Upload
armtec
View
244
Download
0
Embed Size (px)
Citation preview
1
© 2015 Armtec LP • Confidential & Proprietary
Doug Lowry,P.Eng.
Region Engineer
Armtec, Drainage Solutions
Drew Willms
Sales Engineer
Armtec, Drainage Solutions
INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS
FRIDAY JUNE 5 TH, 2015 / 9AM PST / 11AM CST / 12PM EST
TECHNICAL WEBINAR
2
© 2015 Armtec LP • Confidential & Proprietary
CPD CREDIT CERTIFICATES
• CPD Credit Certificates will be given out for attending Live Webinars• Qualifies in Most Jurisdictions in Canada & USA for 1 Hour Technical
Informal• Formal completion certificates are emailed within one week of attending• Check your local guidelines if unsure of your requirements
Email your complete attendee list should there be multiple individuals viewing the same screen.:
• Full Name• Title• Email
Armtec will send certificate to all participants
3
© 2015 Armtec LP • Confidential & Proprietary
Armtec is one of Canada’s largest infrastructure company supplying precast, corrugated steel and HDPE products and solutions. Every day, our proven products, engineered solutions and dedicated people are counted on to support construction and infrastructure projects in communities everywhere. With a national presence and a local focus on exceptional customer service, we are dedicated to building excellence.
ABOUT ARMTEC
4
© 2015 Armtec LP • Confidential & Proprietary
YOUR SPEAKERS
Doug Lowry P.Eng.Region Engineer
Armtec, Drainage Solutions
Drew WillmsSales Engineer,
Armtec, Drainage Solutions
5
© 2015 Armtec LP • Confidential & Proprietary
AGENDA
Innovative Engineered Infrastructure Solutions for Challenging Drainage Projects
1. Pennask Culvert Rehabilitation
2. YVR Detention System
3. Noisy River Bridge
4. Putnam Rail Trestle Replacement
6
© 2015 Armtec LP • Confidential & Proprietary
Innovative Engineered Infrastructure Solutions for Challenging Drainage Projects
PENNASK CULVERT REHABILITATION
7
© 2015 Armtec LP • Confidential & Proprietary
PROJECT BACKGROUND
Owner: BC MOTI
Consultant: Associated Engineering
Contractor: PW Trenchless
Location: Pennask Tributary Creek, 50km outside of Kelowna, BC along Highway 97C
Existing Culvert Condition: 2440mm Span x 1739mm Rise Galvanized Multi-Plate
INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS
8
© 2015 Armtec LP • Confidential & Proprietary
PROJECT BACKGROUND
Project Requirements• Restore structural capacity of the culvert• 75+ year service life
INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS
9
© 2015 Armtec LP • Confidential & Proprietary
PROJECT BACKGROUND
Challenges & Project Conditions
• Approximately 30ft. surcharge
• Timeline – difficult winter conditions
• Max. water velocity 3.0 m/sec with sand and gravel bedloads
• Acidic drain rock• Water inside conduit: 4 ≤ pH ≤ 9• Leachate from acidic surcharge
(3 ≤ pH ≤ 9) around conduit/grout
INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS
10
© 2015 Armtec LP • Confidential & Proprietary
STRUCTURAL PLATE
INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS
Product Galvanized Aluminum Strata-CAT
Multi-Plate
Mini-Span
Bridge-Plate
Tunnel Liner Plate
Aluminum SPCAP
Durability
3 coatings types are available toaddress varying site conditions:
• Galvanized• Aluminum• Strata-CAT Polymer Coating
11
© 2015 Armtec LP • Confidential & Proprietary
STRUCTURAL PLATE DURABILITY
INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS
Coating Selection Criteria
12
© 2015 Armtec LP • Confidential & Proprietary
STRUCTURAL PLATE DURABILITY
INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS
1Durability of Structural Plate Corrugated Steel Pipe and Deep Corrugated Structural Plate Structures,, February 27, 2012
Estimated Material Service Life (EMSL)
Approach for Galvanized SPCSP1
13
© 2015 Armtec LP • Confidential & Proprietary
STRUCTURAL PLATE DURABILITY
INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS
Strata-CAT Polymer Coating
= Add-On Life
Zinc Primer
Estimated Material Service Life (EMSL)
Approach for Polymer Coated SPCSP
14
© 2015 Armtec LP • Confidential & Proprietary
PENNASK CULVERT RELINE
Solution• Reline with 2046 x 1538mm Polymer Coated Multi-Plate Pipe Arch• Polymer Coated hardware• Aluminum fish baffles• 4mm crown plates• 6mm invert plates
INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS
15
© 2015 Armtec LP • Confidential & Proprietary
INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS
Installation
1) Dewatering & Cleaning 2) Install Rails/Bracing 3) Prepare Staging Area 4a) Assemble & Slipline
PENNASK CULVERT RELINE
16
© 2015 Armtec LP • Confidential & Proprietary
INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS
4b) Sliplining (continued) 5a) Grouting 5b) Grout Inspection 6) End Treatments
Installation
PENNASK CULVERT RELINE
17
© 2015 Armtec LP • Confidential & Proprietary
PENNASK CULVERT RELINE
INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS
18
© 2015 Armtec LP • Confidential & Proprietary
Innovative Engineered Infrastructure Solutions for Challenging Drainage Projects
YVR DETENTION SYSTEM
19
© 2015 Armtec LP • Confidential & Proprietary
PROJECT BACKGROUND
Owner: Vancouver Airport Authority
Consultant: Urban Systems Ltd.
