INTRODUCING

FAST FLOWBreakthrough Drainage Technology

Who We Are

We believe that drainage is as

much an art as it is a science.

Our artful development and

application of siphonic and

pressurised drainage technology

are testament to that belief.

2

Page of Contents

Introducing Fast Flow 02

Fast Flow’s Business Model 03

Competitive Advantages of Fast

Flow 04

Key Milestones and

Accomplishments 05

Siphonic rainwater system had existed since 1968, but Asia was slow to

develop it. However, in 1994 the first project in Singapore was

implemented. Based on the success of this project, the potential was

established and by 1996, Fast Flow in Singapore was firmly entrenched.

To date Fast Flow has completed over 2000 projects with more than

30.000.000 square meters of roof area drained in South East Asia and

China. It has over 214 workers, from managers to designers and

installers who are skilled in the siphonic management of rainwater.

Fast Flow Siphonic makes use of lesser and smaller pipes compared to

conventional rainwater drainage system. Our company is organized to

encourage the strong technical process, to cross-pollinate ideas and

talents across offices and deliver quality at all levels, in all places. Our

passionate pursuit of excellence, the application of our creativity to solve

our clients' challenges, our technical expertise and our collaborative spirit

are measures of our success.

Over 18 years, as we have evolved into a leader in roof drainage systems

today, opening offices worldwide and expanding our services, we have

remained committed to one clear purpose:

“Seek and imagine new ways to solve tomorrow’s drainage

challenges.”

Fast Flow’s Business Model

Design , Supply & Installation

(DSI)

Design & Supply

(DS)

DS Model Type 1

Design

+

Supply of Fast Flow outlets

DS Model Type 2 (full system)

Design

+

Supply of Fast Flow outlets

+

Supply of pipes/ fittings

Design, Supply & Installation (DSI)

Fast Flow undertakes the full construction of the

project from design, supply to system installation. All

system installation are coordinated and integrated by

our high skilled and fully trained staff.

www.fastflowgroup.com 3

Design & Supply Material (DSM)

Fast Flow undertakes the full design including

concept and detail as well as design and detail

coordination. All drawings are completed as part of

the service and all siphonic outlets are provided

along with a complete set of installation techniques

and guidelines for the plumbers/ installers/

contractors appointed for the projects to do the

installation.

As part of service, we provide our own supply chain

and produce our own pipe system. Fast Flow

psPipe™ LEAD-FREE UPVC pressure pipes

system is a materialization of our commitment as a

responsible company that is not only providing

leadership in innovative rainwater management

technologies, but also leading the market trend

towards a better and healthier environment.

Rainwater systems are often used to collect

water for recycling and Fast Flow’s LEAD-FREE

psPipe™ and psFittings™ now provide a safer

way to do this.

Whatever your situation, whatever your project, Fast Flow has a design and service

solution to assist you.

Competitive Advantages

of Fast Flow

Here in Fast Flow, we encourage the combined usage of different types

of outlets/systems as one of the main selling points of Fast Flow

Systems. Fast Flow’s Pressurised System can be engineered with

precise calculation using different pipe configurations, making it easy for

coordination with other services in tight spaces. Our Siphonic System is

designed based on the principle of full bore flow. Fast Flow Siphonic

System combines creative design with precision hydraulic

engineering to provide innovative solutions to any roof drainage

requirement.

Smaller pipes also indicates less material, less time and less labor

used for the buildings. The reduction in material use signifies less

energy used in generating lesser amount of material required,

reducing the total carbon footprint for the building.

With Fast Flow, clients are able to

enjoy the array of benefits that can

be achieved with siphonic system.

This includes rainwater pipes

travelling long distance without any

gradient to the pipe work, sizes

and number rainwater pipes

significantly reduced, water depth

in the gutters significantly lowered

to allow precise engineering and

many more.

Fast Flow is committed to continuous

R&D with scientific consistency and

rigour to sustain our product innovation,

system integration, breakthrough in

design technology leadership in almost

all the market we participate. Fast Flow

has developed patented technologies in

the pursuit of rainwater management.

We have a complete test rig in Singapore

for our research and development team who

are continuously at the forefront to create

innovative drainage solution to suit the

increasingly sophisticated architecture in

buildings. All Fast Flow systems are fully

tested and validated by the relevant

authorities and governing bodies namely,

SIRIM QAS, TÜV SÜD PSB, BizSafe4 and

last but not least, we have helped

developers achieve the Green Mark award

on certain projects.

www.fastflowgroup.com 4

5www.fastflowgroup.com

1 2

Fast Flow’s Key Milestones and Accomplishments

1993

Pilot Project

The first siphonic system

project (Givaudan Singapore

Pte Ltd) is completed in

Singapore under Fastrack

Projects

1995

Colin Thoms and Yap Kern

Ling agree to venture into

siphonic business

1996

Fast Flow first office set up in

Singapore

1997

Fast Flow expansion to

Malaysia

1998

Fast Flow awarded Esplanade

project in Singapore

Fast Flow Hong Kong

set up

2000

Fast Flow seeks distributor

Fast Flow Malaysia office set

up in Kuala Lumpur

1999

Fast Flow enters China

2002

Fast Flow Thailand office

set up in Bangkok

2004

Fast Flow Australia set up in

Brisbane

Since becoming fully

operational in 1996, Fast

Flow has already achieved

a number of key milestones

and outcomes, making a

significant impact on

rainwater management

development in Asia Pacific.

