Hunter Mill Road and Sunset Hills Road Study
Community Meeting #2
Existing & No-Build Conditions
February 25, 2015
Meeting Agenda
• Introductions
• Project Objectives
• Summary of Previous Studies
• Existing Conditions
• 2030 No Build Conditions
• Question & Answer
• Charrette
• Summary
2
Project Objectives
• Address existing congestion
• Plan for future traffic
• Address queuing along Hunter Mill Road and Sunset Hills Road
• Improve access to the Dulles Toll Road by minimizing congestion
• Maintain Hunter Mill Roads Character by applying Context Sensitive Solutions
4
Project Study Area
6
Intersection ID IntersectionIntersection Control Type
1Hunter Mill Road at Sunrise Valley Drive
Signalized
2Hunter Mill Road at
DTR EB RampsSignalized
3Hunter Mill Road at
DTR WB RampsSignalized
4Hunter Mill Road at
Sunset Hills RoadSignalized
5Hunter Mill Road at
Crowell RoadUnsignalized
(All-Way Stop)
6Hunter Mill Road at Hunting Crest Lane
Unsignalized(Two-Way Stop)
7Hunter Mill Road at
Lake Fairfax ParkUnsignalized
(Two-Way Stop)
7
6
5
43
2
1
Previous Studies
• VDOT Study of Hunter Mill Road/Dulles Toll Road Interchange
• Hunter Mill Road Traffic Calming Study, NVRC
7
VDOT Alternatives Study
8
VDOT conducted a study of the Hunter Mill Road and Dulles Toll Road interchange in 2000, but no formal action was taken
Hunter Mill Road Traffic Calming Study
9
NVRC, Hunter Mill Road Traffic Calming Study, 2006
The study was sponsored by the Northern Virginia Regional Commission (NVRC) and completed in 2006. It provides both a traffic calming conceptual plan for Hunter Mill Road, as well as context sensitive roadway design techniques, as referenced in the Comprehensive Plan.
Existing Conditions - Geometry
• Hunter Mill Road• Type B Minor Arterial
• 1 Lane in each direction (north of Sunset Hills Road)
• 2 Lanes Northbound, 1 Lane Southbound (south of Dulles Toll Road)
• 35 miles per hour
• Sunset Hills Road• Type B Minor Arterial
• 1 Lane in each direction
• 35 miles per hour
11
Existing Conditions - Geometry
12
• Sunrise Valley Drive• Urban Minor Arterial
• 1 Lane in each direction (East of Hunter Mill Road)
• 2 Lanes in each direction (West of Hunter Mill Road)
• 35 miles per hour
• Crowell Road• Urban Minor Arterial
• 1 Lane in each direction
• 35 miles per hour
13
Level of ServiceDelay (s/veh)
LOSSignalized
Intersections
Unsignalized
Intersections
A ≤ 10 ≤ 10
B > 10 - 20 10–15
C > 20 - 35 15–25
D > 35 - 55 25–35
E > 55 - 80 35–50
F > 80 ≥50
• LOS measures how well traffic moves along a roadway or delay at an intersection. LOS is generally defined in terms of speed and travel time, freedom to maneuver, safety, and traffic interruptions.
• Outside of Activity Centers the current County LOS standard is - LOS D for the peak hour(s)
Existing Conditions: AM(PM) Peak HourHunter Mill Road & Sunrise Valley Drive
14
752 (469)353 (143)
520 (379)171 (436)
51
4 (
43
4)
39
2 (
67
8)
Hu
nte
r M
ill R
d
Sunrise Valley Dr
D (D)D (D)
D (D)B (C)
A (
A)
D (
C)
Hu
nte
r M
ill R
d
Sunrise Valley Dr
Overall: C (C)
Volumes Level of Service
Existing Conditions: AM(PM) Peak HourHunter Mill Road & EB Dulles Toll Road
15
42
6 (2
17
)
84
6 (6
31
)
75 (104)300 (276)
12
6 (
17
6)
60
6 (
83
6)
A (A
)
C (B
)
D (D)D (D)
D (
E)A
(A
)
Overall: C (B)
Volumes Level of Service
Existing Conditions: AM(PM) Peak HourHunter Mill Road & WB Dulles Toll Road
16
68
3 (4
88
)
23
8 (2
47
)
284 (149)193 (360)
53
