Transcript
Page 1: PRINCE2 Methodology Diagram

CUPE Projects: PRINCE2® Methodology Diagram

Managing A Stage Boundary

Plan Next Stage

UpdateProject Plan

UpdateBusiness  Case

Produce anException Plan

ReportStage End

Closing a 

Project

Prepare Premature Closure

Hand Over Products

Evaluate the Project

Initiating a Project

Prepare Risk Management 

Strategy

Prepare Configuration Management 

Strategy

Prepare Quality Management 

Strategy

Set Up Project Controls

Prepare Communication Management 

Strategy

Assemble the PID

Create Project Plan

Refine Business Case

Recommend Project Closure

Prepare Planned Closure

AppointExec. & PM

Capture Previous Lessons

Design & Appoint Project 

Management Team

Prepare  Outline Business 

Case

Select Approach & Assemble Project Brief Plan

InitiationStage

Starting Upa Project

Project Start NotificationProject End Notification

Info from External Sources & Feedback

•Draft PID

•Project Brief•Organisation•Initiation Stage Plan

ReviewStage Status

AuthorizeWork Package

Review Work Package Status

TakeCorrectiveAction

ReceiveCompleted 

Work Package

ReportHighlights

EscalateProject Issues & 

Risks

Capture & Examine

Project Issues

Agree to deliver

Checkpoint Reports

Completed Work 

Package

Managing Product Delivery

Accept aWork Package

Execute aWork Package

Deliver aWork Package

•PID

•Lessons Report

•Follow‐on Actions

•Benefits Review Plan

•End Project Report

Ad Hoc Direction

Work Package

Corporate / Programme Management Authorising

InitiationAuthorising a

Project

Authorising aStage or

Exception Plan

Confirming Project Closure

GivingAd-Hoc

Direction

DP3DP2DP1 DP4 DP5

Authorization To Proceed

Based on the PRINCE2® manual 5th edition V5.1.5.180510PRINCE2® is a trademark of OGC www.cupe.co.uk

Directing a Project

AuthorizeInitiation

Authorize theProject

Authorize aStage or

Exception Plan

AuthorizeProject Closure

GiveAd‐HocDirection

•End Stage Report•Next Stage Plan•Exception Plan

•Highlight Reports

•Requests for Advice

•Exception Reports

Controllinga Stage

Project Mandate

Trigger Stage

Planning

Trigger Premature

Closure

Archive Project Files

Trigger Exception

Plan

Project Issues

Trigger Planned Closure

Authorized Initiation Plan

Recommended