UML Diagram Diagram IV Activity Diagram Description Activity Diagram elements 1

Bai giang-uml-25-27feb14

Embed Size (px)

DESCRIPTION

Bài giảng UML cho lớp 55PM1, Khoa Công nghệ thông tin, Đại học Xây Dựng Hà nội, ngày 25 & 27 tháng 02 năm 2014

Citation preview

Page 1: Bai giang-uml-25-27feb14

1

UML Diagram

Diagram IV

Activity Diagram

● Description

● Activity Diagram elements

Page 2: Bai giang-uml-25-27feb14

2

Activity Diagram

●Activity diagram captures the dynamic behaviour of the system.

●An activity diagram is a connected oriented graph made of activity nodes and activity edges connecting a pair of activity nodes.

● The flow of control is drawn from one operation to another. This flow can be sequential, branched, concurrent, parallel, or single.

Page 3: Bai giang-uml-25-27feb14

3

Activity Diagram

● Elements

● Initial node● An initial node is a control node at which flow starts

when the activity is invoked. An activity may have more than one initial node.

● Notation:

Page 4: Bai giang-uml-25-27feb14

4

Activity Diagram

● Elements

● Final nodes● An activity may have more than one activity final

node. The first one reached stops all flows in the activity.

● Notation:

Page 5: Bai giang-uml-25-27feb14

5

Activity Diagram

● Elements

● Action nodes● An action node describe what will be done in the

process modelled by the activity diagram.● Notation: Action is shown as a round-cornered

rectangle with action name in the center.

Page 6: Bai giang-uml-25-27feb14

6

Activity Diagram

● Elements

● Activity ● An activity specifies the coordination of executions

of subordinate behaviors that are modeled as activity nodes connected by activity edges. An activity may include flow of control constructs (e.g., decision, merge nodes, etc.,).

● Notation: Activity is shown as a round-cornered rectangle with activity name in the upper left corner and nodes and edges of the activity inside the border.

Page 7: Bai giang-uml-25-27feb14

7

Activity Diagram

● Elements

● Object nodes● An object node is an activity node that indicates an

instance of a particular classifier, possibly in a particular state, may be available at a particular point in the activity.

● Notation:

Page 8: Bai giang-uml-25-27feb14

8

Activity Diagram

● Elements

● Control flow edges● A control flow edge connects two nodes and depicts

the flowing of a control token from the first to the latter. The action nodes may have any number of ingoing and outgoing control flow edges, whereas the initial nodes may have only outgoing edges and the final nodes only ingoing edges.

● Notation:

Page 9: Bai giang-uml-25-27feb14

9

Activity Diagram

● Elements

● Control flow edges● A control flow edge connects two nodes and depicts

the flowing of a control token from the first to the latter. The action nodes may have any number of ingoing and outgoing control flow edges, whereas the initial nodes may have only outgoing edges and the final nodes only ingoing edges.

● Notation:

Page 10: Bai giang-uml-25-27feb14

10

Activity Diagram

● Elements

● Decision nodes● A decision node accepts tokens on an incoming

edge and presents them to multiple outgoing edges. Which of the edges is actually traversed depends on the evaluation of the guards on the outgoing edges.

● Notation:

Page 11: Bai giang-uml-25-27feb14

11

Activity Diagram

● Elements

● Merge node● A merge node is a control node that bring together

multiple alternate flows. It is not used to synchronize concurrent flows but to accept one among several alternate flows. A merge node has multiple incoming edges and a single outgoing edge.

● Notation:

Page 12: Bai giang-uml-25-27feb14

12

Activity Diagram

● Elements

● Fork nodes● A fork node is a control node that splits a flow into

multiple concurrent flows. A fork node has one incoming edge and multiple outgoing edges.

● Notation:

Page 13: Bai giang-uml-25-27feb14

13

Activity Diagram

● Elements

● Join nodes● A join node is a control node that synchronizes

multiple flows. A join node has multiple incoming edges and one outgoing edge.

● Notation:

Page 14: Bai giang-uml-25-27feb14

14

Activity Diagram

● Elements

● Activity partition (Swimlane) ● An activity partition is a kind of

activity group for identifying actions that have some characteristic in common.

● Notation: Activity partition is indicated with parallel lines, (horizontal or vertical), a name labeling the partition in a box at one end. Any activity nodes and edges placed between these lines are considered to be contained within the partition.

Page 15: Bai giang-uml-25-27feb14

15

Activity Diagram Example

Page 16: Bai giang-uml-25-27feb14

16

Sequence Diagram Example