Page 1: Scaffolding awareness presentation

SCAFFOLDING AWARENESS SCAFFOLDING AWARENESS TRAINING COURSETRAINING COURSE

Page 2: Scaffolding awareness presentation

COURSE ITINERARY

•Introduction & Course Aims.

•The law and your responsibilities

•Types of scaffolding.

•Component identification & use..

•Scaffolding terminology

•Inspection of scaffolding.

•Recording of inspections.

•Reasons for collapses.

•Course questionnaire

1

Page 3: Scaffolding awareness presentation

INTRODUCTION & COURSE AIMS

THE REASON FOR THIS COURSE IS THAT “THE WORK AT HEIGHT

REGULATIONS 2005” PLACES AN IMPLICIT DUTY ON THOSE USING SCAFFOLDING TO INSPECT AND

RECORD THE RESULTS OF THOSE INSPECTIONS, BEFORE USE AND

WITHIN SEVEN DAYS.

THE AIM OF THE COURSE IS THAT THOSE TAKING PART WILL HAVE

AN AWARENESS OF WHAT A LEGAL SCAFFOLDING SHOULD BE

THAT THEY ARE RESPONSIBLE FOR

2

Page 4: Scaffolding awareness presentation

LEGISLATION

• Health & Safety at Work Act 1974

• Provision and Use of Work Equipment Regulations 1998

• Management of Health & Safety at Work Regulations 1999

• Work at Height Regulations 2005

• Manual Handling Regulations 1992

3

Page 5: Scaffolding awareness presentation

Health & Safety at Work Act 1974

• Places a duty of care on your employer, who MUST;

• Protect your health & safety and the health & safety of others who they may not employ this basic duty involves providing you with;

1. A SAFE PLACE OF WORK2. A SAFE SYSTEM OF WORK3. SAFE PLANT & EQUIPMENT4. TRAINING, INFORMATION,

INSTRUCTION OR SUPERVISION• You have a duty of care to protect yourself &

others whilst at work;• You may be held liable for any harm you

cause to others at work;• Suppliers have a duty to supply equipment

that is safe to use, and to supply the relevant information/instructions for safe and correct use.

4

Page 6: Scaffolding awareness presentation

Provision & Use of Work Equipment Regulations 1998

These Regulations place duties on employers & suppliers to provide equipment for use at work which meets three basic criteria;

1. IT MUST BE FIT FOR USE (it must work)

2. IT MUST BE FIT FOR IT’S INTENDED PURPOSE

( it must do what you want it to do)

3. IT MUST COMPLY LEGALLY & MEET ALL STANDARDS

The provision of instructions, information, and training on the safe use of work equipment or the provision of competent supervision is a mandatory requirement under these regulations!

If you find any work equipment unsafe or inoperative you must not use it, you must take out of service and inform your supervisor.

5

Page 7: Scaffolding awareness presentation

Management of Health & Safety at Work Regulations 1998

These Regulations place duties on Employers to carry out Risk Assessments on all work activities which will identify significant risks to peoples health & safety.

Hazards found during work activities which have the potential to cause harm need to be removed if possible or if this is not possible they must be controlled in such a way as to reduce the likelihood of harm to the lowest possible risk.

Safe systems of work are formulated from these risk assessments usually in the form of method statements which detail a safe method of work, the hazards identified, the controlling provisions put in place to protect workers and any residual risks for which appropriate PPE will be issued and must be worn.

Employers are duty bound to Manage Health & Safety in such a way as to prevent foreseeable accidents and injuries to people in their employment and also people not in their employment.

Workers who are to carry out working operations covered by a method statement must follow the safe method of work if this cannot be done then stop work!

6

Page 8: Scaffolding awareness presentation

Work at Height Regulations 2005

These regulations place an implicit duty on places

from where it may be possible to fall.

The overriding principal for employers to comply

with these regulations is to do all that is reasonably

Practicable to prevent anyone from falling.

The hierarchy of control for managing and selecting

equipment for work at height is:

1. Avoid work at height whenever possible.

2. Use work equipment or other measures to prevent falls where they cannot avoid working at height.

3. Where they cannot eliminate the risk of a fall, use work equipment or other measures to minimise the distance and consequences of a fall should one occur.

8

Page 9: Scaffolding awareness presentation

Work at Height Regulations 2005

These regulations place an implicit duty on places where it may be possible to fall.