To date Fast Flow has

completed over 2000

projects with more than

30.000.000 square meters

of roof area drained in

South East Asia, Greater

China and Australia.

6www.fastflowgroup.com

1 2

2007

Arteco™ siphonic outlet range is

expanded

2005

Fast Flow sets up

manufacturing operation in

China

Fast Flow awarded Beijing

Olympic Stadium

2007

Fast Flow supplies Primo™

range of outlets to Akatherm

under the brand of Akasision.

First public appearance in ISH

Frankfurt

2008

Fast Flow awarded two

integrated resorts in Singapore

(Marina Bay Sands Integrated

Resort and Resorts World

Sentosa)

2009

Fast Flow Systems regional

distributorship program is

launched. Fast Flow Systems

ventures into Taiwan,

Indonesia, Philippines and

Turkey setting up

distributorship

2008

psVent™ is invented

2010

Fast Flow corporate

rebranding

2012

Primo 75HD™ (Heavy Duty),

car park drainage system is

launched

Second MOU is signed by

Fast Flow and Aliaxis

2006

Primo™ siphonic outlet range

is born

2013

psStackH System, psPipe &

psFittings (LEAD-FREE) are

launched

2014

The future begins

Fast Flow’s Key Milestones and Accomplishments

Sport Complexes

Beijing Olympic Stadium, China Educity Sports Complex, Malaysia

Sports Hub, Singapore Shanghai Badminton Center, China

My Dinh National Stadium, Vietnam Aomen Stadium, China

Xinhui Gymnasium, China Nanjing Stadium, China Nanjing Tennis Court, China

7www.fastflowgroup.com

JB Sentral, Malaysia

Transport

Shanghai Pudong Airport, ChinaNingbo Airport, China Sydney Airport, Australia

Changi Airport, Singapore

New Dehli Airport, IndiaSenai Cargo Airport, Malaysia

Kuala Namu Medan International Airport, IndonesiaBali International Airport, Indonesia

Kuching Airport, Malaysia

Beijing Capital Airport, China

Makassar Intl. Airport, Indonesia

Garuda Maintenance Facilities, Indonesia

8www.fastflowgroup.com

Gedung Dinas Pekerjaan Umum Provinsi Riau Baru. Indonesia

Civil

Supreme Court, Singapore

Jakarta Automated Traffic Services, Indonesia

Museum Sejarah dan Purbakala, Indonesia

Ministry of Finance,

Malaysia

Islamic Arts Museum,

Malaysia

Dewan Undangan Negeri

Sarawak, Malaysia

9www.fastflowgroup.com

Hospitality

Four Points Sheraton, KuchingThe Hilton Hotel Gold Coast, Australia

Quincy Hotel, SingaporeCrowne Plaza Changi Airport, Singapore

Kingwood Hotel Sibu, Malaysia Vibe Hotel, Australia

10www.fastflowgroup.com

Healthcare

Queensland Institute of Medical

Research, Australia

Sultanah Bahiyah Hospital,

Malaysia

Pandan Hospital,

Malaysia

Gold Coast Hospital ,

Australia

Khoo Teck Puat Hospital,

Singapore

Sarawak International Hospital, Malaysia Darul Ehsan Medical Center , Malaysia

Serdang Hospital,

Malaysia

Riverson Medical Centre,

Malaysia

11www.fastflowgroup.com

Commercial

Marina Bay Sands Integrated Resort,

Singapore

Jurong Point Mixed Development,

Singapore

ION Orchard, Singapore

Point 92,

Malaysia

SCG Experience, Thailand Resorts World Sentosa, Singapore

One Marina Boulevard, Singapore SW1 Offices Southbank, Brisbane

Citigroup Shanghai, China Beijing CCTV Tower, China Menara Great Eastern, Malaysia

12www.fastflowgroup.com

Industrial

Coca Cola Amatil Warehouse, Indonesia Hubei Tobacco Cigarette Factory, China

CP Ram Plant, Thailand

MK Restaurant Plant, ThailandNissan Plant, Thailand

Schlumberger , Malaysia

Baker Hughes, Malaysia Mycron Steel Factory, Malaysia

13www.fastflowgroup.com

Residential

Reflections @ Keppel Bay,

Singapore

The Ritz-Carlton Residence,

Singapore

Soleil Condominium,

Singapore

The Interlace, Singapore The Rivergate, Singapore Pinnacle @ Duxton, Singapore

The Ascott KL ,

Malaysia

Villa Rachatewi,

Thailand

The Wave Apartments,

Australia

The Twins Bukit Damansara,

Malaysia

14www.fastflowgroup.com

Education

NUS Edu Sport, Singapore University Teknologi Petronas, Malaysia

University College of Technology Sarawak – rainforest Canopy, Malaysia Manipal International University, Nilai Campus

15www.fastflowgroup.com

Thank You