INTRODUCTION
Operation is strategy to create the smooth management on the business. Operational
planning is very important because the operational planning will explain about the process
and procedures on how to manage an order to ensure that the service can operate effectively
and efficiently therefore fulfill the need of the customers. The systematic operation also is the
main factor that contributes to the profit of the business.
We suppose to produce more productivity services which are in the standard cost and
at the same time maximize our profit. In addition, quality of good services also can attract
more customers to use our cleaning service. Our main objective is to make sure that our
customers always satisfy with our services. The service that we produce also symbolizes our
commitment on the business and the bad service will affect our company reputation as there
are other competitors in this field.
To make the operation run according to the planned that had been set before, the
planning must be futuristic. So, the operation management had make lots of research and
study on how to run this kind of business and have always try to find a new good strategy to
make sure that this business continues perfectly.
With the proper planning for this operation all the Cleaning Services staffs are very
confident that we can achieve our goals and successfully against competition from other
competitors, Cleaning Services promised to give excellent and good services to our
customers.
1.1 OPERATION PROCESS
The flow of FV service raw material from supplier makes order from supplier
THE FLOW OF PROCESS – BY CONTRACT
Receiving the materials, equipments and machines from the supplier
Ensure that the materials, equipments and machines are of right quality
Arrange the materials, equipment and machines at the store
Recognizing company
1.1 PROCESS FLOW CHART
1.1.1 The Symbols used in the Operation Flow Chart:
SIMBOL TYPE OF
ACTIVITY
DESCRIPTION
Operation Activities that modify transform or give
values to the input.
Transportation
Transport activity occurs when materials
are transported from one point to another.
Inspection Activity that measures standard of the in-
process material, finished products or
services.
Delay
The symbol is used when in-process
material is retained in a location waiting
for next activity.
Storage The symbol is used when the in-process
materials or finished products are storage
in the storage area.
1.1.1 Operation flow chart
FLOW CHART OF VENTURE SERVICE CORP. RAW MATERIAL
FROM SUPPLIER
MAKE ORDER FROM SUPPLIER
ACCEPT ORDER FROM SUPPLIER
CHECK STOCK
KEEP STORE IN STORE
WE CAN USE THE MATERIAL TO PRODUCE THE SERVICE
Suppliers are needed to supply all the material to our business. We choose the
supplier around Kedah because it can be easily to get cheap prices and nearest with business
place. We accept the order from supplier, who supplies good material such as detergent. We
made a deal with them, if there any damages we can return back the material. After getting
raw material from supplier, workers from our company will check stock to make sure there is
no mistake. We can use the material to produce the service.
FLOW CHART OF PROCESS FRONT VENTURE CORP. – BY CONTRACT
RECOGNIZING COMPANY
SENDING
ACCEPTING
CHECKING
START DUTY
QUALITY CHECKING
RECOGNIZING COMPANY -> which offer the tender to clean up their place. We also
find tender to Front Venture. Any info about tender can be finding in the advertisement in
newspaper/notice from contract.
SENDING -> Front Venture will send the price list of our services to the customer will make
decision whether to give tender to us.
ACCEPTING -> Customers will start their agreement and sign the contract there will state
customers requirement and rules.
CHECKING -> The supervisor from Front Venture will go to location and check it. It is to
make sure that the right machines equipment and material use.
START DUTY -> The workers will be sent to the location. The supervisor will give some
explanation to them before they start.
QUALITY CHECKING -> The supervisor will check the services that sub-ordinates had
done to make sure that there would be no complain from customer.
FLOW CHART OF PROCESS FRONT VENTURE CORP. – BY DEMAND
RECEIVING
SENDING
ACCEPTING
CHECKING
START THE DUTIES
QUALITY CHECKING
RECEIVING -> The Front Venture Corporation will get the demand from customer will
telephone, fax or write a letter to us. We will consider whether to accept it or not.
SENDING -> The Front Venture Corporation will send the price lists of our services to
customers. The customers will decide whether to get our services or not.
ACCEPTING -> The customer’s will stated their agreement with us. They will state their
requirements or hope to us. We will try the best to fulfill their needs.
CHECKING -> The supervisors from Front Venture Corp. will go to the location to make
sure that the right machine, equipment and materials are use to serve the services.
START DUTIES -> The workers will be sending to the location. They will be giving some
explanation about their duties and rules. Then the duties will carry out.
QUALITY CECKING -> The supervisors will check the works that sub-ordinates also will
works with their honestly and careful. Then the equipments will be kept in the store.
FLOW CHART OF FRONT VENTURE CORP. - CLEANING SERVICE
RECEIVED ORDER FROM CUSTOMERS
ACCEPT THE OFFER
CHECK THE EQUIPMENT TO BE USED
IDENTIFY THE FACILITY TO BE SERVICE
START THE WORKS
LIST OF MACHINE
TYPES ADVANTAGES PRPOSE
Wet and Dry Vacuum Professional vacuum
New improved design
Available in 5 colors
Easy to clean body
JU 20 watt power
Cleaning a place from dirt like
stairs, floors and furniture
Scrubbing Machine Cost effective cleaning
Easy operation/ maintenance
Designed to wash floors more
efficiency
Scrubbing and
burnishing the floors
Washing the floors
High Jet Pressure
Water
70% more efficient than other
standard lances
Quick and easy to change
accessories
Auto start/stop less strain on
the pump and hose than other
system.
Upright design – large rubber
coated wheels makes it easy to
monomer.
Cleaning the drain
Destroying the hard
dirt at the
complicated place.