Fall prevention measures include the provision of;1. Top hand-rail no less than 950mm;2. Toe boards on all open edges from which objects

can fall;3. Toe board minimum height 150mm;4. Maximum gap between the top of the toe board

and any guardrail 470mmthis usually means double guardrails are employed, but other suitable protection can replace the middle rail such as a substantial mesh panel, but the requirement for this protection to remain in place for the life of the working platform must be enforced by management.

5. Minimum width of a working platform must be adequate for the work to be carried out but not less than 600mm for persons only, if depositing materials then minimum width must be 800mm.

6. Maximum vertical climb to a working platform must not exceed 9mtrs (rest deck)

7

Page 10: Scaffolding awareness presentation

Manual Handling Regulations 1994

These regulations place a duty on employers to

carry out risk assessments on activities which may

involve manually handling loads.

The risks of manual handling injuries must be

reduced by;

• Removing the need to manually handle loads;

• Redesigning the work place or equipment or redesigning the working process to reduce manual handling operations;

• Reducing size, weight, shape or centre of gravity of loads;

• Making available mechanical means so loads can be moved safely;

If loads have to be moved by human effort the

employer must provide manual handling training so

that people know how to lift & move loads correctly

so as to reduce the risk of a manual handling injury.

9

Page 11: Scaffolding awareness presentation

LEGAL REQUIREMENTS

The three main pieces of legislation / codes of practice governing the use of scaffolding are:

•Work at Height Regulations 2005

•BS EN12811-1

•Regulation 12 (10) - WAHR - Inspections are required by competent persons:

•Training.

•Knowledge.

•Experience.

•Under supervision.

10

Page 12: Scaffolding awareness presentation

LEGAL REQUIREMENTS

•Regulation 12 - WAHR - Inspections are required on all scaffolding from which a person can fall :

•Before use

•After substantial alteration

•After adverse weather or occurrence

•Within every seven days

11

Page 13: Scaffolding awareness presentation

TYPES OF SCAFFOLDING

•INDEPENDENT

•BIRDCAGE

•PUTLOG

•TOWER

•SYSTEM

•Kwikstage

•Cuplok

•Alloy towers

12

Page 14: Scaffolding awareness presentation

INDEPENDENT

13

Page 15: Scaffolding awareness presentation

BIRDCAGE

14

Page 16: Scaffolding awareness presentation

PUTLOG

15

Page 17: Scaffolding awareness presentation

TOWER

16

Page 18: Scaffolding awareness presentation

SYSTEM SCAFFOLDING

There are numerous types of system scaffolding on the market and they all have their good points and bad points. The three types of system scaffolding we are concentrating on in this course are probably the most popular:

• Alloy Tower

• Kwikstage

• Cuplok

17

Page 19: Scaffolding awareness presentation

ALLOY TOWER

18

Page 20: Scaffolding awareness presentation

KWIKSTAGE

1

2 3

4

5

6

7

8

19

Page 21: Scaffolding awareness presentation

IDENTIFICATION EXERCISE ANSWERS

1. 2 metre standard.

2. 3.54 metre diagonal brace.

3. 1.2 metre transom.

4. 2.4 metre Steelstage / battens.

5. 2.4 metre ledger.

6. Collar jack.

7. 1.2 metre Steelstage / toeboard.

8. 2.4 metre Guardrail.

20

Page 22: Scaffolding awareness presentation

KWIKSTAGE NODE POINT DETAIL

21

Page 23: Scaffolding awareness presentation

CUPLOK

Fig 1Fig 2

Fig 3

22

Page 24: Scaffolding awareness presentation

SCAFFOLDING COMPONENTS

•Base Plate

•Brick Guard

•Double Coupler

•Girder Clamp

•Joint Pin

•Putlog Coupler

•Reveal Pin

•Scaffold Boards

•Sleeve Coupler

•Swivel Coupler

23

Page 25: Scaffolding awareness presentation

BASE PLATE

24

Must be 150mm x 150mm with a pin centrally positioned and be placed under every standard at all times.

Page 26: Scaffolding awareness presentation

BRICKGUARD

25

Page 27: Scaffolding awareness presentation

DOUBLE COUPLERS

26

These are load bearing couplers or fittings which must be used for ties at all

times.

Page 28: Scaffolding awareness presentation

GIRDER CLAMP

27

Used to tie scaffolds to steel girders, must always be used in pairs.

Page 29: Scaffolding awareness presentation

JOINT PIN / SPIGOT

28

Used to butt join scaffold tubes end to end, should not be used in ledgers or sway braces.

Page 30: Scaffolding awareness presentation

PUTLOG COUPLERS

Wrapover

Mills hook

29

Used to fasten intermediate transoms to ledgers, non load

bearing fitting.

