M/s.______________ITEM DESCRIPTION
1
a Basic Rate of Strandsb Excise Duty 12.50% -
Total - c VAT @ 5% 5.00% -
Total - d Transporte Crane Charges
Landed Cost of Strands -
2
a -
b
c
d
e
f
g Design and Shop Drawings
h
I Overheads
j Profit Margin
TOTAL -
Rate Analysis for Design, Supply, Installation, Stressing & Grouting for Post Tensioning work for
podium slab for Residential Towers at My City - Dombivali.
HT Strands including WastageAnchorage Set - Guide, Bearing, WedgesSheathing Pipe (GI Ducts Flat)
Consumables including Additives (Cebex) and Painting, Adhesive Tape, Thermocol, Cutting Wheel
Equipment & AccessoriesMachinery Tools and Plants
Labour - Manpower (Staff and Labour)Accomodation for LaboursEngineers and Technicians
Freight, travel, insurance, site expenses, conveyance, accommodation etc
DETAIL RESPONSIBILITY
ITEMS DESCRIPTION OF WORK RESPONSIBILITY
1 Supply of High Tensile Steel (12.7 mm dia Strand)
2
3
4
5
6
7 Supply of Cement for grouting at slab level
8 Supply & fabrication and fixing of Bursting Links
9 Supply fabrication of Chairs for Tendon supports
10 Fixing of Tendon supports
11
12 Filling of end Recess pockets left out for stressing.
13
14
15
16 Providing Potable Water for Grouting
17
18
19
20 CAR and Third Party liability insurance.
21 Slab Soffit low point marking for tendons.
22
Supply of Post Tensioning Anchorages, Gl Ducts/Sheating, Barrels, Wedges with Consumables.
Installation (Cutting and Profiling) of Strands, Ducts, Anchor blocks and Wedges.
Stressing of Tendons with PT Contractors's equipments.
Grouting of the Tendons with Utracon's Grouting Pump
Providing required Qualified Engineers, Technicians for PT Works
Supply of Admixtures for Grouting(Fosrock-cebex100)
Covered space for storing the PT materials and Equipments
Providing working platform for stressing and grouting (Min.750 mm from the face)
Power supply as per Contractor's requirement in all working areas at site, equipments and stores. (15 HP)
Design of slabs for gravity loads and submission of shop drawings to consultant
Submission of as built drawings on completion of work
Insurance for Contractor's workmen, Equipments and Materials
Lifting arrangement for for Men/Materials and Equipments.
23 Space provision for Labour Accomodation