Hunter Mill Road and Sunset Hills Road Study Community Meeting #6 Preferred Alternative Presentation November 17, 2016 Kristin Calkins Fairfax County Department of Transportation

Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

Embed Size (px)

Citation preview

Page 1: Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

Hunter Mill Road and Sunset Hills Road Study

Community Meeting #6Preferred Alternative Presentation

November 17, 2016

Kristin CalkinsFairfax County Department of Transportation

Page 2: Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

2

Presentation Agenda• Project Objectives• Summary of Prior Community Involvement• Review of Alternatives Considered • Alternative Evaluation Matrix• Staff Preferred Alternative• Next Steps• Questions and Answers

Page 3: Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

3

Project Objectives• Address existing congestion• Plan for future traffic• Address queuing along Hunter Mill Road and

Sunset Hills Road• Improve access to the Dulles Toll Road by

minimizing congestion• Maintain Hunter Mill Road’s character by

applying context sensitive solutions

Page 4: Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

4

Project Study AreaIntersection ID Intersection

CurrentIntersection Control Type

1Hunter Mill Road at Sunrise Valley Drive

Signalized

2Hunter Mill Road at

DTR EB RampsSignalized

3Hunter Mill Road at

DTR WB RampsSignalized

4Hunter Mill Road at

Sunset Hills RoadSignalized

5Hunter Mill Road at

Crowell RoadUnsignalized

(All-Way Stop)

6Hunter Mill Road at Hunting Crest Lane

Unsignalized(Two-Way Stop)

7Hunter Mill Road at

Lake Fairfax ParkUnsignalized

(Two-Way Stop)

7

6

5

4 32

1

Page 5: Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

Project Background• Board of Supervisors authorized study as a follow-on study to

the Reston Phase I Plan Amendment (February 11, 2014)• Meetings held on:

• December 8, 2014: Kick-Off • February 24, 2015: Existing & No-Build conditions and community

input on alternatives• May 20, 2015: Analysis Findings

• Project put on hold in July 2015 at request of community to allow for new capacity analysis methodologies for roundabouts to be adopted by the Transportation Research Board in January 2016

• June 30, 2016: Roundabout capacity results• September 15, 2016: Alternatives developed and results presented

5

Page 6: Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

Project Process

Kick

Off

Mee

ting

Existi

ng

Cond

ition

sFu

ture

Con

ditio

ns

Com

mun

ity

Mee

ting

#2

Deve

lopm

ent o

f Al

tern

ative

s

Com

mun

ity

Mee

ting #

3

Proj

ect p

ut

on H

old

Com

mun

ity

Mee

ting

#4

Anal

ysis

of

Alte

rnati

ves

Com

mun

ity

Mee

ting #

5

Sele

ction

of

Pref

erre

d Al

tern

ative

Com

mun

ity

Mee

ting

#6Fin

al R

epor

tIn

corp

orati

on in

to

Com

p Pl

an

PC/B

OS P

ublic

He

arin

gs

24 MONTHS

6

We are Here

Page 7: Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

Summary of Community Comments• Concern that traffic from Wiehle Avenue may be

diverted to Hunter Mill Road• Concern that the signal at Crowell Road may

increase delays in the off-peak• Maintain the character of Hunter Mill Road• Improve Level of Service (LOS) on Hunter Mill

Road• Roundabouts preferred at Dulles Toll Road ramps

7

Page 8: Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

Summary of Community Comments (Cont.)• Consider widening Hunter Mill Road from eastbound

Dulles Toll Road to Sunrise Valley Drive• Concern that improvements may attract more

development• Community wants an in-depth review of

roundabouts• There should be a mix and match of alternatives• Limit impact to Reston Presbyterian Church• Realign Sunset Hills to limit parcel impacts

8

Page 9: Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

Alternatives Considered

9

Crowell Road

Sunset Hills Road

Sunrise Valley Drive

Hunt

er M

ill R

oad

WB DTR

EB DTR

No-BuildCrowell Road

Sunset Hills Road

Sunrise Valley Drive

Hunt

er M

ill R

oad

WB DTR

EB DTR

Alt. 1ACrowell Road

Sunset Hills Road

Sunrise Valley Drive

Hunt

er M

ill R

oad

WB DTR

EB DTR

Alt. 1B

Roundabout

Signal Proffered

Page 10: Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

Alternatives Considered (Cont.)

