e e ig h th s in c h = o n e fo o t
4 0
0 4
8
o n e q u a rt e r in c h = o n e fo o t
VA FORM 08-6231
F
E
D
C
B
A
Department of Veterans Affairs
VA PARKING GARAGE Eriksson Engineering Assoc. 145 Commerce Drive
Suite A Graylake, IL 60030 T: 847.223.4804 www.eea-ltd.com
Hinman
One Bush Street Suite 510 San Francisco, CA 94104 T: 415.875.7709
www.hce.com
ECS Midwest, LLC 1575 Barclay Boulevard Buffalo Grove, IL 60089 T:
847.777.0344 www.ecslimited.com
LOWER LEVEL A - FIRE PROTECTION PLAN
F0103 JJS RJL
1/16" = 1'-0" F2
79
636-125
M
L
K
J
H
G
F
E
D
C
B
A
1.522.53
4
4.5
5
5.5
6.5
6
1
FDC
T: 314.241.6250 F: 314.241.2570
CANNON DESIGN PROJECT NO. 03640.50
© CannonDesign 2016 All rights reserved. No part of this document
may be reproduced or utilized in any form, without prior written
authorization by the Cannon Corporation
MARCH 10, 2017
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and
Facilities Management
o n e e ig h th in c h = o n e fo o t 1 6
8 4
0
B
A
C
D
E
F
th re e in c h e s = o n e fo o t
6 "
6 "
o n e a n d o n e h a lf in c h e s = o n e fo o t
o n e in c h = o n e fo o t
2 0
0 2
th re e q u a rt e rs in c h = o n e fo o t
o n e h a lf in c h = o n e fo o t
4 0
th re e e ig h th s in c h = o n e fo o t
4 0
0 4
8
o n e q u a rt e r in c h = o n e fo o t
VA FORM 08-6231
F
E
D
C
B
A
Department of Veterans Affairs
VA PARKING GARAGE Eriksson Engineering Assoc. 145 Commerce Drive
Suite A Graylake, IL 60030 T: 847.223.4804 www.eea-ltd.com
Hinman
One Bush Street Suite 510 San Francisco, CA 94104 T: 415.875.7709
www.hce.com
ECS Midwest, LLC 1575 Barclay Boulevard Buffalo Grove, IL 60089 T:
847.777.0344 www.ecslimited.com
LEVEL ONE - FIRE PROTECTION PLAN
F0104 JJS RJL
1/16" = 1'-0" F2
80
636-125
A/C AIR CONDITIONING A/E ARCHITECT/ENGINEER AAV AUTOMATIC AIR VENT
(VALVE) ABV ABOVE ACCU AIR-COOLED CONDENSING UNIT ACH AIR CHANGES
PER HOUR ACU AIR CURTAIN AD ACCESS DOOR AF AIR FOIL FAN AFF ABOVE
FINISHED FLOOR AFMS AIR FLOW MEASURING STATION AHU AIR HANDLING
UNIT ALT ALTERNATE ALUM ALUMINUM AMP AMPERE AP ACCESS PANEL APD AIR
PRESSURE DROP APPROX APPROXIMATE ARCH ARCHITECT/ARCHITECTURAL AS
AIR SEPARATOR ATD AIR TRANSFER DUCT AUTO AUTOMATIC AVG AVERAGE AWT
AVERAGE WATER TEMPERATURE AXF AXIAL FAN
BB BASEBOARD RADIATION BDD BACK DRAFT DAMPER BF BOILER FEED WATER
BG BOTTOM GRILLE (3"-12" ABOVE FLOOR) BHP BRAKE HORSEPOWER BLDG
BUILDING BMS BUILDING MANAGEMENT SYSTEM BOD BOTTOM OF DUCT BR
BOTTOM REGISTER (3"-12" ABOVE FLOOR) BSMT BASEMENT BTU BRITISH
THERMAL UNIT BTUH BRITISH THERMAL UNIT PER HOUR
CA COMPRESSED AIR CAP CAPACITY CC COOLING COIL CCW COUNTER
CLOCKWISE CD CONDENSATE DRAIN CENTRIF CENTRIFUGAL CF CUBIC FEET CFH
CUBIC FEET PER HOUR CFM CUBIC FEET PER MINUTE CH CABINET HEATER CHR
CHILLER CHWR CHILLED WATER RETURN CHWS CHILLED WATER SUPPLY CI CAST
IRON CL CENTER LINE CLG COOLING CO CLEAN OUT CO2 CARBON DIOXIDE
COMP COMPRESSOR CONC CONCRETE CONN CONNECTION CONST CONSTRUCTION
CONT CONTINUOUS, CONTINUATION CONTR CONTRACTOR CONV CONVECTOR CP
CONTROL PANEL CT COOLING TOWER CU CONDENSING/ER UNIT CU FT CUBIC
FEET CV CONSTANT VOLUME CV CONSTANT VOLUME CWR CONDENSER WATER
RETURN CWS CONDENSER WATER SUPPLY
D DRAIN OR DRYER DB DECIBEL OR DRY BULB TEMPERATURE DDC DIRECT
DIGITAL CONTROL DEG.F DEGREE FAHRENHEIT DEMO DEMOLISH DG DOOR
GRILLE DIA DIAMETER DIAG DIAGONAL DIFF DIFFUSER DIM DIMENSION DISCH
DISCHARGE DN DOWN DP DIFFERENTIAL PRESSURE DPDT DOUBLE POLE, DOUBLE
THROW DPST DOUBLE POLE, SINGLE THROW DTR DUAL TEMPERATURE RETURN
DTS DUAL TEMPERATURE SUPPLY DWDI DOUBLE WIDTH, DOUBLE INLET DWG
DRAWING DX DIRECT EXPANSION
E/P ELECTRIC-PNEUMATIC EA EXHAUST AIR EAT ENTERING AIR TEMPERATURE
EBB ELECTRIC BASEBOARD HEATER EC EXPANSION COMPENSATOR/JOINT ECWR
EQUIPMENT COOLING WATER RETURN ECWS EQUIPMENT COOLING WATER SUPPLY
EDB ENTERING DRY BULB TEMPERATURE EER ENERGY EFFICIENCY RATIO EF
EXHAUST FAN EFF EFFICIENCY EHC ELECTRIC HEATING COIL EL/ELEV
ELEVATION ELEC ELECTRIC/ELECTRICAL ELEM ELEMENT ELEV ELEVATOR EMD
END OF MAIN DRIP (STEAM) EMER EMERGENCY ENG ENGINEER ENT ENTERING
ERP ELECTRIC RADIANT PANEL ESP EXTERNAL STATIC PRESSURE EST
ESTIMATE ET EXPANSION TANK ETO ETHYLENE OXIDE EUH ELECTRIC UNIT
HEATER EV EXHAUST AIR VALVE EVAP EVAPORATOR EVF FUME HOOD EXHAUST
AIR VALVE EVL LAB EXHAUST AIR VALVE
H HUMIDISTAT OR HUMIDIFIER HC HEATING COIL HEPA HIGH EFFICIENCY
PARTICULATE AIR FILTER HG HOT GAS HL HIGH LIMIT HORIZ HORIZONTAL HP
HORSEPOWER OR HEAT PUMP HPR HIGH PRESSURE CONDENSATE RETURN HPS
HIGH PRESSURE STEAM HR HOUR HRC HEAT RECOVERY COIL HT HEIGHT HTG
HEATING HTWR HIGH TEMPERATURE WATER RETURN HTWS HIGH TEMPERATURE
WATER SUPPLY HUM HUMIDIFIER HVAC HEAT, VENTILATION, & AIR
CONDITIONING HVU HEATING & VENTILATING UNIT HWR HOT WATER
RETURN HWS HOT WATER SUPPLY HX HEAT EXCHANGER HZ HERTZ
ID INSIDE DIAMETER IN OR " INCHES IN W.C. INCHES WATER COLUMN IN
W.G. INCHES WATER GAUGE INSUL INSULATION INT INTERNAL
KW KILOWATT KWH KILOWATT HOUR
LAT LEAVING AIR TEMPERATURE LBS POUNDS LDB LEAVING DRY BULB
TEMPERATURE LF LINEAR FEET LPG LIQUID PETROLEUM GAS LPR LOW
PRESSURE CONDENSATE RETURN LPS LOW PRESSURE STEAM LRA LOCKED ROTOR
AMPERES LVG LEAVING LVR LOUVER LWB LEAVING WET BULB TEMPERATURE LWT
LEAVING WATER TEMPERATURE
M MOTOR OPERATOR MAINT MAINTENANCE MAU MAKE-UP AIR UNIT MAX MAXIMUM
MBH THOUSAND BTU PER HOUR MCC MOTOR CONTROL CENTER MECH MECHANICAL
MERV MINIMUM EFFICIENCY REPORTING VALUE MEZZ MEZZANINE MFR
MANUFACTURER MIN MINIMUM MISC MISCELLANEOUS MPR MEDIUM PRESSURE
CONDENSATE RETURN MPS MEDIUM PRESSURE STEAM MTD MOUNTED
N.C. NORMALLY CLOSED N.O. NORMALLY OPEN NC NOISE CRITERIA NIC NOT
IN CONTRACT NO. OR # NUMBER NR NOT REQUIRED NTS NOT TO SCALE NV
NATURAL VENTILATION
OA OUTSIDE AIR OAI OUTSIDE AIR INTAKE OBD OPPOSED BLADE DAMPER OED
OPEN END DUCT OFCI OWNER FURNISHED/CONTRACTOR INSTALLED OFOI OWNER
FURNISHED/OWNER INSTALLED OH OVERHEAD OPNG OPENING
