Waste Cause Analysis and CP Techniques

Samantha KumarasenaDeputy DirectorNational Cleaner Production Centre, Sri Lanka

05/03/2023 1Samantha Kumarasena

Page 2: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Option generation

An organized, participative activity!

Brainstorming is a good tool!!

05/03/2023 Samantha Kumarasena 2

Page 3: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Cause Analysis (Reasons for Waste)

Page 4: Cp gp day02 session 8 waste cause analysis & cp techniques2012

How Do We Find Waste Causes Ask Questions

What, Why, Where, When, How Never WHO

Make Observations with CP Team Conduct Brainstorming sessions Use suitable Tools such as

Fishbone Diagram

Page 5: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Is the waste caused due to…

Choice & quality input

material

Choice of technology

Technical status of

equipment

Operation & maintenance

Personal skills & motivation

Product specification

Management planning & information

systems

Design & layout of plant &

machinery

Waste Cause Categories

05/03/2023 Samantha Kumarasena 5

Page 6: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Choice & Quality of Input Material

• low quality• Impurities• Composition• Size of material• Cleaning requirement• Toxicity / hazardousness

IS THIS THE BEST RAW MATERIAL?

Page 7: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Choice of Production Technology

Obsolete technologies Available technologiesModern technologies Appropriate technology

Page 8: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Obsolete equipment Absence of indicator

instruments Improperly working

controllers

Technical Status of Equipment

Page 9: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Design and Layout of Equipment

Arrangement at the production floor

Placement and arrangement of stores

Material conveying method Long distance distribution Capacity balance Service / utility needs

Page 10: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Product Specification

Dimensions (size) Colors Surface finishPackaging

requirementPerformance

properties

Page 11: Cp gp day02 session 8 waste cause analysis & cp techniques2012

• Inefficient process controls

• Cleanliness / housekeeping

• Correct load / parameters• Frequent down time• Power failures• Improper maintenance /

lack of maintenance planning

Operation & Maintenance

Page 12: Cp gp day02 session 8 waste cause analysis & cp techniques2012

• Lack of production planning

• Wrong information• Inadequate information• Inventory management• Absence of record

keeping culture

Management Planning & Information Systems

Page 13: Cp gp day02 session 8 waste cause analysis & cp techniques2012

• Attitudes• Carelessness• Short cuts• Incomplete work

Personal Skills & Motivation

Page 14: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Cleaner Production techniques Input substitutionGood housekeepingBetter process control Product modification Equipment modification Technology change On-site recovery/reuse Creation of useful by products

05/03/2023 Samantha Kumarasena 14

Page 15: Cp gp day02 session 8 waste cause analysis & cp techniques2012

15

Classification of CP Techniques

CP TECHNIQUES

PRODUCT MODIFICATION

RECYCLING

Onsite recovery and reuse

Creation ofUseful by-products

SOURCE REDUCTION

Process

Change

s

GoodHouse-Keeping

InputMaterialchange

Better process control

Equipment

modification

Technology change

Page 16: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Good housekeeping

05/03/2023 Samantha Kumarasena 16

Page 17: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Good Housekeeping

Take appropriate operational actions to prevent:

- leaks- spills

Formulate & enforce to practice appropriate operational instructions

Page 18: Cp gp day02 session 8 waste cause analysis & cp techniques2012

• Tighten valves, check & repair leaking pumps, valves, pipes to reduce/ avoid leaks

• Store chemicals in appropriate places

• Insulate steam pipes and design proper steam distribution system

Page 19: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Spills The spilling of dyes and chemicals at a

washing plant amounted to Rs 37,600/- per month

Drips In a rubber factory the dripping of a

chemical was estimated to be Rs 46,000/- per month

Leaks The steam leaks in a textile industry

was equivalent to 9300 liters of furnace oil (Rs 67,000/-) per month (23% of total cost)

Page 20: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Input substitution

05/03/2023 Samantha Kumarasena 20

Page 21: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Input SubstitutionSubstitute input materials where

ever possible with- less toxic materials- renewable materials- materials with longer

lifetime

Page 22: Cp gp day02 session 8 waste cause analysis & cp techniques2012

• Replace organic solvents with water• Replace Formic acid by Hydrochloric

Acid in textile dyeing• Replace chlorine bleaching with O3

bleaching• Use of soft water for preparation of dye

bath: Higher dye exhaustion levels lower dye consumption

Page 23: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Better process control

05/03/2023 Samantha Kumarasena 23

Page 24: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Better Process ControlModify:

- operational procedures- equipment instructions

Process record keeping in order to run the processes more efficiently and at lower waste and emission generation rates

Page 25: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Improving process controls – e.g.

• Optimize and control operating parameters in the plant to reduce product reprocessing rate

eg: pH, temperature, time• Optimize the boiler operations

Combustion (CO2> 12%, O2< 2%)Reduce heat losses (surface, flue gas) therefore reduce fuel consumption

• Optimize fabric : liquor ratio for dyeing

Reduce energy, water and chemical consumption

Page 26: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Equipment modification

05/03/2023 Samantha Kumarasena 26

Page 27: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Equipment ModificationModify the existing production

equipment and utilities to- run the processes at higher

efficiency- lower waste and emission

generation ratesRepair faulty equipment to reduce

losses and rejectsReplace obsolete equipment or parts

Page 28: Cp gp day02 session 8 waste cause analysis & cp techniques2012

• Multiple countercurrent rinsing• Installation of hood above dryer drums

for faster moisture withdrawal • Replace solvent cleaning with

mechanical cleaning• Use of high pressure jet nozzles for

for screen washing in printing- efficient cleaning and save

water

Page 29: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Technology Change

Change the product & process technology in order to minimize waste and emission generation and optimize the resource efficiency

Page 31: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Product modification

05/03/2023 Samantha Kumarasena 31

Page 32: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Product Modification

Modify the product characteristicsin order:

- to minimize the environmental impacts of the product during or after its use (disposal) - to minimize the environmental impacts of its production

Page 33: Cp gp day02 session 8 waste cause analysis & cp techniques2012

33

Product Modification

Raw Material Extraction Manufacture Transportation Use End-of-life

Page 35: Cp gp day02 session 8 waste cause analysis & cp techniques2012

On site Recovery/Reuse

Reuse/recovery or recycling of the wasted materials in the same process or outside, for same or another application

Page 36: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Recovery, reuse, recycle• Water of last rinse for the first

rinse• Chrome recovery in leather

industry• In plastic injection moulding the

waste is recycled• Condensate recovery in boilers

Page 37: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Production of Useful By-products

Reuse of the wasted materials for manufacturing of another product.

eg:• Waste tyres are used for energy recovery• Use of fabric cuttings for mattress

manufacturing• Coconut water from DC mills

- Juice Preparation- Vinegar production

Page 38: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Creation of useful by products

05/03/2023 Samantha Kumarasena 38

Page 39: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Your Questions

05/03/2023 Samantha Kumarasena 39

?

Page 40: Cp gp day02 session 8 waste cause analysis & cp techniques2012

Thank you!