19
A multi- disciplinary approach to debottlenecking processes André Gerard Gibson Key Engineering Solutions

Automining Presentation by Andre Gibson - Key Engineering Solutions

Embed Size (px)

Citation preview

Page 1: Automining Presentation by Andre Gibson - Key Engineering Solutions

A multi-disciplinary approach to debottlenecking processesAndré Gerard GibsonKey Engineering Solutions

Page 2: Automining Presentation by Andre Gibson - Key Engineering Solutions

Agenda

1. Introduction – why?2. Identification of the bottlenecks3. New control philosophy implementation4. Challenging designs5. Sustainability6. Demonstrate results

Page 3: Automining Presentation by Andre Gibson - Key Engineering Solutions

Why?

• Systems too difficult for users to understand• Challenging to maintain over time• Very complex• “Black Box” implementations• Automation negatively impacts stability

Common issues seen within the mining industry

Page 4: Automining Presentation by Andre Gibson - Key Engineering Solutions

Why use this approach?

• Simple to use & visualize• Easy to maintain• Standard methods used in process control• Reduces variability and pushes active

constraint

Excellence = Quality x AcceptanceExcellence = Quality x Acceptance

Page 5: Automining Presentation by Andre Gibson - Key Engineering Solutions

Identifying the bottlenecksPerformance workshops

Prepare for the workshop

Facilitate workshop

Close-out workshop

• Plan agenda & brainstorming activity• Invite experienced operations personnel from all disciplines• Send through any relevant details prior

• Explore opinions on issues limiting increased performance• Question why they are an issue• Ensure everyone has input

• Ask group for possible fixes• Provide examples of automated solutions• Summarise solutions from the group

Page 6: Automining Presentation by Andre Gibson - Key Engineering Solutions

Identifying the bottlenecksData analysis

• Break system down into distinct areas

• Determine utilization calculation for each

• Develop utilization histogram

Area Utilization calculation

Infeed % utilization = rate / max rate

Screening % utilization = average screen house bin level / nominal maximum level

Scrubbing % utilization = total rate / (max. line rate x number available lines)

Desands % utilization = % level in feed tank / nominal maximum level

Crushing % utilization = average crusher building bin level / nominal maximum level

Stacking % utilization = rate / max rate

Thickener % utilization = slurry export rate / maximum export capacity

Underutilized True when % utilization for all other areas is under an acceptable level (e.g. 85%)

Page 7: Automining Presentation by Andre Gibson - Key Engineering Solutions

Identifying the bottlenecksConstraint utilization visualization

• Live representation of previous histogram

• Provides real-time data on current bottlenecks

• Easy to identify when the bottleneck shifts

• Useful tool for management decisions

Page 8: Automining Presentation by Andre Gibson - Key Engineering Solutions

Implementation – constraint control

Standard process control “tool chest”

• Proportional, integral & derivative (PID) controllers– Simple feedback control– Commonly implemented

in industry– Easy to tune– Only a set-point required

by operator

Page 9: Automining Presentation by Andre Gibson - Key Engineering Solutions

Implementation – constraint control

Standard process control “tool chest”

• Smith predictors– Predicted process

variable w/ correction (filter)

– Eliminates dead-time (Delay)

– Allows for quicker PID response

Page 10: Automining Presentation by Andre Gibson - Key Engineering Solutions

Implementation – constraint control

Standard process control “tool chest”

• Override control scheme– Various PIDs controlling

the same equipment– Minimum selector to

control active constraint– CV limited for non-active

constraints– Non selected loops

placed into manual mode

Page 11: Automining Presentation by Andre Gibson - Key Engineering Solutions

Implementation – constraint control

Putting it all together – Feed rate example

• Feed rate control for a conveying system with multiple feed points• Large dead-time prior to each weightometer feedback• Requirement to maintain consistent set-point tonnage

• Simple Smith predictor to mitigate dead-time• Filter = 1st order model of process• Delay = Weightometer dead-time (Delay3)

• Smith predictor with delayed PV input from previous weightometer

• Delay1 = time between weightometers• Delay4 = dead-time from feeder to

weightometer• Set-point adjusted to cater for

peaks/dips from previous controller

• Same process as previous controller• Correction for controller & process

variation maximized• Reduced variability & maximum

performance

Design & implementation: 8 daysCommissioning: 2 hours

Page 12: Automining Presentation by Andre Gibson - Key Engineering Solutions

Implementation – constraint controlPutting it all together – screening example

Fines /Final Product

Tertiary

Secondary

Desands

W

W

W

W

PID

PVSP

CV

PID

PVSP

CV

PID

PVSP

CV

<

S S

PID

PVSP

CV

PID

PVSP

CV

PID

PVSP

CV

S S

<

P

PVSP

CV

P

PVSP

CV

P

PVSP

CV

• Six primary constraints to control• Three secondary constraints to control• Two separate feeder areas to control

ProductFeeders

DesandsFeeders

PID

PVSP

CV

PID

PVSP

CV

Page 13: Automining Presentation by Andre Gibson - Key Engineering Solutions

Challenging equipment designs

• With now tighter control, less risk of overloading• Original designs come with generic assumptions that may not

always be true• Equipment designs cater for worst case scenario. If you can control

the scenario, you can alleviate the risk• Just needs a simple first principles engineering approach

Why can we challenge the design?

Page 14: Automining Presentation by Andre Gibson - Key Engineering Solutions

Challenging equipment designsExamples of challenging designs

- Ore profile of conveyor at capacity

- Torque & power within design limits

- VSD max. frequency of 50Hz

- Tripper designed for 10,000tph

- Tripper movement speed 0.5m/s

- Conveyor speed 4.5m/s

- Transfer chute at maximum capacity

- Increase VSD max. frequency to 60Hz

- Reduction in profile to 83.3%

- Reduce tripper speed to 0.25m/s in VSD

- Allows increase in maximum rate to approx. 10,500tph

Page 15: Automining Presentation by Andre Gibson - Key Engineering Solutions

Sustainability

Excellence = Quality x AcceptanceExcellence = Quality x Acceptance• Quality

– Invest time in philosophy design– Tune all loops prior to

completion– Cater for abnormal situations– Provide visual implementation

of what is in control– Develop “issues” log book for

operators and address problems– Coach operators in best

methods to control

• Acceptance– Prior to implementation, sit

with all operators– Be open to feedback from

operators– Make them feel like part of the

solution– Never reject operator concerns,

even when incorrect

Page 16: Automining Presentation by Andre Gibson - Key Engineering Solutions

Results

• Reduction in Standard Deviation• Before: 1251• After: 925.2

• Whilst there is no increase in rate, variability reduction generated confidence for step change increase in rate set-point

Page 17: Automining Presentation by Andre Gibson - Key Engineering Solutions

Results

• Reduction in Standard Deviation• Before: 3428• After: 2476

• Increase in rate• Before:

15,258tph• After:

16,671tph

Page 18: Automining Presentation by Andre Gibson - Key Engineering Solutions

Conclusion• Simple problems don’t require complex

solutions• Method doesn’t require specialist

knowledge• Great results can be obtained if correctly

planned, designed & executed• Never underestimate the importance of

acceptance• Always be willing to challenge constraints

Page 19: Automining Presentation by Andre Gibson - Key Engineering Solutions

Questions?

www.keyengineering.com.au