P/DP DIFFERENTIAL PRESSURE P PUMP P/E PNEUMATIC-ELECTRIC SWITCH PA
PASCAL PCD PUMPED CONDENSATE DISCHARGE/RETURN PCF POUNDS PER CUBIC
FOOT PCWR PROCESSED CHILLED WATER RETURN PCWS PROCESSED CHILLED
WATER SUPPLY PD PRESSURE DROP PF PROPELLER FAN PG PRESSURE
GAUGE
PH PHASE PLBG PLUMBING PRESS PRESSURE PROP PROPELLER PRV PRESSURE
REDUCING VALVE PSF POUNDS PER SQUARE FOOT PSI POUNDS PER SQUARE
INCH PSIA POUNDS PER SQUARE IN ABSOLUTE PSIG POUNDS PER SQUARE IN
GAUGE
QTY QUANTITY
R RETURN RA RETURN AIR RAD RADIATION RAF RETURN AIR FAN REBAL
REBALANCE REG REGISTER REV REVISED RH RELATIVE HUMIDITY RHC REHEAT
COIL RHG REFRIGERANT HOT GAS RL REFRIGERANT LIQUID RM ROOM RO
RELIEF OPENING RP RADIANT PANEL RPM REVOLUTIONS PER MINUTE RS
REFRIGERANT SUCTION RTU ROOF TOP UNIT RV REFRIGERANT VENT OR RELIEF
VALVE (VENT) RV RETURN AIR VALVE
S/W SUMMER-WINTER SA SUPPLY AIR OR SOUND ATTENUATOR SCR SILICON
CONTROLLED RECTIFIER SD SMOKE DETECTOR SENS SENSIBLE LOAD SF
SMOKE-FIRE DAMPER SHT SHEET SM SMOKE DAMPER SOL SOLENOID SP STATIC
PRESSURE SQ SQUARE SQ. FT. SQUARE FEET SS STAINLESS STEEL STD
STANDARD STL STEEL STM STEAM STRUC STRUCTURE/STRUCTURAL SV SUPPLY
AIR VALVE SWSI SINGLE WIDTH, SINGLE INLET
3SF 3 HOUR SMOKE FIRE DAMPER TC TEMPERATURE CONTROL TD TRANSFER
DUCT TEMP TEMPERATURE TL TOTAL LOAD TO TRANSFER OPENING TSP TOTAL
STATIC PRESSURE TSTAT THERMOSTAT TU TERMINAL UNIT TYP TYPICAL
UGRD UNDERGROUND UH UNIT HEATER (HYDRONIC OR STEAM) UNO UNLESS
NOTED OTHERWISE UPS UNINTERUPTIBLE POWER SUPPLY UV UNIT
VENTILATOR
V VOLT OR VENT VAV VARIABLE AIR VOLUME VD VOLUME DAMPER VEL
VELOCITY VERT VERTICAL VI VIBRATION ISOLATION VIF VERIFY IN FIELD
VOL VOLUME VR VACUUM RETURN VRV VARIABLE REFRIGERANT VOLUME VSD
VARIABLE SPEED DRIVE VTR VENT THROUGH ROOF
W WATT W.G. WATER GAGE W/ WITH W/O WITHOUT WB WET BULB TEMPERATURE
WC WATER COLUMN WMS WIRE MESH SCREEN WPD WATER PRESSURE DROP WT
WEIGHT WTR WATER
EWB ENTERING WET BULB TEMPERATURE EWT ENTERING WATER TEMPERATURE
EXH EXHAUST EX EXISTING EXIST EXISTING EXT EXTERNAL
F FAHRENHEIT F&T FLOAT & THERMOSTATIC STEAM TRAP F.D. FLOOR
DRAIN FA FREE AREA FC FORWARD CURVED FCU FAN COIL UNIT FD FIRE
DAMPER FF FINAL FILTER FH FUME HOOD FLA FULL LOAD AMPERES FLEX
FLEXIBLE FLR FLOOR FLT FLASH TANK FM FLOW METER FOG FUEL OIL GAUGE
FOR FUEL OIL RETURN FOS FUEL OIL SUPPLY FOV FUEL OIL VENT FP FIRE
PROTECTION FPB FAN POWERED TERMINAL UNIT FPM FEET PER MINUTE FPS
FEET PER SECOND FR FINNED RADIATION FSTAT FREEZESTAT FT FEET FV
FACE VELOCITY
G NATURAL GAS GA GAUGE GAL GALLON GCWR GEOTHERMAL CONDENSER WATER
RETURN GCWS GEOTHERMAL CONDENSER WATER SUPPLY GD GRAVITY DAMPER GPH
GALLONS PER HOUR GPM GALLONS PER MINUTE GR GLYCOL RETURN GRL GRILLE
GRV GRAVITY RELIEF VENT GS GLYCOL SUPPLY GV GRAVITY VENTILOR OR
NATURAL GAS VENT
TP
T
1
M0101
SECTION INDICATOR TOP INDICATES SECTION NUMBER BOTTOM INDICATES
SHEET NUMBER
VARIABLE SPEED DRIVE
EXHAUST DUCT RISE
SINGLE LINE EXHAUST DUCT
ELBOW WITH TURNING VANES
SINGLE LINE RETURN DUCT
SINGLE LINE SUPPLY DUCT
ROOM PRESSURIZATION MONITOR
FLEXIBLE CONNECTION
ROUND (DIAMETER)
ANALOG OUTPUT, PNEUMATIC
THERMOSTAT WITH LOCKING COVER
SUPPLY DUCT DROP
RETURN DUCT DROP
EXHAUST DUCT DROP
OR
RECTANGULAR DUCT DIMENSIONS (SIZE IN INCHES, FIRST DIMENSION IS
SHOWN)
ROUND DUCT DIMENSIONS (DIAMETER)
OVAL DUCT DIMENSIONS (SIZE IN INCHES, FIRST DIMENSION IS
SHOWN)
MOTORIZED DAMPER
CARBON DIOXIDE SENSOR
P PRESSURE GAGE
200-5
200-2 SUPPLY AIR DEVICE - (REFER TO SCHEDULE FOR SIZE) FIRST NO.
CFM, SECOND NO. TYPE (REFER TO SPECIFICATION FOR AIR DEVICE
TYPE)
200-14 10x8
SUPPLY/ RETURN/EXHAUST SIDEWALL GRILLE- FIRST NO. CFM, SECOND NO.
TYPE BOTTOM NO. WIDTH BY HEIGHT OF GRILLE (REFER TO SPECIFICATION
FOR AIR DEVICE TYPE)
RETURN AIR DEVICE - (REFER TO SCHEDULE FOR SIZE) FIRST NO. CFM,
SECOND NO. TYPE (REFER TO SPECIFICATION FOR AIR DEVICE TYPE)
EXHAUST AIR DEVICE - (REFER TO SCHEDULE FOR SIZE) FIRST NO. CFM,
SECOND NO. TYPE (REFER TO SPECIFICATION FOR AIR DEVICE TYPE)
VSD
PIPE BOTTOM DROP
MANUAL AIR VENT
PRESSURE/TEMPERATURE TEST PORT
ANALOG INPUT, FLOW
FD,SF, OR SM
CALLOUT INDICATOR TOP INDICATES NUMBER ON THE SHEET BOTTOM
INDICATES SHEET NUMBER
NEW DUCT
G
1. ALL MITERED ELBOWS AND TEES SHALL BE PROVIDED WITH SINGLE
THICKNESS TURNING VANES.
2. COMPLY WITH APPLICABLE LOCAL, STATE, FEDERAL, AND OWNER CODES
AND STANDARDS DURING THE EXECUTION OF WORK DESCRIBED ON DRAWINGS
AND OTHER CONTRACT DOCUMENTS.
3. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR ALL CEILING
AIR DEVICE LOCATIONS.
4. LOCATE ALL DUCT BALANCING DAMPERS AND TERMINAL UNITS ABOVE
ACCESSIBLE CEILINGS, OR PROVIDE ACCESS DOORS. MINIMUM ACCESS DOOR
SIZE SHALL BE 18x18 UNLESS OTHERWISE APPROVED BY ENGINEER.
5. THE DRAWINGS ARE DIAGRAMMATIC AND ARE PROVIDED TO SHOW THE
INTENT OF THE WORK.. PROVIDE WORK AND EQUIPMENT NECESSARY TO
COMPLETE THE INSTALLATION IN ACCORDANCE WITH APPLICABLE BUILDING
CODES, STATE AND LOCAL BUILDING CODES, OWNERS INSURANCE
UNDERWRITER(S), N.F.P.A., AND OTHER GOVERNING AUTHORITIES HAVING
JURISDICTION.
6. REFER TO ARCHITECTURAL ELEVATION DRAWINGS FOR LOCATION OF WALL
MOUNTED MECHANICAL ITEMS.
7. INSTALL ALL FLOOR MOUNTED HVAC EQUIPMENT, INCLUDING AHU'S,
PUMPS, CHILLER, ETC. ON 4" CONCRETE PAD.
8. ROUTE ALL FAN COIL UNIT CONDENSATE PIPING TO THE NEAREST FLOOR
DRAIN, MOP SINK, OR TIE INTO SANITARY DRAIN SYSTEM. COORDINATE WITH
PLUMBING CONTRACTOR FOR SANITARY DRAIN SYSTEM TIE INS. PROVIDE 2"
PVC CONDENSATE DRAIN PIPING FOR 2 OR MORE FAN COIL UNITS SERVED BY
A SINGLE DRAIN LINE. SLOPE ALL CONDENSATE DRAIN PIPING 1/4" PER
FOOT IN THE DIRECTION OF FLOW. ALL CONDENSATE DRAIN PIPING SHALL BE
INSULATED WITH MINIMUM 1/2" FOIL FACED FIBERGLASS INSULATION.
9. ALL HYDRONIC PIPING SHALL BE 3/4" UNLESS NOTED OTHERWISE. ALL
STEAM PIPING SHALL BE 1" UNLESS NOTED OTHERWISE.
10. MECHANICAL DRAWINGS ARE SCHEMATIC IN NATURE. COORDINATION WITH
ALL OTHER TRADES IS REQUIRED FROM LAYOUT THROUGH
CONSTRUCTION.
