THE RIVIERE BLANCHE HYDROELECTRIC PROJECT GENERAL The Riviere Blanche is located in the Sud- Est Department of Haiti. This river runs from the La Selle mountain range from the pine forest of Seguin at La Visite National Park to the Caribbean sea near the small city of Marigot. A preliminary study was performed to estimate the potential power and energy generating capacity of Riviere Blanche. Seguin Waterfall A run-of-the-river scheme was selected as the most suitable. This facility could produce a maximum power output of 7,730 KW. At the potential diversion dam location set at elevation 915 meters, the tributary basin area is 18 KM 2 , and the minimum flow is evaluated at 0.020 m 3 /s, while the maximum flow is evaluated at 1.555 m 3 /s. The project design flow is 1.206 m 3 /s. The site available gross head is 835 meters. Energy production cost is estimated at $0.074/KWH, and investment payback period at 3 years for an IRR of 35.73% over 35 years. This project intends to generate electricity for the Sud-Est Department, develop Haiti’s natural resources, and capitalize on the energy market. DESIGN DATA Dam Type: Dam Crest Elevation: Penstock Length: Penstock Diameter: Power House Elevation: Turbine Type: Number of Turbine: Design Flow: Maximum Power: Average Power: Minimum Power: Energy Generation: Estimated Const. Cost: Tyrolean 915 meters 6,620 meters 0.750 meter 80 meters PELTON 4 1.206 m 3 /s 7,730 KW 4,180 KW 220 KW 36,614,730 KWH $18,095,041 Power Duration Curve by Month PROJECT STATUS The firm of SOLEO ENERGIES is seeking suitable investors to form a partnership and develop this site. For further information please contact: Francis Mitchell, (305)-979-6387, [email protected] Philippe Bayard, (509)-3613-1313, [email protected]

Riviere Blanche Hydropower Project Fact Sheet

Embed Size (px)

Citation preview

Page 1: Riviere Blanche Hydropower Project Fact Sheet

THE RIVIERE BLANCHE HYDROELECTRIC PROJECT

GENERAL

The Riviere Blanche is located in the Sud-

Est Department of Haiti. This river runs

from the La Selle mountain range from

the pine forest of Seguin at La Visite

National Park to the Caribbean sea near

the small city of Marigot.

A preliminary study was performed to

estimate the potential power and energy

generating capacity of Riviere Blanche. Seguin Waterfall

A run-of-the-river scheme was selected as the most suitable. This facility could produce a

maximum power output of 7,730 KW. At the potential diversion dam location set at elevation

915 meters, the tributary basin area is 18 KM2, and the minimum flow is evaluated at 0.020

m3/s, while the maximum flow is evaluated at 1.555 m3/s. The project design flow is 1.206

m3/s. The site available gross head is 835 meters. Energy production cost is estimated at

$0.074/KWH, and investment payback period at 3 years for an IRR of 35.73% over 35 years.

This project intends to generate electricity for the Sud-Est Department, develop Haiti’s natural resources, and capitalize on the energy market.

DESIGN DATA

Dam Type:

Dam Crest Elevation:

Penstock Length:

Penstock Diameter:

Power House Elevation:

Turbine Type:

Number of Turbine:

Design Flow:

Maximum Power:

Average Power:

Minimum Power:

Energy Generation:

Estimated Const. Cost:

Tyrolean

915 meters

6,620 meters

0.750 meter

80 meters

PELTON

4

1.206 m3/s

7,730 KW

4,180 KW

220 KW

36,614,730 KWH

$18,095,041

Power Duration Curve by Month

PROJECT STATUS

The firm of SOLEO ENERGIES is seeking suitable investors to form a partnership and

develop this site. For further information please contact:

Francis Mitchell, (305)-979-6387, [email protected]

Philippe Bayard, (509)-3613-1313, [email protected]