5
June 13th 2013 Safaricom Digital City FTTB Build Out Overview

FTTB build out overview

Embed Size (px)

Citation preview

Page 1: FTTB build out overview

June 13th 2013

Safaricom Digital City

FTTB Build Out Overview

Page 2: FTTB build out overview

June 13th 2013

The ConceptOld way to build. Individual ducts and bricks and mortar MH New way Microducts and flat pack fiber cement MH

2x7-way Microduct

plus 1x24-way

Microduct in CBD

and Business

dictates

1x7-w

ay

rest o

f the

netw

ork

1x7-way rest of the

network

Page 3: FTTB build out overview

June 13th 2013

CBDRed is metro fiber, dark blue acces to

sites, light blue access to Buldings

Page 4: FTTB build out overview

June 13th 2013

Demarcation Point 1

Demarcation Point 2

Demarcation Point 3

The Demarcation Points

2x7-way Microduct

plus 1x24-way Microduct in CBD

and Business dictates

Page 5: FTTB build out overview

June 13th 2013

Open issues

Demarcation Point 1

Demarcation Point 2

Demarcation Point 3

The Demarcation Points