11. DUCTWORK, PIPING, AND EQUIPMENT CONNECTIONS SHOWN ON THE
DRAWINGS ARE SCHEMATIC IN NATURE AND ARE PROVIDED AS A GUIDE FOR
THE INSTALLATION OF EQUIPMENT AND ASSOCIATED SYSTEMS. THE DRAWINGS
ARE NOT INTENDED TO BE SCALED FOR ROUGHING IN MEASUREMENTS OR TO
SERVE AS SHOP DRAWINGS. PROVIDE MINOR ADJUSTMENTS TO THE DUCTWORK
AS REQUIRED TO SUIT FIELD CONDITIONS WITHOUT ADDITIONAL COST TO THE
OWNER. MAJOR DEVIATIONS TO THE DESIGN REQUIRE PRIOR APPROVAL BEFORE
STARTING WORK. PROMPTLY REPORT UNRESOLVED INTERFERENCES AND
CONFLICTS TO OWNER.
12. SUPPORTS, ROOF AND WALL OPENINGS, EQUIPMENT CONNECTIONS,
EQUIPMENT ARRANGEMENT, AND ELECTRICAL POWER PROVISIONS FOR
MECHANICAL EQUIPMENT ARE BASED ON PRELIMINARY INFORMATION FOR THE
EQUIPMENT DESIGN BASIS SELECTION. PROVIDE AND INSTALL EQUIPMENT
SUPPORTS, MAKE ROOF AND WALL OPENINGS, ADJUST CONNECTION SIZE AND
TYPE, ADJUST EQUIPMENT SPACE ARRANGEMENT, AND PROVIDE ELECTRICAL
BRANCH CIRCUIT AND DISTRIBUTION MODIFICATIONS BASED UPON CERTIFIED
EQUIPMENT DRAWINGS, WITHOUT ADDITIONAL COST TO THE OWNER.
13. PREPARE AND SUBMIT DUCTWORK SHOP DRAWINGS FOR APPROVAL, PRIOR
TO PERFORMING FABRICATION WORK. INCLUDE DUCTWORK PLANS, ELEVATIONS,
AND SECTIONS, SHOWING DUCT FITTINGS, EQUIPMENT CONNECTIONS, AND
ACCESS REQUIREMENTS.
14. PROVIDE WORK IN STRICT ACCORDANCE WITH APPROVED SHOP DRAWINGS.
THE OWNER OR OWNER'S REPRESENTATIVE RESERVES THE RIGHT TO REJECT
WORK NOT IN ACCORDANCE WITH THE APPROVED SHOP DRAWINGS.
15. FURNISH AND INSTALL THE NECESSARY APPURTENANCES AND MINOR
AUXILIARIES REQUIRED TO MAKE EACH SYSTEM COMPLETE AND OPERABLE IN
EVERY RESPECT. FURNISH AND INSTALL WORK DESCRIBED IN THE
SPECIFICATIONS AND NOT SHOWN ON THE DRAWINGS, OR VICE VERSA.
16. WORK AND EQUIPMENT TO BE FULLY GUARANTEED FOR ONE (1) YEAR FROM
THE DATE OF FINAL ACCEPTANCE OF WORK.
17. TEST AND ADJUST INSTALLED EQUIPMENT AND SYSTEMS IN ACCORDANCE
WITH CONTRACT DOCUMENTS. CORRECT DEFECTS AND SYSTEM DEFICIENCIES
DISCLOSED BY TESTING, WITHOUT ADDITIONAL COST TO THE OWNER.
18. OPERATION OF THE EQUIPMENT, DUCTWORK, OR INSTALLED PIPING DOES
NOT CONSTITUTE AN ACCEPTANCE OF THE WORK BY THE OWNER. FINAL
ACCEPTANCE IS DEFINED IN THE CONTRACT DOCUMENTS.
19. FURNISH CERTIFICATES OF APPROVAL FROM ALL AUTHORITIES HAVING
JURISDICTION AS PART OF THE SYSTEM ACCEPTANCE DOCUMENTATION.
20. PROVIDE ADDITIONAL VOLUME DAMPERS AT BRANCH CONNECTIONS IN
DUCTWORK REQUIRED TO PROPERLY BALANCE THE SYSTEM.
21. FURNISH AND INSTALL ACCESS DOORS IN DUCTWORK TO SERVICE HEATING
COILS, FIRE DAMPERS, AUTOMATIC AND MANUAL DAMPERS, CONTROL
HARDWARE, LOUVER SCREENS, ETC. WHERE ACCESS IS REQUIRED FOR
MAINTENANCE AND AS REQUIRED BY BUILDING CODES, MECHANICAL CODES,
AND FIRE CODES.
22. LOCATIONS SHOWN ON DRAWINGS FOR THERMOSTATS, HUMIDISTATS AND
LOCAL INDICATING PANELS ARE APPROXIMATE. COORDINATE FINAL LOCATION
TO SUIT FIELD CONDITIONS, OR AS DIRECTED BY OWNER.
23. INSTALL PIPING TO HVAC HEATING AND COOLING COIL(S) TO ALLOW
CLEAR REMOVAL SPACE FOR THE COILS, AIR FILTERS, UNIT CONTROLS,
FANS, AND MOTORS.
24. COIL PIPING SHALL NOT BLOCK FILTER OR MOTOR ACCESS.
25. RUN DUCTWORK AND PIPE INSULATION CONTINUOUSLY THROUGH FLOOR,
ROOF, AND WALL PENETRATIONS.
26. PENETRATIONS NOT OTHERWISE NOTED SHALL BE FURNISHED BY THE
MECHANICAL CONTRACTOR.
27. CONTRACTOR SHALL COORDINATE WITH OTHER DISCIPLINES AND RESOLVE
ANY INTERFERENCES PRIOR TO INSTALLATION.
28. EQUIPMENT MAINTENANCE ACCESS SPACE SHOWN WITH DASHED
LINES.
29. PROVIDE SPARE TAPS AND ISOLATION VALVES AT ALL BRANCH
CONNECTIONS TO HOT WATER AND CHILLED WATER CONNECTIONS TO RISERS TO
ALLOW FOR FUTURE CONNECTIONS.
30. UNLABELED STEAM TRAPS ARE 1/2".
31. SLOPE ALL STEAM LINES TOWARD NEAREST TRAP. SLOPE ALL STEAM
CONDENSATE LINES TO NEAREST COLLECTION POINT.
32. INSTALL 3/4" MANUAL HIGH POINT VENTS AND LOW POINT DRAINS IN
ALL RELATIVE HIGH AND LOW POINTS IN HYDRONIC PIPE SYSTEMS TO
PREVENT TRAPPING OF AIR DURING FILLING AND TO FACILITATE COMPLETE
DRAINAGE.
33. CONTRACTOR SHALL COORDINATE ALL FCU'S AND ASSOCIATED DUCTWORK
& PIPING WITH OTHER DISCIPLINES EQUIPMENT TO ENSURE REQUIRED
ACCESS AND CLEARANCES ARE MAINTAINED.
34. PROVIDE WALL MOUNTED DDC THERMOSTAT INSIDE ALL ELECTRICAL AND
DATA ROOMS TO SERVE FAN COIL UNITS LOCATED IN EACH SPACE. LOCATE
THERMOSTAT ON WALL ADJACENT TO LIGHT SWITCHES IN EACH ROOM.
35. ALL BRANCH DUCTWORK TAPS CONNECTING TO DIFFUSERS SHALL BE EQUAL
TO DIFFUSER NECK SIZE AS SPECIFICED IN THE AIR DEVICE
SCHEDULE.
36. ALL CONTRACTORS//SUB-CONTRACTORS ARE TO REFERENCE/COORDINATE
WITH ALL OTHER DISCIPLINE'S DRAWING SHEETS WITHIN THIS ENTIRE SET
OF DOCUMENTS.
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
CANNON DESIGN PROJECT NO. 03640.50
© CannonDesign 2016 All rights reserved. No part of this document
may be reproduced or utilized in any form, without prior written
authorization by the Cannon Corporation
MARCH 10, 2017
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and
Facilities Management
o n e e ig h th in c h = o n e fo o t 1 6
8 4
0
B
A
C
D
E
F
th re e in c h e s = o n e fo o t
6 "
6 "
o n e a n d o n e h a lf in c h e s = o n e fo o t
o n e in c h = o n e fo o t
2 0
0 2
th re e q u a rt e rs in c h = o n e fo o t
o n e h a lf in c h = o n e fo o t
4 0
th re e e ig h th s in c h = o n e fo o t
4 0
0 4
8
o n e q u a rt e r in c h = o n e fo o t
VA FORM 08-6231
F
E
D
C
B
A
Department of Veterans Affairs
VA PARKING GARAGE Eriksson Engineering Assoc. 145 Commerce Drive
Suite A Graylake, IL 60030 T: 847.223.4804 www.eea-ltd.com
Hinman
One Bush Street Suite 510 San Francisco, CA 94104 T: 415.875.7709
www.hce.com
ECS Midwest, LLC 1575 Barclay Boulevard Buffalo Grove, IL 60089 T:
847.777.0344 www.ecslimited.com
SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES
M0001 MEM CH
C02
INTAKE LOUVER WITH MODULATING DAMPER. SEE DETAIL 8B ON M0501 FOR
DAMPER CONTROL SEQUENCE. SEE ARCH FOR SIZING.