CAPACITY PLANNING
LIST OF MACHINE REQUIREMENT
The materials that are required by out company are as follow:-
ITEM MODEL QUANTITY PRICE/UNIT
(RM)
AMOUNT
(RM)
Wet and dry
vacuum cleaner
3 2500
Scrubbing
machine
1500
High water
pressure jet
1200
LOUYOUT FOR OFFICE 2ND FLOOR
1.1 CAPACITY PLANNING
The total of user that can enter a pool in one time is estimate about 100 people
maximum for adult pool and 80 people maximum for children pool.
The amount of user that comes to the center is estimate according to the average
amount per-week, month and year.
TIME TOTAL OF USER
Week 1375
Month 5500
Year 66,000
1.2 MATERIAL REQUIREMENT
1.2.1 The materials that are required by our shop are as follow:-
Type No of UnitPrice Per Unit
(RM)Price (RM)
Goggles 100 20 2000
Swimming Cap 100 20 2000
Buoy 100 25 2500
Surf-board 100 15 1500
Water ball 50 10 500
Swimming trunk & swimming suit 100 30 3000
TOTAL 120 11,500
1.3 MACHINE AND EQUIPMENT
1.3.1 The machine and equipment that are required by our center are as follow:-
Type Price Per Unit
(RM)
No of Unit Total Cost
(RM)
Water pump machine 1200 3 3600
Water vacuum 500 2 1000
Lane-buoy 1000 8 (50m) 8000
Life-buoy 100 4 400
Relax chair 150 20 3000
Table & chair 200 5 1000
Locker 1000 4 4000
Mop 10 5 50
Starting block 120 10 1200
Goggles 20 20 400
Swimming Cap 20 20 400
Buoy 25 20 500
Surf-board 15 30 450
Water ball 10 10 100
Swimming trunk & swimming suit 30 20 600
TOTAL 24, 700
1.4 LIST OF OPERATIONS PERSONNEL
POSITION NO. OF PERSONNEL
Operational Manager 1
Life Guard 2
General Worker 2
TOTAL 5
1.5 SCHEDULE OF TASK AND RESPONSIBILITIES
POSITION TASK AND RESPONSIBILITIES
Operation Manager Direct production on operation and processes for
plants, division and maintain production schedules.
Measures progress by established standard
performances.
Recognize and solves problem effecting production
including schedules, staff, quality, and order of
booking of services.
Manage facilities and equipment.
Supervised staff.
Maintain production schedule
Plan and assign work, had authority for hiring,
discipline and performance decisions.
Will make sure the operation and all activities are
well performing following the exact time.
Work together and cooperate with workers on
managing the centre.
Responsible to ensure the quality and quantity of
the centre or product.
General Worker &
Life Guard
Arrange the materials and equipment at the
place that have been fixed.
Vacuuming the moss and dirt in the water.
Checking the status of the swimming pool
water ph.
Putting the chlorine in the swimming pool
water.
Changing the swimming pool water once a
month.
Rotate the use of the water pump machine.
Monitor the cleaning work and cleanliness at the
centre.
Make sure the quality of the centre area place.
Make sure the safety of the customer.
Take care of the swimming shop.
Take care of the equipment renting counter.
Take care of the registration counter.
1.6 SHEDULE OF REMUNERATION
PositionNo
.
Basic Salary
(RM)
EPF (13%)
(RM)SOCSO (2%) Total (RM)
Life Guard 2 1000 130 20 2300
General Worker 2 600 78 12 1380
TOTAL 4 1600 208 32 3680
1.7 LIST OF SUPPLIER
New U- United Chemical Sdn. Bhd.
Supplier of chlorine
67890, Jalan Raja Uda Butterworth
Pulau Pinang.
04 – 323 3252
Maju Jaya Sport Accessories Sdn. Bhd.
Supplier of aquatic sport equipment
65400, Persiaran Gurney
Pulau Pinang.
04 – 356 3154
Delta Business Solution Sdn. Bhd.
78 / 80, Lebuh Bistop
10200 Penang
04 – 262 2600
CAR PARK
OFFICE
CAFE
PRAYERRO
OM
STOR
SWIM
MIN
GSH
OP &
RENTIN
G
COU
NTER
BACKDOOR
CHILD
RENPO
OL
MENS TOILET & CHANGING ROOM
WOMENS TOILET & CHANGING ROOM
ADU
LTPO
OL
SHOWER
LIFE GUARD
FRONT DOOR
STARTIN
G
BLOCK
PUMPHOUSE
BENCH
1.8 LAYOUT PLAN
1.9 LOCATION
Swimming Recreation Center Sdn. Bhd. were located at Lot 2701, Jalan Dato’ Mat Junan,
13700 Perai, Pulau Pinang.
1.10 OPERATION OVERHEAD
UTILITIES COST / MONTH (RM) COST / YEAR (RM)
Water 2000 24,000
Electricity 5000 60,000
Telephone 300 3600
Maintenance
- Outsourcing
- Chlorine
8000
1200
96,000
14,400
TOTAL 16,500 198,000
1.11 OPERATION BUDGET
Type
Fixed Asset
Cost (RM)
Monthly
Expenses
(RM)
Others
Expenses
(RM)
Total
(RM)
Capital expenditures /
Fixed Asset
- Machine & Equipment 24, 700 24, 700
Working capital / Monthly
Expenses
- Material
- Salaries
- Utilities
- Maintenances
11,500
3680
16,500
2000
11,500
44,160
198,000
24,000
Others Expenses
- Deposit for electric,
water and telephone
5,000
Total 24, 700 33,680 307, 360