Page 31: Scaffolding awareness presentation

REVEAL PIN

30

Used to fix tubes between two opposing faces as part of a reveal tie

Page 32: Scaffolding awareness presentation

SCAFFOLD BOARDS

31

Page 33: Scaffolding awareness presentation

BOARDED PLATFORMS

32

Faults that should be checked for when inspecting a boarded platform are:

• Oversail no less than 50mm.

• Oversail no more than 150mm.

• No gaps in working platform.

• Correctly spaced transoms.

•Max.1.2m for visually graded boards.

• Boards fixed to prevent movement.

• Not Damaged.

• No undue cracks.

• Not contaminated.

• Not banded or Scaffplated.

Page 34: Scaffolding awareness presentation

SLEEVE COUPLER

33

Should always be used to butt join ledgers and sway bracing in

preference to joint pins.

Page 35: Scaffolding awareness presentation

SWIVEL COUPLER

34

Used to connect any two tubes at any angle other than 90°, often used with a small butt to splice joints which require staggering.

Page 36: Scaffolding awareness presentation

SCAFFOLDING TERMINOLOGY

•Bay. - Distance between standards.

• Brace- Tube at an angle to give stability.

• Guardrail - To stop persons falling.

• Ledger - Tube supporting transoms.

• Lift - Distance between ledgers.

• Soleboard - placed under baseplate to spread weight on soft ground.

• Standard - Upright tube.

• Ties - Means of fixing scaffold to structure.

• Toeboard - Upstand to prevent tools falling.

• Transom - Tubes to support platform.

• Working platform - set of boards to work on.

35

Page 37: Scaffolding awareness presentation

SCAFFOLDING TERMINOLOGY

There are three types of bracing used in scaffolding, with three distinct functions and they are:

• Ledger brace - to add rigidity to it.

• Sway brace - to stop it from swaying.

• Plan brace - to stop it twisting.

The foundations or base of a scaffold is of vital importance and must be adequate to carry the weight of the scaffold and any load to be placed on it. The three main criteria when inspecting the base of a scaffold is:

• Firm and level base.

• Base plates at all times.

• Soleboards when required.

36

Page 38: Scaffolding awareness presentation

SCAFFOLDING TERMINOLOGY

37

Page 39: Scaffolding awareness presentation

SCAFFOLD INSPECTION

All scaffolding must be inspected at the four times previously mentioned, by a competent person. This inspection must be completed before the end of the working period and after completing the inspection they must provide the report or a copy of it to the person responsible for the scaffolding, within 24 hours. This report must include the following:

•Name & address of the person on whose behalf the inspection was carried out.

•Location of the scaffold inspected.

•Date & time of inspection.

•Details of any faults identified.

•Any action taken to rectify those faults.

•Any further action required.

•Name & position of person making the report.

38

Page 40: Scaffolding awareness presentation

39

Page 41: Scaffolding awareness presentation

REASONS WHY SCAFFOLDS COLLAPSE

•Constructed with inadequate materials.

•Inadequate for the intended purpose.

•Erected by incompetent people.

•Placed on inadequate foundations.

•Overloaded.

•Undermined.

•Altered by incompetent people.

•Hit by machinery or shock loaded.

•Subjected to excessive wind loads by being sheeted, whether flexible or solid.

•Not regularly inspected by competent people

40

Page 42: Scaffolding awareness presentation

TYING SCAFFOLDS TO STRUCTURES

Adequate stability for most scaffolds is achieved by tying them to the structure, these ties need to be positive two way ties. They are usually constructed from tubes & load bearing fittings in different configurations depending on the type of structure being tied to. Any scaffold which has been sheeted or debris netted will require more ties than one without, so no scaffold should be sheeted or debris netted without consultation with the scaffolding company. Any structure used to tie scaffolding to must be strong enough to take the weight and stress of the scaffolding and any weight to be placed on it. Most structures would be classed as normal facades and would be tied using one of the five most common methods of tying scaffolding which are:

41

Page 43: Scaffolding awareness presentation

TYING SCAFFOLDS TO STRUCTURES

•Through Tie

•Box Tie

•Anchor Tie

•Lip Tie

•Raker Tie

Other methods used are:

•Reveal Tie

•Buttress ties.

Ties would usually start at the four metre level then as a rule of thumb they would be every other lift and every other standard.