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
CANNON DESIGN PROJECT NO. 03640.50
© CannonDesign 2016 All rights reserved. No part of this document
may be reproduced or utilized in any form, without prior written
authorization by the Cannon Corporation
MARCH 10, 2017
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and
Facilities Management
o n e e ig h th in c h = o n e fo o t 1 6
8 4
0
B
A
C
D
E
F
th re e in c h e s = o n e fo o t
6 "
6 "
o n e a n d o n e h a lf in c h e s = o n e fo o t
o n e in c h = o n e fo o t
2 0
0 2
th re e q u a rt e rs in c h = o n e fo o t
o n e h a lf in c h = o n e fo o t
4 0
th re e e ig h th s in c h = o n e fo o t
4 0
0 4
8
o n e q u a rt e r in c h = o n e fo o t
VA FORM 08-6231
F
E
D
C
B
A
Department of Veterans Affairs
VA PARKING GARAGE Eriksson Engineering Assoc. 145 Commerce Drive
Suite A Graylake, IL 60030 T: 847.223.4804 www.eea-ltd.com
Hinman
One Bush Street Suite 510 San Francisco, CA 94104 T: 415.875.7709
www.hce.com
ECS Midwest, LLC 1575 Barclay Boulevard Buffalo Grove, IL 60089 T:
847.777.0344 www.ecslimited.com
LOWER LEVEL C - HVAC DUCTWORK PLAN
M0101 MEM CH
1/16" = 1'-0" 3F
8F LOWER LEVEL C STAIR 02 - ENLARGED PLAN
82
636-125
T
T
T
T
T
T
T
T
T
T
M
L
K
J
H
G
F
E
D
C
B
A
11.522.53
4
4.5
5
5.5
6
ELEVATOR
M0102
8F
M0102
8D
M0102
1C
L
K
5.56
UH-7
C D
PROVIDE INTAKE LOUVER WITH MODULATING DAMPER IF DEDUCT ALTERNATE D
IS ACCEPTED. SEE DETAIL 8B ON M0501 FOR DAMPER CONTROL SEQUENCE.
SEE ARCH FOR SIZING.
1
3
14x14
4
CU-1
2
5
M0102
1C
MCU-1
6
8
RL
RS
RL
RS
RL
RS
6
T: 314.241.6250 F: 314.241.2570
CANNON DESIGN PROJECT NO. 03640.50
© CannonDesign 2016 All rights reserved. No part of this document
may be reproduced or utilized in any form, without prior written
authorization by the Cannon Corporation
MARCH 10, 2017
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and
Facilities Management
o n e e ig h th in c h = o n e fo o t 1 6
8 4
0
B
A
C
D
E
F
th re e in c h e s = o n e fo o t
6 "
6 "
o n e a n d o n e h a lf in c h e s = o n e fo o t
o n e in c h = o n e fo o t
2 0
0 2
th re e q u a rt e rs in c h = o n e fo o t
o n e h a lf in c h = o n e fo o t
4 0
th re e e ig h th s in c h = o n e fo o t
4 0
0 4
8
o n e q u a rt e r in c h = o n e fo o t
VA FORM 08-6231
F
E
D
C
B
A
Department of Veterans Affairs
VA PARKING GARAGE Eriksson Engineering Assoc. 145 Commerce Drive
Suite A Graylake, IL 60030 T: 847.223.4804 www.eea-ltd.com
Hinman
One Bush Street Suite 510 San Francisco, CA 94104 T: 415.875.7709
www.hce.com
ECS Midwest, LLC 1575 Barclay Boulevard Buffalo Grove, IL 60089 T:
847.777.0344 www.ecslimited.com
LOWER LEVEL B - HVAC DUCTWORK PLAN
M0102 MEM CH
1/16" = 1'-0" 3F
KEYED NOTES:
ROUTE CONDENSATE TIGHT TO STRUCTURE. DOWN EXTERIOR WALL AND
TERMINATE 0'-6" AFF.
PROVIDE CONCRETE PAD FOR CU-1.
PROVIDE TRANSFER GRILLE ON BOTH SIDES OF FD-2. SEE M0501 DETAIL
5F.
HANG UH-6 FROM DECK ABOVE 9'-0" AFF.
INSTALL BOTTOM OF FCU AT 8'-0" AFF.
FOR SIZES SEE M0601.
MOUNT MCU-1 BETWEEN PRECAST TEES, AND AS TIGHT TO STRUCTURE AS
POSSIBLE.
WIRE THERMOSTAT BACK TO EXISTING BAS, SET TO ALARM AT 95 ºF
(ADJ.).
1.
2.
3.
4.
5.
6.
7.
8.
1/8" = 1'-0" 8D
1" = 1'-0" 1C
83
636-125
T
T
T
T
T
T
T
T
M
L
K
J
H
G
F
E
D
C
B
A
11.522.53
4
4.5
5
5.5
6
6.5
M0103
8F
M0103
8D
M0103
1C
L
K
5.56
UH-4
1130-1 2
4
T: 314.241.6250 F: 314.241.2570
CANNON DESIGN PROJECT NO. 03640.50
© CannonDesign 2016 All rights reserved. No part of this document
may be reproduced or utilized in any form, without prior written
authorization by the Cannon Corporation
MARCH 10, 2017
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and
Facilities Management
o n e e ig h th in c h = o n e fo o t 1 6
8 4
0
B
A
C
D
E
F
th re e in c h e s = o n e fo o t
6 "
6 "
o n e a n d o n e h a lf in c h e s = o n e fo o t
o n e in c h = o n e fo o t
2 0
0 2
th re e q u a rt e rs in c h = o n e fo o t
o n e h a lf in c h = o n e fo o t
4 0
th re e e ig h th s in c h = o n e fo o t
4 0
0 4
8
o n e q u a rt e r in c h = o n e fo o t
VA FORM 08-6231
F
E
D
C
B
A
Department of Veterans Affairs
VA PARKING GARAGE Eriksson Engineering Assoc. 145 Commerce Drive
Suite A Graylake, IL 60030 T: 847.223.4804 www.eea-ltd.com
Hinman
One Bush Street Suite 510 San Francisco, CA 94104 T: 415.875.7709
www.hce.com
ECS Midwest, LLC 1575 Barclay Boulevard Buffalo Grove, IL 60089 T:
847.777.0344 www.ecslimited.com
LOWER LEVEL A - HVAC DUCTWORK PLAN
M0103 MEM CH
1/16" = 1'-0" 3F
KEYED NOTES:
ROUTE CONDENSATE TIGHT TO STRUCTURE. DOWN EXTERIOR WALL AND
TERMINATE 0'-6" AFF.
IF DEDUCT ALTERNATE D IS ACCEPTED ROUTE RS, RL, AND CD ASSOCIATED
WITH FCU-1 TO FCU-1-ALT-D. INSTALL TIGHT TO STRUCTURE.
INSTALL BOTTOM OF FCU AT 8'-0" AFF. PROVIDE GRILLE AND MERV 8
FILTER ON RETURN SIDE OF FCU-1-ALT-D.
FOR SIZES SEE M0601.
WIRE THERMOSTAT BACK TO EXISTING BAS, SET TO ALARM AT 95 ºF
(ADJ.).
1.
2.
3.
4.
5.
1/8" = 1'-0" 8D
1" = 1'-0" 1C
84
636-125
T
T
T
T
T
T
24x18
4
M0104
7B
RL
T: 314.241.6250 F: 314.241.2570
CANNON DESIGN PROJECT NO. 03640.50
© CannonDesign 2016 All rights reserved. No part of this document
may be reproduced or utilized in any form, without prior written
authorization by the Cannon Corporation
MARCH 10, 2017
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and
Facilities Management
o n e e ig h th in c h = o n e fo o t 1 6
8 4
0
B
A
C
D
E
F
th re e in c h e s = o n e fo o t
6 "
6 "
o n e a n d o n e h a lf in c h e s = o n e fo o t
o n e in c h = o n e fo o t
2 0
0 2
th re e q u a rt e rs in c h = o n e fo o t
o n e h a lf in c h = o n e fo o t
4 0
th re e e ig h th s in c h = o n e fo o t
4 0
0 4
8
o n e q u a rt e r in c h = o n e fo o t
VA FORM 08-6231
F
E
D
C
B
A
Department of Veterans Affairs
VA PARKING GARAGE Eriksson Engineering Assoc. 145 Commerce Drive
Suite A Graylake, IL 60030 T: 847.223.4804 www.eea-ltd.com
Hinman
One Bush Street Suite 510 San Francisco, CA 94104 T: 415.875.7709
www.hce.com
ECS Midwest, LLC 1575 Barclay Boulevard Buffalo Grove, IL 60089 T:
847.777.0344 www.ecslimited.com
LEVEL ONE - HVAC DUCTWORK PLAN
M0104 MEM CH
1/16" = 1'-0" 3F
1/8" = 1'-0" 7D
1/8" = 1'-0" 7F
KEYED NOTES:
PROVIDE DUCT AND TYPE 5 GRILLE SIZED TO MATCH THE FAN INLET.
ROUTE CONDENSATE TIGHT TO STRUCTURE, SLOPED TOWARD DRAIN. DOWN
CHASE AND OUT WALL AT 0'-6" AFF, ROUTED TO DRAIN.
PROVIDE TRANSFER GRILLE ON BOTH SIDES OF FD-2. SEE M0501 DETAIL
5F.
INSTALL BOTTOM OF FCU AT 10'-0" AFF.
FOR SIZES SEE M0601. ROUTE PIPE TIGHT TO WALL AND TIGHT TO
STRUCTURE.
1.
2.
3.
4.
5.
1/8" = 1'-0" 1C
1" = 1'-0" 7B
INTEGRAL THERMOSTAT SHALL CYCLE FAN MOTOR AND ENABLE/DISABLE
ELECTRIC HEATING COIL TO MAINTAIN 55 °F (ADJ.) MINIMUM SPACE
TEMPERATURE.
SEQUENCE OF OPERATIONS:
EXHAUST FAN SHALL ENGAGE WHEN THERMOSTAT IN THE FAN'S INLET
DUCTWORK REACHES 90 ºF (ADJ.).
START/STOP
RELAY
POWER
R
26
EDO
INTERLOCK
MOTORIZED BACKDRAFT DAMPER INTEGRAL TO COMBINATION LOUVER AT BOTTOM
OF STAIRS. PROVIDE WITH MOTOR AND MANUAL OPERATOR. PROVIDE WITH
BLADE SEALS.T
SPACE THERMOSTAT SEE PLANS FOR LOCATION
AIT
E
NOTES:
CONTRACTOR SHALL PROVIDE CONTROL DAMPER THAT IS COORDINATED WITH
THE ARCHITECTURAL LOUVER IN ORDER FOR THE ENTIRE ASSEMBLY TO BE NO
THICKER THAT THE WALL THICKNESS.