9 (
65
2)
12
4 (
88
)B
(C)
C (E)
D (C)E (E)
A (
C)
A (
A)
Volumes Level of Service
Existing Conditions: AM(PM) Peak HourHunter Mill Road & Sunset Hills Road
174
04
(45
6)
56
3 (1
81
)
183 (216)136 (395)
52
7 (
34
5)
31
5 (
17
7)
A (A
)
D (C
)
F (F)*D (D)
D (
D)
C (
C)
* Delay (s/veh)- 111.0 (159.2)
Volumes Level of Service
Existing Conditions: AM(PM) Peak HourHunter Mill Road & Crowell Road
183
68
(35
7)
21
9 (3
15
)
28 (199)467 (316)
21
9 (
41
)
37
5 (
20
6)
Hu
nte
r M
ill R
d
Crowell Rd
F (F)***
F (F)**
F (C
)*
Hu
nte
r M
ill R
d
Crowell Rd
Delay (s/veh)
* 66.6 (19.5)** 67.1 (63.2)*** 64.4 (62.1)
Volumes Level of Service
Existing Conditions:AM Travel Speeds
19
. Crowell Road
Dulles Toll Road WB Off Ramp
Dulles Toll Road EB On Ramp
Sunset Hills Road
Sunrise Valley Drive Hunter Mill Road
Dulles Toll Road WB On Ramp
Dulles Toll Road EB Off Ramp
Hu
nte
r M
ill R
oad
Hu
nte
r M
ill R
oad
LEGENDSimulated Speed (mph)
>30>15-300-15
STOP
Existing Conditions:PM Travel Speeds
20
. Crowell Road
Dulles Toll Road WB Off Ramp
Dulles Toll Road EB On Ramp
Sunset Hills Road
Sunrise Valley Drive Hunter Mill Road
Dulles Toll Road WB On Ramp
Dulles Toll Road EB Off Ramp
Hu
nte
r M
ill R
oad LEGEND
Simulated Speed (mph)>30>15-300-15
STOP
Hu
nte
r M
ill R
oad
2030 No Build: AM(PM) Peak HourHunter Mill Road & Sunrise Valley Drive
22
800 (550)400 (150)
600 (550)300 (800)
60
0 (
55
0)
45
0 (
70
0)
Hu
nte
r M
ill R
d
Sunrise Valley Dr
D (C)D (C)
E (D)B (E)
A (
A)
E (E
)
Hu
nte
r M
ill R
d
Sunrise Valley Dr
Volumes Level of Service
2030 No Build: AM(PM) Peak HourHunter Mill Road & EB Dulles Toll Road
23
50
0 (3
00
)
90
0 (8
00
)
100 (100)350 (300)
15
0 (
20
0)
70
0 (
95
0)
A (A
)
C (C
)
D (D)
F (E)*
E (E
)A
(A
)
Overall: C (C)* Delay (s/veh)- 81.7 (72.6)
Volumes Level of Service
2030 No Build: AM(PM) Peak HourHunter Mill Road & WB Dulles Toll Road
248
00
(55
0)
20
0 (3
50
)
350 (250)250 (450)
60
0 (
70
0)
15
0 (
15
0)
C (D
)
C (F)**
D (C)F (F)*
A (
C)
A (
A)
* Delay (s/veh)- 86.1 (147.1)** Delay (s/veh)- 27.3 (97.4)
Volumes Level of Service
2030 No Build: AM(PM) Peak HourHunter Mill Road & Sunset Hills Road
255
00
(55
0)
65
0 (2
50
)
250 (300)200 (450)
55
0 (
40
0)
35
0 (
20
0)
A (A
)
E (C)
F (F)*D (D)
D (
F)**
B (
B)
* Delay (s/veh)- 119.7 (168.2)** Delay (s/veh)- 44.1 (81.3)
Volumes Level of Service
2030 No Build: AM(PM) Peak HourHunter Mill Road & Crowell Road
265
00
(47
0)
25
0 (3
80
)
50 (250)600 (450)
20
0 (
50
)
30
0 (
15
0)
Hu
nte
r M
ill R
d
Crowell Rd
D (D)
Hu
nte
r M
ill R
d
Crowell Rd
A (A
)
C (C
)
Overall: C (C)
C (
B)
C (
B)
Volumes Level of Service
2030 No Build: AM Travel Speeds
27
. Crowell Road
Dulles Toll Road WB Off Ramp
Dulles Toll Road EB On Ramp
Sunset Hills Road
Sunrise Valley Drive Hunter Mill Road
Dulles Toll Road WB On Ramp
Dulles Toll Road EB Off Ramp
Hu
nte
r M
ill R
oad LEGEND
Simulated Speed (mph)>30>15-300-15
Hu
nte
r M
ill R
oad
2030 No Build: PM Travel Speeds
28
. Crowell Road
Dulles Toll Road WB Off Ramp
Dulles Toll Road EB On Ramp
Sunset Hills Road
Sunrise Valley Drive Hunter Mill Road
Dulles Toll Road WB On Ramp
Dulles Toll Road EB Off Ramp
Hu
nte
r M
ill R
oad LEGEND
Simulated Speed (mph)>30>15-300-15
Hu
nte
r M
ill R
oad
AM Comparison of Existing and 2030 No Build
Intersection MovementExisting (2014)
2030 No Build
AM Peak AM Peak
Hunter Mill Road atSunrise Valley Drive
SB C CEB D DWB D D
Overall C D
Hunter Mill Road atDulles Toll Road EB Ramps