42

Page 44: Scaffolding awareness presentation

TYING SCAFFOLDS TO STRUCTURES

43

Page 45: Scaffolding awareness presentation

TYING SCAFFOLDS TO STRUCTURES

44

Page 46: Scaffolding awareness presentation

TYING SCAFFOLDS TO STRUCTURES

45

ANCHOR TIES

Page 47: Scaffolding awareness presentation

TYING SCAFFOLDS TO STRUCTURES

46

LIP TIES

RAKER TIE

The maximum length of raker is 21feet or 6 metres because that is the longest scaffold tube and they should not be jointed for rakers.

Page 48: Scaffolding awareness presentation

TYING SCAFFOLDS TO STRUCTURES

47

REVEAL TIE

Page 49: Scaffolding awareness presentation

LADDERS

• TIED AT TOP AROUND STILES.

• TIED IN MIDDLE (WHEN NECESSARY.

• FIRM & LEVEL FOOTING.

• GOOD CONDITION.

• TOP RUNG LEVEL OR JUST ABOVE STEPPING OFF POINT.

• 4 : 1 RATIO (APPROX. 75°)

• NOT PAINTED.

• PROJECTING AT LEAST 1.05M OR WITH SUITABLE HANDHOLD.

48

Page 50: Scaffolding awareness presentation

HAZARDS WITH LADDERS

• UNSECURED.

• OVER BALANCING.

• SLIPS ON RUNGS.

• DEFECTIVE.

• FALSE STEPS.

49

Page 51: Scaffolding awareness presentation

INTERFERENCE

• TIES REMOVED.

• PLATFORM BOARDS REMOVED.

• GUARDRAILS REMOVED.

• BRICKGUARDS REMOVED

• TOEBOARDS REMOVED.

• STRUCTURAL PARTS REMOVED.

• UNDERMINED.

50

Page 52: Scaffolding awareness presentation

PROTECTING THE PUBLIC

• CAP TUBES BELOW HEAD HEIGHT

• PROTECT ALL SHARP EDGES

• HIGHLIGHT HAZARDOUS TUBES

• AMPLE HEADROOM

• PROTECTION FAN OR GANTRY

• SIGNS AND BARRIERS.

• SHEETING / DEBRIS MESH.

51

Page 53: Scaffolding awareness presentation

PROTECTING THE PUBLIC

52

Page 54: Scaffolding awareness presentation

PROTECTING THE PUBLIC

53

Page 55: Scaffolding awareness presentation

PRE - ERECTION CHECKS

Points to check before allowing the erection of any type of scaffolding:

•Is the surface to be erected on firm and level and will it take the weight of the scaffolding and everything to be placed on it.

•Are there sufficient materials to complete the scaffold or the part to be erected.

•Are the materials in good condition.

•Is the access and egress suitable.

•Are the persons erecting the scaffolding competent & have they seen and understood a risk assessment and if required a method statement.

54

Page 56: Scaffolding awareness presentation

PRE - ERECTION CHECKS CONT.

•On soft ground solepads or soleboards must be used to spread the weight.

•Any sole pad must be a minimum length of 450mm (18”).

•On concrete or steel, base plates may now be omitted.

•At all times ladders must be used to gain access to all levels of scaffolding.

•Ladders should be placed at an angle of 4 -1 (75°) and should be tied at the top.

•Ideally ladder access towers should be separate from the main scaffolding.

55

Page 57: Scaffolding awareness presentation

DISMANTLING PROCEDURES

Points to check before dismantling any type of scaffolding:

•Have any ties been removed?

•Have any ledgers been removed?

•Have any transoms been removed?

•Have any braces been removed.

•Have any other structural parts been removed?

•Is there any damage to the scaffolding?

•Are there any changes to the ground conditions?

•Has the area been cordoned off with barriers and signs to warn others?

56

Page 58: Scaffolding awareness presentation

57

DUTIES OF SCAFFOLDING

Page 59: Scaffolding awareness presentation

SCAFFTAG SYSTEM

58

Page 60: Scaffolding awareness presentation

SCAFFTAG SYSTEM

59

Page 61: Scaffolding awareness presentation

HANDOVER CERTIFICATE

60

This will show a scaffold is, Fit for use, fit for purpose & will comply with all legal requirements.

Page 62: Scaffolding awareness presentation

PROTECTION FROM FALLS OF SCAFFOLDERS

Basic principles of SG4:10 “Preventing Falls From Scaffolding”

•Scaffolders will fit an advanced guardrail on all lifts before accessing it, if this is not possible they will follow these rules.

•Scaffolders will wear harnesses at all times while erecting, altering & dismantling scaffolding.

•Scaffolders will work on a three board wide correctly supported platform.

•Scaffolders will work behind a minimum of a single guardrail protection.