26
BIRDSCREEN
ELECTRICAL JUNCTION BOX. LOCATE CONTROL RELAYS ADJACENT TO ELECT.
JUNCTION BOX
18"H PREFABRICATED INSULATED ROOF CURB W/DAMPER TRAY. SECURE UNIT
TO CURB WITH SHEET METAL SCREWS AT 12" CENTERS ALL AROUND
ROOFING TO EXTEND UP TO TOP OF CURB.
CONDUIT & WIRING TO FAN BY DIVISION 26
MOTORIZED DAMPER
TYPE 5 GRILLE SIZED TO MATCH FAN INLET DUCT
FIRE DAMPER ARRAY ASSEMBLY SIZED TO MATCH OPENING (UL-555 APPROVED
FOR VERTICAL INSTALLATION AND INSTALL TO COMPLY WITH NFPA-90A),
WITH DYNAMIC TYPE DAMPER. INSTALL DAMPER ASSEMBLY AND ALL
ASSOCIATED COMPONENTS IN ACCORDANCE WITH MANUFACTURER'S
INSTALLATION INSTRUCTIONS.
MAINTAIN MANUFACTURER'S RECOMMENDED CLEARANCE FOR ALL FOUR
SIDES.
INTERIOR WALL CONSTRUCTION. REFER TO ARCHITECTURAL DRAWINGS FOR
THICKNESS, TYPE, AND FIRE RATING
1-1/2" x 1-1/2", 14 GAUGE RETAINING ANGLES. SECURE ANGLES TO DAMPER
SLEEVE ON ALL FOUR SIDES AND ON BOTH SIDES OF WALL. ANGLES TO BE
TIGHT TO WALL CONSTRUCTION. INSTALL RETAINING ANGLES IN ACCORDANCE
WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS.
FACTORY SUPPLIED DAMPER SLEEVE, 14 GAUGE FOR DAMPERS LARGER THAN
36" WIDE OR 24" HIGH
REMOVABLE GRILLE TYPE -1 INTERIOR SIDE ONLY.
THREADED STUD @ 24" OC MAX. SECURE GRILLE TO ASSEMBLY WITH WING
NUTS. (TYP BOTH SIDES)
FUSIBLE LINK - 165°F TEMPERATURE RATING.
NOTES:
1. ALL MATERIALS SHALL BE G90 GALVANIZED UNLESS OTHERWISE NOTED. 2.
FOR FIRE DAMPERS IN RATED WALLS WITH EXPOSURE TO THE GARAGE, USE A
LOUVER FOR THE EXPOSED SIDE OF THE ASSEMBLY. SEE ARCH DRAWINGS FOR
LOCATIONS.
LOUVER ON EXTERIOR SIDE ONLY. SEE ARCHITECTURAL DRAWINGS FOR SIZE
AND LOCATION.
DUCTWORK-REFER TO FLOOR PLAN FOR SIZE
FIRE DAMPER ASSEMBLY (UL-555 APPROVED FOR VERTICAL INSTALLATION AND
INSTALL TO COMPLY WITH NFPA-90A), WITH DYNAMIC TYPE DAMPER OUTSIDE
OF AIR STREAM.
WALL SLEEVE-SIZE AS REQUIRED. WELD OR BOLT AIR TIGHT TO ANGLES
(BOTH SIDES OF WALL)
1/8" MAXIMUM CLEARANCE FOR ALL FOUR SIDES. DO NOT FILL OR SEAL WITH
FIRE CAULK OR FIRE STOP MATERIALS
INTERIOR WALL CONSTRUCTION. REFER TO ARCHITECTURAL DRAWINGS FOR
THICKNESS, TYPE, AND FIRE RATING
1-1/2" x 1-1/2" x 14 GAUGE RETAINING ANGLES FOR NEW WALL
CONSTRUCTION. SECURE ANGLES TO DAMPER SLEEVE ON ALL FOUR SIDES AND
ON BOTH SIDES OF WALL. ANGLES TO BE TIGHT TO WALL CONSTRUCTION
WITHOUT ATTACHING DIRECTLY TO WALL CONSTRUCTION. USE 1/4" x 20 x
3/4" LONG ROUND HEAD STOVE BOLTS @12" O.C. MAXIMUM OR WELD
FACTORY SUPPLIED DAMPER SLEEVE, 16 GAUGE FOR DAMPERS NOT EXCEEDING
36" WIDE OR 24" HIGH. 14 GAUGE FOR DAMPERS LARGER THAN 36" WIDE OR
24" HIGH
AIR FLOW
FUSIBLE LINK - 165°F TEMPERATURE RATING, UNLESS OTHERWISE
NOTED
2. WHERE ACCESS DOORS ARE INSTALLED ON THE SIDE OF A DUCT, PROVIDE
A LABEL OR SIGN AT THE BOTTOM OF THE DUCT WITH AN ARROW AND
"FIRE/SMOKE DAMPER ACCESS DOOR" TEXT POINTING TO THE ACCESS DOOR.
WHERE ACCESS DOORS ARE INSTALLED ON THE TOP OF THE DUCT, PROVIDE A
LABEL OR SIGN AT THE BOTTOM OF THE DUCT WITH "FIRE/SMOKE DAMPER
ACCESS DOOR ON TOP OF DUCT."
4. REFER TO FIRE DAMPER SCHEDULE FOR FURTHER INFORMATION.
1. FOLLOW THIS DETAIL, UNLESS THE DAMPER MANUFACTURER'S
INSTALLATION DETAILS AND INSTRUCTIONS (AS TESTED AND APPROVED BY
UL) OR THE PROJECT SPECIFICATION IS MORE STRINGENT.
A. FIRE DAMPER MODE: HIGH TEMPERATURE MELTS FUSIBLE LINK, CLOSING
FIRE DAMPER.
3. SEQUENCE OF OPERATION:
BIRDSCREEN ELECTRICAL JUNCTION BOX. LOCATE CONTROL RELAYS ADJACENT
TO ELECT. JUNCTION BOX
18"H PREFABRICATED INSULATED WALL MOUNTING PLATE W/DAMPER TRAY.
SECURE UNIT TO CURB WITH SHEET METAL SCREWS AT 12" CENTERS ALL
AROUND
CONDUIT & WIRING TO FAN BY DIVISION 26
MOTORIZED DAMPER
CAP / COUNTER FLASHING
REMOVABLE TYPE 5 GRILLE SIZED TO MATCH FAN INLET DUCT
PROVIDE FIRE DAMPER, SEE DETAIL 5D.
AIR DEVICE SCHEDULE
NECK SIZE (IN)
5 EXHAUST GRILLE ---- 1
DRAIN PAN WITH INTEGRAL CONDENSATE PUMP
FAN COIL UNIT SEQUENCE OF OPERATION
FAN COIL SHALL OPERATE ON A SCHEDULE AS SET BY BAS. FAN SHALL RUN
CONTINUOUSLY IN OCCUPIED MODE. FAN STATUS SHALL BE MONITORED AND AN
ALARM MESSAGE SHALL BE GENERATED IN THE EVENT THE UNIT FAILS TO RUN
BETWEEN THE RANGE OF 95 °F OR HIGHER SPACE TEMPERATURE. UPON RISE
IN TEMPERATURE ABOVE 85 °F FAN COIL SHALL ENGAGE COOLING MODE AS
CONTROLLED BY THE INTEGRAL CONTROL SEQUENCE TO MAINTAIN 85
°F.
ALARM MONITORING AN ALARM WILL BE GENERATED AT THE BAS IF SPACE
TEMPERATURE RISES ABOVE 95 ºF (ADJ.)
RELAY
UNIT FAN SWITCH
T: 314.241.6250 F: 314.241.2570
CANNON DESIGN PROJECT NO. 03640.50
© CannonDesign 2016 All rights reserved. No part of this document
may be reproduced or utilized in any form, without prior written
authorization by the Cannon Corporation
MARCH 10, 2017
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and
Facilities Management
o n e e ig h th in c h = o n e fo o t 1 6
8 4
0
B
A
C
D
E
F
th re e in c h e s = o n e fo o t
6 "
6 "
o n e a n d o n e h a lf in c h e s = o n e fo o t
o n e in c h = o n e fo o t
2 0
0 2
th re e q u a rt e rs in c h = o n e fo o t
o n e h a lf in c h = o n e fo o t
4 0
th re e e ig h th s in c h = o n e fo o t
4 0
0 4
8
o n e q u a rt e r in c h = o n e fo o t
VA FORM 08-6231
F
E
D
C
B
A
Department of Veterans Affairs
VA PARKING GARAGE Eriksson Engineering Assoc. 145 Commerce Drive
Suite A Graylake, IL 60030 T: 847.223.4804 www.eea-ltd.com
Hinman
One Bush Street Suite 510 San Francisco, CA 94104 T: 415.875.7709
www.hce.com
ECS Midwest, LLC 1575 Barclay Boulevard Buffalo Grove, IL 60089 T:
847.777.0344 www.ecslimited.com
SCHEDULES, CONTROL DIAGRAMS, AND DETAILS
M0501 MEM CH
EXHAUST FAN SCHEDULE
DRIVE TYPE FAN
VOLTAGE (V/PH/HZ)
NOTES
EF-1-ALT-D 3050 1.25 DIRECT 48% 12.0 2 208/1/60 70 1, 2
EF-2 2200 1.25 DIRECT 57% 12.4 1 120/1/60 89 1
EF-3 420 0.5 DIRECT 41% 3.4 1/6 120/1/60 33 1
EF-4 1400 0.75 DIRECT 51% 6.7 1/2 120/1/60 66 1
EVAPORATOR UNIT SCHEDULE
HEATING (MBH)
MAXIMUM DIMENSIONS
(L"XH"XD") NOTES
FCU-1 494 2.0 23.8 R-410A 208/1/60 60 28.7 44" x 13" x 9" 1, 2, 3,
6
FCU-1-ALT D 1130 3.0 32.0 R-410A - - 136.7 48" x 15" x 26" 1, 2, 4,
5
FCU-2 494 2.0 23.8 R-410A 208/1/60 60 28.7 44" x 13" x 9" 1, 2, 3,
6
FCU-3 328 1.0 13.5 R-410A 208/1/60 45 17.6 33" x 12" x 8" 1, 2, 3,
6
FCU-4 328 1.0 13.5 R-410A 208/1/60 45 17.6 33" x 12" x 8" 1, 2, 3,
6
UNIT HEATER SCHEDULE
FLA MAXIMUM DIMENSIONS
(LxWxD) UNIT WEIGHT
UH-1 250 5 480/3/60 7 35"x27"x10" 120 1
UH-2 250 5 480/3/60 7 35"x27"x10" 120 1
UH-3 250 5 480/3/60 7 35"x27"x10" 120 1
UH-4 250 5 480/3/60 7 35"x27"x10" 120 1
UH-5 250 5 480/3/60 7 35"x27"x10" 120 1
UH-6 250 5 480/3/60 7 35"x27"x10" 120 1
UH-7 250 5 480/3/60 7 35"x27"x10" 120 1
UH-8 250 5 480/3/60 7 35"x27"x10" 120 1
UH-9 250 5 480/3/60 7 35"x27"x10" 120 1
NOTES: 1. PROVIDE WITH INTEGRAL CONDENSATE PUMP. 2. COMPLY WITH
MAXIMUM ELEVATION DIFFERENCE AND MAXIMUM REFRIGERANT PIPING LENGTH,
PER SELECTED MANUFACTURER. 3. DELETE FCU IF DEDUCT ALTERNATE D IS
ACCEPTED. 4. INDOOR UNIT IS POWERED BY OUTDOOR CONDENSER.