NB B CSB B BEB D E
Overall C C
Hunter Mill Road atDulles Toll Road WB Ramps
NB B CSB A AWB D E
Overall C C
Hunter Mill Road atSunset Hills Road
NB C CSB D DEB F (82.3) F (85.6)
Overall D D
Hunter Mill Road at Crowell Road
NB T/R F (64.4) BSB L/T F(66.6) C
WB L/R F (67.1) DOverall -* C
*Existing configuration is unsignalized and therefore does not report Overall LOS
29
2030: Sunset Hills Road 4 lanes
2030: Signal at Crowell Road & Hunter Mill Road
PM Comparison of Existing and 2030 No Build
Intersection MovementExisting (2014)
2030 No Build
PM Peak PM Peak
Hunter Mill Road atSunrise Valley Drive
SB B DEB D EWB D C
Overall C D
Hunter Mill Road atDulles Toll Road EB Ramps
NB B BSB B BEB D E
Overall B C
Hunter Mill Road atDulles Toll Road WB Ramps
NB D F (97.4)SB C CWB E F (105.2)
Overall D E
Hunter Mill Road atSunset Hills Road
NB B BSB D EEB F (85.6) F (93.3)
Overall D D
Hunter Mill Road at Crowell Road
NB T/R F (62.1) BSB L/T C B
WB L/R F (63.2) DOverall -* C
*Existing configuration is unsignalized and therefore does not report Overall LOS
30
2030: Sunset Hills Road 4 lanes
2030: Signal at Crowell Road & Hunter Mill Road
31
Findings/Conclusions
• AM Peak Hour (Existing) – Dulles Toll Road EB Ramp is source of congestion northbound
• AM Peak Hour (Existing) – Crowell Road stop sign is source of congestion in both directions (northbound & southbound)
• PM Peak Hour (Existing) – Sunset Hills intersection is main source of congestion in both directions
32
Findings/Conclusions (Cont’d)
• By 2030 traffic conditions are anticipated to degrade
• At the EB DTR ramps: The ramp goes from LOS D to E during both periods and the intersection degrades from LOS B to C in the PM.
• At the WB DTR ramps: The ramp goes from D to E in the AM and E to F in the PM. In the PM the intersection degrades from a LOS D to E.
• Installation of signal at Crowell reduces delay in the long term
33
Question & Answers
• 15 Minutes maximum
• Please limit yourself to one question so others have an opportunity to ask questions
Charrette
• Discuss with group leader
• Be prepared to share ideas and proposals with the larger group
• Each group will report concepts
34
Summary and Next Steps• Review and document all presented ideas and
comments
• Develop future concepts for analysis
• Perform analysis of three alternatives
• Public meeting to present findings of analysis
• FCDOT will review ideas presented at previous meeting, and considerations given to each recommendation
• Community Feedback
• Public meeting to present preferred alternative
35
Project TimelineTask No. Description
0
Finalize Scope
Consultant Selection
Contracting/Issue NTP
1
Establish Existing Conditions
Kick off meeting
Public/Stakeholder Meeting
Summary Document on Existing Conditions
2
Develop MOEs
Preliminary Concepts
Public/Stakeholder Meeting
Finalize Concepts
Summary Document on Alternatives
3
Preliminary Assessment of Alternatives
Final Assessment of Alternatives
Public/Stakeholder Meeting
Summary Document on Alternatis Analysis
4
Chapter 1 (draft)
Chapter 2 (draft)
Chapter 3 (draft)
Chapter 4 (draft)
Chapter 5 (draft)
Technical Appendices
Final Report & Project Files
Deliverables Meetings Working Time
December January February March April May June July
December 2014 - July 2015
October November
Existing Conditions
Develop Alternatives & MOEs
Alternatives Analysis
Documentation
Scoping
We are here
36