10

Crowell Road

Sunset Hills Road

Sunrise Valley Drive

Hunt

er M

ill R

oad

WB DTR

EB DTR

No-BuildCrowell Road

Sunset Hills Road

Sunrise Valley Drive

Hunt

er M

ill R

oad

WB DTR

EB DTR

Alt. 2Crowell Road

Sunset Hills Road

Sunrise Valley Drive

Hunt

er M

ill R

oad

WB DTR

EB DTR

Alt. 3

Signal Proffered

Page 11: Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

Alternatives Considered (Cont.)

11

Crowell Road

Sunset Hills Road

Sunrise Valley Drive

Hunt

er M

ill R

oad

WB DTR

EB DTR

No-BuildCrowell Road

Sunset Hills Road

Sunrise Valley Drive

Hunt

er M

ill R

oad

WB DTR

EB DTR

Alt. 4ACrowell Road

Sunset Hills Road

Sunrise Valley Drive

Hunt

er M

ill R

oad

WB DTR

EB DTR

Alt. 4B

Signal Proffered

Roundabout

Page 12: Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

Traffic Analysis ResultsTraffic Analysis:

• Performed for both 2030 and 2050• Consistent with VDOT Policies and Procedures • Used new Roundabout Methodology• 2030 – Volumes from Reston Phase I Plan

Amendment• 2050 – Volumes from Reston Network

Analysis (includes new DTR crossings)

12

Page 13: Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

2030 Traffic Analysis Summary

13

LOS Standard = LOS D* Alt 2 in new location ** No Build includes the proffered signal at Crowell Road

IntersectionRoundabouts Signals Mix & Match

No Build Alt. 1A Alt. 1B Alt. 2 Alt. 3 Alt. 4A Alt. 4BOVERALL LOS AM (PM)

Hunter Mill Rd. @Crowell Rd. / Sunset Hills Rd. - - C (B) - D (C) - C (B)

Hunter Mill Rd. @Crowell Rd.** C (C) E (C) - C (C) - C (C) -

Hunter Mill Rd. @Sunset Hills Rd.* D (D) - - D (D) - - -

Hunter Mill Rd. @DTR WB Ramps & Sunset Hills Rd. - D (D) - - - D (D) -

Hunter Mill Rd. @DTR WB Ramps C (E) - B (D) C (D) B (D) - D (C)

Hunter Mill Rd. @DTR EB Ramps C (C) B (B) B (B) C (C) D (C) B (B) E (C)

Hunter Mill Rd. @Sunrise Valley Dr. D (D) C (D) C (D) D (D) C (D) F (F) C (D)

Page 14: Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

2050 Traffic Analysis Summary

14

IntersectionRoundabouts Signals Mix & Match

No Build Alt. 1A Alt. 1B Alt. 2 Alt. 3 Alt. 4A Alt. 4BOVERALL LOS AM (PM)

Hunter Mill Rd. @Crowell Rd. / Sunset Hills Rd. - - F (B) - F (C) - F (B)

Hunter Mill Rd. @Crowell Rd.** B (C) F (F) - C (B) - C (B) -

Hunter Mill Rd. @Sunset Hills Rd.* C (B) - - E (D) - - -

Hunter Mill Rd. @DTR WB Ramps & Sunset Hills Rd. - F (F) - - - F (F) -

Hunter Mill Rd. @DTR WB Ramps D (C) - C (C) D (C) C (C) - D (C)

Hunter Mill Rd. @DTR EB Ramps E (C) D (B) D (B) E (C) E (C) D (B) E (C)

Hunter Mill Rd. @Sunrise Valley Dr. E (D) D (B) D (B) E (D) E (D) F (E) D (B)

LOS Standard = LOS D* Alt 2 in new location ** No Build includes the proffered signal at Crowell Road

Page 15: Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

Alternative Comparison Matrix

15

* Poor ** Average*** Best

Comparative Metric

Roundabouts Signals Mix & Match

Alt. 1A Alt. 1B Alt. 2 Alt. 3 Alt. 4A Alt. 4B

Level-of-Service ** ** *** ** * **

Right-of-Way ** * ** ** ** *

Cost ** * *** *** ** **

Community Input *** *** * ** ** **

Constructability * ** *** *** ** **

Page 16: Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

Alternative Comparison Summary

16

• No one alternative outshines the rest• Operations for the alternatives vary• Community input is a important consideration• The “Mix-and-Match” alternatives show promise

Page 17: Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

Staff Preferred Alternative

17

• Roundabout at Crowell Road/Realigned Sunset Hills Road

• Sunset Hills Road realignment adjusted based on community input

• Signals remain at Dulles Toll Road Ramps and Sunrise Valley Drive

Page 18: Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

Staff Preferred Alternative (Cont.)