4B ELECTRIC UNIT HEATER CONTROL DIAGRAM
8B EXHAUST FAN CONTROL DIAGRAM
1E ROOF EXHAUST FAN
FIRE DAMPER SCHEDULE
MARK RATING (HOURS)
NOTES: 1. PROVIDE WITH ADJUSTABLE INTEGRAL THERMOSTAT.
5D FIRE DAMPER
3E SIDEWALL EXHAUST FAN
NOTES: 1. PROVIDE WITH TEFC, PREMIUM EFFICIENCY ECM MOTOR. 2.
PROVIDE EF-1 IF DEDUCT ALTERNATE D IS ACCEPTED.
CONDENSER UNIT SCHEDULE
FLA UNIT WEIGHT
(LBS) REFRIGERANT
TYPE NOTES
CU-1 7240 6 4.2 81 4.65 460/3/60 16.4 450 R410A 1, 2, 3, 4
CU-1-ALT D 3040 3 - 32 - 208/1/60 16.1 194 R410A 1
NOTES: 1. PROVIDE WITH LOW AMBIENT KIT. 2. DELETE CU IF DEDUCT
ALTERNATE D IS ACCEPTED.
5B FCU-1-ALT-D CONTROL DIAGRAM
5. INSTALL LOUVERED GRILL ON RA OPENING OF FCU. 6. VRF SYSTEM
EVAPORATOR, HIGH WALL UNIT.
3. CU-1 SHALL BE PROVIDED AS A HEAT RECOVERY VRF SYSTEM WITH ALL
NECESSARY COMPONENTS REQUIRED FOR A WORKING SYSTEM.
4. VRF SYSTEM CONDENSER SERVING FCU-1,2,3,4.
86
636-125
FCU-4
Pipe Size : 1/4" / 1/2"
Pipe Size : 1/4" / 1/2"
Pipe Size : 3/8" / 5/8"
Pipe Size : 3/8" / 5/8"
NOTES:
REFRIGERANT PIPING LENGTH AND SIZE ARE BASED ON CURRENT PIPING
LAYOUT. MODIFICATIONS TO THIS LAYOUT WILL NEED TO BE COORDINATED
WITH THE VRF MANUFACTURER FOR ACTUAL PIPING LENGTH AND SIZE AND
SUBMITTED TO ENGINEER FOR APPROVAL.
CONTRACTOR SHALL VERIFY LINE SIZES AND PROVIDE CONFIRMED LENGTHS TO
SELECTED MANUFACTURER PRIOR TO PROCUREMENT AND CONSTRUCTION.
FLOW DIAGRAMS ARE SCHEMATIC IN NATURE. EACH LINE SHOWN REPRESENTS A
LIQUID AND SUCTION LINE PAIR. CONSULT THE MANUFACTURER'S PROJECT
SPECIFIC INSTALLATION INSTRUCTIONS FOR CURRENT SCHEMATIC FLOW
DIAGRAMS, LINE SIZING, AND INSTALLATION INSTRUCTIONS.
IF DEVIATION FROM BASIS OF DESIGN, CONTRACTOR MUST SOLICIT SYSTEM
SELECTION, SIZING, AND LAYOUT CRITERIA FROM NEW MANUFACTURER PRIOR
TO CONSTRUCTION. CONTRACTOR MUST THEN FURNISH AND INSTALL SYSTEMS
IN ACCORDANCE WITH MANUFACTURER'S PROJECT SPECIFIC INSTALLATION
INSTRUCTIONS.
PROVIDE AN ISOLATION VALVE AT EVERY EVAPORATOR AND CONDENSING COIL
CONNECTION IF SPECIFICALLY ALLOW BY THE SELECTED
MANUFACTURER.
CONTRACTOR SHALL COORDINATE MCU-1 INSTALLATION WITH ELECTRICAL
CONTRACTOR TO PROVIDE LOCAL POWER TO THE EQUIPMENT.
CONTRACTOR SHALL COORDINATE POWER AND CONTROL REQUIREMENTS WITH
SELECTED MANUFACTURER'S INSTALLATION INSTRUCTIONS AND ELECTRICAL
DESIGN.
INSTALL ALL REFRIGERANT LINES WITHOUT TRAPS AND IN ACCORDANCE WITH
THE PROJECT SPECIFIC MANUFACTURER'S INSTALLATION
INSTRUCTIONS.
VARIABLE REFRIGERANT FLOW SEQUENCE OF OPERATIONS:
ZONE CONTROL WHEN AT LEAST ONE ZONE TEMPERATURE RISES ABOVE
SETPOINT, THE ZONE EVAPORATOR FAN WILL START. CONDENSER WILL START
AFTER A DELAY AND WILL PROVIDE CAPACITY CONTROL WHEN AT LEAST ONE
ZONE CALLS FOR COOLING. WHEN ZONE TEMPERATURE DROPS BELOW THE
SETPOINT, THE ZONE EVAPORATOR FAN WILL STOP. WHEN ALL ZONE
EVAPORATORS STOP WITHIN A SYSTEM, THE CONDENSER WILL STOP.
COOLING MODE TO ENSURE AN OPTIMAL SYSTEM START. DURING THIS TIME,
AND BEFORE THE COMPRESSOR STARTS, A LOGIC JUDGMENT IS MADE ON HOW
BEST TO SAFELY START THE SYSTEM BASED ON THE REQUESTED CAPACITY AND
OUTDOOR AMBIENT TEMPERATURE WHILE PREVENTING LIQUID FLOODBACK TO
THE COMPRESSORS. AFTER THE JUDGMENT IS COMPLETE, ALL ENABLED MCU
EEVS OPEN TO 480 STEPS. WHEN THE COOLING SOLENOID VALVE ENERGIZES
ON THE MCU, ANY UNIT NOT REQUESTING COOLING CAPACITY OR IN HEATING
MODE WILL HAVE ITS MCU EEV DRIVEN TO 0 STEPS. THE INDOOR UNIT EEV
WILL OPEN TO 250 STEPS FOR THE DURATION OF SAFETY START. EVI
SOLENOID 1 AND EVI SOLENOID 2 ENERGIZE. THE MAIN EEV OPENS TO 2000
STEPS. THE EVI BYPASS SOLENOID ENERGIZES. THE HGBP 1 ENERGIZES. THE
CRANKCASE HEATERS ENERGIZE IF POWER HAS NOT BEEN APPLIED FOR MORE
THAN 12 HOURS PRIOR TO START. WHEN THE DESIGNATED MAIN COMPRESSOR
STARTS, BUT IS STILL IN A SAFETY START MODE, A LOGIC JUDGMENT IS
MADE ON HOW BEST TO SAFELY START THE SYSTEM WHILE PREVENTING LIQUID
FLOODBACK TO THE COMPRESSORS. AFTER THE JUDGMENT IS COMPLETE, THE
OFFLINE COMPRESSOR EVI SOLENOID CLOSES. WHILE STILL IN A SAFETY
START MODE, THE SECOND COMPRESSOR STARTS AND THE EVI SOLENOID
ASSOCIATED WITH THAT COMPRESSOR ENERGIZES. AFTER 27°F DISCHARGE
SUPERHEAT (DSH) IS ACHIEVED, THE SYSTEM WILL EXIT THE SAFETY START
MODE AND THE HGBP 1 VALVE DE-ENERGIZES. IF NECESSARY, THE HGBP 1
WILL ENERGIZE DURING ABNORMALLY LOW SUCTION PRESSURE WITH NORMAL
OPERATION IN COOLING MODE. IF THE SUCTION PRESSURE FALLS TO 45
PSIG, THE HGBP 1 WILL ENERGIZE TO INCREASE SUCTION PRESSURE. IF THE
SUCTION PRESSURE RISES ABOVE 59 PSIG, THE HGBP 1 WILL
DE-ENERGIZE.
