WELCOMETO
210 MW SIDDHIRGANJ THERMAL POWER STATIONBANGLADESH POWER DEVELOPMENT
BOARD
OBJECTIVE
Refo
rmat
ion
& Re
stru
ctur
ing
of B
PDB
Ongoing Reformation of BPDB
Vision of BPDB
Mission of BPDB
Organogram of BPDB
Installed Capacity (MW)
Generation Capacity by Plant
Generation Capacity by Fuel
Bulk electricity Sales by BPDB
Distribution System Loss (%)
Transmission SummaryTransmission Summary
Transmission Line Type Circuit Length (Km.)
400kV Transmission line 165
230kV Transmission line 3,171
132kV Transmission line 6,359
Transmission Loss (%) 2.77%
Grid Sub-Station Summary
Installations in the Siddhirganj
Sh
i ta
lakkya
Rive
r
Highway
Main Gate
Desh Energy Ltd. 210MW Siddhirganj Power station, BPDB.
2x120MW PPP, EGCB Ltd.
335MW Power plant Project, EGCB Ltd.
Substation, PGCB Ltd.
DPDC Ltd.
Adamjee EPZ Area
Total area: 88.56 acres
ORGANOGRAM(Down to the level of
XEN/equiv.)
Executive Engineer
(Operation)
Executive Engineer
(Efficiency)
Executive Engineer
(Shift) (Five Nos.)
Deputy Manager
(Operation)
Deputy Manager
Maintenance
Executive Engineer
(Boiler)
Executive Engineer
(Turbine)
Executive Engineer
(Generator)
Executive Engineer
(Auto-control)
Executive Engineer
(Electrical)
Executive Engineer
(Measuring)
Executive Engineer
(Civil)
Executive Engineer
(Workshop)
CHIEF ENGINEER
Manager (Operation) Manager (Maintenance)
Deputy Director (Admn.) Asstt. Chief Engineer
Deputy Director (Acc.)
Chief Chemist
At A Glance
Power Plant overview
Control Room
SUPERHEATER
BOILER DRUM
BOILER
LPHP IP
HARIPUR 230kv S/S
TURBINE
GENERATOR
REHEATER
LP 3LP 4FEED WATER PUMP
DEAERATOR
LP HEATERS CONDENSATE PUMP
CONDENSER
LP 1LP 2HP 5HP 6HP 7
HP HEATERS
SIMPLIFIED FLOW DIAGRAM5400C130kg/cm2
3340C28kg/cm2
5400C26kg/cm2
Economizer
15.75/230kvX-former
ENERGY CONVERSION
Main Components
• Boiler Specification : Manufacturer : TKZ, Russia.
Type : Ep 670-138-545G (Model:TGME-206/VSO)
Rated Steam Capacity : 670 t/h
Superheated Steam Temperature : 545oc
Pressure of Superheated Steam : 138 kgf/cm2
Fuel : Natural Gas
Reheated Steam temperature inlet/outlet : 334 / 545oc
Temperature of Feed Water : 246oc
MAJOR EQUIPMENT
CIRCULATING WATER PUMP
MAJOR EQUIPMENT
Manufacturer : Russia
Type : 96ДB-4.5/23TB3
Vertical, Mixed Flow, Single Stage.
Number of Pumps : Three
Delivery : 14290 m3/ h
Capacity : 1048 KW.
Head : 21.3m
Voltage : 6.6KV
Pumphouse
Turbine Specification : Manufacturer : LMZ, Russia.
Type : K-210-130-8
No. of Cylinder : Three
Nominal Power : 210MW
Rotor speed : 3000 rpm
Pressure of Live Steam : 130 kgf/cm2
Temperature of Live Steam : 540 0C
No. of Regenerative Extraction : 7
No. of Stages : 29
MAJOR EQUIPMENT
MAJOR EQUIPMENTGenerator Specification :
Manufacturer : ELEKTROTJAZMASH, UKRAINE
Type : TΓB-200MT3Capacity : 210MW (247MVA)
Generating Voltage : 15.75KVPower Factor : 0.85R.P.M. : 3000rpm (50Hz)Stator current : 9060 Ampere
Rotor Current: 1950 AmpereExcitation Voltage : 430 VPhase : Three
CWP Intake (Siphon)
CIRCULATING WATER SYSTEM
Discharge Channel
Single Line Diagram
125 MVA15.75 / 230 KV
Unit Transformer
Haripur 230 KV Substation
Unit Breaker
Siddhirganj 132 KV
Auxiliary 6.6 KV Bus
Diesel Generator
DC Power
Stand-by 6.6 KV Bus
0.4 KV Bus