18

Sunset Hills Road Realignment would be

further designed at implementation

Page 19: Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

Staff Preferred Alternative (Cont.)

19

• Provides for the future travel demand in the corridor• Separates the closely spaced intersections of Sunset

Hills Road and the Westbound Dulles Toll Road Ramps• Roundabout at Crowell Road and Realigned Sunset

Hills Road serves as a transition between northern segment of Hunter Mill Road and the Dulles Toll Road

• Incorporates community desire to see roundabouts in the corridor

Page 20: Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

Preferred Alternative Traffic Analysis

20

Sunrise Valley Drive

Hunt

er M

ill R

oad

WB DTR

EB DTR

Crowell RoadSunset Hills Road Crowell Road

WB DTR

EB DTR

C C

C B

D D

Sunset Hills Road

Hunt

er M

ill R

oad

21 sec./12 sec.

21 sec./44 sec.

34 sec./31 sec.

37 sec./44 sec.

C D

LOS: A, B, C

LOS: D

LOS: E

LOS: F

AM/PM LOS

Key for Levels of Service

Sunrise Valley Drive

2030

Crowell Road

WB DTR

EB DTR

D C

F B

E D

Sunset Hills Road

Hunt

er M

ill R

oad

104 sec./14 sec.

41 sec./32 sec.

67 sec./22 sec.

58 sec./48 sec.

D C

2050

Roundabout

Page 21: Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

2030 Traffic Analysis Summary

21

LOS Standard = LOS D* Alt 2 in new location ** No Build includes the proffered signal at Crowell Road

Intersection

Roundabouts Signals Mix & Match

No Build Alt. 1A Alt. 1B Alt. 2 Alt. 3 Alt. 4A Alt. 4BStaff Pref. Alt.

OVERALL LOS AM (PM)Hunter Mill Rd. @

Crowell Rd. / Sunset Hills Rd. - - C (B) - D (C) - C (B) C (B)

Hunter Mill Rd. @Crowell Rd.** C (C) E (C) - C (C) - C (C) - -

Hunter Mill Rd. @Sunset Hills Rd.* D (D) - - D (D) - - - -

Hunter Mill Rd. @DTR WB Ramps & Sunset Hills Rd. - D (D) - - - D (D) - -

Hunter Mill Rd. @DTR WB Ramps C (E) - B (D) C (D) B (D) - D (C) C (D)

Hunter Mill Rd. @DTR EB Ramps C (C) B (B) B (B) C (C) D (C) B (B) E (C) C (C)

Hunter Mill Rd. @Sunrise Valley Dr. D (D) C (D) C (D) D (D) C (D) F (F) C (D) D (D)

Page 22: Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

2050 Traffic Analysis Summary

22

Intersection

Roundabouts Signals Mix & Match

No Build Alt. 1A Alt. 1B Alt. 2 Alt. 3 Alt. 4A Alt. 4B

Staff Pref. Alt.

OVERALL LOS AM (PM)Hunter Mill Rd. @

Crowell Rd. / Sunset Hills Rd. - - F (B) - F (C) - F (B) F (B)Hunter Mill Rd. @

Crowell Rd.** B (C) F (F) - C (B) - C (B) - -Hunter Mill Rd. @Sunset Hills Rd.* C (B) - - E (D) - - - -

Hunter Mill Rd. @DTR WB Ramps & Sunset Hills

Rd.- F (F) - - - F (F) - -

Hunter Mill Rd. @DTR WB Ramps D (C) - C (C) D (C) C (C) - D (C) D (C)

Hunter Mill Rd. @DTR EB Ramps E (C) D (B) D (B) E (C) E (C) D (B) E (C) D (C)

Hunter Mill Rd. @Sunrise Valley Dr. E (D) D (B) D (B) E (D) E (D) F (E) D (B) E (D)

LOS Standard = LOS D* Alt 2 in new location ** No Build includes the proffered signal at Crowell Road

Page 23: Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

23

Next Steps • Evaluate Community Feedback

• Please send comments by December 9, 2016• Finalize Preferred Alternative and complete Final

Report• Incorporate Preferred Alternative into the

Comprehensive Plan• Planning Commission and Board Public Hearings

• Identify funding for implementation• Incorporate in Transportation Priorities Plan

Page 24: Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, 2016

24

Question & Answers

30 MinutesPlease limit yourself to one question so others

have an opportunity to ask

[email protected]