OUTDOOR UNIT AFTER THE RELEASE TO A NORMAL START, ALL COMPRESSORS
WILL START IN BOTH SINGLE UNIT OR MODULE SYSTEMS. IF CAPACITY
REQUEST DOES NOT MEET THE NEED FOR MULTIPLE COMPRESSORS TO BE
RUNNING, ANY UNNECESSARY COMPRESSORS AND ASSOCIATED VALVES WILL
SHUT DOWN WHEN THEIR MINIMUM RUN TIMERS EXPIRE. IF CAPACITY REQUEST
DICTATES THAT MULTIPLE COMPRESSORS ARE REQUIRED, THE REQUIRED
COMPRESSORS WILL CONTINUE TO RUN. WHEN THE SYSTEM HAS SETTLED OUT,
HGBP 2 WILL OPEN (HR SYSTEM, COOLING MODE ONLY) TO BRING BACK LOW
PRESSURE SUCTION GAS ON THE LOW PRESSURE SUCTION LINE AND THE HIGH
PRESSURE SUCTION LINE TOGETHER. DOING SO EFFECTIVELY INCREASES THE
VOLUME OF REFRIGERANT THAT IS RETURNED TO THE COMPRESSOR, WHICH
WILL AID IN MINIMIZING PRESSURE DROPS CAUSED BY LONG LINE LENGTHS.
IN ORDER TO MAINTAIN TARGET HEAD PRESSURE, THE OUTDOOR UNIT FAN
SPEED VARIES: THE FAN SPEED INCREASES TO REDUCE HEAD PRESSURE AND
DECREASES TO INCREASE HEAD PRESSURE. CONDITIONS, SUCH AS LOW LOAD,
LOW AMBIENT, AND LIMITED INDOOR UNIT CAPACITY REQUEST, CAN OCCUR
AND MAY PREVENT THE OUTDOOR UNIT FAN FROM RUNNING. INDOOR UNIT EEVS
WILL METER REFRIGERANT TO MAINTAIN TARGET EVAIN TEMPERATURES SET BY
THE OUTDOOR UNIT OPTION SETTINGS. THE OUTDOOR UNIT WILL ALSO
DYNAMICALLY CHANGE THE TARGET SUCTION PRESSURE BASED ON THE AVERAGE
EVAIN TEMPERATURE OF THE OPERATING INDOOR UNITS. THE OUTDOOR UNIT
WILL SPEED UP OR SLOW DOWN THE COMPRESSOR TO MEET THE TARGET
SUCTION PRESSURE: AS THE SUCTION PRESSURE DECREASES TO BELOW
TARGET, THE COMPRESSOR SLOWS DOWN TO INCREASE SUCTION PRESSURE. AS
THE PRESSURE INCREASES TO ABOVE TARGET, THE COMPRESSOR SPEEDS UP TO
DECREASE SUCTION PRESSURE.
INDOOR UNIT WHEN THE FAN SPEED IS SET TO AUTO, THE FAN WILL RUN AT
A SPEED THAT IS DEPENDENT ON THE INDOOR UNIT SPACE TEMPERATURE 'T
FROM SETPOINT (SEE TABLE 5 AND THE INDOOR UNIT SEQUENCE OF
OPERATION SECTION FOR MORE DETAILS).
LIQUID / HOT GAS / COLD GAS
HEATING MODE UPON A CALL FOR HEATING FROM AN INDOOR UNIT, A SAFETY
START IS IMPLEMENTED FOR UPWARDS OF 12 MINUTES ENSURE AN OPTIMAL
SYSTEM START. DURING THIS TIME, AND BEFORE THE COMPRESSOR STARTS, A
LOGIC JUDGMENT IS MADE ON HOW BEST TO SAFELY START THE SYSTEM BASED
ON THE REQUESTED CAPACITY AND OUTDOOR AMBIENT TEMPERATURE WHILE
PREVENTING LIQUID FLOODBACK TO THE COMPRESSORS. AFTER THE JUDGMENT
IS COMPLETE, ANY ENABLED MCU EEVS ARE AT 0 STEPS. THE INDOOR UNIT
EEV WILL OPEN TO 960 STEPS FOR THE DURATION OF SAFETY START. EVI
SOLENOID 1 AND EVI SOLENOID 2 OPEN. THE MAIN EEV OPENS TO 1200
STEPS. THE EVI BYPASS SOLENOID ENERGIZES. THE HGBP 1 ENERGIZES. THE
CRANKCASE HEATERS ENERGIZE IF POWER HAS NOT BEEN APPLIED FOR MORE
THAN 12 HOURS PRIOR TO START. JUST BEFORE THE COMPRESSOR STARTS,
THE MCU HEATING SOLENOIDS ENERGIZE OPEN AND ALL OFFLINE INDOOR UNIT
EEVS IN HEATING MODE GO TO BETWEEN 80–230 STEPS. THE NUMBER OF
STEPS IS DEPENDENT ON COMPRESSOR HZ. THIS DEPENDENCY PREVENTS
HOARDING OF REFRIGERANT AND OIL IN UNITS THAT ARE NOT ACTIVELY
HEATING. WHEN THE DESIGNATED MAIN COMPRESSOR STARTS, BUT STILL IS
IN A SAFETY START MODE, A LOGIC JUDGMENT IS MADE ON BEST TO SAFELY
START THE SYSTEM AND PREVENT LIQUID FLOODBACK TO THE COMPRESSORS.
AFTER THE JUDGMENT IS COMPLETE, THE OFFLINE COMPRESSOR EVI SOLENOID
CLOSES. WHILE STILL IN A SAFETY START MODE, THE SECOND COMPRESSOR
STARTS AND THE EVI SOLENOID ASSOCIATED WITH THAT COMPRESSOR
ENERGIZES. AFTER 27°F DSH IS ACHIEVED, THE SYSTEM EXITS THE SAFETY
START MODE AND THE HGBP 1 VALVE DE-ENERGIZES. IF NECESSARY, THE
HGBP 1 WILL ENERGIZE DURING ABNORMALLY LOW SUCTION PRESSURE DURING
NORMAL OPERATION IN HEATING MODE. IF THE SUCTION PRESSURE FALLS
BELOW 19 PSIG SUCTION PRESSURE, THE HGBP 1 WILL ENERGIZE. IT WILL
THEN DE-ENERGIZE AT 34 PSIG SUCTION PRESSURE.
OUTDOOR UNIT AFTER THE RELEASE TO A NORMAL START, ALL COMPRESSORS
WILL START IN BOTH SINGLE UNIT OR MODULE SYSTEMS. IF CAPACITY
REQUEST DOES NOT MEET THE NEED OF HAVING MULTIPLE COMPRESSORS
RUNNING, ANY UNNECESSARY COMPRESSORS AND ASSOCIATED VALVES WILL
SHUT DOWN WHEN THEIR MINIMUM RUN TIMERS EXPIRE. IF CAPACITY REQUEST
DICTATES THAT MULTIPLE COMPRESSORS ARE REQUIRED, THE REQUIRED
COMPRESSORS WILL CONTINUE TO RUN. THE OUTDOOR UNIT WILL SPEED UP OR
SLOW DOWN COMPRESSOR(S) TO MEET THE TARGET HIGH PRESSURE SET BY THE
OUTDOOR UNIT. AS THE PRESSURE DECREASES BELOW TARGET, THE
COMPRESSOR WILL SPEED UP TO INCREASE HEAD PRESSURE. WHEN THE
PRESSURE INCREASES ABOVE TARGET, THE COMPRESSOR SLOWS DOWN TO
DECREASE HEAD PRESSURE. IN RESPONSE, THE EVAOUT TEMPERATURES AT THE
INDOOR UNIT COIL INCREASE OR DECREASE. IN ORDER TO MAINTAIN TARGET
SUCTION PRESSURE, THE OUTDOOR UNIT FAN SPEED VARIES: THE FAN SPEED
INCREASES TO REDUCE HEAD PRESSURE AND DECREASES TO INCREASE HEAD
PRESSURE. THE LOWER THE AMBIENT TEMPERATURE, THE FASTER THE OUTDOOR
UNIT FAN WILL RUN. CONDITIONS CAN OCCUR THAT PREVENT THE OUTDOOR
UNIT FAN FROM RUNNING.
INDOOR UNIT WHEN THE FAN SPEED IS SET TO AUTO, THE FAN WILL RUN AT
A SPEED THAT IS DEPENDENT ON THE INDOOR UNIT SPACE TEMPERATURE 'T
FROM SETPOINT (SEE TABLE 7 AND THE INDOOR UNIT SEQUENCE OF
OPERATION SECTION FOR MORE DETAILS.) THE CRITERION OF HEAT CAPACITY
RATIO (HCR) IS USED FOR MODE CHANGEOVER ON A HEAT RECOVERY SYSTEM.
THE RATIO IS REPRESENTED BY THE LINE IN FIGURE 34, WHICH IS BASED
ON THE INDOOR COOLING TEMPERATURE, THE INDOOR HEATING TEMPERATURE,
AND THE OPERATION CAPACITY RATIO OF THE INDOOR UNITS THAT ARE
OPERATING. THIS LINE IS CONTINUALLY CHANGING. IF THE HCR IS ABOVE
THE LINE, THE MODE WILL CHANGE FROM MAINLY COOLING TO MAINLY
HEATING. IF THE HCR IS BELOW THE LINE, THE MODE WILL CHANGE FROM
MAINLY HEATING TO MAINLY COOLING.
MAINLY COOLING MODE WHEN A CAPACITY REQUEST IS INITIATED BY THE
INDOOR UNIT(S) FOR MIXED MODE OF OPERATION WHERE THE MAJORITY OF
THE CAPACITY REQUEST IS FOR COOLING, THE OUTDOOR UNIT WILL START IN
MAINLY COOLING MODE. SYSTEM START-UP WILL FOLLOW THE SEQUENCE OF
COOLING ONLY MODE WITH THE EXCEPTION THAT INDOOR UNITS REQUESTING
HEAT WILL ENERGIZE THE HEATING SOLENOID IN THE ASSOCIATED
MCU.
MAINLY HEATING MODE WHEN A CAPACITY REQUEST IS INITIATED BY THE
INDOOR UNIT(S) FOR MIXED MODE OF OPERATION WHERE THE MAJORITY OF
THE CAPACITY REQUEST IS FOR HEATING, THE OUTDOOR UNIT WILL START IN
MAINLY HEATING MODE. SYSTEM START-UP WILL FOLLOW THE SEQUENCE OF
HEATING ONLY MODE WITH THE EXCEPTION THAT INDOOR UNITS REQUESTING
COOL WILL ENERGIZE THE COOLING SOLENOID IN THE ASSOCIATED
MCU.