Contractor: Hexcel Construction Ltd.
Location: Vancouver International Airport
INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS
20
© 2015 Armtec LP • Confidential & Proprietary
PROJECT BACKGROUND
Project Requirements• Design for 200m3 storage volume• Minimum 75 year service life• Minimal infiltration/exfiltration
INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS
21
© 2015 Armtec LP • Confidential & Proprietary
PROJECT BACKGROUND
Challenges & Constraints
Geometric• Needed to fit the system in a trench
width of 4.5m• Maximum depth of the system was
1.9m due to a high water table• Total available footprint was 60m x
4.8m
Time-dependent• Needed the system onsite within 4
weeks of order placement
INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS
22
© 2015 Armtec LP • Confidential & Proprietary
YVR DETENTION SYSTEM
INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS
Solution
2 x 55m runs of 1400mm Hel-Cor CSP• Trenchcoat Polymer Laminated• H-500 Hugger-Band Couplers
23
© 2015 Armtec LP • Confidential & Proprietary
YVR DETENTION SYSTEM
INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS
24
© 2015 Armtec LP • Confidential & Proprietary
STORMWATER DETENTION
INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS
CSP Detention Systems
• Hel-Cor & Ultra-Flo CSP• Pre-fabricated bulkheads & fittings
Hel-Cor CSP Detention System Bulkheads & Risers
25
© 2015 Armtec LP • Confidential & Proprietary
STORMWATER DETENTION
INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS
CSP Detention Systems
• Aluminized & Trenchcoat Polymer-Laminated for superior durability• Smooth interior of Ultra-Flo simplifies maintenance
Polymer-Laminated CSP Detention Tanks Ultra-Flo Tank w/ Bulkheads, Risers, & Flow-Restricting Outlet Stub
26
© 2015 Armtec LP • Confidential & Proprietary
STORMWATER DETENTION
INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS
Design Considerations for CSP Detention Systems
1. Required storage volume
2. Geometry / footprint
3. Required lifespan
4. Pre-treatment
5. Infiltration / exfiltration
6. Outflow / release structure
7. Maintenance
27
© 2015 Armtec LP • Confidential & Proprietary
STORMWATER DETENTION
INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS
Advantages of CSP Detention
• Customizable shape, size, layout• Cost effective• Familiar installation methods• Easy maintenance• Can perforate to create a retention / infiltration system
28
© 2015 Armtec LP • Confidential & Proprietary
STORMWATER DETENTION
INNOVATIVE ENGINEERED INFRASTRUCTURE SOLUTIONS FOR CHALLENGING DRAINAGE PROJECTS
HDPE Detention Systems
• Steel-reinforced HDPE for superior durability• Up to 3000mm dia. for storage of large volumes• Pre-fabricated bulkheads & fittings• Watertight system
DuroMaxx Detention System DuroMaxx Detention Tank w/ Bulkhead & Access Riser
29
© 2015 Armtec LP • Confidential & Proprietary
Innovative Engineered Infrastructure Solutions for Challenging Drainage Projects
NOISY RIVER BRIDGE
30
© 2015 Armtec LP • Confidential & Proprietary
NOISY RIVER BRIDGE
• Owner: County of Dufferin• Consultant: R. J. Burnside & Associates• Project: Replacing Cast in Place Box Culvert
31
© 2015 Armtec LP • Confidential & Proprietary
NOISY RIVER BRIDGE
Major Site Constraints:• Couldn’t close road • Couldn’t enter or contaminate stream• Contract limits = County Right of Way