•If the two bullet points above can not be followed and the scaffolders are at four metres or above , then they will clip on their harnesses to an adequate anchorage point above head height or if not possible at foot height or above.

61

Page 63: Scaffolding awareness presentation

SCAFFOLD INSPECTION QUESTIONNAIRE

Name: ---------------------------------------------- Date: -----------------------

Company: --------------------------------------------------------------------------

62

1) Name the 4 instances when scaffold requires to be inspected?

a) --------------------------------------------------------------------------------------------

b) --------------------------------------------------------------------------------------------

c) --------------------------------------------------------------------------------------------

d) --------------------------------------------------------------------------------------------

2) On inspecting a ladder on a scaffold, what will you be looking for?

a) ----------------------------------------- b) -----------------------------------------------

c) ----------------------------------------- d) -----------------------------------------------

e) ----------------------------------------- f) -----------------------------------------------

3) Give the 5 legal requirements of a working platform with dimensions

a) ----------------------------------------- b) -----------------------------------------------

c) ----------------------------------------- d) -----------------------------------------------

e) --------------------------------------------------------------------------------------------

4) What are the 5 most common methods of tying scaffold?

a) ------------------------------------------ b) ----------------------------------------------

c) ------------------------------------------ d) ----------------------------------------------

e) --------------------------------------------------------------------------------------------

5) What type of fitting should you not use for butt joining ledgers & sway braces?

------------------------------------ what should you use? ----------------------------

1) What three checks should you be looking for at the base of a scaffold?

• ------------------------- b) ---------------------------- c) -------------------------------

a) What type of fitting or coupler must be used for tying scaffolds?

--------------------------------------------------------------------------------------------

Page 64: Scaffolding awareness presentation

63

8) As a rule of thumb what should you be looking for in the spacing of ties?

--------------------------------------------------------------------------------------------

9) Show allowable safe working loads and bay sizes for the following ?

BAY SWL

a) Very light duty --------- ----------

b) General Purpose Scaffold --------- ----------

a) Heavy duty ---------- ----------

10) What spacings for transoms for the following thickness of boards?

a) 38mm ------------------------------- b) 34mm ----------------------------------------

11) What faults would you be looking for when inspecting a boarded platform?

a) ------------------------------------------ b) ----------------------------------------------

c) ------------------------------------------ d) ----------------------------------------------

e) --------------------------------------------------------------------------------------------

12) Explain the following scaffolding terminology?

9) Bay size: -----------------------------------------------------------------

10) Lift height: -----------------------------------------------------------------

13) Explain the purpose of the following braces?

a) Ledger brace: --------------------------------------- -------------------------

b) Sway brace: --------------------------------------------------- -------------

c) Plan brace: --------------------------------- -------------------------------

14) What is the maximum length of a raker tube and why?

--------------------------------------------------------------------------------------------

a) Give 5 precautions you should look for to protect members of the public?

a) ------------------------------------------ b) ----------------------------------------------

10) ------------------------------------------ d) ----------------------------------------------

e) ------------------------------------------------------------------------------------------

Page 65: Scaffolding awareness presentation

64

16) What must be done with a scaffold inspection report after the inspection has taken place and by what time scale?

--------------------------------------------------------------------------------------------

17) Although not a legal requirement what are the 3 benefits of asking for a handover certificate?

a) --------------------------------------------------------------------------------------------

b) --------------------------------------------------------------------------------------------

c) --------------------------------------------------------------------------------------------

18) Using the Scafftag system, what is the weight allowable on a light duty scaffold in either kilonewtons / kilograms or men & tools?

--------------------------------------------------------------------------------------------

19) Using the Scafftag system, what is the weight allowable on a heavy duty scaffold in either kilonewtons / kilograms or men & equipment?

---------------------------------------------------------------------------------------20) Name 6 things which can contribute to scaffold collapses?

a) --------------------------------------- b) -----------------------------------------------c) -------------------------------------- d) -----------------------------------------------e) -------------------------------------- f) ------------------------------------------------

MAXIMUM POINTS ACHEIVABLE: --------------------

ACTUAL POINTS ACHIEVED: --------------------

Page 66: Scaffolding awareness presentation

FOR MORE INFORMATION ON ALL OF OUR COMPETENCY TRAINING COURSES

PLEASE CONTACT:

Bob Robinson AIIRSM AIOSH

Proprietor

A1 Training & Safety

10 Trenholme Road,Middlesbrough,

Cleveland,TS4 2JX.

Tel/Fax: 01642 - 292178Mob: 07790 675193

E- Mail: [email protected]

Web site: www.a1trainingandsafety.co.uk