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
CANNON DESIGN PROJECT NO. 03640.50
© CannonDesign 2016 All rights reserved. No part of this document
may be reproduced or utilized in any form, without prior written
authorization by the Cannon Corporation
MARCH 10, 2017
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and
Facilities Management
o n e e ig h th in c h = o n e fo o t 1 6
8 4
0
B
A
C
D
E
F
th re e in c h e s = o n e fo o t
6 "
6 "
o n e a n d o n e h a lf in c h e s = o n e fo o t
o n e in c h = o n e fo o t
2 0
0 2
th re e q u a rt e rs in c h = o n e fo o t
o n e h a lf in c h = o n e fo o t
4 0
th re e e ig h th s in c h = o n e fo o t
4 0
0 4
8
o n e q u a rt e r in c h = o n e fo o t
VA FORM 08-6231
F
E
D
C
B
A
Department of Veterans Affairs
VA PARKING GARAGE Eriksson Engineering Assoc. 145 Commerce Drive
Suite A Graylake, IL 60030 T: 847.223.4804 www.eea-ltd.com
Hinman
One Bush Street Suite 510 San Francisco, CA 94104 T: 415.875.7709
www.hce.com
ECS Midwest, LLC 1575 Barclay Boulevard Buffalo Grove, IL 60089 T:
847.777.0344 www.ecslimited.com
FLOW AND CONTROL DIAGRAMS
NUMBERS IN SEQUENCE - 1,2,3, ETC.
BPS BOLTED PRESSURE SWITCH CB CIRCUIT BREAKER CRT FIRE ALARM CRT
ANNUNCIATOR DS UNFUSED DISCONNECT SWITCH EC ELEVATOR CONTACTOR FAP
FIRE ALARM ANNUNCIATOR FATC FIRE ALRAM TERMINAL CABINET FDS FUSED
DISCONNECT SWITCH FPU FIELD PROCESSING UNIT GC GENERAL PURPOSE
CONTACTOR IDRS INTEGRATED DATA CENTER RACK SYSTEM IEC INTERCOM
EQUIPMENT CABINET IPC INTEGRATED POWER CENTER LC LIGHTING CONTACTOR
LRC LIGHTING RELAY CABINET LVS LOW VOLTAGE POWER SWITCHGEAR MMC
MODULAR METER CENTER MS METER SOCKET MVR MEDIUM VOLTAGE REGULATOR
MVS MEDIUM VOLTAGE SWITCHGEAR NEC NURSE CALL EQUIPMENT CABINET PBL
PLUG-IN BUSWAY LIGHTING PBP PLUG-IN BUSWAY POWER PSS PRIMARY
SUBSTATION PSU PATIENT SERVING UNIT PSWGR PARALLELING SWITCHGEAR
RUPS ROTARY HYBRID UNINTERRUPTIBLE POWER SUPPLY SFP SURGICAL
FACILITY PANEL SWBDN SWITCHBOARD, NORMAL SWBDS SWITCHBOARD, LIFE
SAFETY (NEC 517) SWBDC SWITCHBOARD, CRITICAL (NEC 517) S SWBDE
SWITCHBOARD, EQUIPMENT (NEC 517) SWBDE SWITCHBOARD, EMERGENCY (NEC
700) SWBDS SWITCHBOARD, STANDBY (NEC 701) SWBDO SWITCHBOARD,
OPTIONAL (NEC 702) T TRANSFORMER TBTP TELECOMMUNICATION BACKBONE
TERMINATION PANEL TDTP TELECOMMUNICATION DEVICE TERMINATION PANEL
TMGR TELECOMMUNICATION MAIN GROUND BUS TMGB TELECOMMUNICATION ROOM
GROUND BUS TVSS TRANSIENT VOLTAGE SURGE SUPPRESSOR USSHV UNIT
SUBSTATION AT 480Y/277 SECONDARY VOLTAGE USSLV UNIT SUBSTATION AT
208Y/120 SECONDARY VOLTAGE
X EXTERIOR C LEVEL C B LEVEL B A LEVEL A 1 LEVEL 01
G "G" BUILDING (GARAGE)
H 480Y/277V L 208V/120V OR 240V
N NORMAL BRANCH G GENERATOR POWER S LIFE SAFETY BRANCH (NEC 517) C
CRITICAL BRANCH (NEC 517) E EQUIPMENT BRANCH (NEC 517) M MIXED
EXISTING BRANCH E EMERGENCY BRANCH (NEC 700) S STANDBY BRANCH (NEC
701) O OPTIONAL BRANCH (NEC 702)
I ISOLATED PANELBOARD K KITCHEN PANELBOARD L LIGHTING AND APPLIANCE
PANELBOARD O OPERATING ROOM PANELBOARD P POWER DISTRIBUTION
PANELBOARD
X EXTERIOR C LEVEL C B LEVEL B A LEVEL A 1 LEVEL 01
G "G" BUILDING (GARAGE)
CONDUCTOR AWG #12 #10 #8
MAXIMUM CONDUCTOR LENGTH AT 120V 95 160 245 MAXIMUM CONDUCTOR
LENGTH AT 277V 225 375 565 MAXIMUM CONDUCTOR LENGTH AT 208V 1 PH.
170 280 425 MAXIMUM CONDUCTOR LENGTH AT 480V 1 PH. 390 650 985
GROUND CONDUCTOR AWG #12 #10 #8
NOTES:
1. INCREASE BRANCH CIRCUIT CONDUCTOR AS INDICATED.
2. BASED ON 20A CIRCUIT LOADED TO 10A USING SINGLE PHASE, 2 WIRE
CIRCUITS.
3. SCHEDULE REPRESENTS MINIMUM CONDUCTOR SIZE BASED ON LENGTH OF
BRANCH CIRCUIT CONDUCTOR FROM PANEL TO PHYSICAL CENTER OF LOAD TO
OVERCOME VOLTAGE DROP. 3% VOLTAGE DROP ASSUMED.
4. TRANSITION FROM LARGER CONDUCTOR SIZE TO #12 FOR FINAL
TERMINATION TO OUTLET DEVICE. PROVIDE JUNCTION BOX WITHIN 10' OF
OUTLET. EXTEND #12 CONDUCTOR TO OUTLET.
COMMUNICATION SYMBOLS OUTLET, COMBINATION TELEPHONE/DATA
COMMUNICATION
CABLE TELEVISION LINE = CATV
FIBEROPTICS LINE = FO
TELEPHONE LINE = T
SOUND LINE = S
RADIO CONDUIT RUN, MINIMUM 3/4" [19mm] CONDUIT
TELECOMMUNICATIONS MANHOLE
FLOOR RECEPTACLE, TELEPHONE
OUTLET TELEPHONE; LETTER INDICATES AS FOLLOWS: J = JACK TYPE W =
WALL TYPE
OUTLET DATA ONLY
OUTLET; LETTER INDICATES AS FOLLOWS: A = AUDIO V =VIDEO I =
INTERCOM
SPEAKER, CEILING MOUNTED, "X" INDICATES THE TYPE, PROVIDE SCHEDULE
ON LEGEND
SPEAKER, WALL MOUNTED, "X" INDICATES THE TYPE, PROVIDE SCHEDULE ON
LEGEND. MTD. 7'-6" [2286mm] AFF UNLESS OTHERWISE NOTED
RADIO CHANNEL SELECTOR FACILITIES, MTD. 4'-6" [1372mm] AFF UNLESS
OTHERWISE NOTED
SPEAKER PROGRAM SELECTOR SWITCH & VOLUME CONTROL MTD. 4'-6"
[1372mm] AFF UNLESS OTHERWISE NOTED
OUTLET, TEVEVISION BLANK = 4 11/16" [119mm] MASTER ANTENNA OUTLET
BOX W/BLANK
COVER, MTD. 18" [457mm] AFF UNLESS OTHERWISE NOTED. C = CAMERA
(CCTV SYSTEM), MTD 18" [457mm] AFF M = MONITOR (CCTV SYSTEM)
TELEPHONE TERMINAL CABINET
REMOTE DICTATING OUTLET MTD 1'-6" [457mm] AFF. UNLESS OTHERWISE
NOTED
INTERCOM STATION (REFER TO SPECS. FOR FUNCTIONAL OPERATION OF
INSTRUMENT & TYPE REQUIRED)
INTERCOM STAFF STATION
NOTE: FOR WHEELCHAIR PATIENT USE MOUNT TELEPHONE OUTLET 36" [914mm]
AFF TO BOTTOM OF OUTLET BOX.
DESK PHONES - MOUNT OUTLET 1'-6" [457mm] AFF
PAY PHONES - MOUNT OUTLET 4'-0" [1219mm] AFF
HEIGHT OF TELECART OUTLETS SHALL BE AS INDICATED ON BEDWALLS OR
PBPU DETAILS.
SEE VA BARRIER FREE DESIGN GUIDE PG-18-13.
CATV
CCTV
FO
T
II
S
NC
R
C
J
A
SECURITY ACCESS, BUZZER, MTD. 1'-6" [457mm] AFF UNLESS OTHERWISE
NOTED
SECURITY ACCESS, CONTROL UNIT WITH CLOSED CIRCUIT TELEVISION
CAMERA
SECURITY ACCESS, GENERIC "X" INDICATES THE TYPE, PROVIDE SCHEDULE
OR LEGEND
SECURITY ACCESS, HORN OR SIREN
SECURITY ACCESS, OUTDOOR MICROWAVE TRANSMISSION UNIT
SECURITY ACCESS, PANIC ALARM
SECURITY ACCESS, VOLUMETRIC SENSOR
SECURITY ACCESS, SWITCH, BALANCED MAGNETIC CONTROL
SECURITY ACCESS, TELEPHONE HANDSET
CODE ONE CONTROL AND ALARM STATION. MTD 5'-0" [15