32
© 2015 Armtec LP • Confidential & Proprietary
NOISY RIVER BRIDGE
Stage 1 - Construction
Temporary Geotextile Wall
33
© 2015 Armtec LP • Confidential & Proprietary
Temporary Wall Construction
1. Pull geotextile tight, keep tension applied until backfill is placed.
Compacted fill
Native Soil
Depression for geotextile wrap
Removable form
2. Place backfill in specified lifts and compact to 95% Standard Proctor.
34
© 2015 Armtec LP • Confidential & Proprietary
Temporary Wall Construction
1. Place second removable form by repeating step 2.
Native Soil
2. Place second layer of geotextile and reinforced fill by repeating steps 3 through 4.
3. After completion of second lift, jump the first form.
35
© 2015 Armtec LP • Confidential & Proprietary
NOISY RIVER BRIDGE
Detour 1 Temporary Wall
36
© 2015 Armtec LP • Confidential & Proprietary
NOISY RIVER BRIDGE
Multi-Plate
Bridge-Plate
• Long Span Soil Steel Structures • Spans 5m to 20m
• 400 x 150 mm Corrugation • Arches & Boxes
37
© 2015 Armtec LP • Confidential & Proprietary
NOISY RIVER BRIDGEStructure:• 36 m long, 9m half round arch on concrete footings; footings encased in sheet piling• 5.0mm thick Bridge Plate, 5 plates per ring • Constructed in halves
38
© 2015 Armtec LP • Confidential & Proprietary
NOISY RIVER BRIDGE
Steel Erection - Phase 1
39
© 2015 Armtec LP • Confidential & Proprietary
NOISY RIVER BRIDGE
Backfilling - Phase 1
40
© 2015 Armtec LP • Confidential & Proprietary
NOISY RIVER BRIDGE
Phase 2 - Steel Erection
41
© 2015 Armtec LP • Confidential & Proprietary
NOISY RIVER BRIDGE
Phase 2 - Backfilling
42
© 2015 Armtec LP • Confidential & Proprietary
NOISY RIVER BRIDGE
Completed Project
43
© 2015 Armtec LP • Confidential & Proprietary
Innovative Engineered Infrastructure Solutions for Challenging Drainage Projects
PUTNAM RAIL TRESTLE
44
© 2015 Armtec LP • Confidential & Proprietary
PUTNAM RAIL TRESTLE
Replacement of a high maintenance wooden rail trestle with minimum track shutdown
45
© 2015 Armtec LP • Confidential & Proprietary
PUTNAM RAIL TRESTLE
Twin 3050mm diameter Multi-Plate Soil-Steel Structures
46
© 2015 Armtec LP • Confidential & Proprietary
PUTNAM RAIL TRESTLE
Installation of Uni-axial geogrids to create a 1:1 Reinforced Slope, 8m high
47
© 2015 Armtec LP • Confidential & Proprietary
PUTNAM RAIL TRESTLE
Partially buried trestle with Wrapped Face Geogrid Reinforced Slope
48
© 2015 Armtec LP • Confidential & Proprietary
PUTNAM RAIL TRESTLE
Installation of Geocell Slope Protection System
49
© 2015 Armtec LP • Confidential & Proprietary
PUTNAM RAIL TRESTLE
50
© 2015 Armtec LP • Confidential & Proprietary
PUTNAM RAIL TRESTLE
51
© 2015 Armtec LP • Confidential & Proprietary
Contact Your Local Sales Rep:www.armtec.com/sales-offices/
Todays Speakers:
Doug Lowry
Drew Willms
52
© 2015 Armtec LP • Confidential & Proprietary
UPCOMING WEBINARS
Stay connected or get involved with Armtec events. We are dedicated to the continuing education of our customers, colleagues and fellow employees through personalized lunch and learns and free online webinars.
For more info please visit www.armtec.com/events
53
© 2015 Armtec LP • Confidential & Proprietary
Follow us on social media to learn more about our company, projects and people, while getting all the latest Armtec and industry news.
Webinars will be posted with in five business days from the broadcast date. We will notify all subscribers over our social media channels.
Today’s session will be available on YouTube and SlideShare
JOIN US ON SOCIAL MEDIA!
54
© 2015 Armtec LP • Confidential & Proprietary
Innovative Engineered Infrastructure Solutions for Challenging Drainage Projects
REFER QUESTIONS TO YOUR LOCAL ARMTEC SALES REPS
55
© 2015 Armtec LP • Confidential & Proprietary
Contact Your Local Sales Rep:www.armtec.com/sales-offices/
Todays Speakers:
Doug Lowry
Drew Willms